AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 2/14/2014 N/A WY PRA YELL 10(17), Grand Loop Road, Norris to Golden Gate, Phase I
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
DTFH70-13-R-00004
9B. DATED (SEE ITEM 11)
01/24/2014
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WY PRA YELL 10(17), Grand Loop Road, Norris to Golden Gate, Phase I
SEE PAGE 2 FOR REVISIONS
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A001, dated 02/14/2014 WY PRA YELL 10(17) Solicitation No. DTFH70-13-R-00004 Grand Loop Road, Norris to Golden Gate, Phase I
REVISIONS ARE AS FOLLOWS:
BID SCHEDULE
Schedule A
Page A-8 Bid Item 15706-0200 Revises quantity Page A-9 Bid Item 20301-1100 Revises description Page A-9 Bid Item 20301-2700 Revises description Page A-9 Bid Item 20303-0300 Revises description Page A-10 Bid Item 20303-3600 Revises description Page A-10 Bid Item 20303-3600 Revises description Page A-10 Bid Item 20304-1000 Revises description Page A-10 Bid Item 20435-2000 Revises description Page A-11 Bid Item 25101-0000 Revises quantity Page A-11 Bid Item 25101-3000 Revises quantity Page A-11 Bid Item 25120-1000 Revises quantity Page A-12 Bid Item 60501-0000 Revises quantity Page A-12 Bid Item 60801-0200 Revises quantity Page A-12 Bid Item 60901-7000 Revises quantity Page A-13 Bid Item 61902-0900 Revises description Page A-13 Bid Item 62002-0000 Revises quantity Page A-13 Bid Item 62002-0000 Revises quantity Page A-13 Bid Item 62010-0000 Revises description Page A-13 Bid Item 62201-0300 Revises quantity Page A-14 Bid Item 62201-3000 Adds item Page A-14 Bid Item 62201-3000 Adds item Page A-14 Bid Item 62302-0000 Revises description Page A-14 Bid Item 62302-0000 Revises description Page A-15 Bid Item 63401-0300 Revises description Page A-15 Bid Item 63401-0300 Revises description Page A-15 Bid Item 63401-0400 Revises description Page A-15 Bid Item 63401-0450 Revises description Page A-16 Bid Item 63701-0000 Revises description Page A-16 Bid Item 64604-3000 Revises description Page A-16 Bid Item 64604-3000 Revises description Page A-16 Bid Item 64604-3000 Revises description Page A-17 Bid Item 64632-0000 Revises description
Schedule B Page A-18 Bid Item 15706-0200 Revises quantity Page A-19 Bid Item 20301-1100 Revises description Page A-19 Bid Item 20301-2700 Revises description Page A-19 Bid Item 20303-0300 Revises quantity Page A-20 Bid Item 20303-3600 Revises description Page A-20 Bid Item 20303-3600 Revises description Page A-20 Bid Item 20304-1000 Revises description Page A-20 Bid Item 20435-2000 Revises description Page A-21 Bid Item 25101-0000 Revises quantity Page A-21 Bid Item 25101-3000 Revises quantity
Page A-21 Bid Item 25120-1000 Revises quantity Page A-21 Bid Item 30802-2000 Revises quantity Page A-22 Bid Item 60501-0000 Revises quantity Page A-22 Bid Item 60801-0200 Revises quantity Page A-22 Bid Item 60901-7000 Revises quantity Page A-23 Bid Item 61902-0900 Revises description Page A-23 Bid Item 62002-0000 Revises quantity Page A-23 Bid Item 62002-0000 Revises quantity Page A-23 Bid Item 62010-0000 Revises description Page A-23 Bid Item 62201-0300 Revises quantity Page A-24 Bid Item 62201-3000 Adds item Page A-24 Bid Item 62201-3000 Adds item Page A-24 Bid Item 62302-0000 Revises description Page A-24 Bid Item 62302-0000 Revises description Page A-24 Bid Item 63301-1000 Revises quantity Page A-25 Bid Item 63401-0300 Revises description Page A-25 Bid Item 63401-0300 Revises description Page A-25 Bid Item 63401-0400 Revises description Page A-25 Bid Item 63401-0450 Revises description Page A-26 Bid Item 63701-0000 Revises description Page A-26 Bid Item 64604-3000 Revises description Page A-26 Bid Item 64604-3000 Revises description Page A-26 Bid Item 64604-3000 Revises description Page A-27 Bid Item 64632-0000 Revises description
Schedule C Page A-28 Bid Item 15705-0500 Adds item Page A-29 Bid Item 15706-0200 Revises quantity Page A-29 Bid Item 20301-1100 Revises description Page A-30 Bid Item 20301-2700 Revises description Page A-30 Bid Item 20303-0300 Revises description Page A-30 Bid Item 20303-3600 Revises description Page A-30 Bid Item 20303-3600 Revises description Page A-30 Bid Item 20304-1000 Revises description Page A-30 Bid Item 20402-0000 Revises quantity Page A-30 Bid Item 20411-0000 Revises quantity Page A-31 Bid Item 20435-2000 Revises description Page A-31 Bid Item 20701-1000 Revises quantity Page A-31 Bid Item 20703-2000 Revises quantity Page A-31 Bid Item 25101-0000 Revises quantity Page A-31 Bid Item 25101-3000 Revises quantity Page A-31 Bid Item 25101-5000 Revises quantity Page A-31 Bid Item 25120-1000 Revises quantity Page A-32 Bid Item 30802-2000 Revises quantity Page A-32 Bid Item 55302-2500 Deletes item Page A-32 Bid Item 55302-3700 Adds item Page A-33 Bid Item 60501-0000 Revises quantity Page A-33 Bid Item 60510-0000 Revises quantity
Page A-34 Bid Item 60801-0200 Revises quantity Page A-34 Bid Item 60901-7000 Revises quantity Page A-34 Bid Item 61902-0900 Revises description Page A-34 Bid Item 62002-0000 Revises quantity Page A-34 Bid Item 62002-0000 Revises quantity Page A-34 Bid Item 62010-0000 Revises description Page A-35 Bid Item 62201-0300 Revises quantity Page A-35 Bid Item 62201-3000 Adds item Page A-35 Bid Item 62201-3000 Adds item Page A-35 Bid Item 62302-0000 Revises description Page A-36 Bid Item 62302-0000 Revises description Page A-36 Bid Item 63301-1000 Revises quantity Page A-36 Bid Item 63401-0300 Revises description Page A-36 Bid Item 63401-0300 Revises description Page A-36 Bid Item 63401-0400 Revises description Page A-36 Bid Item 63401-0450 Revises description Page A-38 Bid Item 63601-3000 Revises description Page A-38 Bid Item 63701-0000 Revises description Page A-38 Bid Item 64604-3000 Revises description Page A-38 Bid Item 64604-3000 Revises description Page A-38 Bid Item 64604-3000 Revises description Page A-38 Bid Item 64632-0000 Revises description
Schedule D Page A-39 Bid Item 15705-0500 Adds item Page A-40 Bid Item 15706-0200 Revises quantity Page A-40 Bid Item 20301-1100 Revises description Page A-41 Bid Item 20301-2700 Revises description Page A-41 Bid Item 20303-0300 Revises quantity Page A-41 Bid Item 20303-3600 Revises description Page A-41 Bid Item 20303-3600 Revises description Page A-41 Bid Item 20304-1000 Revises description Page A-41 Bid Item 20402-0000 Revises quantity Page A-41 Bid Item 20411-0000 Revises quantity Page A-42 Bid Item 20435-2000 Revises description Page A-42 Bid Item 20701-1000 Revises quantity Page A-42 Bid Item 20703-2000 Revises quantity Page A-42 Bid Item 20705-1000 Revises quantity Page A-42 Bid Item 25101-0000 Revises quantity Page A-42 Bid Item 25101-3000 Revises quantity Page A-42 Bid Item 25101-5000 Revises quantity Page A-42 Bid Item 25120-1000 Revises quantity Page A-43 Bid Item 30802-2000 Revises quantity Page A-43 Bid Item 55302-2500 Deletes item Page A-43 Bid Item 55302-3700 Adds item Page A-44 Bid Item 60501-0000 Revises quantity Page A-44 Bid Item 60510-0000 Revises quantity Page A-45 Bid Item 60801-0200 Revises quantity Page A-45 Bid Item 60901-7000 Revises quantity
Page A-45 Bid Item 61902-0900 Revises description Page A-45 Bid Item 62002-0000 Revises quantity Page A-45 Bid Item 62002-0000 Revises quantity Page A-45 Bid Item 62010-0000 Revises description Page A-46 Bid Item 62201-0300 Revises quantity Page A-46 Bid Item 62201-3000 Adds item Page A-46 Bid Item 62201-3000 Adds item Page A-47 Bid Item 62302-0000 Revises description Page A-47 Bid Item 62302-0000 Revises description Page A-47 Bid Item 63301-1000 Revises quantity Page A-47 Bid Item 63401-0300 Revises description Page A-47 Bid Item 63401-0300 Revises description Page A-47 Bid Item 63401-0400 Revises description Page A-47 Bid Item 63401-0450 Revises description Page A-49 Bid Item 63601-3000 Revises description Page A-49 Bid Item 63701-0000 Revises description Page A-49 Bid Item 64604-3000 Revises description Page A-49 Bid Item 64604-3000 Revises description Page A-49 Bid Item 64604-3000 Revises description Page A-49 Bid Item 64632-0000 Revises description
CONTRACT CLAUSES
SOLICITATION PROVISIONS
Page C-16. Revises, FAR Clauses 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) Alternate I (Apr 1984).
SPECIAL CONTRACT REQUIREMENTS
Page Section/Table Revision TOC Adds Section K E-1 101.03(a) Acronyms Adds Subsection E-1 101.04 Definitions Adds EEBACS E-3 102.05 Public Opening of Bids Revises Subsection number E-8 104.05 Load Restrictions Adds Subsection 104.05 E-10 105.02(a)(1) Material Sources Adds (i) E-27 107.12 Contractors Camp and Housing Adds sentence E-29 108.01 Commencement, Prosecution and Adds paragraph
Notice to Bidders: Please submit revised pages A-7 through A-49 with your bid.
Completion of Work E-30 108.01 Commencement, Prosecution and
Completion of Work Adds paragraphs
E-31 Repagination E-32 109.01 Measurement of Work Revises paragraph E-35 Table 109-2 Revises bid number E-38 109.08 Progress Payments Adds (d) E-47 152.03(1) Deletes(k) and (l) E-48 152.03(3) Survey and Staking Requirements Adds (6)
E-51 153.01 Description Adds paragraph E-55 153.03(b) General Adds (3) E-55a 153.07 Measurement Adds paragraph E-55a 153.08 Payment Revises Subsection E-55b Blank page E-64 156.03(a)(1) Full road closures Revises dates E-64 156.03(a)(2) Nighttime closures Revises dates F-4 203.03 Salvaging Material Add paragraph F-37 304.10 Removing and Salvaging Material Revises paragraph F-98 620.03 General Revises paragraph F-110 Construction Signs Adds paragraph Section K Adds Section
PLANS
Plan sheet #B.1 through B.22 Refer to Bid Schedule changes Plan sheet #C.3 Revises top section and detail and revises note and footnotes Plan sheet #C.6: Adds toe of existing embankment label to Type 4 Subexcavation and Backfill
Section Plan sheet #D.1 Revises Schedule B & D quantities for Item No. 20303-0300; Added Note 4 Plan sheet #D.3 Adds callout for scupper adjustments Plan sheets #G.1-4 Adds “VC Vitrified Clay” definition to Allowable Pipe Material Legend Plan sheet #J.2 Revises Note 1 Plan sheet #J.4 Revises Footnotes 1 and 2 Plan sheet #M.6 Revises Footnote 3 Plan sheet #M.7 Revises Footnote 1; Revises Footnote 2 Plan sheet #M.8 Revises Footnote references to benchmark and stockpiles Plan sheet #N.1 Revises MUTCD No. for Sign No. 20; Revises Sign No. 26 Requirements and
Quantities; Revises total quantities for all schedules Plan sheet #N.4 Revises Footnote 3 Plan sheet #N.7 Revises detail for Work Zone Control at Parking Areas and No Outlet Roads;
Revises Footnote 5 Plan sheet #N.8 Revises callout on Sign Post Installation Profile detail; Revises Note 2; Revises
Note 3 Plan sheet #P.2 Revises Sign Type and Quantity for Government furnished sign at 44+42 RT
(See Table for Item No. 63301-1000); Revises Sign Type for Government furnished sign at 287+75 LT (See Table for Item No. 63301-1000); Revises Sign System Installation Side at
156+75 (See Table for Item No. 63302-0000); Revises total quantities for all schedules; - Adds Permanent Traffic Control Note 3; Revises Footnote 3
Plan sheet #P.16 Revises Norris Campground Sign Plan sheet #P.17Adds Pavement Marking Callouts Plan sheet #P.18Deletes floating Pavement Marking Callout Plan sheet #P.21 Revises callout on detail for Sign Post Installation; Revises Ref-1 detail to Sign detail; Revises Note 1; Adds Notes 2 and 3 Plan sheet #P.22 Revises callouts on Type 2 government furnished sign installation with sleeve Plan sheet #Q.1 Revises Item No. for Temporary Culvert Pipe, (12-Inch) Plan sheet #Q.3Deletes Footnote 4 reference for Item No. 20402-0000; Deletes Footnote 3 reference for Item No. 20703-2000; Revises quantities for Item Nos. 20402-0000, 20411- 0000, 20701-1000, and 20703-2000; Adds Note 4; Adds Subgrade Work Breakdown Table
Plan sheet #S.2 Revises Item No. and Description for Precast, Prestressed Concrete Decked Bulb Tee Girders, (44”)
Plan sheet #S.14 Revises text of Original Note 5 with text of Original Note 6 and deletes Note 6 in its entirety
ENCLOSURES
Pages:
Table of Contents A-7 through A-49 C-16 E-1 E-3 E-8 E-10 E-27 E-29 E-30 through E-32 E-35 E-38 E-47 E-48 E-51 E-55 through E-55b E-64 F-4 F-37 F-98 F-110 K-1 through K-4
Plan Sheets:
B.1 through B.22 C.3
C.6
D.1 D.3 G.1 through G.4 J.2 J.4 M.6 through M.8 N.1 N.4 N.7 through N.8 P.2 P.16 though P.18 P.21 through P.22 Q.1 Q.3 S.2 S.14
Table of Contents Project: WY PRA YELL 10(17), Grand Loop Road, Norris to Golden Gate, Phase I
03USC10/06/11
TABLE OF CONTENTS
DESCRIPTION PAGE
Notice to Offeror .................................................................................................................... A-1
Solicitation, Offer, and Award (SF 1442) .............................................................................. A-3
Bid Schedule .......................................................................................................................... A-7
Solicitation Provisions ........................................................................................................... B-1
Contract Clauses .................................................................................................................... C-1
Minimum Wage Schedule ...................................................................................................... D-1
SCRs Table of Contents
SPECIAL CONTRACT REQUIREMENTS (SCRs)
The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-03) U.S.
Customary Version, U.S. Department of Transportation, Federal Highway Administration.
Division 100 ..................................................................................................................... E-1 Division 150 ..................................................................................................................... E-41
Division 200 ..................................................................................................................... F-1 Division 250 ..................................................................................................................... F-34 Division 300 ..................................................................................................................... F-37 Division 400 ..................................................................................................................... F-39 Division 550 ..................................................................................................................... F-66 Division 600 ..................................................................................................................... F-85
Division 700 .................................................................................................................... G-1
Permits ................................................................................................................................... H-1
Storm Water Pollution Prevention Plan ................................................................................... I-1
Yellowstone National Park Director’s Order #65: Explosives Use and Blasting Safety ........ J-1
Yellowstone National Park Size and Weight Limitations of Traffic ..................................... K-1
Revised by Amendment A001
A - 7
Offerors please note: Before preparing the bid, carefully read the Solicitation Provisions.
Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit bid price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the Amount Bid for the item will be based on the Unit Bid Price.
When a "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.
When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.
Total the amounts bid for all pay items and insert the total bid amount.
Bid Schedule
Project No:WY PRA YELL 10(17)
Project Name:Grand Loop Road, Norris to Golden Gate, Phase 1
A - 8
Contract Quantity Pay Items
20101-0000 CLEARING AND GRUBBING
21101-1000 ROADWAY OBLITERATION, METHOD 1
31001-0000 RECYCLED AGGREGATE BASE
62406-0100 PLACING CONSERVED TOPSOIL, 2-INCH DEPTH
62515-1000 MULCHING, DRY METHOD
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A1000 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A1050 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A1100 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
ALL LPSM $___LPSM_____ $____________
A1150 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A1200 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A1250 15704-1000 SOIL EROSION CONTROL, PLASTIC LINING
1,700 SQYD $____________ $____________
A1300 15705-0100 SOIL EROSION CONTROL, SILT FENCE
4,470 LNFT $____________ $____________
A1350 15705-0600 SOIL EROSION CONTROL, TEMPORARY 24-INCH CULVERT PIPE
400 LNFT $____________ $____________
A1400 15705-1300 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
500 LNFT $____________ $____________
A1450 15705-1500 SOIL EROSION CONTROL, SEDIMENT WATTLE
22,410 LNFT $____________ $____________
A001 A1500 15706-0200 SOIL EROSION CONTROL, CHECK DAM
180 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 9
A1550 15706-0300 SOIL EROSION CONTROL, SANDBAG
440 EACH $____________ $____________
A1600 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
A1650 20101-0000 CLEARING AND GRUBBING
35.0 ACRE $____________ $____________
A001 A1700 20301-1100 REMOVAL OF GATE , (Double swing)
3 EACH $____________ $____________
A1750 20301-1200 REMOVAL OF HEADWALL
21 EACH $____________ $____________
A1800 20301-1400 REMOVAL OF INLET
1 EACH $____________ $____________
A1850 20301-1800 REMOVAL OF MONUMENT
1 EACH $____________ $____________
A1900 20301-1900 REMOVAL OF PIPE CULVERT
11 EACH $____________ $____________
A1950 20301-2000 REMOVAL OF PIPE END SECTION
3 EACH $____________ $____________
A2000 20301-2300 REMOVAL OF SIGN/MARKER
65 EACH $____________ $____________
A001 A2050 20301-2700 REMOVAL OF STRUCTURE , (Boardwalk)
1 EACH $____________ $____________
A2100 20302-0500 REMOVAL OF CURB, CONCRETE
53 LNFT $____________ $____________
A2150 20302-0625 REMOVAL OF CURB, LOG
620 LNFT $____________ $____________
A001 A2200 20303-0300 REMOVAL OF CONCRETE , (Pad)
7 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 10
A2250 20303-3000 REMOVAL OF SIDEWALK, ASPHALT
235 SQYD $____________ $____________
A2300 20303-3500 REMOVAL OF STONE MASONRY
25 SQYD $____________ $____________
A001 A2350 20303-3600 REMOVAL OF WALL , (Rockery toe)
45 SQYD $____________ $____________
A001 A2400 20303-3600 REMOVAL OF WALL , (Timber)
38 SQYD $____________ $____________
A001 A2450 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS , (Log deck)
ALL LPSM $___LPSM_____ $____________
A2500 20401-0000 ROADWAY EXCAVATION
120,000 CUYD $____________ $____________
A2550 20402-0000 SUBEXCAVATION
11,435 CUYD $____________ $____________
A2600 20411-0000 SELECT BORROW
12,700 TON $____________ $____________
A001 A2650 20435-2000 BACKFILL, GRANULAR , (quartz sand)
1,360 CUYD $____________ $____________
A2700 20465-0000 CONSERVE AND PLACE BOULDER
175 EACH $____________ $____________
A2750 20701-0700 EARTHWORK GEOTEXTILE, TYPE II-A
2,550 SQYD $____________ $____________
A2800 20701-1000 EARTHWORK GEOTEXTILE, TYPE III-A
9,860 SQYD $____________ $____________
A2850 20703-2000 GEOGRID, BIAXIAL
1,600 SQYD $____________ $____________
A2900 20704-0000 GEOMEMBRANE
20,000 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 11
A2950 20705-1000 INSULATION BOARD, POLYSTYRENE FOAM
41,000 SQYD $____________ $____________
A3000 21101-1000 ROADWAY OBLITERATION, METHOD 1
18,535 SQYD $____________ $____________
A001 A3050 25101-0000 PLACED RIPRAP
1,920 CUYD $____________ $____________
A001 A3100 25101-3000 PLACED RIPRAP, CLASS 3
60 CUYD $____________ $____________
A001 A3150 25120-1000 RIPRAP DITCH, CLASS 1 , (or Class 2)
1,700 LNFT $____________ $____________
A3200 30802-2000 ROADWAY AGGREGATE, METHOD 2
8,490 TON $____________ $____________
A3250 31001-0000 RECYCLED AGGREGATE BASE
63,950 SQYD $____________ $____________
A3350 40101-1000 SUPERPAVE PAVEMENT, 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE,
0.3 TO <3 MILLION ESAL
20,500 TON $____________ $____________
A3450 40401-0000 MINOR HOT ASPHALT CONCRETE
10 TON $____________ $____________
A3500 40801-0000 COLD RECYCLED ASPHALT BASE COURSE
28,900 TON $____________ $____________
A3550 40920-1000 FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H
77 TON $____________ $____________
A3600 41105-0000 BLOTTER
1,070 TON $____________ $____________
A3650 41201-1000 TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
180 TON $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 12
A3700 57501-0000 MINOR BRIDGE WORK
ALL LPSM $___LPSM_____ $____________
A3750 60201-0600 18-INCH PIPE CULVERT
175 LNFT $____________ $____________
A3800 60201-0800 24-INCH PIPE CULVERT
2,185 LNFT $____________ $____________
A3850 60201-0900 30-INCH PIPE CULVERT
120 LNFT $____________ $____________
A3900 60201-1000 36-INCH PIPE CULVERT
230 LNFT $____________ $____________
A3950 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
2 EACH $____________ $____________
A4000 60404-1000 CATCH BASIN, TYPE 1
1 EACH $____________ $____________
A001 A4050 60501-0000 STANDARD UNDERDRAIN SYSTEM
315 LNFT $____________ $____________
A4100 60510-0700 6-INCH COLLECTOR PIPE
1,100 LNFT $____________ $____________
A4150 60510-0800 6-INCH OUTLET PIPE
430 LNFT $____________ $____________
A001 A4200 60801-0200 PAVED WATERWAY, TYPE 2 , (6-foot width)
145 SQYD $____________ $____________
A4250 60901-3500 CURB, STONE, TYPE 1, 12-INCH DEPTH
400 LNFT $____________ $____________
A001 A4300 60901-7000 CURB, LOG
1,490 LNFT $____________ $____________
A4350 61501-1100 SIDEWALK, ASPHALT
280 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 13
A001 A4400 61902-0900 GATE, METAL , (40-foot width)
2 EACH $____________ $____________
A4450 61902-0900 GATE, METAL , (32-foot width)
1 EACH $____________ $____________
A001 A4500 62002-0000 STONE MASONRY , (Channel)
40 SQYD $____________ $____________
A001 A4550 62002-0000 STONE MASONRY , (Basin)
25 SQYD $____________ $____________
A001 A4600 62010-0000 STONE MASONRY , (Curb)
120 LNFT $____________ $____________
A4650 62010-3000 STONE MASONRY GUARDWALL TYPE 1
210 LNFT $____________ $____________
A4700 62011-0300 STONE MASONRY HEADWALL FOR 18-INCH PIPE CULVERT
4 EACH $____________ $____________
A4750 62011-0500 STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT
71 EACH $____________ $____________
A4800 62011-0600 STONE MASONRY HEADWALL FOR 30-INCH PIPE CULVERT
4 EACH $____________ $____________
A4850 62011-0700 STONE MASONRY HEADWALL FOR 36-INCH PIPE CULVERT
8 EACH $____________ $____________
A001 A4900 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY
600 HOUR $____________ $____________
A4950 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
18-INCH WIDTH
200 HOUR $____________ $____________
A5000 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY
200 HOUR $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 14
A5050 62201-1350 BULLDOZER, 200HP MINIMUM FLYWHEEL POWER
200 HOUR $____________ $____________
A001 A5080 62201-3000 HYDRAULIC EXCAVATOR (140 HP minimum with 3500 lb minimum hammer attachment)
100 HOUR $____________ $____________
A001 A5090 62201-3000 HYDRAULIC EXCAVATOR (140 HP minimum with 50 foot minimum reach)
200 HOUR $____________ $____________
A5100 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT
400 HOUR $____________ $____________
A5150 62201-3750 CHAIN SAW
60 HOUR $____________ $____________
A5200 62301-0000 GENERAL LABOR
1,500 HOUR $____________ $____________
A001 A5250 62302-0000 SPECIAL LABOR , (Carpenter)
200 HOUR $____________ $____________
A001 A5300 62302-0000 SPECIAL LABOR , (Stone Mason)
200 HOUR $____________ $____________
A5350 62406-0100 PLACING CONSERVED TOPSOIL, 2-INCH DEPTH
30.7 ACRE $____________ $____________
A5400 62515-1000 MULCHING, DRY METHOD
30.7 ACRE $____________ $____________
A001 A5450 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN
30 EACH $____________ $____________
A5500 63302-0000 SIGN SYSTEM
159 SQFT $____________ $____________
A5550 63308-2000 OBJECT MARKER, TYPE 2
12 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:WY PRA YELL 10(17)
Project Name:Grand Loop Road, Norris to Golden Gate, Phase 1
Leeann.Bush Rectangle
A - 15
A5600 63308-3000 OBJECT MARKER, TYPE 3
12 EACH $____________ $____________
A5650 63318-1000 SNOWPOLE HOLDER
77 EACH $____________ $____________
A001 A5700 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID , (White)
90,620 LNFT $____________ $____________
A001 A5750 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID , (Yellow)
79,200 LNFT $____________ $____________
A001 A5800 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN , (Yellow)
13,420 LNFT $____________ $____________
A001 A5850 63401-0450 PAVEMENT MARKINGS, TYPE B, DOTTED , (White)
10,832 LNFT $____________ $____________
A5900 63403-0200 PAVEMENT MARKINGS, TYPE B Solid White, (Stop Line)
150 SQFT $____________ $____________
A5950 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL
2 EACH $____________ $____________
A6000 63502-0400 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 1
85 EACH $____________ $____________
A6050 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
16 EACH $____________ $____________
A6100 63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 42-INCH
175 EACH $____________ $____________
A6150 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
75 EACH $____________ $____________
A6200 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
40 EACH $____________ $____________
A6250 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
80 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 16
A6300 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C
160 EACH $____________ $____________
A6350 63502-3700 TEMPORARY TRAFFIC CONTROL, SNOWPOLE
48 EACH $____________ $____________
A6400 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
24,050 LNFT $____________ $____________
A6450 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
3,000 LNFT $____________ $____________
A001 A6500 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
1,370 SQFT $____________ $____________
A6550 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
1,250 HOUR $____________ $____________
A6600 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
324 DAY $____________ $____________
A6650 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER
7,368 FXHR $38.00 $279,984.00
A001 A6700 63601-3000 SYSTEM INSTALLATION, ELECTRICAL
ALL LPSM $___LPSM_____ $____________
A001 A6750 63701-0000 FIELD OFFICE , (relocation)
1 EACH $____________ $____________
A001 A6800 64604-3000 FIXTURE, PEDESTRIAN RAILING , (Type 3)
195 LNFT $____________ $____________
A001 A6850 64604-3000 FIXTURE, PEDESTRIAN RAILING , (Type 1)
145 LNFT $____________ $____________
A001 A6900 64604-3000 FIXTURE, PEDESTRIAN RAILING , (Type 2)
110 LNFT $____________ $____________
A6950 64620-1100 REMOVE AND RESET KIOSK
1 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:WY PRA YELL 10(17)
Project Name:Grand Loop Road, Norris to Golden Gate, Phase 1
Leeann.Bush Rectangle
A - 17
A001 A7000 64632-0000 ROADSIDE DEVELOPMENT , (Remove and reset stairs)
10 SQYD $____________ $____________
A7050 64702-1000 MITIGATION, LANDSCAPING LOG
5,280 LNFT $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
A - 18
20101-0000 CLEARING AND GRUBBING
21101-1000 ROADWAY OBLITERATION, METHOD 1
31001-0000 RECYCLED AGGREGATE BASE
62406-0100 PLACING CONSERVED TOPSOIL, 2-INCH DEPTH
62515-1000 MULCHING, DRY METHOD
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
B1000 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
B1050 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
B1100 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
ALL LPSM $___LPSM_____ $____________
B1150 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
B1200 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
B1250 15704-1000 SOIL EROSION CONTROL, PLASTIC LINING
1,800 SQYD $____________ $____________
B1300 15705-0100 SOIL EROSION CONTROL, SILT FENCE
4,780 LNFT $____________ $____________
B1350 15705-0600 SOIL EROSION CONTROL, TEMPORARY 24-INCH CULVERT PIPE
400 LNFT $____________ $____________
B1400 15705-1300 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
500 LNFT $____________ $____________
B1450 15705-1500 SOIL EROSION CONTROL, SEDIMENT WATTLE
25,505 LNFT $____________ $____________
A001 B1500 15706-0200 SOIL EROSION CONTROL, CHECK DAM
195 EACH $____________ $____________
Bid Schedule Schedule:B Schedule Type:Base
A - 19
B1550 15706-0300 SOIL EROSION CONTROL, SANDBAG
565 EACH $____________ $____________
B1600 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
B1650 20101-0000 CLEARING AND GRUBBING
39.5 ACRE $____________ $____________
A001 B1700 20301-1100 REMOVAL OF GATE , (Double swing)
3 EACH $____________ $____________
B1750 20301-1200 REMOVAL OF HEADWALL
24 EACH $____________ $____________
B1800 20301-1400 REMOVAL OF INLET
1 EACH $____________ $____________
B1850 20301-1800 REMOVAL OF MONUMENT
1 EACH $____________ $____________
B1900 20301-1900 REMOVAL OF PIPE CULVERT
12 EACH $____________ $____________
B1950 20301-2000 REMOVAL OF PIPE END SECTION
3 EACH $____________ $____________
B2000 20301-2300 REMOVAL OF SIGN/MARKER
70 EACH $____________ $____________
A001 B2050 20301-2700 REMOVAL OF STRUCTURE , (Boardwalk)
1 EACH $____________ $____________
B2100 20302-0500 REMOVAL OF CURB, CONCRETE
53 LNFT $____________ $____________
B2150 20302-0625 REMOVAL OF CURB, LOG
620 LNFT $____________ $____________
A001 B2200 20303-0300 REMOVAL OF CONCRETE , (Pad)
9 SQYD $____________ $____________
Bid Schedule Schedule:B Schedule Type:Base
A - 20
B2250 20303-3000 REMOVAL OF SIDEWALK, ASPHALT
235 SQYD $____________ $____________
B2300 20303-3500 REMOVAL OF STONE MASONRY
25 SQYD $____________ $____________
A001 B2350 20303-3600 REMOVAL OF WALL , (Rockery toe)
45 SQYD $____________ $____________
A001 B2400 20303-3600 REMOVAL OF WALL , (Timber)
38 SQYD $____________ $____________
A001 B2450 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS , (Log deck)
ALL LPSM $___LPSM_____ $____________
B2500 20401-0000 ROADWAY EXCAVATION
137,100 CUYD $____________ $____________
B2550 20402-0000 SUBEXCAVATION
13,520 CUYD $____________ $____________
B2600 20411-0000 SELECT BORROW
18,605 TON $____________ $____________
A001 B2650 20435-2000 BACKFILL, GRANULAR , (quartz sand)
1,470 CUYD $____________ $____________
B2700 20465-0000 CONSERVE AND PLACE BOULDER
185 EACH $____________ $____________
B2750 20701-0700 EARTHWORK GEOTEXTILE, TYPE II-A
2,550 SQYD $____________ $____________
B2800 20701-1000 EARTHWORK GEOTEXTILE, TYPE III-A
15,000 SQYD $____________ $____________
B2850 20703-2000 GEOGRID, BIAXIAL
1,600 SQYD $____________ $____________
B2900 20704-0000 GEOMEMBRANE
23,000 SQYD $____________ $____________
Bid Schedule Schedule:B Schedule Type:Base
A - 21
B2950 20705-1000 INSULATION BOARD, POLYSTYRENE FOAM
47,000 SQYD $____________ $____________
B3000 21101-1000 ROADWAY OBLITERATION, METHOD 1
18,535 SQYD $____________ $____________
A001 B3050 25101-0000 PLACED RIPRAP
1,955 CUYD $____________ $____________
A001 B3100 25101-3000 PLACED RIPRAP, CLASS 3
60 CUYD $____________ $____________
A001 B3150 25120-1000 RIPRAP DITCH, CLASS 1 , (or Class 2)
1,700 LNFT $____________ $____________
A001 B3200 30802-2000 ROADWAY AGGREGATE, METHOD 2
9,875 TON $____________ $____________
B3250 31001-0000 RECYCLED AGGREGATE BASE
72,270 SQYD $____________ $____________
B3350 40101-1000 SUPERPAVE PAVEMENT, 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE,
0.3 TO <3 MILLION ESAL
23,000 TON $____________ $____________
B3450 40401-0000 MINOR HOT ASPHALT CONCRETE
10 TON $____________ $____________
B3500 40801-0000 COLD RECYCLED ASPHALT BASE COURSE
32,400 TON $____________ $____________
B3550 40920-1000 FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H
82 TON $____________ $____________
B3600 41105-0000 BLOTTER
1,185 TON $____________ $____________
B3650 41201-1000 TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
200 TON $____________ $____________
Bid Schedule Schedule:B Schedule Type:Base
A - 22
B3700 57501-0000 MINOR BRIDGE WORK
ALL LPSM $___LPSM_____ $____________
B3750 60201-0600 18-INCH PIPE CULVERT
175 LNFT $____________ $____________
B3800 60201-0800 24-INCH PIPE CULVERT
2,545 LNFT $____________ $____________
B3850 60201-0900 30-INCH PIPE CULVERT
120 LNFT $____________ $____________
B3900 60201-1000 36-INCH PIPE CULVERT
230 LNFT $____________ $____________
B3950 60202-0300 21-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
72 LNFT $____________ $____________
B4000 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
2 EACH $____________ $____________
B4050 60404-1000 CATCH BASIN, TYPE 1
1 EACH $____________ $____________
A001 B4100 60501-0000 STANDARD UNDERDRAIN SYSTEM
315 LNFT $____________ $____________
B4150 60510-0700 6-INCH COLLECTOR PIPE
1,700 LNFT $____________ $____________
B4200 60510-0800 6-INCH OUTLET PIPE
595 LNFT $____________ $____________
A001 B4250 60801-0200 PAVED WATERWAY, TYPE 2 , (6-foot width)
145 SQYD $____________ $____________
B4300 60901-3500 CURB, STONE, TYPE 1, 12-INCH DEPTH
400 LNFT $____________ $____________
A001 B4350 60901-7000 CURB, LOG
1,855 LNFT $____________ $____________
Bid Schedule Schedule:B Schedule Type:Base
A - 23
B4400 61501-1100 SIDEWALK, ASPHALT
280 SQYD $____________ $____________
A001 B4450 61902-0900 GATE, METAL , (40-foot width)
2 EACH $____________ $____________
B4500 61902-0900 GATE, METAL , (32-foot width)
1 EACH $____________ $____________
A001 B4550 62002-0000 STONE MASONRY , (Channel)
40 SQYD $____________ $____________
A001 B4600 62002-0000 STONE MASONRY , (Basin)
25 SQYD $____________ $____________
A001 B4650 62010-0000 STONE MASONRY , (Curb)
120 LNFT $____________ $____________
B4700 62010-3000 STONE MASONRY GUARDWALL TYPE 1
210 LNFT $____________ $____________
B4750 62011-0300 STONE MASONRY HEADWALL FOR 18-INCH PIPE CULVERT
4 EACH $____________ $____________
B4800 62011-0500 STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT
85 EACH $____________ $____________
B4850 62011-0600 STONE MASONRY HEADWALL FOR 30-INCH PIPE CULVERT
4 EACH $____________ $____________
B4900 62011-0700 STONE MASONRY HEADWALL FOR 36-INCH PIPE CULVERT
8 EACH $____________ $____________
A001 B4950 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY
600 HOUR $____________ $____________
B5000 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
18-INCH WIDTH
200 HOUR $____________ $____________
Bid Schedule Schedule:B Schedule Type:Base
A - 24
A001 B5050 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY
200 HOUR $____________ $____________
A001 B5100 62201-1350 BULLDOZER, 200HP MINIMUM FLYWHEEL POWER
200 HOUR $____________ $____________
A001 B5130 62201-3000 HYDRAULIC EXCAVATOR (140 HP minimum with 3500 lb minimum hammer attachment)
100 HOUR $____________ $____________
A001 B5140 62201-3000 HYDRAULIC EXCAVATOR (140 HP minimum with 50 foot minimum reach)
200 HOUR $____________ $____________
B5150 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT
400 HOUR $____________ $____________
B5200 62201-3750 CHAIN SAW
60 HOUR $____________ $____________
B5250 62301-0000 GENERAL LABOR
1,500 HOUR $____________ $____________
A001 B5300 62302-0000 SPECIAL LABOR , (Carpenter)
200 HOUR $____________ $____________
A001 B5350 62302-0000 SPECIAL LABOR , (Stone Mason)
200 HOUR $____________ $____________
B5400 62406-0100 PLACING CONSERVED TOPSOIL, 2-INCH DEPTH
34.4 ACRE $____________ $____________
B5450 62515-1000 MULCHING, DRY METHOD
34.4 ACRE $____________ $____________
A001 B5500 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN
35 EACH $____________ $____________
B5550 63302-0000 SIGN SYSTEM
172 SQFT $____________ $____________
Bid Schedule Schedule:B Schedule Type:Base
Project No:WY PRA YELL 10(17)
Project Name:Grand Loop Road, Norris to Golden Gate, Phase 1
Leeann.Bush Rectangle
A - 25
B5600 63308-2000 OBJECT MARKER, TYPE 2
12 EACH $____________ $____________
B5650 63308-3000 OBJECT MARKER, TYPE 3
12 EACH $____________ $____________
B5700 63318-1000 SNOWPOLE HOLDER
90 EACH $____________ $____________
A001 B5750 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID , (White)
99,850 LNFT $____________ $____________
A001 B5800 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID , (Yellow)
90,900 LNFT $____________ $____________
A001 B5850 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN , (Yellow)
14,780 LNFT $____________ $____________
A001 B5900 63401-0450 PAVEMENT MARKINGS, TYPE B, DOTTED , (White)
13,632 LNFT $____________ $____________
B5950 63403-0200 PAVEMENT MARKINGS, TYPE B Solid White, (Stop line)
150 SQFT $____________ $____________
B6000 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL
2 EACH $____________ $____________
B6050 63502-0400 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 1
95 EACH $____________ $____________
B6100 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
16 EACH $____________ $____________
B6150 63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 42-INCH
200 EACH $____________ $____________
B6200 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
100 EACH $____________ $____________
B6250 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
50 EACH $____________ $____________
Bid Schedule Schedule:B Schedule Type:Base
A - 26
B6300 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
80 EACH $____________ $____________
B6350 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C
190 EACH $____________ $____________
B6400 63502-3700 TEMPORARY TRAFFIC CONTROL, SNOWPOLE
57 EACH $____________ $____________
B6450 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
34,910 LNFT $____________ $____________
B6500 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
3,200 LNFT $____________ $____________
A001 B6550 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
1,370 SQFT $____________ $____________
B6600 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
1,400 HOUR $____________ $____________
B6650 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
336 DAY $____________ $____________
B6700 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER
7,728 FXHR $38.00 $293,664.00
A001 B6750 63601-3000 SYSTEM INSTALLATION, ELECTRICAL
ALL LPSM $___LPSM_____ $____________
A001 B6800 63701-0000 FIELD OFFICE , (relocation)
1 EACH $____________ $____________
A001 B6850 64604-3000 FIXTURE, PEDESTRIAN RAILING , (Type 3)
195 LNFT $____________ $____________
A001 B6900 64604-3000 FIXTURE, PEDESTRIAN RAILING , (Type 1)
400 LNFT $____________ $____________
A001 B6950 64604-3000 FIXTURE, PEDESTRIAN RAILING , (Type 2)
110 LNFT $____________ $____________
Bid Schedule Schedule:B Schedule Type:Base
Project No:WY PRA YELL 10(17)
Project Name:Grand Loop Road, Norris to Golden Gate, Phase 1
Leeann.Bush Rectangle
A - 27
B7000 64620-1100 REMOVE AND RESET KIOSK
1 EACH $____________ $____________
A001 B7050 64632-0000 ROADSIDE DEVELOPMENT , (Remove and reset stairs)
10 SQYD $____________ $____________
B7100 64702-1000 MITIGATION, LANDSCAPING LOG
5,820 LNFT $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:B Schedule Type:Base
A - 28
20101-0000 CLEARING AND GRUBBING
20212-0000 SPECIAL CLEARING
20801-0000 STRUCTURE EXCAVATION
21101-1000 ROADWAY OBLITERATION, METHOD 1
31001-0000 RECYCLED AGGREGATE BASE
55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
55302-2500 PRECAST, PRESTRESSED CONCRETE DECKED BULB TEE GIRDERS, 45"
55302-3700 PRECAST, PRESTRESSED CONCRETE DECKED BULB TEE GIRDERS , (44")
55401-1000 REINFORCING STEEL
55401-2000 REINFORCING STEEL, EPOXY COATED
55901-0000 MEMBRANE WATERPROOFING
56401-1000 BEARING DEVICE, ELASTOMERIC
62406-0100 PLACING CONSERVED TOPSOIL, 2-INCH DEPTH
62515-1000 MULCHING, DRY METHOD
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
C1000 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
C1050 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
C1100 15214-1000 SURVEY AND STAKING, BRIDGE
ALL LPSM $___LPSM_____ $____________
C1150 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
ALL LPSM $___LPSM_____ $____________
C1200 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
C1250 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
C1300 15704-1000 SOIL EROSION CONTROL, PLASTIC LINING
2,105 SQYD $____________ $____________
C1350 15705-0100 SOIL EROSION CONTROL, SILT FENCE
5,755 LNFT $____________ $____________
A001 C1390 15705-0500 SOIL EROSION CONTROL, TEMPORARY CULVERT PIPE , (12-inch)
60 LNFT $____________ $____________
Bid Schedule Schedule:C Schedule Type:Base
A - 29
C1400 15705-0600 SOIL EROSION CONTROL, TEMPORARY 24-INCH CULVERT PIPE
400 LNFT $____________ $____________
C1450 15705-1300 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
500 LNFT $____________ $____________
C1500 15705-1500 SOIL EROSION CONTROL, SEDIMENT WATTLE
22,985 LNFT $____________ $____________
A001 C1550 15706-0200 SOIL EROSION CONTROL, CHECK DAM
185 EACH $____________ $____________
C1600 15706-0300 SOIL EROSION CONTROL, SANDBAG
860 EACH $____________ $____________
A001 C1650 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
C1700 20101-0000 CLEARING AND GRUBBING
36.6 ACRE $____________ $____________
C1750 20212-0000 SPECIAL CLEARING
2,950 SQYD $____________ $____________
A001 C1800 20301-1100 REMOVAL OF GATE , (Double swing)
3 EACH $____________ $____________
C1850 20301-1200 REMOVAL OF HEADWALL
23 EACH $____________ $____________
C1900 20301-1400 REMOVAL OF INLET
1 EACH $____________ $____________
C1950 20301-1800 REMOVAL OF MONUMENT
1 EACH $____________ $____________
C2000 20301-1900 REMOVAL OF PIPE CULVERT
11 EACH $____________ $____________
C2050 20301-2000 REMOVAL OF PIPE END SECTION
3 EACH $____________ $____________
Bid Schedule Schedule:C Schedule Type:Base
Project No:WY PRA YELL 10(17)
Project Name:Grand Loop Road, Norris to Golden Gate, Phase 1
A - 30
C2100 20301-2300 REMOVAL OF SIGN/MARKER
91 EACH $____________ $____________
A001 C2150 20301-2700 REMOVAL OF STRUCTURE , (Boardwalk)
1 EACH $____________ $____________
C2200 20302-0500 REMOVAL OF CURB, CONCRETE
53 LNFT $____________ $____________
C2250 20302-0625 REMOVAL OF CURB, LOG
620 LNFT $____________ $____________
A001 C2300 20303-0300 REMOVAL OF CONCRETE , (Pad)
7 SQYD $____________ $____________
C2350 20303-3000 REMOVAL OF SIDEWALK, ASPHALT
235 SQYD $____________ $____________
C2400 20303-3500 REMOVAL OF STONE MASONRY
25 SQYD $____________ $____________
A001 C2450 20303-3600 REMOVAL OF WALL , (Rockery toe)
45 SQYD $____________ $____________
A001 C2500 20303-3600 REMOVAL OF WALL , (Timber)
38 SQYD $____________ $____________
A001 C2550 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS , (Log deck)
ALL LPSM $___LPSM_____ $____________
C2600 20304-2000 REMOVAL OF BRIDGE
ALL LPSM $___LPSM_____ $____________
C2650 20401-0000 ROADWAY EXCAVATION
122,000 CUYD $____________ $____________
A001 C2700 20402-0000 SUBEXCAVATION
12,485 CUYD $____________ $____________
A001 C2750 20411-0000 SELECT BORROW
14,850 TON $____________ $____________
Bid Schedule Schedule:C Schedule Type:Base
A - 31
A001 C2800 20435-2000 BACKFILL, GRANULAR , (quartz sand)
1,360 CUYD $____________ $____________
C2850 20465-0000 CONSERVE AND PLACE BOULDER
185 EACH $____________ $____________
C2900 20701-0700 EARTHWORK GEOTEXTILE, TYPE II-A
6,550 SQYD $____________ $____________
A001 C2950 20701-1000 EARTHWORK GEOTEXTILE, TYPE III-A
11,610 SQYD $____________ $____________
A001 C3000 20703-2000 GEOGRID, BIAXIAL
8,250 SQYD $____________ $____________
C3050 20704-0000 GEOMEMBRANE
20,000 SQYD $____________ $____________
C3100 20705-1000 INSULATION BOARD, POLYSTYRENE FOAM
41,000 SQYD $____________ $____________
C3150 20801-0000 STRUCTURE EXCAVATION
800 CUYD $____________ $____________
C3200 20803-0000 STRUCTURAL BACKFILL
360 CUYD $____________ $____________
C3250 21101-1000 ROADWAY OBLITERATION, METHOD 1
18,535 SQYD $____________ $____________
A001 C3300 25101-0000 PLACED RIPRAP
1,930 CUYD $____________ $____________
A001 C3350 25101-3000 PLACED RIPRAP, CLASS 3
60 CUYD $____________ $____________
A001 C3400 25101-5000 PLACED RIPRAP, CLASS 5
250 CUYD $____________ $____________
A001 C3450 25120-1000 RIPRAP DITCH, CLASS 1 , (or Class 2)
1,700 LNFT $____________ $____________
Bid Schedule Schedule:C Schedule Type:Base
A - 32
A001 C3500 30802-2000 ROADWAY AGGREGATE, METHOD 2
9,480 TON $____________ $____________
C3550 31001-0000 RECYCLED AGGREGATE BASE
70,250 SQYD $____________ $____________
C3600 40101-1000 SUPERPAVE PAVEMENT, 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE,
0.3 TO <3 MILLION ESAL
21,570 TON $____________ $____________
C3750 40401-0000 MINOR HOT ASPHALT CONCRETE
375 TON $____________ $____________
C3800 40801-0000 COLD RECYCLED ASPHALT BASE COURSE
30,400 TON $____________ $____________
C3850 40920-1000 FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H
81 TON $____________ $____________
C3900 41105-0000 BLOTTER
1,130 TON $____________ $____________
C3950 41201-1000 TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
190 TON $____________ $____________
C4000 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
274 CUYD $____________ $____________
A001 C4050 55302-2500 PRECAST, PRESTRESSED CONCRETE DECKED BULB TEE GIRDERS, 45"
546 LNFT $____________ $____________
A001 C4060 55302-3700 PRECAST, PRESTRESSED CONCRETE DECKED BULB TEE GIRDERS , (44")
546 LNFT $____________ $____________
C4100 55401-1000 REINFORCING STEEL
29,800 LB $____________ $____________
C4150 55401-2000 REINFORCING STEEL, EPOXY COATED
2,400 LB $____________ $____________
Bid Schedule Schedule:C Schedule Type:Base
A - 33
C4200 55601-1300 BRIDGE RAILING, TIMBER
212 LNFT $____________ $____________
C4250 55901-0000 MEMBRANE WATERPROOFING
317 SQYD $____________ $____________
C4300 56401-1000 BEARING DEVICE, ELASTOMERIC
12 EACH $____________ $____________
C4350 57501-0000 MINOR BRIDGE WORK
ALL LPSM $___LPSM_____ $____________
C4400 57502-0000 TEMPORARY BRIDGE
ALL LPSM $___LPSM_____ $____________
C4450 60201-0600 18-INCH PIPE CULVERT
175 LNFT $____________ $____________
C4500 60201-0800 24-INCH PIPE CULVERT
2,230 LNFT $____________ $____________
C4550 60201-0900 30-INCH PIPE CULVERT
120 LNFT $____________ $____________
C4600 60201-1000 36-INCH PIPE CULVERT
230 LNFT $____________ $____________
C4650 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
2 EACH $____________ $____________
C4700 60404-1000 CATCH BASIN, TYPE 1
1 EACH $____________ $____________
A001 C4750 60501-0000 STANDARD UNDERDRAIN SYSTEM
315 LNFT $____________ $____________
A001 C4800 60510-0700 6-INCH COLLECTOR PIPE
1,130 LNFT $____________ $____________
C4850 60510-0800…