RFP_ISA_LakeReduced.pdf
PDF 6 MB Posted
- Attached to
- WY PRA YELL 10(21), Isa Lake Bridge Replacement
- Solicitation number
- DTFH70-13-R-00003
About this file
Solicitation
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
YELLOWSTONE, GRAND TETON, & SURROUNDING AREA MATOC
TASK ORDER REQUEST FOR PROPOSALS
Solicitation No. DTFH70-13-R-00003
WY PRA YELL 10(21)
ISA LAKE BRIDGE REPLACEMENT
Solicitation, Offer & Award, Bid Schedule, Contract Clauses Minimum Wage Schedule, Special Contract Requirements, and Plans
This solicitation cites Standard Specifications for Construction of Roads and Bridges on Federal Highway
Projects, FP-03 - US Customary Units
ISSUING OFFICE:
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
610 EAST FIFTH STREET
VANCOUVER, WA 98661-3801
Phone (360) 619-7520 -- FAX (360) 619-7932
WEB SITE: HTTP://WWW.WFL.FHWA.DOT.GOV/CONTRACTING/
EMAIL: WFL.CONTRACTS@DOT.GOV
WORLD HERITAGE
SITE
QUICK INDEX
Page Item
--- Special Notice --- Offer Submittal Checklist --- Authority to Sign --- Bid Bond --- Table of Contents A-1 Notice to Offerors A-3 SF1442, Solicitation, Offer and Award A-6a Subcontracting Plan A-7 Bid Schedule B-1 Solicitation Provisions C-1 Contract Clauses D-1 Davis-Bacon Wage Rates E-1 Special Contract
Requirements H-1 Permits I-1 Stormwater Pollution
Prevention Plan
Proposal Due Date:
See Page A-3, Block 13A
PROPOSAL REMINDERS
Electronic bids will not be accepted. Submit printed copy of bid to the address listed on the enclosed SF 1442. Before submitting your bid, please review the following:
• Have you rechecked your bid figures?
• Have you completed the bid schedule?
• Have you completed and signed the SF 1442, Solicitation, Offer & Award?
• Have you acknowledged all amendments?
• Have you completed the Representations &
Certifications (Page B-1)?
• Is your bid guarantee enclosed in proper form and amount (see FAR Clause 52.228-1), including Power of Attorney affidavit?
• Does the lower left corner of the proposal envelope state “Proposal Enclosed”?
• Does the lower left corner include the Solicitation Number and WY PRA YELL 10(21), ISA LAKE
BRIDGE REPLACEMENT?
http://www.wfl.fhwa.dot.gov/contracting/ mailto:wfl.contracts@dot.gov
PROJECT WY PRA YELL 10(21)
BEGINNING AT 8+50
ENDING AT 22+00
NATIONAL PARK YELLOWSTONE
COUNTY TETON
STATE WYOMING
LENGTH 0.26 MILES
FIXED COMPLETION DATE See FAR Clause 52.211-10 (FAR Clauses begin on page C-1)
SPECIAL NOTICE
Solicitation No.: DTFH70-13-R-00003
THIS “TASK ORDER REQUEST FOR PROPOSAL” IS SOLELY FOR THE
FOLLOWING CONTRACTS AND CONTRACTORS:
Contract Number Contractor Name Contractor Number DTFH7014D00003 Knife River Corporation – Northwest 208.362.6152 DTFH7014D00004 HK Contractors, Inc. 208.523.6600 DTFH7014D00005 Eagle Peak Rock & Paving, Inc. 530.233.4568 DTFH7014D00006 Riverside Contracting, Inc. 406.721.9267 DTFH7014D00007 Granite Construction Company 831.724.1011 DTFH7014D00008 Oftedal Construction, Inc. 307.232.2303 DTFH7014D00009 Skanska USA Civil West Rocky 970.565.8000
Mountain District Inc.
THIS PROJECT IS BEING ADVERTISED ON THE FEDERAL BUSINESS
OPPORTUNITIES WEBSITE TO ANNOUNCE THE UPCOMING PROJECT
AND ASSIST POTENTIAL SUBCONTRACTORS BY PUBLICIZING
OPPORTUNITIES. A PROPOSAL WILL ONLY BE ACCEPTED FROM THE
ABOVE PRIME CONTRACTORS.
Additional information may be found on our web pages:
Construction Projects: http://www.wfl.fhwa.dot.gov/contracting/construction/
Description: This web page contains links to access upcoming (synopsized) projects, advertised (solicitation) projects, bids and proposals received, awarded projects, awarded IDIQ contracts, bid tabs, and bid history.
Advertised Projects: www.wfl.fhwa.dot.gov/contracting/construction/advertised.htm
Description: This web page contains projects that are out for bid with links to the Federal Business Opportunities project page, question submittals, and a link to the project Question and Answers.
Yellowstone/Grand Teton MATOC1: http://www.wfl.fhwa.dot.gov/contracting/construction/idiq/ygt.htm
Description: This web page contains the contractor’s information, a description of the contract and the projects that have been awarded under the contract.
1 A Multiple Award Task Order Contract (MATOC) is a group of contracts awarded to several contractors for upcoming work in a certain geographical area (in this case, work in Yellowstone and Grand Teton National Parks).
The contracts allow the contractor to compete for upcoming highway/bridge construction projects.
http://www.wfl.fhwa.dot.gov/contracting/construction/ http://www.wfl.fhwa.dot.gov/contracting/construction/advertised.htm http://www.wfl.fhwa.dot.gov/contracting/construction/idiq/ygt.htm
Offer Submittal Checklist
Before submitting your offer, please review the following:
Done?
Is this in the envelope?
Bid Envelope
Did I correctly address the envelope? (See page A-3, blocks 7 & 8) Does the lower left corner of the envelope include the Solicitation Number and the project name/number?
Pages A-3 & A-4 (SF 1442, Solicitation Offer & Award) Did I include our firm name and address in block 14?
Did I include our firm’s phone number in block 15?
Did I include our firm’s remittance address in block 16?
(Use when different than block 14)
Did I include my DUNS number?
Did I include the number & date of all amendments in block 19?
Did the appropriate official sign/date in block 20A, 20B & 20C?
Bid Schedule (see page A-7) Did I insert “Unit Bid Price” and “Amount Bid” for each bid item?
Did the appropriate official initial corrections?
Did I include the “Total” on the last page of each bid schedule?
Did I include the firm’s name on the last page of each bid schedule?
When applicable, did I include the totals for each schedule in the summary page? (See last page of bid schedules.)
Bid Bond (Standard Form 24) Offers received without a valid bid bond may be delayed.
Did I complete my bid bond correctly?
Did I attach the Power of Attorney to the bid bond?
Authority to Sign Did I include a completed form for each person signing the SF1442 and Bid Bond?
Representations & Certifications & FAR Clause Did I include the completed B-pages (beginning on B-1)?
Did I include the completed clause 1252.228-73 Notification of Miller Act Payment Bond Protection (See page C-101)?
System for Award Management (SAM) https://www.sam.gov/portal/public/SAM/ Do we have up-to-date data in SAM?
Vets100 Reporting http://www.dol.gov/vets/vets100filing.htm If applicable, did I ensure our firm has completed this annual report?
NOTE: The Contractor is fully responsible to verify that all data is correct each time a offer package is submitted. Failure to properly input and/or update your data may cause the offer to be rejected.
https://www.sam.gov/portal/public/SAM/ http://www.dol.gov/vets/vets100filing.htm
Driving Directions to our Vancouver Washington Office:
See our web page at http://www.wfl.fhwa.dot.gov/about/directions.htm http://www.wfl.fhwa.dot.gov/about/directions.htm
INSTRUCTIONS: When the offeror/ p rinc ipa l is a c orpora tion, inc lude this c ertific a tion with your offer/ b id .
Corporate Certificate
I, ____________________________________________ (name), certify that I am the
________________________________________(title), of the corporation named as the Offeror/Principal herein;
that _________________________________________(name), who signed this offer and/or bid bond on behalf of ___________________________ (c ompany name) is
________________________________________ (title) of this corporation;
that the offer was duly signed for and on behalf of said corporation by authority and scope of its governing body, and within the scope of its corporate powers.
_____________________________________ (signature) Affix Corporate Seal
_____________________________________ (title)
BID BOND
( See instructions on reverse)
DATE BOND EXECUTED (Must not be later than bid opening date) OMB Number: 9000-0045
Expiration Date: 6/30/2016 Public reporting burden for this collection of information is estimated to average 25 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspects of this collection of information, including suggestions for reducing this burden, to the FAR Secretariat (MVR), Federal Acquisition Policy Division, GSA, Washington, DC 20405.
PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION ("X" one)
INDIVIDUAL
JOINT VENTURE
PARTNERSHIP
CORPORATION
STATE OF INCORPORATION
SURETY(IES) (Name and business address)
PERCENT
OF BID
PRICE
PENAL SUM OF BOND
AMOUNT NOT TO EXCEED
MILLION (S) THOUSAND(S) HUNDRED(S) CENTS
BID IDENTIFICATION
BID DATE
FOR (Construction, supplies, or Services)
INVITATION NO.
OBLIGATION
We, the Principal and Surety (ies) are firmly bound to the United States of America (hereinafter call the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit or liability is the full amount of the penal sum.
CONDITIONS:
The principal has submitted the bid identified above.
THEREFORE:
The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10 days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to executes such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.
Each surety executing this instrument agrees that its obligations is not impaired by any extension(s) of the time for acceptance of the bid that the principal may grand to the Government. Notice to the surety (ies) of extensions (s) are waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the periods originally allowed for acceptance of the bid.
WITNESS
The principal and Surety (ies) executed this bid bond and affixed their seals on the above date.
PRINCIPAL
SIGNATURE(S)
NAME(S) &
TITLE(S)
(Typed)
1.
1. 2.
2.
3.
3.
(Seal) (Seal) (Seal) Corporate Seal
INDIVIDUAL SURETY(IES)
SIGNATURE(S)
NAME(S)
(Typed)
1.
1.
2.
2.
(Seal) (Seal)
CORPORATE SURETY(IES)
SU
R
ET
Y
A
NAME &
ADDRESS
STATE OF INC. LIABILITY LIMIT ($)
SIGNATURE(S)
NAME(S) &
TITLE(S)
(Typed)
1.
1.
2.
2. Corporate Seal
AUTHORIZED FOR LOCAL REPRODUCTION
Pervious edition is usable
STANDARD FORM 24 (REV. 10/1998)
Prescribed by GSA - FAR (48 CFR) 53.228(a)
DTFH70-13-R-00003
WY PRA YELL 10(21), ISA LAKE BRIDGE REPLACEMENT
SU
R
ET
Y
B
NAME &
ADDRESS
STATE OF INC. LIABILITY LIMIT ($)
SIGNATURE(S)
NAME(S) &
TITLE(S)
(Typed)
1.
1.
2.
2. Corporate Seal
Corporate Seal
LIABILITY LIMIT ($)STATE OF INC.
2.
2.
1.
1.NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
SU
R
ET
Y
C
Corporate Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INC.
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
SU
R
ET
Y
D
Corporate Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INC.
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
SU
R
ET
Y
E
Corporate Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INC.
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
SU
R
ET
Y
F
Corporate Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INC.
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
SU
R
ET
Y
G
INSTRUCTIONS
1. This form is authorized for use when a bid guaranty is required. any deviation from this form will require the written approval of the Administrator of General Services.
2, Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., ab attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.
3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).
4. (a) Corporation executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitation listed therein. where more than one corporate surety is involved, their names and address shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY (IES)." In the space designed "SURETY (IES)" on the face of the form, insert only the letter identification of the sureties.
(b) Where individual sureties are involved, a completed Affidavit of Individual surety (Standard Form 28), or each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.
5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word " Corporate Seal";
and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.
6. Type the name and title of each person signing this bond in the space provided.
7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "Offeror."
STANDARD FORM 24 (REV. 10/1998) BACK
Table of Contents Project: WY PRA YELL 10(21), Isa Lake Bridge Replacement
03USC10/06/11
TABLE OF CONTENTS
DESCRIPTION PAGE
Notice to Offeror .................................................................................................................... A-1
Solicitation, Offer, and Award (SF 1442) .............................................................................. A-3
Bid Schedule .......................................................................................................................... A-7
Solicitation Provisions ........................................................................................................... B-1
Contract Clauses .................................................................................................................... C-1
Minimum Wage Schedule ...................................................................................................... D-1
SCRs Table of Contents
SPECIAL CONTRACT REQUIREMENTS (SCRs)
The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-03) U.S.
Customary Version, U.S. Department of Transportation, Federal Highway Administration.
Division 100....................................................................................................................E-1 Division 150....................................................................................................................E-35
Division 200....................................................................................................................F-1 Division 250....................................................................................................................F-17 Division 300....................................................................................................................F-24 Division 400....................................................................................................................F-24 Division 550....................................................................................................................F-25 Division 600....................................................................................................................F-45
Division 700................................................................................................................... G-1
Permits .................................................................................................................................. H-1
Storm Water Pollution Prevention Plan .................................................................................. I-1
Table of Contents
(This page intentionally left blank.)
A-1
Notice to Offeror
03USC01/07/14
NOTICE TO OFFEROR
I. Project Location.
The project work is located 38 miles Southeast of West Yellowstone, ID in Teton County.
Approximate Global Positioning System (GPS) coordinates for the beginning of the project are
50268.409 N and 60315.430 E.
Signs have not been erected to identify the project limits. No Government personnel will be available for show-me tours.
II. Pre- proposal Information.
This solicitation is solicited under the Yellowstone, Grand Teton, & Surrounding Area Multiple Award Task Order Contract (MATOC). Selection of the successful offer is based on price.
This solicitation includes electronic data listed in FAR Clause 52.236-4, Physical Data and plan sheets. Plan sheets can be found at http://www.wfl.fhwa.dot.gov/contracting/construction/plans/isa/.
The plan sheets can be viewed or downloaded by individual sections, or by the entire plan set. A paper copy of the plan sheets is available by submitting the form posted with this solicitation. A CD of the physical data is available by submitting the form posted with this solicitation.
REPS & CERTS. Submit or update Representations and Certifications online at https://www.sam.gov/portal/public/SAM/ before proposal submittal. For more details go to FAR Provision 52.204-8 Annual Representations and Certifications (see page B-2). If you have previously registered on-line and the NAICS code for this solicitation is different than the code listed in your online file, please note the amended changes on the lines provided in FAR 52.204- 8.
Requests for technical information (Plan and Division 100 – 700 Specification questions only) about this project will only be accepted in writing (see Block 9 on page A-5).
TECHNICAL QUESTIONS REGARDING PROPOSED WORK FOR THIS
PROJECT WILL BE ACCEPTED UNTIL CLOSE-OF-BUSINESS ON APRIL 3,
2014.
Questions can be submitted and answers viewed by going to project information at:
http://www.wfl.fhwa.dot.gov/contracting/construction/advertised.htm Every attempt to respond to questions will be made. However, response to questions received after the above posted date is not guaranteed.
http://www.wfl.fhwa.dot.gov/contracting/construction/plans/isa/
A-2
Particular attention should be paid to Standard Form l442, Solicitation, Offer and Award, to assure that Blocks 14, 15, 16, 19, 20A, and 20C are completed correctly. Sign Block 20B according to the instructions in Subsection 102.02. You must submit a completed ‘Authority to Sign’ document. You must also complete the representations and certifications contained in the Contract Provisions beginning on page B-1. Failure to furnish or complete any of the above may result in your bid being considered nonresponsive and being rejected.
Facsimile and email offers are not authorized for this solicitation. Offers may be modified or withdrawn by facsimile, if such notice is received by the time specified for receipt of offers. The Government will not be responsible for any failure attributable to the transmission or receipt of facsimile data. See FAR Provision 52.215-1, Instructions to Offerors – Competitive Acquisition (Jan 2004). FAX 360-619-7932.
Surety Bond Guarantee Program. Small businesses that need surety bonds can qualify for U.S.
Small Business Administration (SBA) backed surety bonds of up to $5,000,000. SBA assistance in locating a participating surety company or agent, and completing application forms is available online. For more information on the U.S. SBA’s Surety Bond Guarantee program, go online to http://www.sba.gov/surety-bonds or call 1-800-U-ASK-SBA.
Current and potential U.S. Department of Transportation (DOT) Contractors have recently been receiving fraudulent letters purporting to be issued by DOT. These fraudulent letters request that the Contractors resubmit their banking information to DOT. If you receive such a letter, please DO NOT complete the requested worksheet that is attached to the letters and DO NOT release any information. To register or update information, Contractors are required to go directly through the System for Award Management (SAM) website and never through a third party. You can access SAM at https://www.sam.gov/portal/public/SAM/.
III. Post Award Information.
Insurance requirements are set forth in Subsection 107.05.
Contractor Performance Evaluations. This office posts performance evaluations in the Construction Contractor Appraisal Support System (CCASS). A user’s manual can be found at http://www.cpars.csd.disa.mil/cparsfiles/ccass/ccassrefmatl.htm. Upon receiving an email notice of evaluation availability, you will have 30 days to review the evaluation online and submit comments. If you are unable to access the system, call 360-619-7520 for assistance or for a copy of the evaluation.
http://www.sba.gov/surety-bonds.html http://www.cpars.csd.disa.mil/cparsfiles/ccass/ccassrefmatl.htm
A-2a
IV. Specifications and Permits.
This solicitation and subsequent contract are governed by the Federal Acquisition Regulation (FAR), agency supplemental regulations, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 U.S. Customary Units. Obtain paper copies of the FP-03 by calling 360-619-7520, e-mailing at plans_spec@fhwa.dot.gov, or writing Federal Highway Administration, 610 East Fifth Street, Vancouver, WA 98661. An electronic version may be found at http://flh.fhwa.dot.gov/resources/pse/specs/
Geotechnical, bridge, and design data applicable to this project is listed in FAR Clause 52.236-4, Physical Data.
Carefully review Section 153 Contractor Quality Control of the Special Contract Requirements.
New requirements are included that substantially changes the work required under this Section as compared to previous versions.
Carefully review Section 155 Schedules For Construction Contracts in the Special Contract Requirements. New requirements are included that change the work required under this section as compared to previous versions. A change to the progress payment approval concerning schedule submissions has also been included in this contract. See Subsections 155.03 and 155.05.
Contractors shall use the Government’s web-based system, Engineer’s Estimating, Bidding, Award, and Construction System (EEBACS), to prepare measurement notes (pay notes).
The Contractor shall be required to submit a user account form to gain access to the EEBACS system. See Subsection 108.01.
A user guide, “EEBACS for Construction Contractors”, is available. An electronic version can be found at http://flh.fhwa.dot.gov/resources/pse/estimate/guide.htm http://flh.fhwa.dot.gov/resources/pse/specs/ http://flh.fhwa.dot.gov/resources/pse/estimate/guide.htm
A-2b
(This page intentionally left blank)
SEE BID SCHEDULE
ALL ITEMS ON THE BID SCHEDULE
SEE PAGE A-5
ATTN: FINANCE
Federal Highway Administration Western Federal Lands Highway Div.
610 East Fifth Street Vancouver WA 98661-3801
ANGY LILJEDAHL
A-5
Continuation SF 1442 WY PRA YELL 10(21), Isa Lake Bridge Replacement
Block 9 FOR GENERAL INFORMATION, call 360.619.7520 from the hours of 8:00 a.m. to 4:00 p.m. local time or e-mail us at wfl.contracts@dot.gov. You can also submit questions online from our Western Federal Lands webpage as described below.
FOR TECHNICAL INFORMATION (plan and specification questions only), requests for technical information about this project will only be accepted in writing.
Submit questions via fax (360.619.7932) or e-mail at plans_spec@dot.gov (plans_spec@dot.gov).
QUESTIONS/ANSWERS POSTED ONLINE. You can view questions and answers on our Western Federal Lands website http://www.wfl.fhwa.dot.gov/contracting/construction/advertised.htm.
• In “Advertised Projects”
• Scroll to the project.
• Click on “View all answered Questions”.
FOR DAVIS-BACON WAGE RATE INFORMATION call the Department of Labor at 972.850.2627 (DRBA – Southwest Region).
FOR PHYSICAL DATA, See FAR Contract Clause 52.236-4, Physical Data, (clauses begin on page C-1) for a listing of available data. To obtain copies of Physical Data, submit a written request to the Contracts Section, FAX 360.619-7932 or e-mail us at wfl.contracts@dot.gov. Requests should be made early to assure timely arrival.
Block 11 COMPLETION DATE: Work shall be completed on or before the date specified in FAR Clause 52.211-10, Commencement, Prosecution, and Completion of Work, subject to such extensions as may be authorized by the terms of the contract and the specifications made a part thereof. Contract Clauses begin on pages C-1.
Block 12A PERFORMANCE & PAYMENT BONDS: See FAR Clause, 52.228-15, Performance and Payment Bonds - Construction (clauses begin on page C-1) and Subsection 102.06 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 U.S. Customary Units.
Block 13B BID BOND AMOUNT: See FAR Clause 52.228-1, Bid Guarantee (clauses begin on page C-1).
ADDITIONAL INFORMATION: See Subsections 102.03 and 102.04 of Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP- 03 U.S. Customary Units.
Block 24 SUBMITTING INVOICES: See Subsection 109.08 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03(U.S. Customary Units.
ESTIMATED PRICE RANGE. The price range of the project work is between $3,000,000 and $5,000,000.
mailto:plans_spec@dot.gov
A-6
Continuation SF 1442 WY PRA YELL 10(21), Isa Lake Bridge Replacement
SUBCONTRACTING PLAN. This Request for Proposals requires an offeror who is a LARGE business to submit an acceptable subcontracting plan prior to contract award. A large business is one whose average gross annual receipts over the past 3 years equal $33.5 million or more. For your information the subcontracting plan form is included beginning on page A-6a. This requirement does not apply to SMALL businesses
Subcontracting Plan – A-6a
For Information Only. Do not submit with your bid.
NOTES:
• Consider the following FHWA small business goals in development of Task Order
Subcontracting plans and efforts:
FHWA Small Business Goals (As of FY 2013) Business Size Goal (%)
SB 39.1%
SDB 14.1%
HUBzone 14.5%
WOSB 5.8%
SDVOSB 3.0%
• Where the bidder/offeror has an existing approved master subcontracting plan, those goals may be reflected in the proposed plan for this task order. Please note as such.
• Where subcontracting opportunities will not exist for this task order, furnish a statement to that effect signed by an authorized official.
• Bidder/offeror may use their subcontracting plan format provided the information remains clear, consistent, and meets the requirements of FAR Clause 52.219-9 Small Business Subcontracting Plan.
• Text lines may be added to this form as needed.
• In the first table, provide information expressed in terms of goal percentages of the total planned subcontracting dollars.
• If a subcontractor qualifies in more than one category, include the subcontract amount in each applicable category. If you have questions, contact the Contracting Officer. [Example: If ABC Inc is a small business, a certified HUBZone small business, and a Women-owned small business, then their subcontract amount of $100,000 would be included in the dollar values shown in rows d, g, and i.]
Subcontracting Plan – A-6b
• The following principal types of supplies and/or services are planned to be subcontracted under this task order. (Indicate if planned to subcontract to a LARGE, SB, VOSB, SDVOSB, HUBz, SDB, or WOSB business concern.)
Type of Supply/Service to be subcontracted
Company (if known)
Address (city/state)
Subcontractor type
LARGE, SB, VOSB,
SDVOSB, HUBz, SDB, WOSB
(enter one or more as applicable)
TASK ORDER SUBCONTRACTING PLAN
a. Total prime task order amount $
Ratio Goals
Percent
b. Total planned subcontract awards $
c. Total planned subcontract awards to Large Business concerns (LARGE) $
d. Total planned subcontract awards to all Small
Business concerns (SB) $ (d/b) %
e. Total planned subcontract awards to Veteran-Owned
Small Business concerns (VOSB) $ (e/b) %
f. Total planned subcontract awards to Service-Disabled
Veteran-Owned Small Business concerns (SDVOSB) $ (f/b) %
g. Total planned subcontract awards to certified
HUBZone Small Business concerns (HUBz) $ (g/b) %
h. Total planned subcontract awards to Small Disadvantaged Business concerns (SDB) (includes ANCs and Indian Tribes) $ (h/b) %
i. Total planned subcontract awards to Women-Owned Small Business concerns (WOSB) $ (i/b) %
Subcontracting Plan – A-6c
• The following methods were used to develop the subcontract percentage goals:
• The following methods were used to identify potential subcontract sources for solicitation purposes. (What source lists were used, such as the System for Award Management (SAM), Veterans service organizations, the National Minority Purchasing Council Vendor Information Service, the Research and Information Division of the Minority Business Development Agency in the Department of Commerce, or small, HUBZone, small disadvantaged, and women-owned small business trade associations, and what organizations were contacted to identify potential SB, VOSB, SDVOSB, HUBz, SDB, and WOSB subcontractors.):
• (Check one) Indirect costs (_)were (__)were not included in establishing the subcontracting goals specified in the table above.
• If indirect costs were included, the following method was used to determine the proportionate share of indirect costs to be incurred with SB, SDVOSB, HUBz, SDB, and WOSB subcontractors:
• The following individual will administer the subcontracting program:
Name:_______________________________________________ Title:________________________________________________ Telephone & e-mail:____________________________________________________________
This individual's specific duties, as they relate to the subcontracting program, are as follows:
Subcontracting Plan – A-6d
• The following efforts will be taken to ensure that SB, VOSB, SDVOSB, HUBz, SDB, and WOSB business concerns will have an equitable opportunity to compete for subcontracts:
• It is agreed that: a) FAR Clause 52.219-8, Utilization of Small Business Concerns, will be included in all subcontracts that offer further subcontracting opportunities; and b) All subcontractors (except small business concerns) at all tiers below the prime contractor who receive subcontracts in excess of $650,000 ($1,500,000 if construction) will be required to adopt and comply with a subcontracting plan in accordance with FAR Clause 52.219-9 Small Business Subcontracting Plan.
• The Contractor agrees to:
a. Cooperate in any studies or surveys as may be required.
b. Submit periodic reports as may be required so that the Government can determine the extent of compliance by the Contractor with the subcontracting plan.
c. Submit Subcontracting Report for Individual Contracts and Summary Subcontract Report, to the following Electronic Subcontract Reporting System (eSRS) web site: http://esrs.gov/
d. Ensure that its large business subcontractors with subcontracting plans agree to submit eSRS documents online as required.
e. Provide its prime task order number, its DUNS number, and the email address of the offeror’s official responsible for reviewing reports to all first-tier subcontractors with a subcontracting plan.
f. Require that each subcontractor with a subcontracting plan provide the prime task order number, its own DUNS number, and the email address of the subcontractor official responsible for reviewing the reports to its subcontractors.
• The following types of records concerning procedures that have been adopted to comply with the requirements and goals in the plan shall be maintained through task order completion:
a. Source lists, guides, and other data used to identify SB, VOSB, SDVOSB, HUBz, SDB, and
WOSB concerns.
b. Organizations contacted in an attempt to locate sources that are SB, VOSB, SDVOSB, HUBz, SDB, and WOSB concerns.
c. Records on each subcontract award of more than $150,000 indicating:
i. whether Small businesses were solicited, and if not, why not;
ii. whether VOSB were solicited, and if not, why not:
http://esrs.gov/
Subcontracting Plan – A-6e
iii. whether SDVOSB were solicited, and if not, why not:
iv. whether HUBz's were solicited, and if not, why not;
v. whether SDB's were solicited, and if not, why not;
vi. whether WOSB's were solicited, and if not, why not; and
vii. if applicable, the reason award was not made to a small business concern.
d. Records of outreach efforts to contact the following in an attempt to locate SB, VOSB, SDVOSB, HUBz, SDB, and WOSB sources:
i. trade associations,
ii. business development organizations,
iii. conferences, and trade fairs
iv. veterans service organizations
e. Records of internal guidance and encouragement provided to buyers through:
i. Workshops, seminars, training programs, etc.
ii. Monitoring performance to evaluate compliance with the program’s requirements.
f. On a task order-by-task order basis, records to support award data submitted by the Contractor to the Government, including the name, address and business size of each subcontractor.
• In order to effectively implement this plan, the contractor agrees to perform the functions listed in paragraph (e) of FAR Clause 52.219-9 Small Business Subcontracting Plan.
• The Contractor acknowledges that a failure of the Contractor or subcontractor to comply in good faith with clause 52.219-8, Utilization of Small Business Concerns, or this approved subcontracting plan shall be considered a material breach of the task order.
Contractor
Signed Date
Printed Name Title
Company Name and Address
Email address
Federal Highway Administration
Accepted by: _______________________________________ __________________ Angy Liljedahl, Contracting Officer Date
Subcontracting Plan – A-6f
Reserved
A - 7
Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions.
Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern.
When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.
When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.
Total all of the amounts bid for each pay item and show the total bid amount.
Bid Schedule
Project No:WY PRA YELL 10(21)
Project Name:Isa Lake Bridge Replacement
A - 8
Contract Quantity Pay Items
20801-0000 STRUCTURE EXCAVATION
20803-0000 STRUCTURAL BACKFILL
55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
55401-1000 REINFORCING STEEL
55401-2000 REINFORCING STEEL, EPOXY COATED
55601-1300 BRIDGE RAILING, TIMBER
55901-0000 MEMBRANE WATERPROOFING
56401-1000 BEARING DEVICE, ELASTOMERIC
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A0060 15214-1000 SURVEY AND STAKING, BRIDGE
ALL LPSM $___LPSM_____ $____________
A0080 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
ALL LPSM $___LPSM_____ $____________
A0100 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0120 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A0140 15705-0100 SOIL EROSION CONTROL, SILT FENCE
1,480 LNFT $____________ $____________
A0160 15705-1500 SOIL EROSION CONTROL, SEDIMENT WATTLE
1,885 LNFT $____________ $____________
A0180 15705-2000 SOIL EROSION CONTROL, TURBIDITY BARRIER
220 LNFT $____________ $____________
A0200 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 9
A0220 20103-0000 CLEARING AND GRUBBING
2,640 SQYD $____________ $____________
A0240 20301-0400 REMOVAL OF BRIDGE
1 EACH $____________ $____________
A0260 20301-1400 REMOVAL OF INLET
2 EACH $____________ $____________
A0280 20301-1900 REMOVAL OF PIPE CULVERT
2 EACH $____________ $____________
A0300 20301-2400 REMOVAL OF SIGN , GOVERNMENT-FURNISHED SIGN
1 EACH $____________ $____________
A0320 20302-0625 REMOVAL OF CURB, LOG
380 LNFT $____________ $____________
A0340 20303-3000 REMOVAL OF SIDEWALK, ASPHALT
175 SQYD $____________ $____________
A0360 20303-3500 REMOVAL OF STONE MASONRY , FLAGSTONE
2 SQYD $____________ $____________
A0380 20401-0000 ROADWAY EXCAVATION
3,680 CUYD $____________ $____________
A0400 20402-0000 SUBEXCAVATION
800 CUYD $____________ $____________
A0420 20411-0000 SELECT BORROW
8,600 TON $____________ $____________
A0440 20701-0100 EARTHWORK GEOTEXTILE, TYPE I-A
1,840 SQYD $____________ $____________
A0460 20701-1500 EARTHWORK GEOTEXTILE, TYPE IV-D
19.0 SQYD $____________ $____________
A0480 20703-2000 GEOGRID, BIAXIAL
1,000 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 10
A0500 20704-0000 GEOMEMBRANE , TEXTURED
1,250 SQYD $____________ $____________
A0520 20801-0000 STRUCTURE EXCAVATION
110 CUYD $____________ $____________
A0540 20803-0000 STRUCTURAL BACKFILL
43 CUYD $____________ $____________
A0560 25101-2000 PLACED RIPRAP, CLASS 2
10 CUYD $____________ $____________
A0580 25125-0000 BOULDER
12 EACH $____________ $____________
A0600 25210-0000 ROCKERY
90 SQYD $____________ $____________
A0620 27501-1000 GEOFOAM, LIGHTWEIGHT FILL MATERIAL
1,510 CUYD $____________ $____________
A0640 30302-1000 DITCH RECONDITIONING
245 LNFT $____________ $____________
A0660 30802-2000 ROADWAY AGGREGATE, METHOD 2
2,600 TON $____________ $____________
A0680 40301-0000 HOT ASPHALT CONCRETE PAVEMENT
1,200 TON $____________ $____________
A0700 41201-1000 TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
2.4 TON $____________ $____________
A0720 55101-0200 CONCRETE FILLED STEEL PIPE PILES, IN PLACE (12 x 0.5 in)
2,108 LNFT $____________ $____________
A0740 55115-1000 PREBORING
80 LNFT $____________ $____________
A0760 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
294 CUYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 11
A0780 55302-3500 PRECAST, PRESTRESSED CONCRETE SLABS , 12" NON-VOIDED
1,729 LNFT $____________ $____________
A0800 55401-1000 REINFORCING STEEL
21,101 LB $____________ $____________
A0820 55401-2000 REINFORCING STEEL, EPOXY COATED
39,948 LB $____________ $____________
A0840 55601-1300 BRIDGE RAILING, TIMBER
427 LNFT $____________ $____________
A0860 55901-0000 MEMBRANE WATERPROOFING
626 SQYD $____________ $____________
A0880 56401-1000 BEARING DEVICE, ELASTOMERIC
36 EACH $____________ $____________
A0900 60503-0000 GEOCOMPOSITE PAVEMENT EDGE DRAIN SYSTEM
580 LNFT $____________ $____________
A0920 60704-0000 CLEANING CULVERT IN PLACE
1 EACH $____________ $____________
A0940 60901-7000 CURB, LOG
950 LNFT $____________ $____________
A0960 61501-1100 SIDEWALK, ASPHALT
200 SQYD $____________ $____________
A0980 61902-0000 GATE , STEEL POST
2 EACH $____________ $____________
A1000 61920-2000 REMOVE AND RESET GATE
2 EACH $____________ $____________
A1020 62012-2000 STONE MASONRY SIGN BASE
3 CUYD $____________ $____________
A1040 62025-1000 REMOVE AND RESET STONE MASONRY , BLOCK
2 CUYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 12
A1060 62026-1000 REMOVE AND RESET STONE MASONRY , FLAGSTONE
10 SQYD $____________ $____________
A1080 62031-0000 REPOINT STONE MASONRY
185 SQFT $____________ $____________
A1100 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
40 HOUR $____________ $____________
A1120 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
18-INCH WIDTH
40 HOUR $____________ $____________
A1140 62201-3000 HYDRAULIC EXCAVATOR , 138HP MINIMUM WITH 3740LB MINIMUM
HAMMER ATTACHMENT
40 HOUR $____________ $____________
A1160 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM
CAPACITY WITH THUMB ATTACHMENT
40 HOUR $____________ $____________
A1180 62301-0000 GENERAL LABOR
40 HOUR $____________ $____________
A1200 62405-0100 PLACING CONSERVED TOPSOIL, 2-INCH DEPTH
1,300 SQYD $____________ $____________
A1220 62516-1000 MULCHING, DRY METHOD
3,050 SQYD $____________ $____________
A1240 63302-0000 SIGN SYSTEM
47.00 SQFT $____________ $____________
A1260 63302-0000 SIGN SYSTEM , GOVERNMENT-FURNISHED SIGN
36.75 SQFT $____________ $____________
A1280 63318-1000 SNOWPOLE HOLDER
80 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 13
A1300 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID WHITE HATCH LINES
125 LNFT $____________ $____________
A1320 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID WHITE PARKING LINE
55 LNFT $____________ $____________
A1340 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID WHITE STOP BAR, 12" WIDTH
250 LNFT $____________ $____________
A1360 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID DOUBLE YELLOW CENTERLINE
5,000 LNFT $____________ $____________
A1380 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID WHITE EDGE LINE
4,500 LNFT $____________ $____________
A1400 63401-0450 PAVEMENT MARKINGS, TYPE B, DOTTED WHITE EDGE LINE
750 LNFT $____________ $____________
A1420 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL
1 EACH $____________ $____________
A1440 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
10 EACH $____________ $____________
A1460 63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 42-INCH
100 EACH $____________ $____________
A1480 63502-3700 TEMPORARY TRAFFIC CONTROL, SNOWPOLE
40 EACH $____________ $____________
A1500 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
2,800 LNFT $____________ $____________
A1520 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
210 LNFT $____________ $____________
A1540 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
277.00 SQFT $____________ $____________
A1560 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
277 DAY $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 14
A1580 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER
3,000 FXHR $38.00 $114,000.00
A1600 64703-1000 MITIGATION, LANDSCAPING LOG
10 EACH $____________ $____________
A1620 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION , ISA LAKE TEMPORARY
CROSSING
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
B-1
Solicitation Provisions
WY PRA YELL10(21), ISA LAKE BRIDGE REPLACEMENT
Federal Acquisition Regulation
Representations, Certifications and Other Statements of Offeror
To the extent that any of the following Provisions may be in conflict with the Provisions in the IDIQ contract, the following Provisions will control.
The Offeror Makes the Following Representations and Certifications as a Part of its Offer.
52.204-8 Annual Representations and Certifications. (Jan 2014)
(a) (1) The North American Industry Classification (NAICS) code for this solicitation is 237310 – Highway, Street & Bridge construction.
(2) The small business size standard is $33.5 million.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b) (1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the System for Award Management, and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
[__] (i) Paragraph (d) applies.
[__] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
Completing FAR provision 52.204-8 Annual Representation and Certifications.
• This solicitation is issued under NAICS 237310 – Highway, Street & Bridge Construction with a small business size standard of $33.5 million. If your average annual gross receipts for the past 3 years are above $33.5 million you are a large business for this solicitation. If they are below $33.5 million you are a small business. Please complete the certification listed in paragraph (d).
• Before submitting bids, please ensure you have completed your annual representations and certifications electronically at the System for Award Management (SAM) website: https://www.sam.gov/portal/public/SAM/.
http://www.acquisition.gov/comp/far/current/html/52_200_206.html#wp1137850 http://www.acquisition.gov/comp/far/current/html/52_200_206.html#wp1137850 http://www.acquisition.gov/comp/far/current/html/52_200_206.html#wp1137583 http://www.acquisition.gov/comp/far/current/html/FARTOCP13.html#wp271421
B-2
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(iv) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
(B) (B) Exceed the simplified acquisition threshold; and
(C) (C) Are for contracts that will be performed in the United States or its outlying areas.
(v) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporation Representation.
This provision applies to solicitations using funds appropriated in fiscal years 2008, 2009, 2010 or 2012.
(vi) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(vii) 52.214-14, Place of Performance—Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(viii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(ix) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(x) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.
(xi) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xii) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xiii) 52.222-38, Compliance with Veterans’ Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.
(xiv) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA–designated items; or include the clause at 52.223- 2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(xv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA–designated items.
(xvi) 52.225-2, Buy American Act Certificate. This provision applies to solicitations containing the clause at 52.225-1.
(xvii) 52.225-4, Buy American Act—Free Trade Agreements—Israeli Trade Act Certificate.
(Basic, Alternates I, II and III) This provision applies to solicitations containing the clause at 52.225-3.
(A) If the acquisition value is less than $25,000, the basic provision applies.
(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.
(C) If the acquisition value is $50,000 or more but is less than $79,507, the provision with its Alternate II applies.
(D) If the acquisition value is $79,507 or more but is less than $100,000, the provision with its Alternate III applies.
http://www.acquisition.gov/comp/far/current/html/52_200_206.html#wp1137684 http://www.acquisition.gov/comp/far/current/html/52_200_206.html#wp1137777 http://www.acquisition.gov/comp/far/current/html/52_200_206.html#wp1137850 http://www.acquisition.gov/comp/far/current/html/52_200_206.html#wp1137824 http://www.acquisition.gov/comp/far/current/html/52_207_211.html#wp1140910…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .