WY PRA YELL 10(21) Isa Lake Bridge Replacement, Yellowstone National Park, Teton County, Wyoming
The work consists of bridge construction, grading, paving, embankment, drainage, lightweight fill, parking lot, sidewalk, rockery walls, masonry repairs and other small items of work.
The project includes construction of a 6 span, 176-foot long bridge with 54 precast prestressed concrete slab girders and a cast-in-place concrete deck. Abutments and bents are supported on 45 pipe piles. The work includes demolition of the existing timber bridge prior to completion of the new structure.
Project length: .26 Miles
Tentative Fixed Completion Date: Exp. Fall 2015 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $3 million to $5 million
Location: 38 Miles SE of West Yellowstone, MT
DESCRIPTION OF WORK in US CUSTOMARY UNITS
O ne
S ch ed ul e Sc h N am e
A
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion Control Devices
-Silt Fence -Sediment Wattle -Turbidity Barrier
1,060 LNFT
1,060 LNFT
185 LNFT
158 Watering for Dust Control 5,000 MGAL
DIVISION 200 – Earthwork 201 Clearing & Grubbing 0.9 203 Removal of Structures & Obstructions – Existing Isa Creek Bridge Deck and Appurtenances 1 EACH 204 Excavation & Embankment
-Roadway Excavation -Subexcavation -Select Borrow
3,180 CUYD
880 CUYD
4,670 TON
207 Earthwork Geotextiles (geotextiles) 1,840 SQYD
S ch ed ul e Sc h N
208 Structure Excavation (incidental to work) YES
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap
-Class 1 (incidental to rockery) -Class 2 -Class 3
13 CUYD
2 CUYD
5 CUYD
252 Rockery 91 SQYD
DIVISION 300 – Aggregate Courses 301 Untreated Aggregate Courses (crushed aggregate) 2,710 TON
DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Hot Asphalt Concrete Pavement (asphalt concrete pavement) 1,240 TON 412 Asphalt Tack Coat (asphalt surface treatment) 2.3 TON
DIVISION 550 – Bridge Construction 551 Driven Piles 2,108 LNFT 552 Structural Concrete (concrete – major structures) 302 CUYD 553 Prestressed Concrete (concrete prestressed)
-Slabs 1,729 LNFT 554 Reinforcing Steel
-uncoated -epoxy coated
21,101 LB
39,948 LB
556 Bridge railing 427 LNFT 559 Waterproofing (concrete – major structures) 626 SQYD 564 Bearing device 18 EACH
DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both)
-Culvert -Branch connection
153 LNFT
1 EACH
604 Manholes, Inlets, & Catch Basins(culverts & drains) (indicate which) -Inlet 1 EACH 605 Underdrains, Sheet Drains & Pavement Edge Drains (culverts & drains) (indicate which)
-Underdrains (incidental to subex) YES 609 Curb & Gutter (concrete – minor structures) (indicate which)
-Log curb 830 LNFT 615 Sidewalks, Drive Pads & Paved Medians (concrete – minor structures) 200 SQYD
S ch ed ul e Sc h N
620 Stone Masonry
-Sign base -Repoint
3 CUYD
32 SQFT
622 Rental Equipment (yes/no) Yes 624 Topsoil (landscaping & related items) 1.6 ACRE 633 Permanent Traffic Control Devices (traffic control devices)
-Signs -Remove and reset sign
-Remove and reset government -furnished sign
2 EACH
2 EACH
7 SQYD
634 Permanent Pavement Markings (traffic pavement markings) 4,900 LNFT 635 Temporary Traffic Control – Flagger 1000 FixHr 650 Temporary Diversions -Temporary Bridge over Isa Lake LPSM