WA FS ERFO 971-2023 Suiattle River Road, MP 6.0 – MP 14.4 Combined Projects, Mt. Baker Snoqualmie National Forest, Skagit & Snohomish Counties, Washington.
The work consists of grading, aggregate surfacing and base, subexcavation, asphalt concrete pavement, drainage, re-vegetation and other smaller items of work.
Project length: 2 miles total (work at multiple sites)
Tentative Fixed Completion Date: Fall 2014 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $2 million to $3 million
Location: 15 miles northeast of Darrington, Washington
DESCRIPTION OF WORK in US CUSTOMARY UNITS
Item Quantity DIVISION 150 – Project Requirements
152 Construction Survey & Staking Yes 153 Contractor Quality Control and Assurance Yes 154 Contractor Sampling & Testing Yes 155 Schedules for Construction Contracts (construction schedules) Yes 157 Soil Erosion Control Devices Temp Diversion Channel
Sediment Wattle Soil Tackifier
LPSM
28800 LNFT
8 ACRE
158 Watering for Dust Control 4000 MGAL
DIVISION 200 – Earthwork 201 Clearing & Grubbing Clearing & Grubbing
Clearing
11 ACRE
0.7 ACRE
203 Removal of Structures & Obstructions Removal of cattle guard Removal of gate
Removal of signs
1 EACH
1 EACH
1 EACH
204 Excavation & Embankment Roadway excavation
Select borrow Subexcavation
Conserved aggregate Outlet ditch
Channel modification
36130 CUYD
17000 TON
920 CUYD
590 CUYD
325 CUYD
145 CUYD
205 Rock Blasting: Controlled Blast Hole (rock blasting) 2015 LNFT 205 Blasting Consultant (Consultant/Engineering Services) Yes 207 Earthwork Geotextiles (geotextiles) Type I-A
Type III-A
870 SQYD
28610 SQYD
211 Roadway Obliteration 10000 SQYD
Item Quantity
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Class 2
Class 3 Class 4
515 CUYD
133 CUYD
230 CUYD
252 Special Rock Embankment and Rock Buttress 350 CUYD DIVISION 300 – Aggregate Courses
305 Aggregate Topsoil Course 3 CUYD 308 Minor Crushed Aggregate (crushed aggregate) 7900 CUYD
DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Hot Asphalt Concrete Pavement (asphalt concrete pavement) 1020 TON
DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both) 24 inch
36 inch 48 inch arch 72 inch arch 78 inch arch
710 LNFT
120 LNFT
100 LNFT
60 LNFT
140 LNFT
604 Manholes, Inlets, & Catch Basins Trench drain 90 LNFT 619 Fences, Gates & Cattle Guards Metal gate 1 EACH 622 Rental Equipment Yes 624 Topsoil (landscaping & related items) Place conserved topsoil 8 ACRE 625 Turf Establishment (indicate seeding or mulching separately) 8 ACRE 629 Rolled Erosion Control Products & Cellular Confinement Systems (turf establishment) 250 SQYD 633 Permanent Traffic Control Devices (traffic control devices) Sign system
Delineator
12.5 SQFT
15 EACH
634 Permanent Pavement Markings (traffic pavement markings) 20400 LNFT 635 Temporary Traffic Control – Flagger 100 HOUR