AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 June 13, 2013 N/A WA FS ERFO 071-2023 Suiattle River Road MP 6.0 – MP 14.4
Combined Projects
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
DTFH70-13-B-00009
9B. DATED (SEE ITEM 11)
June 5, 2013
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WA FS ERFO 071-2023, SUIATTLE RIVER ROAD MP 6.0 – MP 14.4 COMBINED PROJECTS
See page 2 for revisions.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A001, dated June 13, 2013 WA FS ERFO 071-2023 Solicitation No. DTFH70-13-B-00009 Suiattle River Road MP 6.0 – MP 14.4 Page 2 Combined Projects
REVISIONS ARE AS FOLLOWS:
BID SCHEDULE
Page A-9. Revises quantity for pay item 20401-0000 Roadway Excavation Page A-9. Revises quantity for pay item 20402-0000 Subexcavation Page A-9. Revises quantity for pay item 20411-0000 Select Borrow Page A-9. Revises quantity for pay item 20701-1000 Earthwork Geotextile, Type III-A (non-woven Page A-9. Revises quantity for pay item 20703-2000 Geogrid, Biaxial Page A-10. Revises quantity for pay item 30802-2000 Roadway Aggregate, Method 2 Page A-10. Revises quantity for pay item 40301-0000 Hot Asphalt Concrete Pavement Page A-12. Revises fixed hourly rate for 63509-1000 Temporary Traffic Control, Flagger
CONTRACT CLAUSES
Page C-74. Revises Clause 52.236-4 Physical Data to show that earthwork and cross-sections have been revised.
NOTE: If you previously ordered the Physical Data CD, we will send you an updated version with the revised earthwork and cross-section files. If you have not ordered the Physical Data CD previously and would like to do so now, please use the updated form posted with this amendment.
MINIMUM WAGE SCHEDULE
Page D-1 through D-40. Updates Davis-Bacon General Wage Decision Number WA1 to current effective date of June 7, 2013.
PLANS
Plan sheets #B.1 Revises quantity for pay item 20401-0000 Roadway Excavation Plan sheets #B.1 Revises quantity for pay item 20402-0000 Subexcavation Plan sheets #B.1 Revises quantity for pay item 20411-0000 Select Borrow Plan sheets #B.1 Revises quantity for pay item 20701-1000 Earthwork Geotextile, Type III-A (non-woven Plan sheets #B.1 Revises quantity for pay item 20703-2000 Geogrid, Biaxial Plan sheets #B.2 Revises quantity for pay item 30802-2000 Roadway Aggregate, Method 2 Plan sheets #B.2 Revises quantity for pay item 40301-0000 Hot Asphalt Concrete Pavement
Plan sheet #C.1 Revises Pavement Structure Quantities Plan sheet #C.2 Revises typical section No. 2, Curve Widening Table and clearing limits on
Detail E
Plan sheet #D.1 Revises Roadway Quantities Plan sheet #D.3 Revises Stationing on Plan and quantities on Profile Plan sheet #D.4 Revises quantities on Profile
Notice to Bidders: Please submit revised pages A-7 through A-12 with your bid.
Amendment No. A001, dated June 13, 2013 WA FS ERFO 071-2023 Solicitation No. DTFH70-13-B-00009 Suiattle River Road MP 6.0 – MP 14.4 Page 3 Combined Projects
ENCLOSURES
Pages:
A-7 through A-12 C-74 D-1 through D-40
Plan Sheets:
B.1 through B.2 C.1 through C.2 D.1 D.3 through D.4
Posted Separately: Amended Physical Data Request Form
A - 7
Bidders please note: Before preparing the bid, carefully read the Solicitation Provisions.
Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit bid price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the Amount Bid for the item will be based on the Unit Bid Price.
When a "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.
When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.
Total the amounts bid for all pay items and insert the total bid amount.
Bid Schedule
Project No:WA FS ERFO 071-2023
Project Name:Suiattle River Road MP 6.0 - MP 14.4 Combined Projects
A - 8
Contract Quantity Pay Items
25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
ALL LPSM $___LPSM_____ $____________
A0080 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0100 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A0120 15702-2000 SOIL EROSION CONTROL, TURBIDITY MONITORING
ALL LPSM $___LPSM_____ $____________
A0140 15703-1500 SOIL EROSION CONTROL, TEMPORARY SOIL TACKIFIER
8.0 ACRE $____________ $____________
A0160 15705-1300 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
940 LNFT $____________ $____________
A0180 15705-1500 SOIL EROSION CONTROL, SEDIMENT WATTLE
28,400 LNFT $____________ $____________
A0200 15801-0000 WATERING FOR DUST CONTROL
4,000 MGAL $____________ $____________
A0220 20101-0000 CLEARING AND GRUBBING
11.0 ACRE $____________ $____________
A0240 20104-0000 CLEARING
0.7 ACRE $____________ $____________
A0260 20301-0600 REMOVAL OF CATTLE GUARD
1 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 9
A0280 20301-1100 REMOVAL OF GATE
1 EACH $____________ $____________
A0300 20301-2400 REMOVAL OF SIGN
1 EACH $____________ $____________
A001 A0320 20401-0000 ROADWAY EXCAVATION
36,330 CUYD $____________ $____________
A001 A0340 20402-0000 SUBEXCAVATION
940 CUYD $____________ $____________
A001 A0360 20411-0000 SELECT BORROW
18,400 TON $____________ $____________
A0380 20425-1000 DITCH, EXCAVATION , OUTLET DITCH
310 LNFT $____________ $____________
A0400 20425-1000 DITCH, EXCAVATION , CHANNEL MODIFIFICATION
145 LNFT $____________ $____________
A0420 20501-0000 CONTROLLED BLAST HOLE
2,015 LNFT $____________ $____________
A0440 20701-0100 EARTHWORK GEOTEXTILE, TYPE I-A (NON-WOVEN)
870 SQYD $____________ $____________
A001 A0460 20701-1000 EARTHWORK GEOTEXTILE, TYPE III-A (NON-WOVEN)
29,100 SQYD $____________ $____________
A001 A0480 20703-2000 GEOGRID, BIAXIAL
4,220 SQYD $____________ $____________
A0500 21101-1000 ROADWAY OBLITERATION, METHOD 1
10,000 SQYD $____________ $____________
A0520 25101-3000 PLACED RIPRAP, CLASS 3 , HEADWALL
133 CUYD $____________ $____________
A0540 25101-4000 PLACED RIPRAP, CLASS 4 , ROCK ARMOR
515 CUYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 10
A0560 25101-4000 PLACED RIPRAP, CLASS 4 , CHANNEL PROTECTION
170 CUYD $____________ $____________
A0580 25101-4000 PLACED RIPRAP, CLASS 4 , ENERGY DISSIPATOR
60 CUYD $____________ $____________
A0600 25120-1000 RIPRAP DITCH, CLASS 1
4,750 LNFT $____________ $____________
A0620 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED
328 CUYD $____________ $____________
A0640 30503-0000 AGGREGATE-TOPSOIL COURSE
3 CUYD $____________ $____________
A001 A0660 30802-2000 ROADWAY AGGREGATE, METHOD 2
7,970 TON $____________ $____________
A001 A0680 40301-0000 HOT ASPHALT CONCRETE PAVEMENT
1,090 TON $____________ $____________
A0700 60201-0800 24-INCH PIPE CULVERT
710 LNFT $____________ $____________
A0720 60201-1000 36-INCH PIPE CULVERT
120 LNFT $____________ $____________
A0740 60202-0800 48-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
105 LNFT $____________ $____________
A0760 60202-1200 72-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
60 LNFT $____________ $____________
A0780 60202-1300 78-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
140 LNFT $____________ $____________
A0800 60413-0000 TRENCH DRAIN , GRATED BOX CULVERT
90 LNFT $____________ $____________
A0820 61902-1400 GATE, METAL, 16 FEET WIDTH
2 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 11
A0840 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
60 HOUR $____________ $____________
A0860 62201-1250 BULLDOZER, 120HP MINIMUM FLYWHEEL POWER
40 HOUR $____________ $____________
A0880 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM
CAPACITY WITH THUMB ATTACHMENT
60 HOUR $____________ $____________
A0900 62201-3750 CHAIN SAW , 24-INCH MINIMUM BAR LENGTH (WITHOUT OPERATOR)
20 HOUR $____________ $____________
A0920 62301-0000 GENERAL LABOR
90 HOUR $____________ $____________
A0940 62406-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH
8.0 ACRE $____________ $____________
A0960 62501-0000 TURF ESTABLISHMENT
9.1 ACRE $____________ $____________
A0980 62901-1100 ROLLED EROSION CONTROL PRODUCT, TYPE 4
250 SQYD $____________ $____________
A1000 63302-0000 SIGN SYSTEM
18.75 SQFT $____________ $____________
A1020 63309-0900 DELINEATOR, TYPE FLEXIBLE
15 EACH $____________ $____________
A1040 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID , SOLID YELLOW EDGE LINE
10,200 LNFT $____________ $____________
A1060 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID , SOLID WHITE EDGE LINE
10,200 LNFT $____________ $____________
A1080 63502-1200 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 28-INCH
42 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 12
A1100 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE , ORANGE
8,500 LNFT $____________ $____________
A1120 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
123.00 SQFT $____________ $____________
A001 A1140 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER
100 FXHR $55.00 $5,500.00
A1160 64706-1000 MITIGATION, WETLANDS MITIGATION , CREATION
6,300 SQYD $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
C-74
Contract Clauses
WA FS ERFO 071-2023, SUIATTLE RIVER ROAD MP 6.0-MP 14.4, COMBINED PROJECTS
(2) GeoTech Report 08-09, FR-26 Suiattle River Road Emergency Repairs, MP 6.0, MP 12.6 to 13.5, and MP 20.8 sites
(3) GeoTech Report 08-09, Supplemental Geotechnical Recommendations MP 12.6 to 13.5 site.
(4) GeoTech Memo 24-11, Geotechnical Recommendations, Suiattle River Road MP 6.
(5) Earthwork data listing end areas, adjusted volumes, and mass ordinates. (Revised by A001)
(6) Plotted cross-sections of earthwork. (Revised by A001)
52.236-5 Material and Workmanship (Apr 1984)
(a) All equipment, material, and articles incorporated into the work covered by this contract shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. References in the specifications to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may, at its option, use any equipment, material, article, or process that, in the judgment of the Contracting Officer, is equal to that named in the specifications, unless otherwise specifically provided in this contract.
(b) The Contractor shall obtain the Contracting Officer’s approval of the machinery and mechanical and other equipment to be incorporated into the work. When requesting approval, the Contractor shall furnish to the Contracting Officer the name of the manufacturer, the model number, and other information concerning the performance, capacity, nature, and rating of the machinery and mechanical and other equipment. When required by this contract or by the Contracting Officer, the Contractor shall also obtain the Contracting Officer’s approval of the material or articles which the Contractor contemplates incorporating into the work. When requesting approval, the Contractor shall provide full information concerning the material or articles. When directed to do so, the Contractor shall submit samples for approval at the Contractor’s expense, with all shipping charges prepaid. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection.
(c) All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may require, in writing, that the Contractor remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable.
52.236-6 Superintendence by the Contractor (Apr 1984)
At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor.
52.236-7 Permits and Responsibilities (Nov 1991)
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor’s fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.
52.236-8 Other Contracts (Apr 1984)
The Government may undertake or award other contracts for additional work at or near the site of the work under this contract. The Contractor shall fully cooperate with the other contractors and with Government employees and shall carefully adapt scheduling and performing the work under this contract
Revised by Amendment A001
D-1
Wage Determination REVISED BY AMENDMENT A001
General Decision Number: WA130001 06/07/2013 WA1
Superseded General Decision Number: WA20120001
State: Washington
Construction Type: Highway
Counties: Washington Statewide.
HIGHWAY (Excludes D.O.E. Hanford Site in Benton and Franklin Counties)
Modification Number Publication Date 0 01/04/2013 1 01/11/2013 2 01/18/2013 3 02/01/2013 4 02/08/2013 5 02/15/2013 6 02/22/2013 7 03/08/2013 8 03/15/2013 9 03/22/2013 10 04/05/2013 11 04/12/2013 12 04/19/2013 13 05/10/2013 14 06/07/2013
CARP0001-008 09/01/2009
Rates Fringes
Carpenters:
COLUMBIA RIVER AREA -
ADAMS, BENTON, COLUMBIA,
DOUGLAS (EAST OF THE 120TH
MERIDIAN), FERRY,
FRANKLIN, GRANT, OKANOGAN
(EAST OF THE 120TH
MERIDIAN) AND WALLA WALLA
COUNTIES
GROUP 1:...................$ 27.73 10.56
GROUP 2:...................$ 29.73 10.56
GROUP 3:...................$ 28.00 10.56
GROUP 4:...................$ 27.73 10.56
GROUP 5:...................$ 63.50 10.56
GROUP 6....................$ 30.75 10.56
GROUP 7....................$ 31.75 10.56
GROUP 8....................$ 28.00 10.56
GROUP 9....................$ 33.75 10.56
SPOKANE AREA: ASOTIN,
GARFIELD, LINCOLN, PEND
OREILLE, SPOKANE, STEVENS
AND WHITMAN COUNTIES
D-2
Wage Determination REVISED BY AMENDMENT A001
GROUP 1:...................$ 26.06 10.56
GROUP 2:...................$ 28.06 10.56
GROUP 3:...................$ 26.32 10.56
GROUP 4:...................$ 26.06 10.56
GROUP 5:...................$ 60.14 10.56
GROUP 6:...................$ 29.07 10.56
GROUP 7....................$ 30.07 10.56
GROUP 8....................$ 27.32 10.56
GROUP 9....................$ 33.07 10.56
CARPENTER & DIVER CLASSIFICATIONS:
GROUP 1: Carpenter
GROUP 2: Millwright, machine erector
GROUP 3: Piledriver - includes driving, pulling, cutting, placing collars, setting, welding, or creosote treated material, on all piling
GROUP 4: Bridge carpenters
GROUP 5: Diver Wet
GROUP 6: Diver Tender, Manifold Operator, ROV Operator
GROUP 7: Diver Standby, Bell/Vehicle or Submersible operator Not Under Pressure
GROUP 8: Assistant Tender, ROV Tender/Technician
GROUP 9: Manifold Operator-Mixed Gas
ZONE PAY:
ZONE 1 0-40 MILES FREE
ZONE 2 41-65 MILES $2.25/PER HOUR
ZONE 3 66-100 MILES $3.25/PER HOUR
ZONE 4 OVER 100 MILES $4.75/PER HOUR
DISPATCH POINTS:
CARPENTERS/MILLWRIGHTS: PASCO (515 N Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
CARPENTERS/PILEDRIVER: SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
CARPENTERS: WENATCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
CARPENTERS: COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
D-3
Wage Determination REVISED BY AMENDMENT A001
CARPENTERS: MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
DEPTH PAY FOR DIVERS BELOW WATER SURFACE:
50-100 feet $2.00 per foot 101-150 feet $3.00 per foot 151-220 feet $4.00 per foot 221 feet and deeper $5.00 per foot
PREMIUM PAY FOR DIVING IN ENCLOSURES WITH NO VERTICAL ASCENT:
0-25 feet Free 26-300 feet $1.00 per Foot
SATURATION DIVING:
The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
HAZMAT PROJECTS:
Anyone working on a HAZMAT job (task), where HAZMAT certification is required, shall be compensated at a premium, in addition to the classification working in as follows:
LEVEL D + $.25 per hour - This is the lowest level of protection. No respirator is used and skin protection is minimal.
LEVEL C + $.50 per hour - This level uses an air purifying respirator or additional protective clothing.
LEVEL B + $.75 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical "splash suit".
LEVEL A +$1.00 per hour - This level utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line.
CARP0003-006 10/01/2011
SOUTHWEST WASHINGTON: CLARK, COWLITZ, KLICKITAT,
LEWIS(Piledriver only), PACIFIC (South of a straight line made by extending the north boundary line of Wahkiakum County west to Willapa Bay to the Pacific Ocean), SKAMANIA AND WAHKIAKUM COUNTIES and INCLUDES THE ENTIRE PENINSULA WEST OF WILLAPA BAY
D-4
Wage Determination REVISED BY AMENDMENT A001
SEE ZONE DESCRIPTION FOR CITIES BASE POINTS
ZONE 1:
Rates Fringes
Carpenters:
CARPENTERS..................$ 32.04 14.18
DIVERS TENDERS..............$ 36.34 14.18
DIVERS......................$ 77.08 14.18
DRYWALL.....................$ 27.56 14.18
MILLWRIGHTS.................$ 32.19 14.18
PILEDRIVERS.................$ 33.04 14.18
DEPTH PAY:
50 TO 100 FEET $1.00 PER FOOT OVER 50 FEET
101 TO 150 FEET $1.50 PER FOOT OVER 101 FEET
151 TO 200 FEET $2.00 PER FOOT OVER 151 FEET
Zone Differential (Add up Zone 1 rates):
Zone 2 - $0.85 Zone 3 - 1.25 Zone 4 - 1.70 Zone 5 - 2.00 Zone 6 - 3.00
BASEPOINTS: ASTORIA, LONGVIEW, PORTLAND, THE DALLES, AND
VANCOUVER, (NOTE: All dispatches for Washington State Counties: Cowlitz, Wahkiakum and Pacific shall be from Longview Local #1707 and mileage shall be computed from that point.)
ZONE 1: Projects located within 30 miles of the respective city hall of the above mentioned cities ZONE 2: Projects located more than 30 miles and less than 40 miles of the respective city of the above mentioned cities ZONE 3: Projects located more than 40 miles and less than 50 miles of the respective city of the above mentioned cities ZONE 4: Projects located more than 50 miles and less than 60 miles of the respective city of the above mentioned cities.
ZONE 5: Projects located more than 60 miles and less than 70 miles of the respective city of the above mentioned cities ZONE 6: Projects located more than 70 miles of the respected city of the above mentioned cities
CARP0770-003 07/01/2012
Rates Fringes
Carpenters:
CENTRAL WASHINGTON:
CHELAN, DOUGLAS (WEST OF
THE 120TH MERIDIAN),
KITTITAS, OKANOGAN (WEST
OF THE 120TH MERIDIAN) AND
YAKIMA COUNTIES
D-5
Wage Determination REVISED BY AMENDMENT A001
CARPENTERS ON CREOSOTE
MATERIAL...................$ 25.93 12.60
CARPENTERS.................$ 25.83 12.60
DIVERS TENDER..............$ 39.15 12.60
DIVERS.....................$ 87.20 12.60
MILLWRIGHT AND MACHINE
ERECTORS...................$ 37.07 12.60
PILEDRIVER, DRIVING,
PULLING, CUTTING, PLACING
COLLARS, SETTING, WELDING
OR CRESOTE TREATED
MATERIAL, ALL PILING.......$ 36.22 12.60
(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL
CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS
Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities:
Seattle Olympia Bellingham Auburn Bremerton Anacortes Renton Shelton Yakima Aberdeen-Hoquiam Tacoma Wenatchee Ellensburg Everett Port Angeles Centralia Mount Vernon Sunnyside Chelan Pt. Townsend
Zone Pay:
0 -25 radius miles Free 26-35 radius miles $1.00/hour 36-45 radius miles $1.15/hour 46-55 radius miles $1.35/hour Over 55 radius miles $1.55/hour
(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT
AND PILEDRIVER ONLY)
Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center
Zone Pay:
0 -25 radius miles Free 26-45 radius miles $ .70/hour Over 45 radius miles $1.50/hour
CARP0770-006 07/07/2012
Rates Fringes
Carpenters:
WESTERN WASHINGTON:
CLALLAM, GRAYS HARBOR,
ISLAND, JEFFERSON, KING,
KITSAP, LEWIS (excludes piledrivers only), MASON, PACIFIC (North of a
D-6
Wage Determination REVISED BY AMENDMENT A001 straight line made by extending the north boundary line of Wahkiakum County west to the Pacific Ocean), PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON AND WHATCOM
COUNTIES
BRIDGE CARPENTERS..........$ 35.39 13.60
CARPENTERS ON CREOSOTE
MATERIAL...................$ 35.49 13.60
CARPENTERS.................$ 35.39 13.60
DIVERS TENDER..............$ 39.15 13.60
DIVERS.....................$ 87.20 13.60
MILLWRIGHT AND MACHINE
ERECTORS...................$ 36.39 13.60
PILEDRIVER, DRIVING,
PULLING, CUTTING, PLACING
COLLARS, SETTING, WELDING
OR CRESOTE TREATED
MATERIAL, ALL PILING.......$ 35.59 13.60
(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL
CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS
Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities:
Seattle Olympia Bellingham Auburn Bremerton Anacortes Renton Shelton Yakima Aberdeen-Hoquiam Tacoma Wenatchee Ellensburg Everett Port Angeles Centralia Mount Vernon Sunnyside Chelan Pt. Townsend
Zone Pay:
0 -25 radius miles Free 26-35 radius miles $1.00/hour 36-45 radius miles $1.15/hour 46-55 radius miles $1.35/hour Over 55 radius miles $1.55/hour
(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT
AND PILEDRIVER ONLY)
Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center
Zone Pay:
0 -25 radius miles Free 26-45 radius miles $ .70/hour Over 45 radius miles $1.50/hour
ELEC0046-001 02/04/2013
D-7
Wage Determination REVISED BY AMENDMENT A001
CALLAM, JEFFERSON, KING AND KITSAP COUNTIES
Rates Fringes
CABLE SPLICER....................$ 46.87 3%+15.96
ELECTRICIAN......................$ 42.61 3%+15.96
* ELEC0048-003 01/01/2013
CLARK, KLICKITAT AND SKAMANIA COUNTIES
Rates Fringes
CABLE SPLICER....................$ 41.85 18.44
ELECTRICIAN......................$ 38.05 18.44
HOURLY ZONE PAY:
Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities:
Portland, The Dalles, Hood River, Tillamook, Seaside and Astoria
Zone Pay:
Zone 1: 31-50 miles $1.50/hour Zone 2: 51-70 miles $3.50/hour Zone 3: 71-90 miles $5.50/hour Zone 4: Beyond 90 miles $9.00/hour
*These are not miles driven. Zones are based on Delorrne Street Atlas USA 2006 plus.
ELEC0048-029 01/01/2013
COWLITZ AND WAHKIAKUM COUNTY
Rates Fringes
CABLE SPLICER....................$ 41.85 16.39
ELECTRICIAN......................$ 38.05 16.39
ELEC0073-001 07/01/2012
ADAMS, FERRY, LINCOLN, PEND OREILLE, SPOKANE, STEVENS, WHITMAN
COUNTIES
CABLE SPLICER....................$ 31.70 15.39
ELECTRICIAN......................$ 28.82 15.39
ELEC0076-002 09/01/2012
GRAYS HARBOR, LEWIS, MASON, PACIFIC, PIERCE, AND THURSTON
D-8
Wage Determination REVISED BY AMENDMENT A001
CABLE SPLICER....................$ 37.54 21.62
ELECTRICIAN......................$ 34.13 21.62
ELEC0112-005 06/01/2012
ASOTIN, BENTON, COLUMBIA, FRANKLIN, GARFIELD, KITTITAS, WALLA
WALLA, YAKIMA COUNTIES
CABLE SPLICER....................$ 38.83 15.83
ELECTRICIAN......................$ 36.55 16.28
ELEC0191-003 06/01/2012
ISLAND, SAN JUAN, SNOHOMISH, SKAGIT AND WHATCOM COUNTIES
Rates Fringes
CABLE SPLICER....................$ 42.85 15.85
ELECTRICIAN......................$ 39.28 15.85
ELEC0191-004 07/01/2012
CHELAN, DOUGLAS, GRANT AND OKANOGAN COUNTIES
Rates Fringes
CABLE SPLICER....................$ 39.28 15.85
ELECTRICIAN......................$ 35.71 15.85
ENGI0302-003 06/01/2012
CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF
THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING,
KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN),
SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE
120TH MERIDIAN) COUNTIES
PROJECTS: CATEGORY A PROJECTS (EXCLUDES CATEGORY B PROJECTS, AS
SHOWN BELOW)
Zone 1 (0-25 radius miles):
Power equipment operators:
Group 1A...................$ 36.54 15.90 Group 1AA..................$ 37.11 15.90 Group 1AAA.................$ 37.67 15.90
D-9
Wage Determination REVISED BY AMENDMENT A001
Group 1.....................$ 35.99 15.90 Group 2.....................$ 35.50 15.90 Group 3.....................$ 35.08 15.90 Group 4.....................$ 32.72 15.90
Zone Differential (Add to Zone 1 rates):
Zone 2 (26-45 radius miles) - $1.00 Zone 3 (Over 45 radius miles) - $1.30
BASEPOINTS: Aberdeen, Bellingham, Bremerton, Everett, Kent, Mount Vernon, Port Angeles, Port Townsend, Seattle, Shelton, Wenatchee, Yakima
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1AAA - Cranes-over 300 tons, or 300 ft of boom (including jib with attachments)
GROUP 1AA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments); Tower crane over 175 ft in height, base to boom
GROUP 1A - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Crane-overhead, bridge type, 100 tons and over; Tower crane up to 175 ft in height base to boom; Loaders-overhead, 8 yards and over; Shovels, excavator, backhoes-6 yards and over with attachments
GROUP 1 - Cableway; Cranes 45 tons thru 99 tons, under 150 ft of boom (including jib with attachments); Crane-overhead, bridge type, 45 tons thru 99 tons; Derricks on building work; Excavator, shovel, backhoes over 3 yards and under 6 yards; Hard tail end dump articulating off-road equipment 45 yards and over; Loader- overhead 6 yards to, but not including 8 yards; Mucking machine, mole, tunnel, drill and/or shield; Quad 9, HD 41, D-10; Remote control operator on rubber tired earth moving equipment; Rollagon;
Scrapers-self propelled 45 yards and over; Slipform pavers;
Transporters, all truck or track type
GROUP 2 - Barrier machine (zipper); Batch Plant Operaor- Concrete; Bump Cutter; Cranes, 20 tons thru 44 tons with attachments; Crane-overhead, bridge type-20 tons through 44 tons; Chipper; Concrete Pump-truck mount with boom attachment; Crusher; Deck Engineer/Deck Winches (power);
Drilling machine; Excavator, shovel, backhoe-3yards and under; Finishing Machine, Bidwell, Gamaco and similar equipment; Guardrail punch; Horizontal/directional drill operator; Loaders-overhead under 6 yards; Loaders-plant feed; Locomotives-all; Mechanics-all; Mixers-asphalt plant;
Motor patrol graders-finishing; Piledriver (other than crane mount); Roto-mill,roto-grinder; Screedman, spreader, topside operator-Blaw Knox, Cedar Rapids, Jaeger, Caterpillar, Barbar Green; Scraper-self propelled, hard tail end dump, articulating off-road equipment-under 45 yards; Subgrade trimmer; Tractors, backhoes-over 75 hp;
Transfer material service machine-shuttle buggy, blaw
D-10
Wage Determination REVISED BY AMENDMENT A001 knox-roadtec; Truck crane oiler/driver-100 tons and over;
Truck Mount portable conveyor; Yo Yo Pay dozer
GROUP 3 - Conveyors; Cranes-thru 19 tons with attachments;
A-frame crane over 10 tons; Drill oilers-auger type, truck or crane mount; Dozers-D-9 and under; Forklift-3000 lbs.
and over with attachments; Horizontal/directional drill locator; Outside hoists-(elevators and manlifts), air tuggers, strato tower bucket elevators; Hydralifts/boom trucks over 10 tons; Loader-elevating type, belt; Motor patrol grader-nonfinishing; Plant oiler- asphalt, crusher;
Pumps-concrete; Roller, plant mix or multi-lift materials;
Saws-concrete; Scrpers-concrete and carry-all; Service engineer-equipment; Trenching machines; Truck Crane Oiler/Driver under 100 tons; Tractors, backhoe 75 hp and under
GROUP 4 - Assistant Engineer; Bobcat; Brooms; Compressor;
Concrete finish mahine-laser screed; Cranes-A frame-10 tons and under; Elevator and Manlift-permanent or shaft type;
Gradechecker, Stakehop; Forklifts under 3000 lbs. with attachments; Hydralifts/boom trucks, 10 tons and under; Oil distributors, blower distribution and mulch seeding operator; Pavement breaker; Posthole digger, mechanical;
Power plant; Pumps, water; Rigger and Bellman; Roller-other than plant mix; Wheel Tractors, farmall type;
Shotcrete/gunite equipment operator
Category B Projects: 95% of the basic hourly reate for each group plus full fringe benefits applicable to category A projects shall apply to the following projects. A Reduced rates may be paid on the following:
1. Projects involving work on structures such as buildings and bridges whose total value is less than $1.5 million excluding mechanical, electrical, and utility portions of the contract.
2. Projects of less than $1 million where no building is involved. Surfacing and paving included, but utilities excluded.
3. Marine projects (docks, wharfs, etc.) less than $150,000.
HANDLING OF HAZARDOUS WASTE MATERIALS:
Personnel in all craft classifications subject to working inside a federally designated hazardous perimeter shall be elgible for compensation in accordance with the following group schedule relative to the level of hazardous waste as outlined in the specific hazardous waste project site safety plan.
H-1 Base wage rate when on a hazardous waste site when not outfitted with protective clothing
D-11
Wage Determination REVISED BY AMENDMENT A001
H-2 Class "C" Suit - Base wage rate plus $ .25 per hour.
H-3 Class "B" Suit - Base wage rate plus $ .50 per hour.
H-4 Class "A" Suit - Base wage rate plus $ .75 per hour.
Zone Differential (Add to Zone 1 rates):
Zone 2 (26-45 radius miles) - $ .70 Zone 3 (Over 45 radius miles) - $1.00
BASEPOINTS: Aberdeen, Bellingham, Bremerton, Everett, Kent, Mount Vernon, Port Angeles, Port Townsend, Seattle, Shelton, Wenatchee, Yakima
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1AAA - Cranes-over 300 tons, or 300 ft of boom (including jib with attachments)
GROUP 1AA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments); Tower crane over 175 ft in height, base to boom
GROUP 1A - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Crane-overhead, bridge type, 100 tons and over; Tower crane up to 175 ft in height base to boom; Loaders-overhead, 8 yards and over; Shovels, excavator, backhoes-6 yards and over with attachments
GROUP 1 - Cableway; Cranes 45 tons thru 99 tons, under 150 ft of boom (including jib with attachments); Crane-overhead, bridge type, 45 tons thru 99 tons; Derricks on building work;
Excavator, shovel, backhoes over 3 yards and under 6 yards;
Hard tail end dump articulating off-road equipment 45 yards and over; Loader- overhead 6 yards to, but not including 8 yards; Mucking machine, mole, tunnel, drill and/or shield;
Quad 9, HD 41, D-10; Remote control operator on rubber tired earth moving equipment; Rollagon; Scrapers-self propelled 45 yards and over; Slipform pavers; Transporters, all truck or track type
GROUP 2 - Barrier machine (zipper); Batch Plant Operaor- Concrete; Bump Cutter; Cranes, 20 tons thru 44 tons with attachments; Crane-overhead, bridge type-20 tons through 44 tons; Chipper; Concrete Pump-truck mount with boom attachment; Crusher; Deck Engineer/Deck Winches (power);
Drilling machine; Excavator, shovel, backhoe-3 yards and under; Finishing Machine, Bidwell, Gamaco and similar equipment; Guardrail punch; Horizontal/directional drill operator; Loaders-overhead under 6 yards; Loaders-plant feed;
Locomotives-all; Mechanics-all; Mixers-asphalt plant; Motor patrol graders-finishing; Piledriver (other than crane mount); Roto-mill,roto-grinder; Screedman, spreader, topside operator-Blaw Knox, Cedar Rapids, Jaeger, Caterpillar, Barbar Green; Scraper-self propelled, hard tail end dump, articulating off-road equipment-under 45 yards; Subgrade
D-12
Wage Determination REVISED BY AMENDMENT A001 trimmer; Tractors, backhoes-over 75 hp; Transfer material service machine-shuttle buggy, blaw knox-roadtec; Truck crane oiler/driver-100 tons and over; Truck Mount portable conveyor; Yo Yo Pay dozer
GROUP 3 - Conveyors; Cranes-thru 19 tons with attachments;
A-frame crane over 10 tons; Drill oilers-auger type, truck or crane mount; Dozers-D-9 and under; Forklift-3000 lbs. and over with attachments; Horizontal/directional drill locator;
Outside hoists-(elevators and manlifts), air tuggers, strato tower bucket elevators; Hydralifts/boom trucks over 10 tons;
Loader-elevating type, belt; Motor patrol grader-nonfinishing; Plant oiler- asphalt, crusher;
Pumps-concrete; Roller, plant mix or multi-lift materials;
Saws-concrete; Scrpers-concrete and carry-all; Service engineer-equipment; Trenching machines; Truck Crane Oiler/Driver under 100 tons; Tractors, backhoe 75 hp and under
GROUP 4 - Assistant Engineer; Bobcat; Brooms; Compressor;
Concrete finish mahine-laser screed; Cranes-A frame-10 tons and under; Elevator and Manlift-permanent or shaft type;
Gradechecker, Stakehop; Forklifts under 3000 lbs. with attachments; Hydralifts/boom trucks, 10 tons and under; Oil distributors, blower distribution and mulch seeding operator;
Pavement breaker; Posthole digger, mechanical; Power plant;
Pumps, water; Rigger and Bellman; Roller-other than plant mix; Wheel Tractors, farmall type; Shotcrete/gunite equipment operator
CATEGORY B PROJECTS: 95% OF THE BASIC HOURLY RATE FOR EACH
GROUP PLUS FULL FRINGE BENEFITS APPLICABLE TO CATEGORY A
PROJECTS SHALL APPLY TO THE FOLLOWING PROJECTS. REDUCED
RATES MAY BE PAID ON THE FOLLOWING:
1. Projects involving work on structures such as buildings and bridges whose total value is less than $1.5 million excluding mechanical, electrical, and utility portions of the contract.
2. Projects of less than $1 million where no building is involved. Surfacing and paving including, but utilities excluded.
3. Marine projects (docks, wharfs, ect.) less than $150,000.
HANDLING OF HAZARDOUS WASTE MATERIALS: Personnel in all craft classifications subject to working inside a federally designed hazardous perimeter shall be elgible for compensation in accordance with the following group schedule relative to the level of hazardous waste as outlined in the specific hazardous waste project site safety plan.
H-1 Base wage rate when on a hazardous waste site when not outfitted with protective clothing.
H-2 Class "C" Suit - Base wage rate plus $.25 per hour.
H-3 Class "B" Suit - Base wage rate plus $.50 per hour.
H-4 Class "A" Suit - Base wage rate plus $.75 per hour.
D-13
Wage Determination REVISED BY AMENDMENT A001
ENGI0370-002 06/01/2012
ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN),
COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY,
FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH
MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN
AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES
ZONE 1:
GROUP 1A...................$ 25.21 12.60
GROUP 1.....................$ 25.21 12.60
GROUP 2.....................$ 25.53 12.60
GROUP 3.....................$ 26.14 12.60
GROUP 4.....................$ 26.30 12.60
GROUP 5.....................$ 26.46 12.60
GROUP 6.....................$ 26.74 12.60
GROUP 7.....................$ 27.01 12.60
GROUP 8.....................$ 28.11 12.60
ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00
Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;
Lewiston, Idaho
Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1A: Boat Operator; Crush Feeder; Oiler; Steam Cleaner
GROUP 1: Bit Grinders; Bolt Threading Machine; Compressors (under 2000 CFM, gas, diesel, or electric power); Deck Hand; Fireman & Heater Tender; Hydro-seeder, Mulcher, Nozzleman; Oiler Driver, & Cable Tender, Mucking Machine;
Pumpman; Rollers, all types on subgrade, including seal and chip coatings (farm type, Case, John Deere & similar, or Compacting Vibrator), except when pulled by Dozer with operable blade; Welding Machine; Crane Oiler-Driver (CLD required) & Cable Tender, Mucking Machine
GROUP 2: A-frame Truck (single drum); Assistant Refrigeration Plant (under 1000 ton); Assistant Plant Operator, Fireman or Pugmixer (asphalt); Bagley or Stationary Scraper; Belt Finishing Machine; Blower Operator (cement); Cement Hog;
Compressor (2000 CFM or over, 2 or more, gas diesel or electric power); Concrete Saw (multiple cut); Distributor Leverman; Ditch Witch or similar; Elevator Hoisting Materials; Dope Pots (power agitated); Fork Lift or Lumber Stacker, hydra-lift & similar; Gin Trucks (pipeline);
Hoist, single drum; Loaders (bucket elevators and
D-14
Wage Determination REVISED BY AMENDMENT A001 conveyors); Longitudinal Float; Mixer (portable-concrete);
Pavement Breaker, Hydra-Hammer & similar; Power Broom;
Railroad Ballast Regulation Operator (self-propelled);
Railroad Power Tamper Operator (self-propelled); Railroad Tamper Jack Operator (self-propelled; Spray Curing Machine (concrete); Spreader Box (self-propelled); Straddle Buggy (Ross & similar on construction job only); Tractor (Farm type R/T with attachment, except Backhoe); Tugger Operator
GROUP 3: A-frame Truck (2 or more drums); Assistant Refrigeration Plant & Chiller Operator (over 1000 ton);
Backfillers (Cleveland & similar); Batch Plant & Wet Mix Operator, single unit (concrete); Belt-Crete Conveyors with power pack or similar; Belt Loader (Kocal or similar);
Bending Machine; Bob Cat (Skid Steer); Boring Machine (earth); Boring Machine (rock under 8 inch bit) (Quarry Master, Joy or similar); Bump Cutter (Wayne, Saginau or similar); Canal Lining Machine (concrete); Chipper (without crane); Cleaning & Doping Machine (pipeline); Deck Engineer; Elevating Belt-type Loader (Euclid, Barber Green & similar); Elevating Grader-type Loader (Dumor, Adams or similar); Generator Plant Engineers (diesel or electric);
Gunnite Combination Mixer & Compressor; Locomotive Engineer; Mixermobile; Mucking Machine; Posthole Auger or Punch; Pump (grout or jet); Soil Stabilizer (P & H or similar); Spreader Machine; Dozer/Tractor (up to D-6 or equivalent) and Traxcavator; Traverse Finish Machine;
Turnhead Operator
GROUP 4: Concrete Pumps (squeeze-crete, flow-crete, pump-crete, Whitman & similar); Curb Extruder (asphalt or concrete); Drills (churn, core, calyx or diamond);
Equipment Serviceman; Greaser & Oiler; Hoist (2 or more drums or Tower Hoist); Loaders (overhead & front-end, under 4 yds. R/T); Refrigeration Plant Engineer (under 1000 ton);
Rubber-tired Skidders (R/T with or without attachments);
Surface Heater & Plant Machine; Trenching Machines (under 7
ft. depth capacity); Turnhead (with re-screening); Vacuum Drill (reverse circulation drill under 8 inch bit)
GROUP 5: Backhoe (under 45,000 gw); Backhoe & Hoe Ram (under 3/4 yd.); Carrydeck & Boom Truck (under 25 tons); Cranes (25 tons & under), all attachments including clamshell, dragline; Derricks & Stifflegs (under 65 tons); Drilling Equipment(8 inch bit & over) (Robbins, reverse circulation & similar); Hoe Ram; Piledriving Engineers; Paving (dual drum); Railroad Track Liner Operaotr (self-propelled);
Refrigeration Plant Engineer (1000 tons & over); Signalman (Whirleys, Highline Hammerheads or similar); Grade Checker
GROUP 6: Asphalt Plant Operator; Automatic Subgrader (Ditches & Trimmers)(Autograde, ABC, R.A. Hansen & similar on grade wire); Backhoe (45,000 gw and over to 110,000 gw); Backhoes & Hoe Ram (3/4 yd. to 3 yd.); Batch Plant (over 4 units);
Batch & Wet Mix Operator (multiple units, 2 & incl. 4);
Blade Operator (motor patrol & attachments); Cable Controller (dispatcher); Compactor (self-propelled with
D-15
Wage Determination REVISED BY AMENDMENT A001 blade); Concrete Pump Boom Truck; Concrete Slip Form Paver;
Cranes (over 25 tons, to and including 45 tons), all attachments including clamshell, dragline; Crusher, Grizzle & Screening Plant Operator; Dozer, 834 R/T & similar; Drill Doctor; Loader Operator (front-end & overhead, 4 yds. incl.
8 yds.); Multiple Dozer Units with single blade; Paving Machine (asphalt and concrete); Quad-Track or similar equipment; Rollerman (finishing asphalt pavement); Roto Mill (pavement grinder); Scrapers, all, rubber-tired;
Screed Operator; Shovel(under 3 yds.); Trenching Machines (7 ft. depth & over); Tug Boat Operator Vactor guzzler, super sucker; Lime Batch Tank Operator (REcycle Train);
Lime Brain Operator (Recycle Train); Mobile Crusher Operator (Recycle Train)
GROUP 7: Backhoe (over 110,000 gw); Backhoes & Hoe Ram (3 yds & over); Blade (finish & bluetop) Automatic, CMI, ABC, Finish Athey & Huber & similar when used as automatic;
Cableway Operators; Concrete Cleaning/Decontamination machine operator; Cranes (over 45 tons to but not including 85 tons), all attachments including clamshell and dragine;
Derricks & Stiffleys (65 tons & over); Elevating Belt (Holland type); Heavy equipment robotics operator; Loader (360 degrees revolving Koehring Scooper or similar);
Loaders (overhead & front-end, over 8 yds. to 10 yds.);
Rubber-tired Scrapers (multiple engine with three or more scrapers); Shovels (3 yds. & over); Whirleys & Hammerheads, ALL; H.D. Mechanic; H.D. Welder; Hydraulic Platform Trailers (Goldhofer, Shaurerly andSimilar); Ultra High Pressure Wateriet Cutting Tool System Operator (30,000 psi); Vacuum Blasting Machine Operator
GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower), all attachments including clamshell, dragline; Loaders (overhead and front-end, 10 yards and over); Helicopter Pilot
BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale
NOTE:
In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.
HAZMAT:
Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.
ENGI0612-006 07/01/2012
LEWIS,PIERCE, PACIFIC (portion lying north of a parallel line extending west from the northern boundary of Wahkaikum County to the sea) AND THURSTON COUNTIES
ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH
D-16
Wage Determination REVISED BY AMENDMENT A001
GROUP SHALL BE 90% OF THE BASE RATE PLUS FULL FRINGE BENEFITS.
ON ALL OTHER WORK, THE FOLLOWING RATES APPLY.
Zone 1 (0-25 radius miles):
GROUP 1A...................$ 36.54 15.90
GROUP 1AA..................$ 37.11 15.90
GROUP 1AAA.................$ 37.67 15.90
GROUP 1.....................$ 35.99 15.90
GROUP 2.....................$ 35.50 15.90
GROUP 3.....................$ 35.08 15.90
GROUP 4.....................$ 32.72 15.90
Zone Differential (Add to Zone 1 rates):
Zone 2 (26-45 radius miles) = $ .70 Zone 3 (Over 45 radius miles) - $1.00
BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1 AAA - Cranes-over 300 tons or 300 ft of boom (including jib with attachments)
GROUP 1AA - Cranes- 200 tonsto 300 tons, or 250 ft of boom (including jib with attachments; Tower crane over 175 ft in height, bas to boom
GROUP 1A - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Crane-overhead, bridge type, 100 tons and over; Tower crane up to 175 ft in height base to boom; Loaders-overhead, 8 yards and over; Shovels, excavator, backhoes-6 yards and over with attachments
GROUP 1 - Cableway; Cranes 45 tons thru 99 tons under 150 ft of boom (including jib with attachments); Crane-overhead, bridge type, 45 tons thru 99 tons; Derricks on building work; Excavator, shovel, backhoes over 3 yards and under 6 yards; Hard tail end dump articulating off-road equipment 45 yards and over; Loader- overhead, 6 yards to, but not including, 8 yards; Mucking machine, mole, tunnel, drill and/or shield; Quad 9 HD 41, D-10; Remote control operator on rubber tired earth moving equipment; Rollagon; Scrapers-self-propelled 45 yards and over; Slipform pavers;
Transporters, all track or truck type
GROUP 2 - Barrier machine (zipper); Batch Plant Operator-concrete; Bump Cutter; Cranes, 20 tons thru 44 tons with attachments; Crane-Overhead, bridge type, 20 tons through 44 tons; Chipper; Concrete pump-truck mount with boom attachment; Crusher; Deck engineer/deck winches (power);
Drilling machine; Excavator, shovel, backhoe-3 yards and under; Finishing machine, Bidwell, Gamaco and similar
D-17
Wage Determination REVISED BY AMENDMENT A001 equipment; Guardrail punch; Loaders, overhead under 6 yards; Loaders-plant feed; Locomotives-all; Mechanics- all;
Mixers, asphalt plant; Motor patrol graders, finishing;
Piledriver (other than crane mount); Roto-mill, roto-grinder; Screedman, spreader, topside operator-Blaw Knox, Cedar Rapids, Jaeger, Caterpillar, Barbar Green;
Scraper-self- propelled, hard tail end dump, articulating off-road equipment- under 45 yards; Subgrader trimmer;
Tractors, backhoe over 75 hp; Transfer material service machine-shuttle buggy, Blaw Knox- Roadtec; Truck Crane oiler/driver-100 tons and over; Truck Mount Portable Conveyor; Yo Yo pay
GROUP 3 - Conveyors; Cranes through 19 tons with attachments;
Crane-A-frame over 10 tons; Drill oilers-auger type, truck or crane mount; Dozer-D-9 and under; Forklift-3000 lbs. and over with attachments; Horizontal/directional drill locator; Outside Hoists-(elevators and manlifts), air tuggers, strato tower bucket elevators; Hydralifts/boom trucks over 10 tons; Loaders-elevating type, belt; Motor patrol grader-nonfinishing; Plant oiler- asphalt, crusher;
Pump-Concrete; Roller, plant mix or multi-lfit materials;
Saws-concrete; Scrapers, concrete and carry all; Service engineers-equipment; Trenching machines; Truck crane oiler/driver under 100 tons; Tractors, backhoe under 75 hp
GROUP 4 - Assistant Engineer; Bobcat; Brooms; Compressor;
Concrete Finish Machine-laser screed; Cranes A-frame 10 tons and under; Elevator and manlift (permanent and shaft type); Forklifts-under 3000 lbs. with attachments;
Gradechecker, stakehop; Hydralifts/boom trucks, 10 tons and under; Oil distributors, blower distribution and mulch seeding operator; Pavement breaker; Posthole digger-mechanical; Power plant; Pumps-water; Rigger and Bellman; Roller-other than plant mix; Wheel Tractors, farmall…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .