AK PRA DENA 10(29), East Fork Toklat River Road Bridge Repairs, In Denali National Park And Preserve, Denali Borough, Alaska.
The work consists of rehabilitation of bridge bearings and abutments along with the installation of scupper extensions and an anchor system and other small items of work.
Tentative Fixed Completion Date: Fall 2013 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: Less than $500,000.00
Location: The project work is located at milepost 43.5 of the Denali Park Road.
DESCRIPTION OF WORK in US CUSTOMARY UNITS
DIVISION 150 – Project Requirements 151 Mobilization Yes 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Testing (yes/no) Yes 155 Schedules for Construction Contracts (yes/no) Yes 157 Soil Erosion Control Devices (silt fence) 200 LNFT DIVISION 200 – Earthwork 208 Structure Excavation 25 CUYD DIVISION 250 – Slope Reinforcement and Retaining Walls 253 Gabions (galvanized or aluminum coated baskets) 100 SQFT DIVISION 550 – Bridge Construction 552 Structural Concrete (class A (AE) ) 10 CUYD 552 Structural Concrete (repair concrete) Yes 554 Reinforcing Steel 1650 LB 562 Temporary Support Structure Yes 564 Bearing Device (elastometeric) 16 EACH 575 Minor Bridge Work (Bearing removal, resin bonded anchor system, drainage trench, scupper extensions) Yes DIVISION 600 – Incidental Construction 635 Temporary Traffic Control Yes
| DIVISION 200 – Earthwork |
| DIVISION 250 – Slope Reinforcement and Retaining Walls |
| DIVISION 550 – Bridge Construction |