AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A002 12-03-2012 N/A AK PRA DENA 10(29), East Fork

Toklat River Road Bridge Repairs

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

DTFH70-12-B-00010

9B. DATED (SEE ITEM 11)

10/19/2012

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

( __ ) is extended, ( X ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

AK PRA DENA 10(29), East Fork Toklat River Road Bridge Repairs

SPECIAL CONTRACT REQUIREMENTS

Page E-18, Subsection 107-13, Contractor Housing. Adds Subsection 107-13, Contractor Housing.

ENCLOSURES

Pages: E-18 through E-18b

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

E-18

Special Contract Requirements Project: AK PRA DENA 10(29), East Fork Toklat River Road Bridge Repairs

(q) If previously unknown cultural resources are located during construction, halt the project in the discovery area until cultural resource staff determines the significance of the finding.

Mitigation standards will be established by others to limit any damage to the cultural information present at the sites.

107.12 Remedial Action (Added Subsection).

Upon receipt of an allegation of non-compliance with traffic laws, public courtesy, or specific requirements of Section 107, the Contractor shall provide the alleged violators name, contact information, company name, and company contact information to the CO within 24 hours.

Should the CO determine that the incident documentation likely substantiates non-compliance, the CO may require the Contractor to prohibit the individual from continued performance of the work activity within the Park boundary (e.g., prohibiting the individual from driving within the park boundary due to non-compliance with speed limits).

107.13 Contractor Housing. (Added Subsection).

Government facilities are not available for use, including but not limited to laundry facilities, showers, restrooms, communication services, and the camp recreation hall.

Establishment of a construction camp/housing facility will be permitted in the park at the Toklat Road Camp (MP 53.38) according to the following restrictions. Submit the exact number of housing units, occupancy, and configuration for approval by the CO at the preconstruction conference.

(a) Toklat Road Camp. Up to eight Recreational Vehicle (RV) sites at the Toklat Road Camp area may be used as sites for Contractor’s office trailer, and Contractor housing/mess/shower trailer(s). Additionally, four dry camp sites without hookups are available. Water, sewer, trash pickup, and limited electrical power will be available seasonally to the 8 RV sites as follows:

(1) Potable water, sewer and household trash pickup service at Toklat Road Camp will be available mid-May through mid-September during the 2013 construction season. Exact dates are subject to adjustment pending weather conditions, access conditions, and operational requirements as determined solely by the Park. Pay the NPS a fee of $750.00 per week for up to 12 sites for use of their potable water, sewer, and household trash pickup service. Pay the fee beginning when the sites are occupied, continuing until they are unoccupied or services cease. Prior to mid-May and after mid-September, all potable water, sewer, and household trash pickup services will be Contractor furnished.

(2) Power service at Toklat Road Camp is limited in availability, quantity and quality. Power service begins as early as May 15, 2013 and ends as late as September 20, 2013. Dates are subject to adjustment pending weather conditions, access conditions, and operational requirements as determined solely by the Park. The Government will measure the Contractor’s electricity usage. The Government will provide up to four kilowatts of electricity per day for the construction season. The Contractor is required to provide his/her own electrical generator and is required to use it for additional electrical needs. A transfer switch isolating the RV loop will be provided by the Park. NPS is not responsible for damage resulting from power quality from NPS sources. The Contractor provided generator must be a fully case enclosed generator with a maximum noise level of 63db. Multiple generators are not permitted.

Revised by Amendment A002

E-18a

(3) Submit an off-season utility plan for approval by the CO at the preconstruction conference. Do not modify NPS utility systems without prior approval of the CO.

(4) Toklat Road Camp has ongoing gravel pit operations. Utilization of the Toklat Road Camp as a housing location is subject to all applicable regulations including, but not limited to, Mine Safety and Health Administration requirements for worker housing at gravel pit operational sites.

(b) The use of dry camp sites and truck tractor sleeper cabs will be allowed at Toklat Road Camp and subject to the restrictions below:

(1) Truck tractor sleeper cabs may be used by drivers for sleeping at Toklat Road Camp in an area designated by the CO;

(2) Outside cooking and food storage will not be allowed; and

(3) NPS will not provide utility hookups (sewer, water, or electricity) for dry camp sites. No gray or black water will be allowed to be discharged to the ground. All gray and black water must be contained in a holding tank. There will be a location provided to obtain potable water and where the holding tanks may be emptied. Supply all necessary sanitary facilities for sleeper cab users. Contractor may provide power generator(s) for dry camp sites according to Subsection 107.13(a)(2). Do not run the generator between the hours of 9:00 p.m. to 7:00 a.m.

(c) General camp provisions.

(1) Keep camp neat and clean. Upon completion of the work, remove all vehicles, trailers, equipment, and materials from the camp site and restore the site to its pre-use condition

(2) NPS will provide kitchen and food waste trash disposal at Toklat Road Camp.

(3) Use private vehicles on Denali Park Road for work related trips only. Persons visiting Contractor employees are required to use the Park bus system for travel on the Denali Park Road.

(4) Ice chests, coolers and food containers are not to be stored outside. Garbage that contains food waste must be disposed of in bear proof containers and hauled to Toklat Road Camp daily, to a location designated by the CO, for disposal by the Government. When the Toklat Road Camp is not maintained by the Government, from mid-September to mid-May, food waste garbage must be disposed of in bear proof containers and hauled outside of the Park weekly.

(5) Do not put cigarette butts on the ground at any time, in any location.

(d) Other provisions.

(1) Cellular phone service is not available at Toklat Road Camp. NPS communication systems, including satellite internet or phone systems, are not available for use. The Contractor may consider satellite phones and/or internet for communication.

E-18b

This page intentionally left blank