INVITATION FOR BIDS

Solicitation No. DTFH70-12-B-00002

OR PFH 163(14)

CROWN POINT VIADUCT RESTORATION PROJECT

Solicitation, Offer & Award, Bid Schedule, Contract Clauses, Minimum Wage Schedule, Special Contract Requirements, and Plans

This solicitation cites

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 U.S. Customary

ISSUING OFFICE:

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

610 EAST FIFTH STREET

VANCOUVER, WA 98661-3801

Phone: (360) 619-7520 – FAX: (360) 619-7932 Web site: http://www.wfl.fhwa.dot.gov/contracting/ e-mail : wfl.contracts@dot.gov

Bid Opening Date:

See Page A-3, Block 13A

QUICK INDEX

Page Item --- Bid Submittal Checklist --- Authority to Sign --- Bid Bond --- Table of Contents A-1 Notice to Bidders A-3 SF 1442, Solicitation, Offer and

Award A-6a Subcontracting Plan A-7 Bid Schedule B-1 Solicitation Provisions C-1 Contract Clauses D-1 Davis-Bacon Wage Rates E-1 Special Contract Requirements H-1 Reserved I-1 Erosion and Sediment Control

Plan

BID REMINDERS

Electronic bids will not be accepted. Submit printed copy of bid to the address listed on the enclosed SF 1442. Before submitting your bid, please review the following:

• Have you rechecked your bid figures?

• Have you completed the bid schedule?

• Have you completed and signed the SF 1442, Solicitation, Offer & Award?

• Have you acknowledged all amendments?

• Have you completed the Representations &

Certifications (Page B-1)?

• Is your bid guarantee enclosed in proper form and amount (see FAR Clause 52.228-1), including Power of Attorney affidavit?

• Does the lower left corner of the proposal envelope state “Bid Enclosed”?

• Does the lower left corner include the Solicitation Number and the project number/name?

A-1 Notice to Bidders http://www.wfl.fhwa.dot.gov/contracting/ mailto:wfl.contracts@fhwa.dot.gov

PROJECT NAME OR PFH 163(14)

BEGINNING AT 3+90.00 (MP 8.83)

ENDING AT 169+00.00 (MP 11.96)

NATIONAL SCENIC COLUMBIA RIVER GORGE

AREA

COUNTY MULTNOMAH

STATE OREGON

LENGTH 3.13 MILES

FIXED COMPLETION DATE See FAR Clause 52.211-10 (FAR Clauses begin on page C-1)

Bid Submittal Checklist

Project: OR PFH 163(14), Crown Point Viaduct Restoration Project

Before submitting your bid, please review the following:

Done?

Is this in the envelope?

Bid Envelope

Did I correctly address the envelope? (See page A-3, blocks 7 & 8) Does the lower left corner of the envelope include the Solicitation Number and the project name/number?

Pages A-3 & A-4 (SF 1442, Solicitation Offer & Award) Did I include our firm name and address in block 14?

Did I include our firm’s phone number in block 15?

Did I include our firm’s remittance address in block 16?

(Use when different than block 14)

Did I include my DUNS number?

Did I include the number & date of all amendments in block 19?

Did the appropriate official sign/date in block 20A, 20B & 20C?

Bid Schedule (see page A-7) Did I insert “Unit Bid Price” and “Amount Bid” for each bid item?

Did the appropriate official initial corrections?

Did I include the “Total” on the last page of each bid schedule?

Did I include the firm’s name on the last page of each bid schedule?

When applicable, did I include the totals for each schedule in the summary page? (See last page of bid schedules.)

Bid Bond (Standard Form 24) Bids received without a valid bid bond will be rejected.

Did I complete my bid bond correctly?

Did I attach the Power of Attorney to the bid bond?

Authority to Sign Did I include a completed form for each person signing the SF1442 and Bid Bond?

Representations & Certifications & FAR Clause Did I include the completed B-pages (beginning on B-1)?

Did I include the completed clause 1252.228-73 Notification of Miller Act Payment Bond Protection (See page C-96)?

HUBZone Information If you are a HUBZone firm, did you include the HUBZone Firm Form?

Online Representations & Certifications Application (ORCA) http://orca.bpn.gov Do we have up-to-date data in ORCA ?

Central Contractor Registration (CCR) http://www.ccr.gov Did I ensure our firm is currently registered in CCR?

Vets100 Reporting https://vets100.vets.dol.gov/ Did I ensure our firm has completed this annual report?

NOTE: The Contractor is fully responsible to verify that all data is correct each time a bid package is submitted. Failure to properly input and/or update your data may cause the bid to be rejected.

http://orca.bpn.gov/ http://www.ccr.gov/ https://vets100.vets.dol.gov/

Project: OR PFH 163(14), Crown Point Viaduct Restoration Project

Driving Directions to our Vancouver Washington Office:

See our web page at http://www.wfl.fhwa.dot.gov/about/directions.htm http://www.wfl.fhwa.dot.gov/about/directions.htm

HUBZone Firm Information

HUBZone Table

HUBZone firms must show that their firm will meet the “50%” requirement of FAR Clause 52.219-3 Notice of Small Business Set Aside or FAR Clause 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns before their bid can be considered responsive. To make this determination, we ask that you submit the following with your bid:

• Completed table (below)

Please include information on the prime HUBZone firm, and all subcontractors (including HUBZone subs.) NOTE: You may create your own version of this form as long as the information is the same.

Company Name Type of work performed HUBZone?

(Yes/No)

Estimated Labor cost

HUBZone Firm Labor cost

Non -HUBZone Firm Labor Cost

Prime Contractor Information

Subcontractor Information

Totals

Percent of Total Labor Cost

HUBZone Firm Information

HUBZone Table

RESERVED

Authority to Sign

INSTRUCTIONS: When the offeror/ p rinc ipa l is a c orpora tion, inc lude this c ertific a tion with your offer/ b id .

Corporate Certificate

I, ____________________________________________ (name), certify that I am the

________________________________________(title), of the corporation named as the Offeror/Principal herein;

that _________________________________________(name), who signed this offer and/or bid bond on behalf of ___________________________ (c ompany name) is

________________________________________ (title) of this corporation;

that the offer was duly signed for and on behalf of said corporation by authority and scope of its governing body, and within the scope of its corporate powers.

_____________________________________ (signature) Affix Corporate Seal

_____________________________________ (title)

INSTRUCTIONS: When the offeror/ p rinc ipa l is a limited liab ility c ompany, inc lude this c ertific a tion with your offer/ b id .

Limited Liability Certificate

I, ____________________________________________ (name), certify that I am the

________________________________________(title), of the limited liability company named as the Offeror/Principal herein;

that _________________________________________(name), who signed this offer and/or bid bond on behalf of ___________________________ (c ompany name) is

________________________________________ (title) of this company;

that the offer was duly signed for and on behalf of said company by authority and scope of its governing body, and within the scope of its powers.

_____________________________________ (signature) Affix Company Seal (as applicable) __________ _________________________ (title)

INSTRUCTIONS: When the offeror/ p rinc ipa l is a partnership , inc lude this

Authority to Bind Partnership

This certifies that the names and signatures of all partners are listed below, and that the person signing the proposal has the authority to actually bind the partnership pursuant to its partnership agreement. Each of the partners individually has full authority to enter into and execute contractual instruments on behalf of said partnership, except as follows:

(State “None” or describe limitations, if any)

This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledge by the Contracting Officer.

(Include names and signatures of all partners)

INSTRUCTIONS: When the offeror/ p rinc ipa l is a jo int venture, inc lude this

Authority to Bind Joint Venture

This certifies that the person signing the proposal has the authority to actually bind the joint venture pursuant to its joint venture agreement, and that each of the named persons listed below individually has full authority to enter into and execute contractual instruments on behalf of said joint venture, except as follows:

(State “None” or describe limitations, if any)

This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledge by the Contracting Officer.

(Include names and signatures of all applicable individuals)

INSTRUCTIONS: When the offeror/ p rinc ipa l is a sole p roprietorship , the signa ture on the offer/ b id and on the bonds must be as fo llows:

Sole Proprietorship Requirement

An Offeror/Principal that is a sole proprietorship must submit an offer/bid and a bond signed by the sole proprietor, or by one duly authorized to sign for the sole proprietor.

If the signature is by someone other than the sole proprietor, a copy of the power of attorney authorizing the individual to sign must be provided with the offer/bid.

BID BOND

( See instructions on reverse)

DATE BOND EXECUTED (Must not be later than bid opening date) OMB NO.: 9000-0045

Expires: 11/30/2012 Public reporting burden for this collection of information is estimated to average 25 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspects of this collection of information, including suggestions for reducing this burden, to the FAR Secretariat (MVR), Federal Acquisition Policy Division, GSA, Washington, DC 20405.

PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION ("X" one)

INDIVIDUAL

JOINT VENTURE

PARTNERSHIP

CORPORATION

STATE OF INCORPORATION

SURETY(IES) (Name and business address)

PERCENT

OF BID

PRICE

PENAL SUM OF BOND

AMOUNT NOT TO EXCEED

MILLION (S) THOUSAND(S) HUNDRED(S) CENTS

BID IDENTIFICATION

BID DATE

FOR (Construction, supplies, or Services)

INVITATION NO.

OBLIGATION

We, the Principal and Surety (ies) are firmly bound to the United States of America (hereinafter call the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit or liability is the full amount of the penal sum.

CONDITIONS:

The principal has submitted the bid identified above.

THEREFORE:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10 days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to executes such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each surety executing this instrument agrees that its obligations is not impaired by any extension(s) of the time for acceptance of the bid that the principal may grand to the Government. Notice to the surety (ies) of extensions (s) are waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the periods originally allowed for acceptance of the bid.

WITNESS

The principal and Surety (ies) executed this bid bond and affixed their seals on the above date.

PRINCIPAL

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1. 2.

2.

3.

3.

(Seal) (Seal) (Seal) Corporate Seal

INDIVIDUAL SURETY(IES)

SIGNATURE(S)

NAME(S)

(Typed)

1.

1.

2.

2.

(Seal) (Seal)

CORPORATE SURETY(IES)

SU

R

ET

Y

A

NAME &

ADDRESS

STATE OF INC. LIABILITY LIMIT ($)

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1.

2.

2. Corporate Seal

AUTHORIZED FOR LOCAL REPRODUCTION

Pervious edition is usable

STANDARD FORM 24 (REV. 10-98)

Prescribed by GSA - FAR (48 CFR) 53.228(a)

DTFH70-12-B-00002

OR PFH 163(14)

Crown Point Viaduct Restoration Project

SU

R

ET

Y

B

NAME &

ADDRESS

STATE OF INC. LIABILITY LIMIT ($)

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1.

2.

2. Corporate Seal

Corporate Seal

LIABILITY LIMIT ($)STATE OF INC.

2.

2.

1.

1.NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

SU

R

ET

Y

C

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INC.

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

SU

R

ET

Y

D

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INC.

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

SU

R

ET

Y

E

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INC.

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

SU

R

ET

Y

F

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INC.

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

SU

R

ET

Y

G

INSTRUCTIONS

1. This form is authorized for use when a bid guaranty is required. any deviation from this form will require the written approval of the Administrator of General Services.

2, Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., ab attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporation executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitation listed therein. where more than one corporate surety is involved, their names and address shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY (IES)." In the space designed "SURETY (IES)" on the face of the form, insert only the letter identification of the sureties.

(b) Where individual sureties are involved, a completed Affidavit of Individual surety (Standard Form 28), or each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word " Corporate Seal";

and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "Offeror."

STANDARD FORM 24 (REV. 10-98) BACK

Table of Contents

03USC10/06/11

TABLE OF CONTENTS

DESCRIPTION PAGE

Notice to Bidder .................................................................................................................... A-1

Solicitation, Offer, and Award (SF 1442) .............................................................................. A-3

Bid Schedule .......................................................................................................................... A-7

Solicitation Provisions ........................................................................................................... B-1

Contract Clauses .................................................................................................................... C-1

Minimum Wage Schedule ...................................................................................................... D-1

SCRs Table of Contents

SPECIAL CONTRACT REQUIREMENTS (SCRs)

The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-03) U.S.

Customary Version, U.S. Department of Transportation, Federal Highway Administration.

Division 100..................................................................................................................... E-1 Division 150..................................................................................................................... E-25

Division 200..................................................................................................................... F-1

Division 250..................................................................................................................... F-9 Division 300..................................................................................................................... F-19 Division 400..................................................................................................................... F-20 Division 550..................................................................................................................... F-28 Division 600..................................................................................................................... F-72

Division 700.................................................................................................................... G-1

Reserved ................................................................................................................................. H-1

Erosion and Sediment Control Plan ......................................................................................... I-1

Table of Contents

(This page intentionally left blank)

A-1

Notice to Bidder Project: OR PFH 163(14), Crown Point Viaduct Restoration Project

NOTICE TO BIDDERS

I. Project Location.

The project work is located along the Historic Columbia River Highway approximately 10 miles east of Troutdale, Oregon in Multnomah County. Approximate Global Positioning System (GPS) coordinates for the beginning of the project are 45.531581, -122.253242.

Signs have not been erected to identify the project limits. No Government personnel will be available for show-me tours.

The Historic Columbia River Highway is designated as a historic highway according to the Historic Preservation Act, 16 USC 470 Section 106, 36 CFR 60, and by Oregon Revised Statute

366.550. The highway and its structures are protected resources and cannot be altered, damaged, or removed without prior approval. Extreme care must be exercised when working around or adjacent to existing highway structures. Protection of the highway resources is critical. Pay attention to the requirements of Sections 107, 413, 609, and 620.

Work on the project is also located within the Columbia River Gorge National Scenic Area (CRGNSA). Disposal of material will not be permitted within the boundaries of the CRGNSA unless indicated in the plans or specifications.

This solicitation includes electronic plan sheets. Plan sheets can be found at http://www.wfl.fhwa.dot.gov/contracting/construction/plans/crownpoint/. The plan sheets can be viewed or downloaded by individual sections, or by the entire plan set. A paper copy of the plan sheets is available by submitting the form posted with this solicitation. A CD of the physical data is available by submitting the form posted with this solicitation.

REPS & CERTS. Submit or update Representations and Certifications online at http://orca.bpn.gov before bid submittal. For more details go to FAR Provision 52.204-8 Annual Representations and Certifications (see page B-2). If you have previously registered on-line and the NAICS code for this solicitation is different than the code listed in your online file, please note the amended changes on the lines provided in FAR 52.204-8.

Requests for technical information (Plan and Division 100 – 700 Specification questions only) about this project will only be accepted in writing (see Block 9 on page A-5).

This solicitation contains a Price Evaluation Factor. In accordance with 13 CFR subsection 126.613, we will apply a factor of 10% to an apparent low bid submitted by a large business when we also receive a bid from a HUBZone small business; the 10% factor does not apply to an apparent low bid submitted by a small business.

TECHNICAL QUESTIONS REGARDING PROPOSED WORK FOR THIS PROJECT

WILL BE ACCEPTED UNTIL CLOSE-OF-BUSINESS ON MAY 17, 2012.

Questions can be submitted and answers viewed by going to project information at:

http://www.wfl.fhwa.dot.gov/contracting/construction/advertised.htm Every attempt to respond to questions will be made. However, response to questions received after the above posted date is not guaranteed.

http://www.wfl.fhwa.dot.gov/contracting/construction/plans/crownpoint/ http://www.wfl.fha.dot.gov/edi/current.htm

A-2

Project: OR PFH 163(14), Crown Point Viaduct Restoration Project

If the contract is awarded after applying the price preference for HUBZone small business concerns under FAR clause 52.219-4; at least 50 percent of the cost of the contract performance incurred for personnel must be spent on the prime Contractor’s employees or the employees of other qualified HUBZone small business concerns.

Particular attention should be paid to Standard Form l442, Solicitation, Offer and Award, to assure that Blocks 14, 15, 16, 19, 20A, and 20C are completed correctly. Sign Block 20B according to the instructions in Subsection 102.02. You must submit a completed ‘Authority to Sign’ document. You must also complete the representations and certifications contained in the Contract Provisions beginning on page B-1. Failure to furnish or complete any of the above may result in your bid being considered nonresponsive and being rejected.

Facsimile and email bids are not authorized for this solicitation. Bids may be modified or withdrawn by facsimile, if such notice is received by the time specified for receipt of bids. The Government will not be responsible for any failure attributable to the transmission or receipt of facsimile data. See FAR Provision 52.214-5, Submission of Bids. FAX 360-619-7932. To confirm receipt, call 360.619.7520.

Notice of CCR Registration. You must register in the Central Contract Registration (CCR) system prior to award of this contact. Failure to register may result in award to the next successful registered Offeror. See FAR 4.1103. Register online at http://www.bpn.gov/ccr.

Attention Limited Liability Company (LLCs). If you are an LLC, do not complete the “Type of Organization” block on the SF-24 Bid Bond form. None of the four boxes fit your entity.

However, if you are an LLC and you are submitting a bid as part of a joint venture or partnership, check the applicable box.

Current and potential U.S. Department of Transportation (DOT) Contractors have recently been receiving fraudulent letters purporting to be issued by DOT. These fraudulent letters request that the Contractors resubmit their Central Contractor Registration System (CCR) banking information to DOT. If you receive such a letter, please DO NOT complete the requested CCR worksheet that is attached to the letters and DO NOT release any information to the facsimile number cited in the letter. The CCR is a legitimate government system. However, to register or update information, Contractors are required to go directly through the CCR website and never through a third party. You can access CCR at http://www.bpn.gov/ccr.

III. Post Award Information.

Insurance requirements are set forth in Subsection 107.05.

Contractor Performance Evaluations. This office posts performance evaluations in the Construction Contractor Appraisal Support System (CCASS). A user’s manual can be found at http://www.cpars.csd.disa.mil/cparsfiles/ccass/ccassrefmatl.htm. Upon receiving an email notice of evaluation availability, you will have 30 days to review the evaluation online and submit comments. If you are unable to access the system, call 360-619-7520 for assistance or for a copy of the evaluation.

http://www.bpn.gov/ccr http://www.bpn.gov/ccr http://www.cpars.csd.disa.mil/cparsfiles/ccass/ccassrefmatl.htm

A-2a

Project: OR PFH 163(14), Crown Point Viaduct Restoration Project

IV. Specifications and Permits.

This solicitation and subsequent contract are governed by the Federal Acquisition Regulation (FAR), agency supplemental regulations, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 U.S. Customary Units. Obtain paper copies of the FP-03 by calling 360-619-7520, e-mailing at plans_spec@fhwa.dot.gov, or writing Federal Highway Administration, 610 East Fifth Street, Vancouver, WA 98661. An electronic version may be found at http://flh.fhwa.dot.gov/resources/pse/specs/

Geotechnical, hydraulic, bridge, and design data applicable to this project is listed in FAR Clause 52.236-4, Physical Data.

http://flh.fhwa.dot.gov/resources/pse/specs/

A-2b

(This page intentionally left blank)

SOLICITATION, OFFER, AND

AWARD

1. Solicitation No. 2. Type of Solicitation 3. Date Issued Page

DTFH70-12-B-00002 x Sealed Bid (IFB) 04/23/2012

A-3 (Construction, Alteration, or Repair) Negotiated (RFP)

IMPORTANT – The “offer” section on the reverse must be fully completed by offeror.

4. Contract No. - 5. Requisition/Purchase Request No. 6. Project No.

N/A OR PFH 163(14), CROWN POINT

VIADUCT RESTORATION PROJECT

7. Issued By Code: N/A 8. Address Offer to Code: N/A U.S. Department of Transportation Attn: Contracts Section Federal Highway Administration 610 East Fifth Street .

Vancouver WA 98661-3801

9. For Information Call:

A. Name B. Telephone No. (Include area code) (No Collect Calls)

See page A-5. 360.619.7520

SOLICITATION

NOTE: In sealed bid solicitation “offer” and “offeror” mean “bid” and “bidder”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:

This solicitation is designated

OR PFH 163(14), CROWN POINT VIADUCT RESTORATION PROJECT, COLUMBIA RIVER GORGE

NATIONAL SCENIC AREA, MULTNOMAH COUNTY, OREGON

IN STRICT ACCORDANCE WITH:

Bid Schedule Federal Acquisition Regulations (FAR) and Transportation Acquisition Regulations (TAR) General Wage Decision Special Contract Requirements Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 US Customary

11. The Contractor shall begin performance within 10 calendar days and complete it within __*___ calendar days after receiving the award, x notice to proceed. This performance period is x mandatory negotiable. ( See *see page A-5 .)

12A. The Contractor must furnish any required performance and payment bonds? 12B. Calendar Days (If “YES”, indicate within how many calendar days after award in item 12B.)

10 x

Yes

No

13. Additional Solicitation Requirements:

A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 2:00 PM local time 05/23/2012. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee x is Is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101 Standard Form 1442 (REV. 4-85) Prescribed by GSA FAR (48 CFR) 53.236-1 (e)

A-4

OFFER (Must be fully completed by offeror)

14. Name and Address of Offeror (Include ZIP Code)

15. Telephone No. (Include are code)

16. Remittance Address (Include on it different than Item 14)

DUNS number:

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this is accepted by the Government in writing within 60 calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D.

Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS

See Bid Schedule

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendment to the solicitation - give number and date of each)

AMENDMENT

No.

DATE

20A NAME,TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or Print) 20B. SIGNATURE 20c. OFFER DATE

AWARD (to be completed by Government)

21. ITEM(S) ACCEPTED

All items on Bid Schedule.

22. Amount

23. Accounting and Appropriation Data

24. Submit Invoices to Address shown in (4 copies unless otherwise specified)

Item See

Page A-5

25. Other Than full and open competition pursuant to

10 U.S.C. 2304(c) (_____) 41 U.S.C 253 (c) (_____)

26. Administered by Payment will be made by Federal Highway Administration Western Federal Lands Highway Division 610 East Fifth Street Vancouver WA 98661-3801

Finance Section Western Federal Lands Highway Division 610 East Fifth Street Vancouver WA 98661-3801

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and(c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

X 29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. Name and Title of Contractor or Person authorized to sign (Type or Print)

31A. Name of Contracting Officer (Type or Print)

Angy Liljedahl

30b. Signature 30C. Date

31B. United States of America

By

31C. Award Date

STANDARD FORM 1442 BACK (REV. 4-85)

A-5

Continuation SF 1442 OR PFH 163(14), Crown Point Viaduct Restoration Project

Block 9 FOR GENERAL INFORMATION, call 360.619.7520 from the hours of 8:00 a.m. to 4:00 p.m. local time or e-mail us at wfl.contracts@dot.gov. You can also submit questions online from our Western Federal Lands webpage as described below.

FOR TECHNICAL INFORMATION (plan and specification questions only), requests for technical information about this project will only be accepted in writing.

Submit questions via fax (360.619.7932) or e-mail at plans_spec@dot.gov (plans_spec@dot.gov).You can also submit questions online from our Western Federal Lands webpage as described below.

SUBMIT QUESTIONS ONLINE. You can submit your questions from our Western

Federal Lands website http://www.wfl.fhwa.dot.gov/contracting/construction/advertised.htm.

• In “Advertised Projects”, scroll to the project.

• Click on “Technical Information Question” or “General Information

Question”, as applicable.

Previously asked and answered questions will be available for viewing on the website.

FOR DAVIS-BACON WAGE RATE INFORMATION call the Department of Labor at 415.625.7716 (DRBA - Western Region)

FOR PHYSICAL DATA, See FAR Contract Clause 52.236-4, Physical Data, (clauses begin on page C-1) for a listing of available data. To obtain copies of Physical Data, submit a written request to the Contracts Section, FAX 360.619-7932 or e-mail us at wfl.contracts@dot.gov. Requests should be made early to assure timely arrival.

FOR BID RESULTS, call 360.619.7773. Bid tabulations will be available on our website approximately 3 work days after the bid opening. Our website is located at:

http://www.wfl.fhwa.dot.gov/contracting/construction/tabs/.

Block 11 COMPLETION DATE: Work shall be completed on or before the date specified in

FAR Clause 52.211-10, Commencement, Prosecution, and Completion of Work, subject to such extensions as may be authorized by the terms of the contract and the specifications made a part thereof. Contract Clauses begin on pages C-1.

Block 12A PERFORMANCE & PAYMENT BONDS: See FAR Clause, 52.228-15, Performance and Payment Bonds - Construction (clauses begin on page C-1) and Subsection 102.06 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 U.S. Customary Units

Block 13B BID BOND AMOUNT: See FAR Clause 52.228-1, Bid Guarantee (clauses begin on page C-1).

ADDITIONAL INFORMATION: See Subsections 102.03 and 102.04 of Standard

Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP- 03 U.S. Customary Units.

Block 24 SUBMITTING INVOICES: See Subsection 109.08 of the Standard Specifications for

Construction of Roads and Bridges on Federal Highway Projects FP-03 U.S. Customary Units.

mailto:wfl.contracts@dot.gov mailto:plans_spec@dot.gov http://www.wfl.fhwa.dot.gov/contracting/construction/advertised.htm mailto:wfl.contracts@dot.gov http://www.wfl.fhwa.dot.gov/contracting/construction/tabs/

A-6

Continuation SF 1442 OR PFH 163(14), Crown Point Viaduct Restoration Project

ESTIMATED PRICE RANGE. The price range of the project work is between $3,000,000 and $5,000,000.

SUBCONTRACTING PLAN. This invitation for bids requires a low bidder who is a LARGE business to submit an acceptable subcontracting plan prior to contract award. Do not submit this form with your bid. A large business is one whose average gross annual receipts over the past 3 years equal $33.5 million or more. For your information the subcontracting plan form is included beginning on page A-6a.

This requirement does not apply to SMALL businesses.

Subcontracting Plan – A-6a

Subcontracting Plan

For Information Only. Do not submit with your bid.

1. NOTES:

• Where the bidder/offeror has an existing approved master subcontracting plan, those goals may be reflected in the proposed plan for this contract. Please note as such.

• Where subcontracting opportunities will not exist for this contract, furnish a statement to that effect signed by an authorized official.

• Bidder/offeror may use their subcontracting plan format provided the information remains clear, consistent, and meets the requirements of FAR Clause 52.219-9 Small Business Subcontracting Plan.

• Text lines may be added to this form as needed.

• In the first table, provide information expressed in terms of goal percentages of the total planned subcontracting dollars.

• If a subcontractor qualifies in more than one category, include the subcontract amount in each applicable category. If you have questions, contact the Contracting Officer. [Example: If ABC Inc is a small business, a certified HUBZone small business, and a Women-owned small business, then their subcontract amount of $100,000 would be included in the dollar values shown in rows d, g, and i.]

SUBCONTRACTING PLAN

a. Total prime contract amount $

Ratio Goals

Percent

b. Total planned subcontract awards $

c. Total planned subcontract awards to Large Business concerns (LARGE) $

d. Total planned subcontract awards to all Small

Business concerns (SB) $ (d/b) %

e. Total planned subcontract awards to Veteran-Owned

Small Business concerns (VOSB) $ (e/b) %

f. Total planned subcontract awards to Service-Disabled

Veteran-Owned Small Business concerns (SDVOSB) $ (f/b) %

g. Total planned subcontract awards to certified

HUBZone Small Business concerns (HUBz) $ (g/b) %

h. Total planned subcontract awards to Small Disadvantaged Business concerns (SDB) (includes ANCs and Indian Tribes) $ (h/b) %

i. Total planned subcontract awards to Women-Owned Small Business concerns (WOSB) $ (i/b) %

Subcontracting Plan – A-6b

2. The following principal types of supplies and/or services are planned to be subcontracted under this contract. (Indicate if planned to subcontract to a LARGE, SB, VOSB, SDVOSB, HUBz, SDB, or WOSB business concern.)

Type of Supply/Service to be subcontracted

Company (if known)

Address (city/state)

Subcontractor type

LARGE, SB, VOSB,

SDVOSB, HUBz, SDB, WOSB

(enter one or more as applicable)

3. The following methods were used to develop the subcontract percentage goals:

4. The following methods were used to identify potential subcontract sources for solicitation purposes.

(What source lists were used, such as CCR, Veterans service organizations, the National Minority Purchasing Council Vendor Information Service, the Research and Information Division of the Minority Business Development Agency in the Department of Commerce, or small, HUBZone, small disadvantaged, and women-owned small business trade associations, and what organizations were contacted to identify potential SB, VOSB, SDVOSB, HUBz, SDB, and WOSB subcontractors.):

5. (Check one) Indirect costs (_)were (__)were not included in establishing the subcontracting goals specified in the table above.

6. If indirect costs were included, the following method was used to determine the proportionate share

Subcontracting Plan – A-6c of indirect costs to be incurred with SB, SDVOSB, HUBz, SDB, and WOSB subcontractors:

7. The following individual will administer the subcontracting program:

Name:_______________________________________________ Title:________________________________________________ Telephone & e-mail:____________________________________________________________

This individual's specific duties, as they relate to the subcontracting program, are as follows:

8. The following efforts will be taken to ensure that SB, VOSB, SDVOSB, HUBz, SDB, and WOSB business concerns will have an equitable opportunity to compete for subcontracts:

9. It is agreed that: a) FAR Clause 52.219-8, Utilization of Small Business Concerns, will be included in all subcontracts that offer further subcontracting opportunities; and b) All subcontractors (except small business concerns) at all tiers below the prime contractor who receive subcontracts in excess of $650,000 ($1,500,000 if construction) will be required to adopt and comply with a subcontracting plan in accordance with FAR Clause 52.219-9 Small Business Subcontracting Plan.

10. The Contractor agrees to:

a. Cooperate in any studies or surveys as may be required.

b. Submit periodic reports as may be required so that the Government can determine the extent of compliance by the Contractor with the subcontracting plan.

c. Submit Subcontracting Report for Individual Contracts and Summary Subcontract Report, to the following Electronic Subcontract Reporting System (eSRS) web site: http://esrs.gov/

d. Ensure that its large business subcontractors with subcontracting plans agree to submit eSRS documents online as required.

e. Provide its prime contract number, its DUNS number, and the email address of the offeror/bidder’s official responsible for reviewing reports to all first-tier subcontractors with a subcontracting plan.

f. Require that each subcontractor with a subcontracting plan provide the prime contract number, http://esrs.gov/

Subcontracting Plan – A-6d its own DUNS number, and the email address of the subcontractor official responsible for reviewing the reports to its subcontractors.

11. The following types of records concerning procedures that have been adopted to comply with the requirements and goals in the plan shall be maintained through contract completion:

a. Source lists, guides, and other data used to identify SB, VOSB, SDVOSB, HUBz, SDB, and

WOSB concerns.

b. Organizations contacted in an attempt to locate sources that are SB, VOSB, SDVOSB, HUBz, SDB, and WOSB concerns.

c. Records on each subcontract award of more than $150,000 indicating:

i. whether Small businesses were solicited, and if not, why not;

ii. whether VOSB were solicited, and if not, why not:

iii. whether SDVOSB were solicited, and if not, why not:

iv. whether HUBz's were solicited, and if not, why not;

v. whether SDB's were solicited, and if not, why not;

vi. whether WOSB's were solicited, and if not, why not; and

vii. if applicable, the reason award was not made to a small business concern.

d. Records of outreach efforts to contact the following in an attempt to locate SB, VOSB, SDVOSB, HUBz, SDB, and WOSB sources:

i. trade associations,

ii. business development organizations,

iii. conferences, and trade fairs

iv. veterans service organizations

e. Records of internal guidance and encouragement provided to buyers through:

i. Workshops, seminars, training programs, etc.

ii. Monitoring performance to evaluate compliance with the program’s requirements.

f. On a contract-by contract basis, records to support award data submitted by the Contractor to the Government, including the name, address and business size of each subcontractor.

12. In order to effectively implement this plan, the contractor agrees to perform the functions listed in paragraph (e) of FAR Clause 52.219-9 Small Business Subcontracting Plan.

13. The Contractor acknowledges that a failure of the Contractor or subcontractor to comply in good faith with clause 52.219-8, Utilization of Small Business Concerns, or this approved subcontracting plan shall be considered a material breach of the contract.

Subcontracting Plan – A-6e

Contractor

Signed Date

Printed Name Title

Company Name and Address

Email address

Federal Highway Administration

Accepted by: _______________________________________ __________________ Angy Liljedahl, Contracting Officer Date

Subcontracting Plan – A-6f

Reserved

Project: OR PFH 163(14)

Bidder please note: Before preparing the bid, carefully read the Solicitation Provisions.

Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid.

Should any mathematical check made by the Government show a mistake in the amount bid, the Amount Bid for the item will be based on the Unit Bid Price.

When "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.

When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.

Total the amounts bid for all pay items and insert the total bid amount.

The quantities for the following items of work are Contract Quantities (see FP-03 Subsection 109.02):

20801-0000, 20803-0000, 25903-0000, 55201-0200, 55201-0200, 55401-1000, 55401-2000, 56603-2000, 56603-4000, 56902-0000, 56905-0000, 56906-0000, 62001-1500, 62026-1000, 62031-0000

A- 7

Bid Schedule

Pay Item No.

Estimated Quantity Unit Bid Price Amount Bid

15101-0000 MOBILIZATION

ALL Lump Sum $___________________

15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL Lump Sum $___________________

15214-2000 SURVEY AND STAKING, RETAINING WALL

ALL Lump Sum $___________________

15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE

ALL Lump Sum $___________________

15401-0000 CONTRACTOR TESTING

ALL Lump Sum $___________________

Project: OR PFH 163(14)

Bid Schedule A

Pay Item No.

Estimated Quantity Unit Bid Price Amount Bid

A- 8

15501-0000 CONSTRUCTION SCHEDULE

ALL Lump Sum $___________________

15703-2000 SOIL EROSION CONTROL, TEMPORARY TURF ESTABLISHMENT

0.5

ACRE $_______________ $___________________

15705-0100 SOIL EROSION CONTROL, SILT FENCE

1,095

LNFT $_______________ $___________________

15706-0400 SOIL EROSION CONTROL, SEDIMENT TRAP

EACH $_______________ $___________________

15706-1200 SOIL EROSION CONTROL, INLET PROTECTION TYPE B

EACH $_______________ $___________________

20103-0000 CLEARING AND GRUBBING

SQYD $_______________ $___________________

20301-1400 REMOVAL OF INLET

EACH $_______________ $___________________

20301-1900 REMOVAL OF PIPE CULVERT

EACH $_______________ $___________________

20301-2400 REMOVAL OF SIGN

EACH $_______________ $___________________

20302-0700 REMOVAL OF FENCE

LNFT $_______________ $___________________

20315-0000 SAWCUTTING PAVEMENT

5,900

LNFT $_______________ $___________________

20401-0000 ROADWAY EXCAVATION

1,300

CUYD $_______________ $___________________

Project: OR PFH 163(14)

Estimated Quantity Unit Bid Price Amount Bid

A- 9

20402-0000 SUBEXCAVATION

4,000

CUYD $_______________ $___________________

20425-1000 DITCH, EXCAVATION , BY HAND, TYPE 1

6,773

LNFT $_______________ $___________________

20435-2000 BACKFILL, GRANULAR

CUYD $_______________ $___________________

20466-0000 CONSERVE AND STOCKPILE TOPSOIL (FROM RUBBLE MASONRY, ROCK

FACE FINISH)

CUYD $_______________ $___________________

20466-0000 CONSERVE AND STOCKPILE TOPSOIL (FROM DEEP PATCH REPAIR AND

WALL RECONSTRUCTION)

CUYD $_______________ $___________________

20466-0000 CONSERVE AND STOCKPILE TOPSOIL (FROM EXTERIOR MICROPILE

CAP AND FOOTING EXCAVATION)

CUYD $_______________ $___________________

20703-0000 GEOGRID

5,000

SQYD $_______________ $___________________

20801-0000 STRUCTURE EXCAVATION

CUYD $_______________ $___________________

20803-0000 STRUCTURAL BACKFILL

CUYD $_______________ $___________________

25105-2000 KEYED RIPRAP, CLASS 2

CUYD $_______________ $___________________

25201-0000 SPECIAL ROCK EMBANKMENT

CUYD $_______________ $___________________

Project: OR PFH 163(14)

Estimated Quantity Unit Bid Price Amount Bid

A- 10

25305-2000 REVET MATTRESS, POLYVINYL CHLORIDE COATED (BLACK)

SQYD $_______________ $___________________

25501-1000 MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE

(BLACK POLYVINYL CHLORIDE COATED)

SQFT $_______________ $___________________

25510-0000 SELECT GRANULAR BACKFILL

1,500

CUYD $_______________ $___________________

25901-0000 SOIL NAIL

2,619

LNFT $_______________ $___________________

25903-0000 VERIFICATION TEST NAIL

EACH $_______________ $___________________

30802-1000 ROADWAY AGGREGATE, METHOD 1

7,000

TON $_______________ $___________________

40301-0000 HOT ASPHALT CONCRETE PAVEMENT

8,220

TON $_______________ $___________________

41201-1000 TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H

TON $_______________ $___________________

41303-0000 ASPHALT PAVEMENT MILLING

9,178

TON $_______________ $___________________

55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (SELF CONSOLIDATING)

CUYD $_______________ $___________________

55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)

CUYD $_______________ $___________________

55401-1000 REINFORCING STEEL

36,535

LB $_______________ $___________________

Project: OR PFH 163(14)

Estimated Quantity Unit Bid Price Amount Bid

A- 11

55401-2000 REINFORCING STEEL, EPOXY COATED

7,014

LB $_______________ $___________________

55901-0000 MEMBRANE WATERPROOFING

SQYD $_______________ $___________________

56603-2000 REINFORCED SHOTCRETE, 4-INCH DEPTH

SQYD $_______________ $___________________

56603-4000 REINFORCED SHOTCRETE, 8-INCH DEPTH

SQYD $_______________ $___________________

56902-0000 MICROPILE

EACH $_______________ $___________________

56903-0000 MICROPILES, ADDITIONAL LENGTH

LNFT $_______________ $___________________

56905-0000 MICROPILE LOAD VERIFICATION TEST

EACH $_______________ $___________________

56906-0000 MICROPILE PROOF LOAD TEST

EACH $_______________ $___________________

57501-0000 MINOR BRIDGE WORK (WEEP HOLES BETWEEN COLUMNS 1-10 AND

COLUMNS 22-29)

ALL Lump Sum $___________________

57501-0000 MINOR BRIDGE WORK (DRILL, EPOXY AND INSTALL STEEL BARS)

ALL Lump Sum $___________________

57501-0000 MINOR BRIDGE WORK (EPOXY INJECTION IN CRACKS IN CURB,

PARAPET, SIDEWALK, COLUMNS, COUNTERFORTS, AND RETAINING

WALL)

ALL Lump Sum $___________________

57501-0000 MINOR BRIDGE WORK (REPAIR DAMAGED CONCRETE IN CURB,

PARAPET, SIDEWALK, COLUMNS, COUNTERFORTS, AND RETAINING

WALL)

ALL Lump Sum $___________________

Project: OR PFH 163(14)

Estimated Quantity Unit Bid Price Amount Bid

A- 12

57501-0000 MINOR BRIDGE WORK (CLEAN AND RESEAL JOINTS)

ALL Lump Sum $___________________

57501-0000 MINOR BRIDGE WORK (CLEAN CONCRETE SURFACE - PRESSURE WASH

TO REMOVE LOOSE AND ORGANIC MATERIAL)

ALL Lump Sum $___________________

57501-0000 MINOR BRIDGE WORK (CLEAN CONCRETE SURFACE - ABRASIVE BLAST

TO 1/4" AMPLITUDE)

ALL Lump Sum $___________________

60201-0400 12-INCH PIPE CULVERT

LNFT $_______________ $___________________

60201-0600 18-INCH PIPE CULVERT

LNFT $_______________ $___________________

60403-0000 INLET (CONCRETE)

EACH $_______________ $___________________

60407-0000 CAPPING INLETS AND MANHOLES

EACH $_______________ $___________________

60501-0000 STANDARD UNDERDRAIN SYSTEM

LNFT $_______________ $___________________

60704-0000 CLEANING CULVERT IN PLACE

EACH $_______________ $___________________

60706-0000 CLEANING DRAINAGE STRUCTURE

EACH $_______________ $___________________

60707-0100 LINING 12-INCH PIPE CULVERT

LNFT $_______________ $___________________

60901-0400 CURB, CONCRETE, 6-INCH DEPTH

1,510

LNFT $_______________ $___________________

Project: OR PFH 163(14)

Estimated Quantity Unit Bid Price Amount Bid

A- 13

60901-1700 CURB, CONCRETE, 18-INCH DEPTH

LNFT $_______________ $___________________

60905-1000 GUTTER, CONCRETE

3,236

LNFT $_______________ $___________________

60911-1000 RECONDITION GUTTER

6,773

LNFT $_______________ $___________________

60915-1000 WHEELSTOP, CONCRETE

EACH $_______________ $___________________

61704-2000 REPLACEMENT POST, WOOD

EACH $_______________ $___________________

61708-1000 REMOVE AND RESET, GUARDRAIL

1,834

LNFT $_______________ $___________________

61710-0000 RAISING GUARDRAIL / LOWERING GUARDRAIL

2,773

LNFT $_______________ $___________________

61901-0000 FENCE

LNFT $_______________ $___________________

62001-1500 RUBBLE MASONRY, ROCK FACE FINISH (BETWEEN COLUMNS 10-12)

CUYD $_______________ $___________________

62001-1500 RUBBLE MASONRY, ROCK FACE FINISH (STA 141+04 TO STA 141+44)

CUYD $_______________ $___________________

62001-1900 DIMENSIONED MASONRY, SPLIT FACE FINISH (GUARDROCK)

CUYD $_______________…