Text version

AK DEN 2009(4), Gakona Village School Road Rehab, Valdez-Cordova Borough, Alaska

The work consists of grading, base, drainage, asphalt surface treatment, aggregate base, and other small items of work.

Project length: 0.700 Miles

Fixed Completion Date: September 30, 2011

Estimated Price Range: $1 million to $2 million

Location: Village of Gakona, Alaska

DESCRIPTION OF WORK in US CUSTOMARY UNITS

DIVISION 150 – Project Requirements 152 Construction Survey & Staking X YES NO 153 Contractor Quality Control and Assurance X YES NO 154 Contractor Sampling & Testing X YES NO 155 Schedules for Construction Contracts (construction schedules) X YES NO 157 Soil Erosion Control Devices (Sediment wattles, silt fence)

Sediment Wattle Temp Turf Establishment

Silt Fence

688 LNFT

2 SLRY UNITS

461 LNFT

158 Watering for Dust Control 270 MGAL

DIVISION 200 – Earthwork 201 Clearing & Grubbing 1.7 ACRE 203 Removal of Pipe Culvert 10 EACH 204 Roadway Excavation 1,325 CUYD 204 Select Borrow 4,700 TON 207 Earthwork Geotextiles (geotextiles) 474 SQYD

DIVISION 250 – Slope Reinforcement & Retaining Walls 251 Riprap 420 CUYD

DIVISION 300 – Aggregate Courses 308 Roadway Aggregate, Method 2 4,300 TON

DIVISION 400 – Asphalt Pavements & Surface Treatments 409 Asphalt Surface Treatment 10,200 TON 409 Emulsified Asphalt 52 TON 411 Asphalt Prime Coat 12 TON 411 Blotter 195 TON

DIVISION 600 – Incidental Construction 634 Permanent Pavement Markings (traffic pavement markings) 32,000 LNFT 635 Flagger 1,000 Hours