Amendment A001 - - indefinitely postpones Bid Opening Date until further notice - updates wage-rates - revises SCR Subsection 152.03 Survey and Staking
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 04/20/2011 N/A AK DEN 2009(4)
Gakona Village School
Road Rehab
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
DTFH70-11-B-00007
9B. DATED (SEE ITEM 11)
03/16/2011
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(_X_) is extended, ( ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AK DEN 2009(4), GAKONA VILLAGE SCHOOL ROAD REHAB
See page 2 for revisions
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A001, dated 04/20/11 AK DEN 2009(4) Solicitation No. DTFH70-11-B-00007 Gakona Village School Road Rehab
REVISIONS ARE AS FOLLOWS:
SF 1442, SOLICITATION, OFFER, AND AWARD (Pen & Ink change)
Page A-3, Block 13A. Revises bid opening date from 04/29/2011 to “Suspended Indefinitely”. -- Once the snow has cleared from the roadway, we will issue another amendment setting a revised bid opening date.
MINIMUM WAGE SCHEDULE
Page D-1 through D-10. Updates Davis-Bacon General Wage Decision Number AK20080006 to current effective date of April 1, 2011.
SPECIAL CONTRACT REQUIREMENTS
Page Section/Table Revision E-21 152.02(c ) General Added paragraph E-21 152.03 (b) Survey and Staking Requirements Added paragraph
ENCLOSURES
Pages:
D-1 to D-10 E-21
Page (not included due to pen & ink revisions):
A-3
Bid opening date suspended indefinitely
D-1
Replaced by Amendment A001 General Wage Determination AK DEN 2009(4), Gakona Village School Road Rehab
General Decision Number: AK100006 04/01/2011 AK6
Superseded General Decision Number: AK20080006
State: Alaska
Construction Type: Highway
Counties: Aleutians East, Aleutians West, Anchorage, Bethel, Bristol Bay, Dillingham, Fairbanks North Star, Kenai Peninsula, Kodiak Island, Matanuska-Susitna, Nome, North Slope, Northwest Arctic, Southeast Fairbanks, Valdez-Cordova, Wade Hampton and Yukon-Koyukuk Counties in Alaska.
Highway Construction Projects
Modification Number Publication Date 0 03/12/2010 1 03/19/2010 2 04/09/2010 3 04/16/2010 4 05/07/2010 5 06/04/2010 6 07/09/2010 7 08/06/2010 8 09/10/2010 9 09/24/2010 10 11/19/2010 11 12/31/2010 12 02/04/2011 13 02/18/2011 14 03/11/2011 15 04/01/2011
CARP1243-004 07/01/2010
North of the 63rd Parallel
Rates Fringes
CARPENTER........................$ 35.49 18.73
CARP1281-006 07/01/2010
South of the 63rd Parallel
Rates Fringes
CARPENTER........................$ 35.49 18.73
CARP2520-004 07/01/2010
Rates Fringes
Piledriver
D-2
AK DEN 2009(4), Gakona Village School Road Rehab
Carpenter...................$ 35.49 18.73 Piledriver, Skiff operator, Rigger............$ 34.49 18.73 Sheet Stabber...............$ 35.49 18.73 Welder......................$ 41.05 18.73
* ELEC1547-004 03/28/2011
Rates Fringes
CABLE SPLICER....................$ 39.77 3%+$21.20
Electrician; Technician...........$ 38.02 3%+$21.20
* ELEC1547-005 03/28/2011
Line Construction
Rates Fringes
CABLE SPLICER....................$ 48.90 3%+23.10
Linemen (Including Equipment Operators, Technician)...........$ 47.15 3%+22.57 Powderman........................$ 45.15 3%+23.10
TREE TRIMMER.....................$ 32.70 3%+$17.95
ENGI0302-002 01/01/2011
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 38.59 18.05
GROUP 1A....................$ 38.83 18.05
GROUP 2.....................$ 36.06 18.05
GROUP 3.....................$ 35.34 18.05
GROUP 4.....................$ 29.13 18.05
TUNNEL WORK
GROUP 1....................$ 39.85 16.95
GROUP 1A...................$ 41.79 16.95
GROUP 2....................$ 39.01 16.95
GROUP 3....................$ 38.21 16.95
GROUP 4....................$ 31.83 16.95
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Roller; Back Filler; Barrier Machine (Zipper); Batch Plant Operator: Batch and Mixer over 200 yds.; Beltcrete with power pack and similar conveyors;
Bending Machine; Boat Coxwains; Bulldozers; Cableways, Highlines and Cablecars; Cleaning Machine; Coating Machine;
Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Shovels, Backhoes, excavators with all attachments, Draglines, Clamshells; Gradalls-3 yards and under; (b) Hydralifts or Transporters, all track or truck type,(c) Derricks; Crushers; Deck Winches-Double Drum; Ditching or Trenching Machine (16 inch or over); Drilling Machines, D-3
AK DEN 2009(4), Gakona Village School Road Rehab core, cable, rotary and exploration; Finishing Machine Operator, concrete paving, Laser Screed, sidewalk, curb and gutter machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell Sno Cat; Hydro Ax: Feller Buncher and similar; Loaders: Forklifts with power boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps, Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:
Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Sauerman-Bagley;
Scrapers-through 40 yards; Service Oiler/Service Engineer;
Sidebooms-under 45 tons; Shot Blast Machine; Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine;
Sub-grader (Gurries, C.M.I. and C.M.I. Roto Mills and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler; Welder; Electrical Mechanic, Camp Maintenance Engineer
GROUP 1A: Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Shovels, backhoes, excavators with all attachments, draglines, clamshells-over 3 yards, (b) Tower cranes; Licensed Water/Waste Water Treatment Operator;
Loaders over 5 yds.; Certified Welder, Electrical Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours);
Motor Patrol Grader, Dozer, Grade Tractor (finish: when finishing to final grade and/or to hubs, or for asphalt);
Power Plants: 1000 k.w. and over; Quad; Screed; Sidebooms over 45 tons; Slip Form Paver C.M.I. and similar types;
Scrapers over 40 yards; Camera/Tool/Video Operator (Slipline).
GROUP 2: Batch Plant Operators: Batch and Mixer 200 yds. per hour and under; Boiler-fireman; Cement Hog and Concrete Pump Operator; Conveyors (except as listed in group 1);
Hoist on steel erection; Towermobiles and Air Tuggers;
Horizontal/Directional Drill Locator; Licensed Grade Technician; Loaders, Elevating Grader, Dumor and similar;
Locomotives: rod and geared engines; Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trenching Machine under 16 inches; Waste/ Waste Water Treatment Operator.
GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;
Bombardier (tack or tow rig); Boring Machine; Brooms-power;
Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber Green and similar types (b) Forklifts or Lumber Carrier (on construction job site) (c) Forklifts with Tower (d) Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey
D-4
AK DEN 2009(4), Gakona Village School Road Rehab
(air, steam, gas and electric) Speeders; Mechanics (light duty); Mixers: Concrete Mixers and Batch 200 yds. per hour and under; Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 300 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor
GROUP 4: Rig Oiler/Assistant Engineer (if over 85 tons or 100 ft. boom);Parts and Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter;
Steam Cleaner; Drill Helper.
FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Assistant Engineer shall be required on cranes over 85 tons or over 100 feet of boom.
IRON0751-003 08/01/2010
Rates Fringes
Ironworkers:
BRIDGE, STRUCTURAL,
ORNAMENTAL, REINFORCING
MACHINERY MOVER, RIGGER,
SHEETER, STAGE RIGGER,
BENDER OPERATOR.............$ 33.25 21.31
FENCE, BARRIER AND
GUARDRAIL INSTALLERS........$ 29.75 21.31
GUARDRAIL LAYOUT MAN........$ 30.49 21.31
HELICOPTER, TOWER...........$ 34.25 21.31
LABO0341-007 07/01/2010
Rates Fringes
Laborers: North of the 63rd Parallel & East of Longitude 138 Degrees
GROUP 1.....................$ 29.00 18.01
GROUP 2.....................$ 29.96 18.01
GROUP 3.....................$ 30.83 18.01
GROUP 3A....................$ 33.97 18.01
GROUP 3B....................$ 34.77 18.01
GROUP 4.....................$ 19.00 18.01
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 31.90 18.01
GROUP 2....................$ 32.96 18.01
GROUP 3....................$ 33.91 18.01
GROUP 3A...................$ 37.37 18.01
GROUP 3B...................$ 38.25 18.01
Laborers: South of the 63rd Parallel & West of Longitude 138 Degrees
GROUP 1.....................$ 29.00 18.01
D-5
AK DEN 2009(4), Gakona Village School Road Rehab
GROUP 2.....................$ 29.96 18.01
GROUP 3.....................$ 30.83 18.01
GROUP 3A....................$ 33.97 18.01
GROUP 3B....................$ 34.77 18.01
GROUP 4.....................$ 19.00 18.01
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 31.90 18.01
GROUP 2....................$ 32.96 18.01
GROUP 3....................$ 33.91 18.01
GROUP 3A...................$ 37.37 18.01
GROUP 3B...................$ 38.25 18.01
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to non-mechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
D-6
AK DEN 2009(4), Gakona Village School Road Rehab
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transferring of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Re-timberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transferring of grade marks, line and grade)
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
PLAS0867-004 02/01/2011
Rates Fringes
CEMENT MASON/CONCRETE FINISHER
North of the 63rd parallel..$ 34.69 17.01 South of the 63rd parallel..$ 34.44 17.01
TEAM0959-003 09/01/2010
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 37.77 14.85
GROUP 1A....................$ 39.04 14.85
GROUP 2.....................$ 36.51 14.85
GROUP 3.....................$ 35.69 14.85
GROUP 4.....................$ 35.11 14.85
GROUP 5.....................$ 34.35 14.85
GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and
D-7
AK DEN 2009(4), Gakona Village School Road Rehab similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon (250 Bbls and above); Tireman, Heavy Duty/Fueler
GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps (driver under load)
GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;
Dump Trucks (including Rockbuggy and Trucks with pups) over 20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;
Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards;
GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers; Partsman;
Oil Distributor Drivers; Trucks/Jeeps (push or pull);
Traffic Control Technician
GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster;
Tireman (light duty); Dump Trucks (including Rockbuggy and Truck with pups) up to and including 10 yards; Track Truck Equipment; Stringing Truck; Grease Truck; Flat Beds, dual rear axle; Hyster Operators (handling bulk aggregate);
Lumber Carrier; Water Wagon, semi; Water Truck, dual axle;
Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and Swing attachments, over 5 tons;
Front End Loader with Forks; Bus Operator over 30 passengers; All Terrain Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam Distributor Truck/dual axle;
Hydro-seeders, dual axle; Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire Truck/Ambulance Driver;
Combination Truck-fuel and grease; Compactor (when pulled by rubber tired equipment); Rigger (air/water/oilfield);
Ready Mix, up to and including 7 yards;
GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards;
D-8
AK DEN 2009(4), Gakona Village School Road Rehab
Gear/Supply Truck; Bus Operator, Up to 30 Passengers;
Rigger/Swamper
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request
D-9
AK DEN 2009(4), Gakona Village School Road Rehab review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
D-10
AK DEN 2009(4), Gakona Village School Road Rehab
RESERVED
E-21
Special Contract Requirements Project: AK DEN 2009(4), Gakona Village School Road Rehab
(d) Pre-survey meeting. Before surveying or staking, discuss and coordinate the following with the CO:
(1) Surveying and staking methods;
(2) Stake marking;
(3) Grade control for courses of material;
(4) Referencing;
(5) Structure control; and
(6) Any other procedures and controls necessary for the work.
Preserve all initial reference and control points. After beginning construction, replace all destroyed or disturbed initial reference or control points necessary to the work.
Prepare field notes in an approved format. Sample note formats are available as listed in Subsection 106.01. Furnish all survey notes at least weekly.
Survey and establish controls within the tolerances shown in Table 152-1. The construction survey and staking work may be spot-checked for accuracy, and unacceptable portions of work may be rejected. Resurvey rejected work, and correct work that is not within the tolerances specified in Table 152-1. Acceptance of the construction staking does not relieve the Contractor of responsibility for correcting errors discovered during the work and for bearing all additional costs associated with the error.
Start work only after staking for the affected work is accepted.
Compute and furnish calculations supporting pay quantities. Measure quantities within the tolerances shown in Table 152-2.
All field notes, pay notes, and supporting documentation become the property of the Government upon completion of the work.
Support roadway prism excavation quantities according to Subsection 204.16 (a)(1)(a). Adjust roadway prism excavation quantities for volume changes resulting from slope stake variations.
See Subsection 152.03(c), Slope stakes and references.
Remove and dispose of all flagging, lath, stakes, and other staking material after the project is complete. Remove visible portions of brushes if used to mark grade finishing stakes.
152.03 Survey and Staking Requirements. Amend as follows:
(b) Roadway cross-sections. Add the following:
Do not take roadway cross-sections unless required for volume adjustments according to Subsection 204.16(a)(1)(a).
Revised by Amendment A001