A001.pdf
PDF 61 KB Posted
- Solicitation number
- DTFH70-09-R-00023
About this file
Amendment A001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 A005.pdf | ||
| SF30 A004.pdf | ||
| SF30 A003.pdf | ||
| SF30.pdf | ||
| sf330_Part2.pdf | ||
| sf330_e.pdf | ||
| sf330_Sec_F.pdf | ||
| 2010 Multi-discipline AE Services SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 9/23/2009 N/A Multi-Discipline Architect/Engineer Services IDIQ
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
DTFH70-09-R-00023
9B. DATED (SEE ITEM 11)
9/01/2009
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (_X ) is extended, ( ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Multi-Discipline Architect/Engineer Services IDIQ
See page 2 for revisions.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A001, dated 09-23-09 Multi-Discipline Architect/Engineer Services Solicitation No. DTFH70-09-R-00023
REVISIONS ARE AS FOLLOWS:
REQUEST FOR QUALIFICATIONS
Page 1: (Pen & Ink change) Revises qualifications submittal date from 10/08/09 to 10/15/09.
New qualifications submittal date: 10-15-09
Page 5, Number 5: Revises the weight percentage from 15% to 5% and revises submittal requirements for Small Disadvantaged (SDB) participation.
Please use the following link to submit and view questions and answers regarding this Request for Qualification:
http://www.wfl.fhwa.dot.gov/contracting/ae/rfq.htm
Notice to Interested Firms
ENCLOSURES: Request for Qualifications, Page 5 http://www.wfl.fhwa.dot.gov/contracting/ae/upcoming.htm
Request For Qualifications Multi-Discipline Architect/Engineer Services
4. Ability to accomplish the work in the required time and to accomplish concurrent task orders issued under this IDIQ (in terms of expertise, and number of personnel appropriate for this work). 15% weight.
A. Current staffing of the firm and its proposed sub-consultants.
B. On-going work loads of the firm and its proposed sub-consultants and their capability of undertaking this contract and the priority it will likely receive in relation to other work.
C. Where sub-consultants are proposed, identify the level of direct involvement in this contract by the prime firm.
D. The firm’s proposed method of contract administration and project management.
E. Direct involvement in this contract of personnel who make up the ownership of the firm.
F. Proposed method for controlling scope, schedule, and budget on specific projects.
G. Proposed quality assurance and quality control (QA/QC) process to assure that work products are accurate, of high quality and meet the design requirements and established submittal deadlines.
5. ) Small Disadvantaged Business (SDB) participation. SDB Participation. 5% weight.
List all SDB firms in the proposed team and the methods used to include SDB’s in the team. Firms will be incorporated into and become part of any resulting contract. After contract award, the Contractor shall notify the Contracting Officer of any proposed substitutions of SDB firms with non-SDB concerns.
Sincerely yours, Michael L. Johnson Contracting Officer
(1) Enclosure:
SF330
Revised by Amendment A001
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| A001 |
File details come from the government source that posted it. Updated .