PROJECT DESCRIPTION_MT PFH 2009(2).doc.pdf

PDF 27 KB Posted

Attached to
MT PFH 2009(2), MT STATEWIDE 2009 PAVEMENT PRESERVATION PROJECTS Federal contract opportunity
Solicitation number
DTFH70-09-B-00014
Issued by
Department of Transportation Federal Highway Administration

About this file

Project Description

View the file

Other files for this federal contract opportunity

Other files attached to MT PFH 2009(2), MT STATEWIDE 2009 PAVEMENT PRESERVATION PROJECTS, newest first.
File Type Posted
A002_Statewide.pdf PDF
A001_posting_Statewide.pdf PDF
http //www.wfl.fhwa.dot.gov/edi/plans/statewide2009/ —
IFB_Sol_Statewide.pdf PDF
PlanRequestforInternet_Statewide.doc.pdf PDF
Call for HUBZone Interest_MT PFH 2009(2).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT PFH 2009(2), MONTANA STATEWIDE 2009 PAVEMENT

PRESERVATION PROJECTS, Flathead National Forest, Flathead County, Montana

Bids are being invited under four separate bid schedules designated - Schedule A, Schedule B, Schedule C, and Schedule D. Schedules A, B, C and D represent different work. Bidders can complete one or more schedules.

Route Name Length in miles

Description of Work Forest/County/State Location

Schedule A FH 61 North Fork Flathead Road 10.5 Crack, cleaning routing

& sealing and asphalt surface treatment.

Approximately 2 miles NE of Columbia Falls, Montana

FH 72 Star Meadows Road 3.6 Crack, cleaning routing & sealing and asphalt surface treatment.

Approximately 15 miles NW of Whitefish, Montana

FH 79 Good Creek Road 0.2 Asphalt pavement milling and hot asphalt concrete pavement overlay.

Flathead NF, Flathead County, Montana

Approximately 19 miles NW of Whitefish, Montana

Schedule B FH 73 Pioneer Mountains Scenic Byway

44.4 Crack, cleaning routing

& sealing , asphalt surface treatment, cold recycled asphalt, and hot asphalt concrete pavement overlay.

Beaverhead-Deerlodge NF, Beaverhead County, Montana

Approximately 36 miles SW of Butte, Montana

Schedule C FH 91 Skalkaho Road 16.3 Crack, cleaning routing

& sealing and asphalt surface treatment.

Beaverhead-Deerlodge NF, Granite County, Montana

Approximately 41 miles east of Hamilton, Montana

Schedule C FH 73 Little Joe Road 1.8 Crack, cleaning routing

& sealing, recycled aggregate base, and hot asphalt concrete pavement overlay.

Lolo NF, Mineral County, Montana

Approximately 2 miles west of St. Regis, Montana

Fixed Completion Date: Schedule A: August 16, 2010 Schedule B: July 27, 2010 Schedule C: August 23, 2010 Schedule D: July 23, 2010

Estimated Price Range: $5 million to $7 million

DESCRIPTION OF WORK in US CUSTOMARY UNITS

DIVISION 150 –Project Requirements 152 Construction Survey & Staking YES X NO 153 Contractor Quality Control and Assurance X YES NO 154 Contractor Sampling & Testing X YES NO 155 Schedules for Construction Contracts (construction schedules)

X YES NO

157 Soil Erosion Control Devices (erosion control devices)

Schedule A Schedule B Schedule C

Silt Fence 4500 LNFT Silt Fence 11,100 LNFT Silt Fence 3,600 LNFT

DIVISION 300 –Aggregate Courses 310 Recycled Aggregate Course (asphalt pavement recycling)

Schedule D 13,700 SQYD

DIVISION 400 –Asphalt Pavements & Surface Treatments 403 Hot Asphalt Concrete Pavement (asphalt concrete pavement)

Schedule A Schedule B Schedule D

475 TON

8,800 TON

3,500 TON

409 Asphalt Surface Treatment Surface Treatment Aggregates

Schedule A Schedule B Schedule C

Emulsified Asphalt Schedule A Schedule B Schedule C

3,190 TON

7,500 TON

3,240 TON

375 TON

880 TON

380 TON

414 Crack, Cleaning Routing and Sealing Schedule A Schedule B Schedule C Schedule D

40,000 LNFT

42,500 LNFT

6,300 LNFT

1,700 LNFT

416 Continuous Cold Recycled Asphalt Base Course (asphalt pavement recycling)

Schedule B Emulsified Binder Agent

Schedule B Blotter

Schedule B

77,000 SQYD

190 TON

390 TON

DIVISION 600 –Incidental Construction 634 Permanent Pavement Markings (traffic pavement markings)

Schedule A Schedule B Schedule C Schedule D

302,016 LNFT

937,728 LNFT

344,256 LNFT

40,128 LNFT

635 Temporary Traffic Control

Flagger Schedule A Schedule B Schedule C Schedule D

644 HRS

1,088 HRS

672 HRS

160 HRS

Pilot Car

Schedule A Schedule B Schedule C Schedule D

Traffic and Safety Supervisor Schedule A Schedule B Schedule C Schedule D

80 HRS

200 HRS

72 HRS

32 HRS

160 HRS

312 HRS

168 HRS

40 HRS

File details come from the government source that posted it. Updated .