ProjectDescription_TetonParkRd.pdf

PDF 30 KB Posted

Attached to
RECOVERY - WY PRA GRTE 11(4) & 112(1), Teton Park Road (Spalding Bay - Jackson Lk Junction) & Signal Mtn Marina Road
Solicitation number
DTFH70-09-B-00012
Issued by

About this file

Project Description

View the file

Other files

File Type Posted
A004_Teton.pdf PDF
A003_Teton.pdf PDF
A002_TetonParkRoad.pdf PDF
Amentment A001_TetonPark.pdf PDF
PhysicalDataRequest_TetonPark.pdf PDF
http //www.wfl.fhwa.dot.gov/edi/plans/grandteton/ —
IFB_SOL_Book 1_TetonPark.pdf PDF
PlanRequestForm_TetonPark.pdf PDF
IFB_SOL_Book 2_TetonPark.pdf PDF
Call for HUBZone_TetonParkRd.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WY PRA GRTE 11(4) & 112(1), Teton Park Road & Signal Mountain Marina Road, Grand Teton National Park, Wyoming

The work consists of subexcavation, base and paving and other small items of work.

Project length: 14.069 & 0.870 Kilometers

Fixed Completion Date: August 20, 2010

Estimated Price Range: $3 million to $5 million

Location: 39.4 Kilometers North of Jackson, WY.

DESCRIPTION OF WORK in US CUSTOMARY UNITS

DIVISION 150 –Project Requirements 152 Construction Survey & Staking X YES NO 153 Contractor Quality Control and Assurance X YES NO 154 Contractor Sampling & Testing X YES NO 155 Schedules for Construction Contracts (construction schedules) X YES NO 157 Soil Erosion Control Devices (erosion control devices) 100 m

DIVISION 200 –Earthwork 203 Removal of Structures & Obstructions

(Removal of curb and gutter, concrete) (Removal of curb, asphalt) (Removal of sidewalk, concrete)

240 m 450 m 55 m2

204 Excavation & Embankment (Subexcavation) (Roadway Excavation)

700 m3 120 m3

207 Earthwork Geotextiles (geotextiles) (geogrid)

30 m2 1800 m2

211 Roadway Obliteration 800 m2

DIVISION 250 - Slope Reinforcement and Retaining Walls 251 Riprap 10 m3

DIVISION 300 –Aggregate Courses 303 Road Reconditioning (Shoulder reconditioning) 1000 m 308 Minor Crushed Aggregate (crushed aggregate) 2600 t 310 Recycled Aggregate Course (asphalt pavement recycling) 27016 m2

DIVISION 400 –Asphalt Pavements & Surface Treatments 401 Superpave Hot Asphalt Concrete Pavement 20000 t 411 Asphalt Prime Coat (asphalt surface treatment) 16 t 412 Asphalt Tack Coat (asphalt surface treatment) 66 t

DIVISION 600 –Incidental Construction 609 Curb & Gutter (concrete)

(asphalt) 540 m 900 m

615 Sidewalks, Drive Pads & Paved Medians (concrete –minor structures) 160 m2

617 Guardrail (Terminals)

450 m 3 each

619 Fences, Gates & Cattle Guards 2 each 622 Rental Equipment X YES NO 633 Permanent Traffic Control Devices (Snowpole holders) 600 each 634 Permanent Pavement Markings (type B, solid yellow)

(type B, solid white) (type B, broken yellow) (Symbols)

42,000 m 30,000 m 10,300 m 25 each

635 Temporary Traffic Control (Cone) (drum) (pavement markings) (Sign) (supervisor)

600 each 100 each 28,500 m 100 m2 61 day

Flagger: Hours:1,550 Pilot Car: Hours:580