WY PRA GRTE 11(4) & 112(1), Teton Park Road & Signal Mountain Marina Road, Grand Teton National Park, Wyoming
The work consists of subexcavation, base and paving and other small items of work.
Project length: 14.069 & 0.870 Kilometers
Fixed Completion Date: August 20, 2010
Estimated Price Range: $3 million to $5 million
Location: 39.4 Kilometers North of Jackson, WY.
DESCRIPTION OF WORK in US CUSTOMARY UNITS
DIVISION 150 –Project Requirements 152 Construction Survey & Staking X YES NO 153 Contractor Quality Control and Assurance X YES NO 154 Contractor Sampling & Testing X YES NO 155 Schedules for Construction Contracts (construction schedules) X YES NO 157 Soil Erosion Control Devices (erosion control devices) 100 m
DIVISION 200 –Earthwork 203 Removal of Structures & Obstructions
(Removal of curb and gutter, concrete) (Removal of curb, asphalt) (Removal of sidewalk, concrete)
240 m 450 m 55 m2
204 Excavation & Embankment (Subexcavation) (Roadway Excavation)
700 m3 120 m3
207 Earthwork Geotextiles (geotextiles) (geogrid)
30 m2 1800 m2
211 Roadway Obliteration 800 m2
DIVISION 250 - Slope Reinforcement and Retaining Walls 251 Riprap 10 m3
DIVISION 300 –Aggregate Courses 303 Road Reconditioning (Shoulder reconditioning) 1000 m 308 Minor Crushed Aggregate (crushed aggregate) 2600 t 310 Recycled Aggregate Course (asphalt pavement recycling) 27016 m2
DIVISION 400 –Asphalt Pavements & Surface Treatments 401 Superpave Hot Asphalt Concrete Pavement 20000 t 411 Asphalt Prime Coat (asphalt surface treatment) 16 t 412 Asphalt Tack Coat (asphalt surface treatment) 66 t
DIVISION 600 –Incidental Construction 609 Curb & Gutter (concrete)
(asphalt) 540 m 900 m
615 Sidewalks, Drive Pads & Paved Medians (concrete –minor structures) 160 m2
617 Guardrail (Terminals)
450 m 3 each
619 Fences, Gates & Cattle Guards 2 each 622 Rental Equipment X YES NO 633 Permanent Traffic Control Devices (Snowpole holders) 600 each 634 Permanent Pavement Markings (type B, solid yellow)
(type B, solid white) (type B, broken yellow) (Symbols)
42,000 m 30,000 m 10,300 m 25 each
635 Temporary Traffic Control (Cone) (drum) (pavement markings) (Sign) (supervisor)
600 each 100 each 28,500 m 100 m2 61 day
Flagger: Hours:1,550 Pilot Car: Hours:580