AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A002 December 4, 2009 N/A WY PRA GRTE 11(4), Teton Park Road
WY PRA GRTE 112(1), Signal MTN Marina Road
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X DTFH70-09-B-00012
9B. DATED (SEE ITEM 11)
9/25/2009
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WY PRA GRTE 11(4), TETON PARK ROAD (Spalding Bay –Jackson Lake Junction)
WY PRA GRTE 112(1), SIGNAL MTN MARINA ROAD
See page 2 for other revisions.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
New Bid Opening Date: December 16, 2009
Amendment No. A002, dated 12/4/2009 WY PRA GRTE 11(4) Solicitation No. DTFH70-09-B-00012 Teton Park Road (Spalding Bay - Jackson LK Junction) Page 2 WY PRA GRTE 112(1)
Signal Mtn Marina Road
REVISIONS ARE AS FOLLOWS:
Notice To Bidders
Page A-1. Revises cut-off date to receive technical questions
SF 1442, Solicitation, Offer and Award
Page A-3, block 13A. Revises bid opening date out to December 16, 2009.
BID SCHEDULE
Page A-10 Revises bid item 30802-1000 to be “Government furnished” Page A-12 Revises bid item 62201-0250 quantity to 286 hours Page A-12 Revises bid item 62201-1000 quantity to 356 hours Page A-12 Revises bid item 62201-2850 quantity to 27 hours
SPECIAL CONTRACT REQUIREMENTS
Page E-6, Subsection 105.02 Material Sources. Revises Subsections 105.02(a)(1) and 105.02(a)(2), to provide for government furnished roadway aggregate.
Page E-19, Subsection 108.01 Commencement, Prosecution, and Completion of Work.
Adds paragraph (d).
Page F-4, Section 303 Road Conditioning and Section 305 Aggregate-Topsoil Course.
Reformatted to accommodate changes to Page F-5.
Page F-5, Section 308 Minor Crushed Aggregate. Adds Section.
Page F-22, Section 605 Underdrains, Sheet Drains, and Pavement Edge Drains. Adds Section.
Page F-28, Subsection 622.02 Rental Equipment. Revises quantity of wheel loader.
New Bid Opening Date: December 16, 2009
Notice to Bidders: Please submit revised pages A-7 through A-14 with your bid.
NOTE: Failure to submit this revised schedule will make your bid nonresponsive and will result in the rejection of your bid.
Amendment No. A002, dated 12/4/2009 WY PRA GRTE 11(4) Solicitation No. DTFH70-09-B-00012 Teton Park Road (Spalding Bay - Jackson LK Junction) Page 3 WY PRA GRTE 112(1)
Signal Mtn Marina Road
PLANS
Plan sheet #A.2 Adds sheet E.16 to index. Revises“B.1-2”to“B.1-3” Plan sheet #B.1 Revises bid item 30802-1000to be “Government furnished” Plan sheet #B.1 For Item 40101-1000 (type IV): 1) Adds estimated quantity in
“Section E” column; and 2) Revises“Plan” quantity in “Estimated Quantities”column.
Plan sheet #B.2 Revises Bid Schedule hours for Items 62201-0250, 622201-1000, and 62201-2850.
Plan sheet #B.3 Reformats sheet. Correct sheet number to from “B.2” to “B.3”.
Plan sheet #E.16 Adds new plan sheet.
Plan sheet #G.10 Revises plan sheet (many changes).
PLANS - PEN AND INK CHANGE
Please make the following pen & ink change:
Plan sheet #C.1 In the “Subexcavation Quantities” table, add “Government furnished” tothe description for Item 30802-1000.
ENCLOSURES
Pages:
A-1 A-3/A-4 A-7 through A-14 E-6 E-19 F-4 F-5 F-22 F-28
Plans A.2 B.1 through B.3 E.16 G.10
Page not included due to Pen and Ink change:
C.1
A-1
Special Contract Requirements Project: WY PRA GRTE 11(4) Teton Park Road (Spalding Bay - Jackson LK Jct) WY PRA GRTE 112(1) Signal Mtn Marina Road
03M07/06/09
NOTICE TO BIDDERS
I. Project Location.
The project work is located 41 kilometers (25 miles) north of Jackson, Wyoming in Teton County.
Signs have not been erected to identify the project limits. No Government personnel will be available for show-me tours.
II. Pre- bid Information.
This solicitation includes electronic plan sheets. Plan sheets can be found at http://www.wfl.fhwa.dot.gov/edi/plans/grandteton/ and viewed by individual sections, downloaded by individual sections, or the entire plan set downloaded in a zip file. A paper copy of the plan sheets is available by submitting the form included in this solicitation. A CD of the physical data is available by submitting the form included in this solicitation.
Recovery Act Requirements. This procurement action will be conducted as part of the American Recovery and Reinvestment Act (Recovery Act) dated February 17, 2009. This solicitation and the resulting contract will be subject to the transparency, accountability, and reporting requirements of the Recovery Act. Special Provisions and Clauses included in this solicitation and the resulting contract pursuant to the Recovery Act are Federal Acquisition Regulation (FAR) Provisions and Clauses:
52.203-15 dealing with whistleblower protections;
52.204-11 dealing with reporting requirements;
52.214-26 (Alt. I) dealing with record keeping and access to records requirements; and
52.225-21 and 52.225-22 dealing with Buy American Act requirements.
Revised by Amendment A002
TECHNICAL QUESTIONS REGARDING PROPOSED WORK FOR THIS
PROJECT WILL BE ACCEPTED UNTIL CLOSE-OF-BUSINESS ON
DECEMBER 10, 2009.
Questions can be submitted and answers viewed by going to project information at:
http://www.wfl.fhwa.dot.gov/contracting/construction/advertised.htm
Every attempt to respond to questions will be made. However, response to questions received after the above posted date is not guaranteed.
1. Solicitation No. 2. Type of Solicitation 3. Date Issued Page
SOLICITATION, OFFER, AND AWARD
DTFH70-09-B-00012 x Sealed Bid (IFB) 9/25/09 A-3 (Construction, Alteration, or Repair) Negotiated (RFP)
IMPORTANT– The “offer” section on the reverse must be fully completed by offeror.
4. Contract No. - 5. Requisition/Purchase Request No. 6. Project No.
N/A WY PRA GRTE 11(4) Teton Park Road (Spalding Bay-Jackson LK Jct) WY PRA GRTE 112(1) Signal Mtn Marina Road
7. Issued By Code: N/A 8. Address Offer to Code: N/A U.S. Department of Transportation Attn: Contracts Section Federal Highway Administration 610 East Fifth Street .
Vancouver WA 98661-3801
A. Name B. Telephone No. (Include area code) (No Collect Calls)
See page A-5. 360.619.75209. For Information Call:
SOLICITATION
NOTE: In sealed bid solicitation “offer” and “offeror” mean “bid” and “bidder”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:
This solicitation is designated WY PRA GRTE 11(4) Teton Park Road (Spalding Bay-Jackson LK Jct) WY PRA GRTE 112(1) Signal Mtn Marina Road, Grand Teton National Park, Teton County, Wyoming
IN STRICT ACCORDANCE WITH:
Bid Schedule Federal Acquisition Regulations (FAR) and Transportation Acquisition Regulations (TAR) General Wage Decision Special Contract Requirements Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 metric.
11. The Contractor shall begin performance within 10 calendar days and complete it within __*___ calendar days after receiving the award, x notice to proceed. This performance period is x mandatory negotiable. ( See *see page A-5 .)
12A. The Contractor must furnish any required performance and payment bonds? 12B. Calendar Days
(If “YES”, indicate within how many calendar days after award in item 12B.)
x Yes No 10
13. Additional Solicitation Requirements:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 2:00 PM local time
12/16/09. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.Revised by Amendment A001 & A002
B. An offer guarantee x is Is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 Standard Form 1442 (REV. 4-85) Prescribed by GSA FAR (48 CFR) 53.236-1 (e)
A-4 OFFER (Must be fully completed by offeror)
15. Telephone No. (Include are code)14. Name and Address of Offeror (Include ZIP Code)
DUNS number:
16. Remittance Address (Include on it different than Item 14)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this is accepted by the Government in writing within 60 calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D.
Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
See Bid Schedule
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendment to the solicitation - give number and date of each)
AMENDMENT
No.
DATE
20A NAME,TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or Print) 20B. SIGNATURE 20c. OFFER DATE
AWARD (to be completed by Government)
21. ITEM(S) ACCEPTED
All items on Bid Schedule.
22. Amount 23. Accounting and Appropriation Data
25. Other Than full and open competition pursuant to24. Submit Invoices to Address shown in (4 copies unless otherwise specified)
Item See
Page A-5 10 U.S.C. 2304(c) (_____) 41 U.S.C 253 (c) (_____)
26. Administered by Payment will be made by
Federal Highway Administration Western Federal Lands Highway Division 610 East Fifth Street Vancouver WA 98661-3801
Finance Section Western Federal Lands Highway Division 610 East Fifth Street Vancouver WA 98661-3801
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
X28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and(c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. Name and Title of Contractor or Person authorized to sign (Type or Print)
31A. Name of Contracting Officer (Type or Print)
Julee McTaggart 30b. Signature 30C. Date 31B. United States of America
By
31C. Award Date
STANDARD FORM 1442 BACK (REV. 4-85)
A-7
Bid Schedule Project: WY PRA GRTE 11(4) TETON PARK ROAD (SPALDING BAY - JACKSON LK JCT)
WY PRA GRTE 112(1) SIGNAL MTN MARINA ROAD
Bid Schedule
Project: WY PRA GRTE 11(4) Teton Park Road (Spalding Bay - Jackson LK Jct) WY PRA GRTE 112(1) Signal Mtn Marina Road
BRAND NAME OR EQUAL NOTIFICATION
If providing other than the brand name product listed in Section 157, complete the following:
(See FAR Provision 52.211-6, Brand Name or Equal)
Offering on Item 15706-1000, Soil erosion control, inlet protection. In lieu of brand name specified for The Dandy BagII in Subsection 713.13A:
Brand: __________________________________________
Manufacturer’s Name: _____________________________
Include with your bid all documents needed by the Government to determine if the proposed product meets the requirements listed in the appropriate Section. The determination as to the equality of the product offered is the responsibility of the Government and will be based on the information furnished by the bidder as well as other information reasonably available to
Project: WY PRA GRTE 11(4) TETON PARK ROAD (SPALDING BAY - JACKSON LK
WY PRA GRTE 112(1) SIGNAL MTN MARINA ROAD
Bidder please note: Before preparing the bid, carefully read the Solicitation Provisions.
Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid.
Should any mathematical check made by the Government show a mistake in the amount bid, the Amount Bid for the item will be based on the Unit Bid Price.
When "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.
When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.
Total the amounts bid for all pay items and insert the total bid amount.
The quantity for the following item of work is a Contract Quantity (see FP-03, Subsection 109.02):
31001-0000
A- 8
Bid Schedule
Pay Item No.
Estimated Quantity Unit Bid Price Amount Bid
15101-0000 Mobilization
ALL Lump Sum $___________________
15201-0000 Construction survey and staking
ALL Lump Sum $___________________
15301-0010 Contractor quality control and assurance
ALL Lump Sum $___________________
15401-0000 Contractor testing
ALL Lump Sum $___________________
15501-0000 Construction schedule
ALL Lump Sum $___________________
15705-0100 Soil erosion control, silt fence m $_______________ $___________________
Project: WY PRA GRTE 11(4) TETON PARK ROAD (SPALDING BAY - JACKSON LK
Bid Schedule A
Pay Item No.
Estimated Quantity Unit Bid Price Amount Bid
A- 9
15706-1000 Soil erosion control, inlet protection
Each $_______________ $___________________
20301-1100 Removal of gate
Each $_______________ $___________________
20301-3400 Removal of wheelstop
Each $_______________ $___________________
20302-0300 Removal of curb and gutter, concrete m $_______________ $___________________
20302-0400 Removal of curb, asphalt m $_______________ $___________________
20302-1200 Removal of guardrail m $_______________ $___________________
20303-3200 Removal of sidewalk, concrete m2 $_______________ $___________________
20401-0000 Roadway excavation m3 $_______________ $___________________
20402-0000 Subexcavation m3 $_______________ $___________________
20701-1300 Earthwork geotextile, type IV-B m2 $_______________ $___________________
20703-0000 Geogrid
1,800 m2 $_______________ $___________________
21101-1000 Roadway obliteration, method 1 m2 $_______________ $___________________
Project: WY PRA GRTE 11(4) TETON PARK ROAD (SPALDING BAY - JACKSON LK
Estimated Quantity Unit Bid Price Amount Bid
A- 10
25101-3000 Placed riprap, class 3 m3 $_______________ $___________________
25125-0000 Boulder Each $_______________ $___________________
30302-2000 Shoulder reconditioning 1,000 m $_______________ $___________________ 30802-1000 Roadway aggregate, method 1 "Government Furnished"
2,600 t $_______________ $___________________
31001-0000 Recycled aggregate base 25,267 m2 $_______________ $___________________ 40101-1000 Superpave pavement, 19mm nominal maximum size aggregate, 0.3 to <3 million
ESAL , type IV pavement roughness 16,500 t $_______________ $___________________ 40101-1000 Superpave pavement, 19mm nominal maximum size aggregate, 0.3 to <3 million
ESAL , type V pavement roughness 3,500 t $_______________ $___________________ 40105-3000 Antistrip additive, type 3 t $_______________ $___________________
41101-1000 Prime coat, grade CMS-2 t $_______________ $___________________ 41105-0000 Blotter t $_______________ $___________________
41201-1000 Tack coat grade CSS-1, CSS-1h, SS-1, or SS-1h t $_______________ $___________________
Project: WY PRA GRTE 11(4) TETON PARK ROAD (SPALDING BAY - JACKSON LK
WY PRA GRTE 112(1) SIGNAL MTN MARINA ROAD
Bid Schedule A
Revised by Amendment A002
Estimated Quantity Unit Bid Price Amount Bid
A- 11
41410-1000 Crack, cleaning and sealing
1,000 m $_______________ $___________________
60406-0000 Inlet adjustment
Each $_______________ $___________________
60501-0000 Standard underdrain system m $_______________ $___________________
60704-0000 Cleaning culvert in place
Each $_______________ $___________________
60901-2100 Curb, asphalt, 100mm depth
1,000 m $_______________ $___________________
60902-1000 Curb and gutter, concrete, 300mm depth m $_______________ $___________________
60910-0000 Reset curb m $_______________ $___________________
60920-0000 Reset wheelstop
Each $_______________ $___________________
61108-1000 Adjust water valve
Each $_______________ $___________________
61501-0100 Sidewalk, concrete m2 $_______________ $___________________
61701-1850 Guardrail system G4, type 4, class A wood posts m $_______________ $___________________
61702-0800 Terminal section type tangent
Each $_______________ $___________________
Project: WY PRA GRTE 11(4) TETON PARK ROAD (SPALDING BAY - JACKSON LK
Estimated Quantity Unit Bid Price Amount Bid
A- 12
61707-1000 Structure transition railing, G4 system m $_______________ $___________________
61902-0900 Gate, metal Each $_______________ $___________________
62201-0250 Dump truck, 10 cubic meter minimum capacity Hour $_______________ $___________________
62201-0400 Backhoe loader, 60 liter minimum rated capacity bucket, 300mm width Hour $_______________ $___________________
62201-1000 Wheel loader, 4 cubic meter minimum rated capacity Hour $_______________ $___________________
62201-1800 Bulldozer, universal blade, 150kW minimum Hour $_______________ $___________________
62201-2050 Roller Hour $_______________ $___________________
62201-2850 Motor grader, 3.6 meter minimum blade Hour $_______________ $___________________
62201-3400 Hydraulic excavator, 1.1 cubic meter minimum capacity with thumb attachment Hour $_______________ $___________________
62301-0000 General labor Hour $_______________ $___________________
62406-0100 Placing conserved topsoil, 50mm depth 0.9 ha $_______________ $___________________ 62510-2000 Seeding, hydraulic method
0.8 ha $_______________ $___________________
Project: WY PRA GRTE 11(4) TETON PARK ROAD (SPALDING BAY - JACKSON LK
WY PRA GRTE 112(1) SIGNAL MTN MARINA ROAD
Bid Schedule A
Revised by Amendment A002
Revised by Amendment A002
Revised by Amendment A002
Estimated Quantity Unit Bid Price Amount Bid
A- 13
62515-2000 Mulching, hydraulic method
0.8 ha $_______________ $___________________
63316-1000 Remove and reset sign
Each $_______________ $___________________
63318-1000 Snowpole holder
Each $_______________ $___________________
63401-0300 Pavement markings, type B, solid yellow
42,000 m $_______________ $___________________
63401-0300 Pavement markings, type B, solid white
30,000 m $_______________ $___________________
63401-0400 Pavement markings, type B, broken yellow
10,500 m $_______________ $___________________
63405-0500 Pavement markings, type B, turn arrow
Each $_______________ $___________________
63405-0550 Pavement markings, type B, straight arrow
Each $_______________ $___________________
63405-0650 Pavement markings, type B, "ONLY" word message
Each $_______________ $___________________
63405-0850 Pavement markings, type B, accessibility symbol
Each $_______________ $___________________
63502-0900 Temporary traffic control, cone, type 700mm
Each $_______________ $___________________
63502-1300 Temporary traffic control, drum
Each $_______________ $___________________
Project: WY PRA GRTE 11(4) TETON PARK ROAD (SPALDING BAY - JACKSON LK
Estimated Quantity Unit Bid Price Amount Bid
A- 14
63503-0700 Temporary traffic control, pavement markings
28,500 m $_______________ $___________________
63504-1000 Temporary traffic control, construction sign m2 $_______________ $___________________
63506-0600 Temporary traffic control, pilot car
Hour $_______________ $___________________
63507-0700 Temporary traffic control, traffic and safety supervisor
Day $_______________ $___________________
63509-1000 Temporary traffic control, flagger
1,550
Fix hr rate 22.00 34,100.00
$_____________________TOTAL
Submitted by:
Name of Bidder
Project: WY PRA GRTE 11(4) TETON PARK ROAD (SPALDING BAY - JACKSON LK
E-6
Project: WY PRA GRTE 11(4) Teton Park Road (Spalding Bay - Jackson LK Jct) WY PRA GRTE 112(1) Signal Mtn Marina Road
03M05/12/09
Section 105.— CONTROL OF MATERIAL
105.02 Material Sources. Amend as follows:
Add the following:
Unless a source is listed as mandatory, the decision to use an identified source is solely that of the Contractor.
(a) Government-provided sources. Add the following to the third paragraph:
Do not perform aggregate source quality tests listed in the Sampling and Testing Requirements Table of other Sections when using Government-provided sources.
Add the following:
Government-provided sources for this project are identified as follows:
(1) Government-provided mandatory sources. Obtain material for use as aggregates under Section 308 from the Spread Creek Pit.
Spread Creek Pit is a gravel deposit located approximately 3 kilometers east of Highway 26/89/187 and approximately 42 kilometers from Jackson, Wyoming, at MP
26. The Pit site is located on lands administrated by the USFS, Bridger-Teton National Forest, in sections 14 and 15 of T44N, R114W as shown on the plans. The Special Use Permit for this source is contained in Section H, Permits.
(2) Government-provided optional sources. Material for use as borrow, riprap, and in the production of aggregates, under Sections 204, 251, 401, may be obtained from the Spread Creek Pit.
Segregate or assure that stone material obtained from the stockpile at Spread Creek Pit remains available in quality and dimension for work under Sections 251.
Heat materials obtained from Spread Creek Pit that are stockpiled outside of the Spread Creek Pit and Park boundaries to 150ºC to ensure sterilization of any noxious weed seed. Heat the materials within 24 hours prior to re-delivery into the Park. These requirements may be waived if the Contractor’s stockpile site meets Park weed-free requirements.
If the Contractor elects to obtain material from, or stockpile materials at the Spread Creek Pit, the following restrictions apply:
(a) Operation in the pit is allowed between the hours of 6 am and 9 pm beginning June 1 through October 31. Operation in the pit is not permitted during the first
E-19
WY PRA GRTE 112(1) Signal Mtn Marina Road
03M05/12/09
Section 108.— PROSECUTION AND PROGRESS
108.01 Commencement, Prosecution, and Completion of Work. Add the following:
Furnish at least 48 hours advance notice before changing the current work schedule. Work schedule changes that include additional shifts require 14 days notice. Notify the CO in writing 7 days prior to working in parking areas or turnouts.
(a) Do not perform construction operations between 6 pm Friday and 6 am the following Tuesday of the Memorial Day and Labor Day weekends, and according to Subsection 156.06(k).
(b) Limit work that disturbs the surface of the traveled way as provided for under Subsections 156.03 and 156.06.
(c) Limit work within Spread Creek Pit according to Subsection 105.02.
(d) Provide 14 days notice to the CO before commencing construction activities at the Brinkerhoff Parking Area."
108.01A Labor. (Added Subsection.)
Follow the requirements of FAR Clause 52.222-6 Davis Bacon Act.
Adjacent or virtually adjacent work sites are defined to be work sites within 0.8 kilometers of the project. Application of the Davis-Bacon Act for work sites beyond 0.8 kilometers of the project will be determined by the CO.
108.02 Subcontracting. Amend as follows:
Delete the first paragraph and substitute the following:
Follow the requirements of FAR clauses 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns, 52.222-11 Subcontracts (Labor Standards), and 52.236-1, Performance of Work by the Contractor.
Delete the fourth paragraph and substitute the following:
In FAR Clauses 51.219-8, Utilization of Small Business Concerns and 52.232-27, Prompt Payment for Construction Contracts, the subcontracts include both on-site work and supply contracts.
Evaluate the percentage of the cost of contract performance incurred for personnel in FAR Clause 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns, according to the following formula:
P = H / T
Where:
F-4
WY PRA GRTE 112(1) Signal Mtn Marina Road
Section 303.— ROAD RECONDITIONING
Description
303.01 Delete the text of this Subsection and substitute the following:
This work consists of reconditioning shoulders and placing aggregate topsoil.
Material
303.02 Add the following to the materials list:
Aggregate Topsoil 703.20
Construction Requirements
303.04 Shoulder Reconditioning. Delete the text of this Subsection and substitute the following:
Repair soft and unstable areas by shaping and filling in ruts and depressions with aggregate topsoil according to Section 305 and according to details on plans. Do not disturb or remove any vegetation within the unpaved foreslope unless directed by the CO. Reshape shoulder and dispose of waste according to Subsection 204.14.
03M01/01/04
Section 305.— AGGREGATE-TOPSOIL COURSE
Description
305.01 Delete the text of this Subsection and substitute the following:
This work consists of furnishing and placing an aggregate-topsoil course on a prepared shoulder or other prepared surface.
Material
305.02 Delete the text of this Subsection and substitute the following:
Conform to the following Subsection:
Aggregate-topsoil 703.20 Water 725.01
Reformatted by Amendment A002
F-5
WY PRA GRTE 112(1) Signal Mtn Marina Road
Construction Requirements
305.04 Mixing, Placing, and Compacting. Delete the text of this Subsection and substitute the following:
Furnish a mixture of 50±10 percent aggregate and 50±10 percent topsoil by volume with sufficient water for compaction.
Mix the components into a uniform mixture. Spread the mixture on the prepared surface in a uniform layer. Shape the mixture to the line, grade, and cross-section. Remove all clods and stones greater than 2 inches in diameter.
Uniformly compact the mixture so that it does not exhibit heaving, pumping, rutting, or shearing.
Compaction tests may be waived by the CO if acceptable compaction is demonstrated.
Remove all material from the pavement surface upon completion.
Government provided topsoil from the RKO Pit (16+493) stockpile may be used for the production of aggregate-topsoil course as quantity of stockpile allows and approved by the CO.
305.05 Acceptance. Delete the text of this Subsection and substitute the following:
See Table 305-1 for sampling and testing requirements.
Aggregate material will be evaluated under Subsection 106.03. Topsoil material and placement of material will be evaluated under Subsections 106.02 and 106.04.
Section 308.— MINOR CRUSHED AGGREGATE
Description
308.01 Delete the text of this Subsection and substitute the following:
This work consists of placing crushed aggregate for bedding, backfill, and roadway aggregate courses.
F-22
WY PRA GRTE 112(1) Signal Mtn Marina Road
Section 605.— UNDERDRAINS, SHEET DRAINS, AND PAVEMENT EDGE DRAINS
Description
605.01 Add the following:
This work also consists of furnishing and installing underdrain systems using pipe, granular backfill, and geotextile
Section 607.— CLEANING, RECONDITIONING, AND
REPAIRING EXISTING DRAINAGE STRUCTURES
Description
607.04 Cleaning Culverts in Place. Add the following:
Provide clean inlet and outlet ditches and adequate drainage as directed by the CO.
Section 609.— CURB AND GUTTER
Materials
609.02 Add the following to the material list:
Tack Coat 412 Portland cement 701.01(a)
Provide an asphalt mixture with 50 kg of Portland cement added per ton of dry aggregate. Adjust the percent of asphalt binder in the material to provide a workable mixture.
Construction Requirements
609.08 Wheelstops. Amend as follows:
Delete the text of Subsection and substitute the following:
Adhere wheelstops with tack coat. Reset wheelstop in the same manner.
F-28
WY PRA GRTE 112(1) Signal Mtn Marina Road
Construction Requirements
622.02 Rental Equipment. Delete the text of the first paragraph and substitute the following:
Furnish and operate the following equipment:
Number of Units Type of Equipment
1 Dump truck, 10 cubic meter minimum capacity.
1 Backhoe loader, 60 liter minimum rated capacity.
1 Motor grader, 3.6 meter minimum blade.
2 Wheel loader, 4 cubic meter minimum rated capacity
1 Roller.
1 Bulldozer, universal blade, 150 kW minimum.
1 Hydraulic excavator, 1.1 cubic meters minimum capacity with thumb attachment.
Submit the model number and serial number for each piece of equipment before use. Make equipment available for inspection and approval before use.
Clean equipment according to Subsection 107.11.
A.2
STATE PROJECT
INDEX TO SHEETS
INDEX TO SHEETS
A. GENERAL INFORMATION
B. SUMMARIES
C. TYPICAL SECTION(S)
D. PLAN & PROFILE
E. ROAD APPROACHES AND TURNOUTS
PRA-GRTE 11(4)
PRA-GRTE 112(1)
F. EROSION CONTROL
G. MISCELLANEOUS DETAILS
H. TEMPORARY TRAFFIC CONTROL PLAN
I. PERMANENT TRAFFIC CONTROL PLAN
NPS Pkg. No. 58792 & 65275 Drwg. No. 136/10067
F.1
F.2
F.3
G.1-2
G.3
G.4-8
G.9
G.10-11
H.1
H.2
H.3
H.4
H.5
H.6
H.7
H.8
I.1
I.2
I.3-5
I.6
I.7
I.8
SHEET
NUMBER
WY
I P
P
W P
:d m s D
E C
7/2009 A. Ahola
C h e c k e d b y
7/2009
Eagle Design Team D e s ig n e d b y
Erosion Control Details, Teton Park Road
Erosion Control Details, Silt Fence
Inlet Protection & Energy Dissipator Details
Gate, Double, Tubular Steel Details
Roadway Obliteration Details
Guardrail Details
Drop Inlet & Valve Box Adjustment Details
Spread Creek Pit Plan
Tabulation of Temporary Traffic Control Quantities
Advance Signing
Temporary Traffic Control, Advance Signing
Temporary Traffic Control, Temporary Pavement Markings
Temporary Traffic Control, Delineation and Signing for Unmarked Pavements
Temporary Traffic Control, Single Lane Closure Layout
Temporary Traffic Control, Shoulder Closure Layout
Temporary Traffic Control, Sign Installation
Permanent Traffic Control Tabulation of Quantities
Pavement Marking Layout, Intersections
Pavement Marking Layout, Parking Areas
Snowpole Holder Details
Pavement Marking Details
Linear Pavement Markings
Revised by Amendment A002
Title Sheet
Index To Sheets
Plan Symbols & Abbreviations
Vicinity Map
Summary of Quantities
Tabulation of Pavement Quantities
Typical Sections, Teton Park Road
Typical Sections, Teton Park Road & Signal Mtn. Marina Road
Typical Section, Subexcavation Details, Teton Park Road
Tabulation of Quantities
Line Diagram, Teton Park Road
Line Diagram, Signal Mtn. Marina Road
Tabulation of Quantities
Road Approach Details, Teton Park Road
Turnout and Parking Details, Teton Park Road
Turnout and Parking Details, Signal Mtn. Marina Road
Curb and Sidewalk Details
Wheelchair Ramp Curb Cut Detail
Parallel Curb Ramp Detail
Paved Turnout & Shoulder Widening Details
Brinkerhoff Parking Area
A.1
A.2
A.3
A.4
B.1-3
C.1
C.2
C.3
C.4
D.1
D.2-11
D.12
E.1
E.2-3
E.4-8
E.9-11
E.12
E.13
E.14
E.15
E.16
PLAN SHEET SECTION -------->> Section C Section D Section E Section G Section H Section I
Typical Plan Road Miscella
Sections Approahes neous Temporary Permanent BID
ITEM DESCRIPTION UNIT Turnouts Traffic Traffic PLAN SCHEDULE
15101-0000 Mobilization LPSM ALL ALL
15201-0000 Construction survey and staking LPSM ALL ALL
15301-0010 Contractor quality control and assurance LPSM ALL ALL
15401-0000 Contractor testing LPSM ALL ALL
15501-0000 Construction schedule LPSM ALL ALL
15705-0100 Soil erosion control, silt fence m 434 434 500
15706-1000 Soil erosion control, inlet protection Each 5 5 5
20301-1100 Removal of gate Each 2 2 2
20301-3400 Removal of wheelstop Each 24 24 24
20302-0300 Removal of curb and gutter, concrete m 228 228 240
20302-0400 Removal of curb, asphalt m 437 437 450
20302-1200 Removal of guardrail m 370 370 370
20303-3200 Removal of sidewalk, concrete m2 50 50 55
20401-0000 Roadway excavation m3 109 109 120
20402-0000 Subexcavation m3 623 47 670 700
20701-1300 Earthwork geotextile, type IV-B m2 29 29 30
20703-0000 Geogrid m2 1749 1749 1,800
21101-1000 Roadway obliteration, method 1 m2 765 765 800
25101-3000 Placed riprap, class 3 m3 10 10 10
25125-0000 Boulder Each 3 3 3
30302-2000 Shoulder reconditioning m 10000 1000 1,000
30802-1000 Roadway aggregate, method 1 "Government
2 Furnished" t 2538 2538 2,600
31001-0000 Recycled aggregate base m2 14517 10750 25267 25,267 (CQ)
40101-1000 Superpave pavement, 19mm nominal maximum size aggregate, 0.3 to <3 million ESAL , type IV
2 pavement roughness t 15732 115 15847 16,500
40101-1000 Superpave pavement, 19mm nominal maximum size aggregate, 0.3 to <3 million ESAL , type V pavement roughness t 620 2745 3365 3,500
2 Revised by Amendment A2
ESTIMATED QUANTITIES
SUMMARY OF QUANTITIES
STATE PROJECT
PRA GRTE 11(4)
PRA GRTE 112(1)
B.1WY
[g r1 S u m m ar y_ A .x ls ]S h ee t -D ec -2
:3 P
M E ag le D es ig n T ea m
A
A h ol a
D es ig n ed b y:
C h ec ke d b y:
Sections Approahes neous Temporary Permanent BID
ITEM DESCRIPTION UNIT Turnouts Traffic Traffic PLAN SCHEDULE
40105-3000 Antistrip additive, type 3 t 164 27 191 200
41101-1000 Prime coat, grade CMS-2 t 16 16 16
41105-0000 Blotter t 314 314 314
41201-1000 Tack coat grade CSS-1, CSS-1h, SS-1, or SS-1h t 53 9 62 66
41410-1000 Crack, cleaning and sealing m 990 990 1,000
60406-0000 Inlet adjustment Each 2 2 2
60501-0000 Standard underdrain system m 28 28 28
60704-0000 Cleaning culvert in place Each 6 752 992 1000
60901-2100 Curb, asphalt, 100mm depth m 240 364 409 435
60902-1000 Curb and gutter, concrete, 300mm depth m 45 364 409 435
60910-0000 Reset curb m 9 9 10
60920-0000 Reset wheelstop Each 8 8 8
61108-1000 Adjust water valve Each 3 3 4
61501-0100 Sidewalk, concrete m2 155 155 160
61701-1850 Guardrail system G4, type 4, class A wood posts m 447 447 450
61702-0800 Terminal section type tangent Each 3 3 3
61707-1000 Structure transition railing, G4 system m 8 8 8
61902-0900 Gate, metal Each 2 2 2
2 62201-0250 Dump truck, 10 cubic meter minimum capacity Hour 286
62201-0400 Backhoe loader, 60 liter minimum rated capacity bucket, 300mm width Hour 80
2 62201-1000 Wheel loader, 4 cubic meter minimum rated capacity Hour 356
62201-1800 Bulldozer, universal blade, 150kW minimum Hour 40
62201-2050 Roller Hour 20
2 62201-2850 Motor grader, 3.6 meter minimum blade Hour 27
62201-3400 Hydraulic excavator, 1.1 cubic meter minimum capacity with thumb attachment Hour 40
62301-0000 General labor Hour 150
2 Revised by Amendment A2
ESTIMATED QUANTITIES
SUMMARY OF QUANTITIES
STATE PROJECT
PRA GRTE 11(4)
PRA GRTE 112(1)
B.2WY
C m yf ile s\ p w p ro d u ct io n \d m s0 g r1
S u m m ar y_ A .x ls ]S h ee t (2
-D ec -2
:3
E ag le D es ig n T ea m
A
A h ol a
D es ig n ed b y:
C h ec ke d b y:
Sections Approahes neous Temporary Permanent BID
ITEM DESCRIPTION UNIT Turnouts Traffic Traffic PLAN SCHEDULE
62406-0100 Placing conserved topsoil, 50mm depth ha .11 0.8 0.9 0.9
62510-2000 Seeding, hydraulic method ha .8 0.8 0.8
62515-2000 Mulching, hydraulic method ha .8 0.8 0.8
63316-1000 Remove and reset sign Each 1 1 1
63318-1000 Snowpole holder Each 545 545 600
63401-0300 Pavement markings, type B, solid yellow m 41778 41778 42,000
63401-0300 Pavement markings, type B, solid white m 29500 29500 30,000
63401-0400 Pavement markings, type B, broken yellow m 10184 10184 10,500
63405-0500 Pavement markings, type B, turn arrow Each 11 11 11
63405-0550 Pavement markings, type B, straight arrow Each 8 8 8
63405-0650 Pavement markings, type B, "ONLY" word message Each 2 2 2
63405-0850 Pavement markings, type B, accessibility symbol Each 4 4 4
63502-0900 Temporary traffic control, cone, type 700mm Each 577 577 600
63502-1300 Temporary traffic control, drum Each 100 100 100
63503-0700 Temporary traffic control, pavement markings m 28200 28200 28,500
63504-1000 Temporary traffic control, construction sign m2 93 93 100
63506-0600 Temporary traffic control, pilot car Hour 580 580 580
63507-0700 Temporary traffic control, traffic and safety supervisor Day 61 61 61
63509-1000 Temporary traffic control, flagger Fix hr rate 1550 1550 1,550
Entire Sheet Revised by Amendment A002
ESTIMATED QUANTITIES
SUMMARY OF QUANTITIES
STATE PROJECT
PRA GRTE 11(4)
PRA GRTE 112(1)
B.3WY
[g r1
S u m m ar y_ A .x ls ]S h ee t (3
-D ec -2
:3 P
M E ag le D es ig n T ea m
A
A h ol a
D es ig n ed b y:
C h ec ke d b y:
NUMBER
SHEET
gkwock Rectangle gkwock Typewritten Text gkwock Typewritten Text
Revision due to table row shift only
ITEM NUMBER DESCRIPTION UNIT
TYPICAL SECTION
QUANTITIES
REMARKS
40101-1000 Superpave pavement, 19mm nominal maximum size aggregate, 0.3 to <3 million ESAL t 115 2.34 tons/m3
PAVEMENT STRUCTURE QUANTITIES
gr1104rf_A2.dgn 12/3/2009 5:06:48 PM
90603001530
SCALE IN METERS
SPREAD CREEK PIT
OPERATION PLAN
SHEET 1 OF 2
Due East
NPS Pkg. No. 58792 & 65275 Drwg. No. 136/10067
G.10
STATE PROJECT
SHEET
NUMBER
PRA-GRTE 11(4)
PRA-GRTE 112(1)
WY
CPCP
SPREAD1
CP
SPREAD1
CP
WELL