REQUEST FOR QUOTE
SOLICITATION NUMBER:
SOLICITATION TYPE:
PROJECT NAME:
DTFH6817Q00004
TOTAL SMALL BUSINESS SET-ASIDE
HARPER'S CORNER ROAD CULVERT
REPAIR
QUOTE DUE DATE:
See Page A-1, Item 13A
ISSUING OFFICE:
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 W. DAKOTA AVENUE, SUITE 360
LAKEWOOD, CO 80228
Web site: http://www.fbo.gov E-mail: CFLContracts@dot.gov mailto:CFLContracts@dot.gov
PROJECT HARPER'S CORNER ROAD CULVERT REPAIR
COUNTY MOFFAT
STATE COLORADO
TYPE OF IMPROVEMENT CULVERT REPAIR
TABLE OF CONTENTS
Notice to Offerors............................................................................................................ A-i
Solicitation, Offer, and Award ........................................................................................ A-1
Basis for Award and Bid Schedule ................................................................................ A-3
APPENDICES
Appendix A ...................................................................................................................Plans
Solicitation Provisions .....................................................................................................B-5
Contract Clauses ..............................................................................................................C-1
Construction Wage Rate Determination .......................................................................... D-1
Bid Schedule & Statement of Work................................................................................ A-6
NOTICE TO BIDDERS
A-i
ELECTRONIC QUOTES WILL BE ACCEPTED. Submit a copy of your quote to the email address listed on the cover page. Please submit the following with your quote:
SF-1442, Solicitation, Offer & Award, Pages A-1 and A-2
Bid Schedule including Buy American Act & Hazardous Materials, Pages A-4 thru A-6
Bidders’ Information, Pages B-1 thru B-4; and Annual Representations and Certifications (FAR 52.204-8), Pages B-6 thru B-10.
Offerors should retain all other pages for their information.
I. PRE-PROPOSAL INFORMATION
It is the responsibility of the offeror to verify that this solicitation document, including the plans, are complete as listed in the table of contents and the index to sheets. Plan sheets can be found at http://www.fbo.gov and viewed by individual sections, downloaded by individual sections, or the entire plan set downloaded in a zip file. Physical data relevant to this solicitation may also be viewed or downloaded at the above site.
This solicitation and subsequent contract are governed by the Federal Acquisition Regulations (FAR), and agency supplemental regulations.
Applicable FAR provisions and clauses in this solicitation are incorporated by reference or full text. FAR provisions and clauses incorporated by reference can be accessed on the Internet at http://farsite.hill.af.mil/vffara.htm.
Notice of SAM Registration – you must register in the System for Award Management (SAM – replaced CCR) prior to award of a contract resulting from this solicitation. Failure to register prior to contract award may require award to the next successful registered offeror. See FAR Subpart 4.1103(c). Register online at www.sam.gov.
Representations and Certifications – This solicitation is issued under NAICS 237310 – Highway, Street & Bridge Construction with a small business size standard of $36.5 million. If your average annual gross receipts for the past 3 years are above $36.5 million, you are a large business for this solicitation. If they are below $36.5 million you are a small business. Please complete the certification listed in paragraph (b) of FAR Provision 52.204-8 Annual Representation and Certifications. The System for Award Management (SAM) is the Official U.S. Government system that consolidated the capabilities of CCR/FedReg, ORCA, and EPLS. Please include NAICS 237310 in SAM. Please include NAICS 237310 in your SAM. Before submitting a quote, please ensure you have completed your annual representations and certifications electronically at the SAM website at www.sam.gov.
NOTICE TO BIDDERS
A-ii
ATTENTION: Minority, Women-owned, and Disadvantaged Business Enterprises (DBEs). The Department of Transportation (DOT), offers working capital financing and bonding assistance for transportation related contracts. DOT's Bonding Assistance Program (BAP) offers bid, performance and payment bonds on contracts up to $1,000,000. DOT's Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $500,000 with interest at the prime rate. For further information, call (800) 532-1169. Internet address:
http://osdbuweb.dot.gov.
Accuracy and Completeness of Quote- The Contractor is fully responsible to verify that all data is correct when an offer is submitted. Failure to properly update your data may cause the offer to be rejected.
Request for Technical Information – Questions relative to the plans and SCRs for this solicitation will only be accepted in writing.
TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL
NOT BE ACCEPTED AFTER 4 P.M. ON MARCH 10, 2017.
Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at http://www.fbo.gov
FAX Number to submit quotes for this project is (720) 963-3360
Email Address to submit quotes for this project is cflcontracts@dot.gov
II. Post Award Information.
Insurance requirements - See Statement of Work, Page A-13.
http://osdbuweb.dot.gov/ mailto:CFLContracts@dot.gov http://www.fbo.gov/
A-1
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration or Repair)
1. SOLICITATION NO.
DTFH6817Q00004
2. TYPE OF SOLICITATION
X SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
March 2, 2017
IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
7. ISSUED BY:
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS DIVISION
12300 WEST DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CODE: 69050001 8. ADDRESS OFFER TO:
Ryan Phillips, Contracting Specialist Federal Highway Administration Central Federal Lands Division Office 12300 W. Dakota Avenue Lakewood, CO 80228
9. FOR INFORMATION CALL
SEE PAGE A-ii
A. NAME:
SEE PAGE A-ii
B. TELEPHONE NO. (Include area code) SEE PAGE A-ii
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:
ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH:
1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)
2. DEPARTMENT OF LABOR, DAVIS BACON MINIMUM WAGE RATES
3. STATEMENT OF WORK
4. PLANS
5. BID SCHEDULE
See Subsection 104.04 of the FP-14 for governing order of precedence
11. The Contractor shall begin performance within 10 calendar days and complete it within 30 calendar days after receiving award notice to proceed. The performance period is mandatory negotiable.
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m. (hour) local time on 3/15/17 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is not required.
C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-102 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53-236-1(e)
X
X
X
X
CO FTNP DINO 101(2)
A-2
GPO: 1985 0 - 469-796 STANDARD FORM 1442 PAGE 2 (REV. 4-85)
OFFEROR (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
DUNS NO.
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing with calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE INDIVIDUAL BID SCHEDULE(S)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED
TO SIGN OFFER (Type or print)
20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 27
(4 copies unless otherwise specified)
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
□ 15 U.S.C. 637( ) □ 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE: 27. PAYMENT WILL BE MADE BY
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 W. DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.)
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by
(a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON
AUTHORIZED TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD
DATE
Bid Schedule Instructions PLEASE NOTE: This project is comprised of one schedule. Before preparing the quote, carefully read the Solicitation Provisions and the following:
• Insert a numeric unit price for each pay item for which a quantity appears in the bid schedule. Unit prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit prices quoted more precisely will be rounded up to the nearest cent by the Government
• Multiply the unit price by the quantity for each pay item and show the amount quoted. When the words “Lump Sum” appear as a unit price, insert an amount for each lump sum pay item.
• Total all amounts quoted for each pay item and show the Cost Total on the space provided on the space provided.
Basis for Award
To be eligible for award of contract, the offeror shall submit prices for each item in the Bid Schedule. Accordingly, contract award will be made to the lowest responsible vendor conforming to the solicitation, provided funds are available.
A-3
BUY AMERICAN ACT- CONSTRUCTION MATERIALS
UNDER TRADE AGREEMENTS
It is understood and agreed that the materials and components listed in Subparts 25.1 and 25.2 of the FAR are a part of this contract and are deemed to be Domestic Construction Material for the purposes of this contract.
NOTE TO CONTRACTOR:
The following information and any applicable supporting data is required for evaluation of requests under FAR Clause 52.225-9 Paragraph (c) & (d) and FAR Provision 52.225-10 Paragraph (b).
Material and/or Component
Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
Material and/or Component
Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]
A-4
HAZARDOUS MATERIALS
As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data - Alternate I, the apparent low bidder must submit prior to award a Material Safety Data Sheet (MSDS) for all hazardous materials that the bidder identifies in paragraph (b) of the FAR clause and defined under the latest version of Federal Standard No. 313.
Hazardous Material Identification Number
USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS
Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) of 1976, as amended (42 U.S.C. 6901 et seq.), requires Federal, State, and local procuring agencies using appropriated Federal funds to purchase items composed of the highest percentage of recovered materials practical. Use of recovered materials is strongly encouraged on Federal Lands Highway Projects. Highway construction items covered by the Environmental Protection Agency’s Comprehensive Guidelines for Procurement of Products Containing Recovered Materials include fly ash, ground granulated blast furnace slag, traffic barricades, traffic cones, hydraulic mulch and compost for mulch.
Use of fly ash and ground granulated blast furnace slag and construction materials containing fly ash and ground granulated blast furnace slag on Federal Lands Highway Projects:
• It is the policy of the United States Government that fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag shall have maximum practicable opportunity for incorporation into its construction projects.
• The Contractor agrees to investigate the use of fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag to the fullest extent consistent with the efficient performance of this contract. Both the contractor and the subcontractors are urged to seek out suppliers of fly ash and ground granulated blast furnace slag, cement and concrete containing fly ash and ground granulated blast furnace slag and to solicit bids for these materials.
• Names of firms that supply fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag are available from the American Coal Ash Association and the National Slag Association.
A-5
Page | 1
CO FTNP 101(2) Deerlodge Road
Harper’s Corner Road Culvert Repair
This project will consist of 36-inch culvert pipe removal and replacement, rip rap apron, roadway embankment, minor aggregate base and roadway asphalt pavement at the culvert 8.2 miles from the park’s headquarters along Harper’s Corner Road in the Dinosaur National Monument.
STATEMENT OF WORK
Bid Schedule:
ITEM NO. ITEM DESCRIPTION UNIT QUANTITY Unit Price Item Cost
Item 1 MOBILIZATION LPSM ALL
Item 2 REMOVAL OF PIPE CULVERT EACH 1
Item 3
REMOVAL OF PAVEMENT,
ASPHALT– 4 INCH DEPTH
SQYD 240
Item 4 EMBANKMENT CONSTRUCTION CUYD 500
Item 5
EARTHWORK GEOTEXTILE,
TYPE IV-C
SQYD 40
Item 6 PLACED RIPRAP, CLASS 3 CUYD 16
Item 7
ROADWAY AGGREGATE,
METHOD 2
TON 35
Item 8
ASPHALT CONCRETE
PAVEMENT
TON 40
Item 9 36-INCH PIPE CULVERT LNFT 80
Item 10
END SECTION FOR 36-INCH
PIPE CULVERT
EACH 2
Item 11 LEAN CONCRETE BACKFILL CUYD 30
Total Cost:
Item 1 – Mobilization Lump Sum
This item includes all necessary work to mobilize and demobilize to and from the site to perform all work included in this contract. This item also includes any testing required to complete the work.
Item 2 – Removal of Pipe Culvert 1 Each
This item includes all work required for the removal and disposal the existing pipe culvert.
Item 3 – Removal of Pavement 4-inch Depth 240 SQYD
This item includes the removal of the roadway pavement for removal of the existing culvert.
Item 4 – Embankment Construction 500 CUYD
This item includes placing material to repair the roadway embankment at the culvert location.
A-6
Page | 2
Item 5 – Earthwork Geotextile, Type IV-C 40 SQYD
This item includes placing geotextile fabric underneath the rip rap apron. See plans for additional information on dimensions.
Item 6 – Placed Rip Rap Class 3 16 CUYD
This item includes all work to place a rip rap apron in at the outlet of the culvert for erosion control. See plans for additional information.
Item 7 – Roadway Aggregate, Method 2 35 TON
This item includes all work required to place roadway aggregate material, 6” depth, to repair the roadway from earthwork excavation due to culvert repair.
Item 8 – Hot Asphalt Concrete Pavement 40 TON
This item includes all work to place roadway asphalt concrete pavement, 3” depth, to repair the roadway from earthwork excavation due to culvert repair.
Item 9 –36-Inch Pipe Culvert 80 LNFT
This item includes all work to install the new culvert. See plans for additional information.
Item 10 –End Section for 36-Inch Pipe Culvert 2 EACH
This item includes all work to attach end segments to the new culvert at the inlet and outlet. See plans for additional information.
Item 11 –Lean Concrete Backfill 30 CUYD
This item includes all work to place lean concrete fill in the culvert structure excavation.
PLANS
The following plan sheets are included:
Title Sheet
Culvert Typical Section
Rip Rap detail
Culvert Standard Drawings
A-7
Page | 3
COMPLETION OF WORK
Contract Time. All work shall be completed 30 calendar days from the Notice to Proceed.
ACCEPTANCE OF WORK
Conformity with Contract Requirements. References to standard documents and test methods of
AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project.
When the Government tests work, copies of test reports are furnished to the Contractor upon request.
Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
The number of significant figures used in the calculations will be according to ASTM E 29, absolute method.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Three methods of determining conformity and accepting work are described below. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.
Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
A-8
Page | 4
(1) Sampling method
(2) Number of samples
(3) Sample transport
(4) Test procedures
(5) Testing laboratories
(6) Reporting
(7) Estimated time and costs
(8) Validation process
Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
(1) Have the work accepted at a reduced price; or
(2) Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
Where sample/testing procedures make reference to AASHTO, ASTM, or other standards (designated as
FLH T), the procedure as modified in the Materials Manual shall govern. Where this statement of work makes reference to AASHTO Test T11, “Procedure B - Washing Using a Wetting Agent” shall be the procedure followed.
Where this statement of work makes reference to AASHTO Test T310, “Direct Transmission Method of
In-Place Nuclear Density and Moisture Content” shall be the procedure followed.
Reference to the Materials Manual means the Federal Lands Highway “Field Materials Manual, U.S.
Department of Transportation, Federal Highway Administration,” dated October 2008, and all amendments and supplements thereto. Copies are available on our website at http://www.cflhd.gov/materials.
Visual Inspection. Acceptance is based on visual inspection of the work for compliance with the contract and prevailing industry standards.
Certification. For material manufactured off-site, use a manufacturer with an ISO 9000 certification or an effective testing and inspection system. Require the manufacturer to clearly mark the material or packaging with a unique product identification or specification standard to which it is produced.
Other than references in or to the FAR or Federal Law, when this statement of work references certifications; certificates; or certified documents, equipment, or individuals, these references are not certifications under Section 4301 of Public Law 104-106, National Defense Authorization Act for Fiscal
Year 1996. These references refer to documentation of non-regulatory, peripheral contract requirements that are required to be validated by an individual or organization having unique knowledge or qualifications to perform such validation.
A-9 http://www.cflhd.gov/materials
Page | 5
Material accepted by certification may be sampled and tested at any time. If found not in conformance with the contract, the material will be rejected whether in place or not.
One of the following certifications may be required:
(a) Production certification. Material requiring a production certification is identified in the
Acceptance Subsection of each Item. Require the manufacturer to furnish a production certification for each shipment of material. Include the following with each production certification:
(1) Date and place of manufacture;
(2) Lot number or other means of cross-referencing to the manufacturer’s inspection and testing system; and
(3) Substantiating evidence that the material conforms to the contract quality requirements as required by FAR 46.105(a)(4), including all of the following:
(a) Test results on material from the same lot and documentation of the inspection and testing system;
(b) A statement from the manufacturer that the material complies with all contract requirements; and
(c) Manufacturer’s signature or other means of demonstrating accountability for the certification.
(b) Commercial certification. When a certification is required, but not a production certification, furnish one commercial certification for all similar material from the same manufacturer.
A commercial certification is a manufacturer's or Contractor's representation that the material complies with all contract requirements. The representation may be labels, catalog data, stamped specification standards, or supplier's certifications indicating the material is produced to a commercial standard or specification.
Inspection at the Plant. Work may be inspected at the point of production or fabrication. Manufacturing plants may be inspected for compliance with specified manufacturing methods. Material samples may be obtained for laboratory testing for compliance with quality requirements. Allow full entry at all times to the parts of the plant producing the work.
Measured or Tested Conformance. Provide all necessary production and processing of the work and control performance of the work so that all of the work complies with the contract requirements.
Results from inspection or testing shall have values within the specified tolerances or specification limits.
When no tolerance values are identified in the contract, the work will be accepted based on customary manufacturing and construction tolerances.
Partial and Final Acceptance. Maintain the work during construction and until the project is accepted.
Damage caused by the Contractor prior to final acceptance of the entire project will be repaired at the
Contractor’s expense. See FAR Clause 52.236-11 Use and Possession Prior to Completion.
(a) Partial acceptance. When a separate portion of the project is completed, a final inspection of that portion may be requested. If the portion is complete and in compliance with the contract, it may be accepted. If accepted, the CO will relieve the Contractor of further responsibility for maintenance of the completed portion. Partial acceptance does not void or alter any of the terms of the contract.
A-10
Page | 6
When public traffic is accommodated through construction and begins using sections of roadway as they are completed, continue maintenance of such sections until final acceptance.
(b) Final acceptance. When notified that the entire project is complete, an inspection will be scheduled. If all work is determined to be complete, the inspection will constitute the final inspection and the Contractor will be notified in writing of final acceptance as of the date of the final inspection.
Final acceptance relieves the Contractor of further responsibility for the maintenance of the project.
If the inspection discloses any unsatisfactory work, the CO will provide to the Contractor a list of the work that is incomplete or requires correction. Immediately complete or correct the work. Furnish notification when the work has been completed as provided above.
PROTECTION OF FORESTS, PARKS, AND PUBLIC LANDS
Thoroughly clean equipment and vehicles prior to start of use to minimize introduction or spread of invasive or non-native plant species.
Wash any new piece of equipment brought in, or any piece of equipment taken off site and then returned to the site. Provide means of removing sand, mud, vegetation and seeds from vehicle wheels and under carriage before entering and exiting the Park onto County roadways through installation of tire cleaning stations near main project entrance. Find similar or other methods for removing soil and vegetation material from vehicles before entering or leaving the Project Area.
To minimize the amount of ground disturbance, obtain approval from the CO and Park and locate staging and stockpiling areas in previously disturbed sites, away from visitor use areas to the greatest extent possible. Return all staging and stockpiling areas to pre-construction conditions following construction.
Limit disturbance of the soils and vegetation to the footprint of each structure and immediately surrounding areas.
Weed Management. Minimize soil disturbance to the greatest extent possible to reduce potential for introduction or spread of invasive non-native plant species.
Native Plant Protection, Soil Disturbance. Minimize soil disturbance to the greatest extent possible to reduce disturbance to native plants and reduce the potential for the introduction or spread of invasive non-native plant species.
Avoid heavy equipment use in wetlands if at all possible. Place heavy equipment used in wetlands on mats, or take other measures to minimize soil and plant root disturbance and to preconstruction elevations.
Take care not to disturb any wildlife species (reptiles, migratory birds, raptors, or bats) found nesting, hibernating, estivating, or otherwise living in, or immediately nearby, worksites.
Due to the fragile ecological systems of Dinosaur National Monument, comply with the following:
(a) Do not feed or disturb wildlife. To prevent unnatural attractants to wildlife, keep all foods, pet foods, garbage, drinks, trash, or food and drink containers inside vehicles, or enclosed
A-11
Page | 7 construction equipment, except during actual use. Supply garbage bins, within the construction site that are bear and animal proof. Remove all garbage and food trash from the project site daily.
(b) Do not disturb cultural resources. Cultural resources exist in many locations immediately adjacent to the roadway. Do not disturb the area beyond the construction limits. Do not excavate, remove, damage, alter or deface any archeological or paleontological remains or specimens.
MEASUREMENT AND PAYMENT
Measurement Terms and Definitions. Unless otherwise specified, the following terms are defined as follows:
Cubic yard (Cubic meter) in the structure. Measure according to the lines of the structure as shown in the plans, except as altered by the CO to fit field conditions. Make no deduction for the volume occupied by reinforcing steel, anchors, weep holes, piling, or pipes less than 8 inches (200 millimeters) in diameter.
Linear foot. As applicable, measure the work along its length from end-to-end; parallel to the base or foundation; along the top; along the front face; or along the invert. Do not measure overlaps
Lump sum. Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that pay item. The quantity is designated as "All".
Estimated quantities of lump sum work shown in the contract are approximate.
Square yard. 1 square yard equals 9 square feet. Measurements for area computations will be made horizontally or vertically to the surface being measured. No deductions from the area computation will be made for individual fixtures having area of 9 square feet (1 square meter) or less. Do not measure overlaps.
Payment. The accepted quantity, measured as provided above, will be paid at the contract price per unit of measurement for the pay item shown in the bid schedule. Payment will be full compensation for the work prescribed in this Section.
Scope of Payment. Payment for all contract work is provided, either directly or indirectly, under the pay items shown in the bid schedule.
(a) Direct payment. Payment is provided directly under a pay item shown in the bid schedule when one of the following applies:
(1) The work is measured in the Measurement Subsection of the Section ordering the work, and the bid schedule contains a pay item for the work from the Section ordering the work.
(2) The Measurement Subsection, of the Section ordering the work, references another Section for measuring the work and the bid schedule contains a pay item for the work from the referenced Section.
(b) Indirect payment. Work for which direct payment is not provided is a subsidiary obligation of the
Contractor. Payment for such work is indirectly included under other pay items shown in the bid
A-12
Page | 8 schedule. This includes instances when the Section ordering the work references another Section for performing the work and the work is not referenced in the Measurement Subsection of the Section ordering the work.
Compensation provided by the pay items included in the contract bid schedule is full payment for performing all contract work in a complete and acceptable manner. All risk, loss, damage, or expense arising out of the nature or prosecution of the work is included in the compensation provided by the contract pay items.
Work measured and paid for under one pay item will not be paid for under any other pay item.
The quantities shown in the bid schedule are approximate unless designated as a contract quantity.
Limit pay quantities to the quantities staked, ordered, or otherwise authorized before performing the work. Payment will be made for the actual quantities of work performed and accepted or material furnished according to the contract. No payment will be made for work performed in excess of that staked, ordered, or otherwise authorized.
A-13
Responsibility for Damage Claims. Indemnify and hold harmless the Government, its employees, and its consultants from suits; actions; or claims brought for injuries or damage received or sustained by a person, persons, or property resulting from the construction operations or arising out of the negligent performance of the contract.
Procure and maintain until final acceptance of the contract, liability insurance of the types and limits specified below. Obtain insurance from companies authorized to do business in the appropriate state. Ensure the insurance covers operations under the contract whether performed by the Contractor or by subcontractors.
Before work begins, submit "certificates of insurance" certifying that the policies will not be changed or canceled until written notice has been given to the Government. Insurance coverage in the minimum amounts set forth below does not relieve the Contractor of liability in excess of the coverage.
Carry insurance conforming to the following minimums:
(a) Worker's compensation insurance. Minimum required by law.
(b) Comprehensive or commercial general liability insurance.
(1) Personal injury and property damage coverage;
(2) Contractual liability coverage;
(3) Completed operations liability coverage;
(4) $1,000,000 combined single limit for each occurrence; and
(5) $2,000,000 general aggregate limit.
(c) Automobile liability insurance. $1,000,000 combined single limit for each occurrence.
Page | 9
ITEM 1. — MOBILIZATION
This work consists of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site. Mobilization includes the obtaining of permits, insurance, and bonds. Mobilization also includes all testing required to complete the work.
Payment. Progress payments for mobilization lump sum will be paid as follows:
(a) Bond premiums will be reimbursed according to FAR Clause 52.232-5 Payments Under Fixed-
Price Construction Contracts, after receipt of the evidence of payment.
(b) When 5 percent of the original contract amount is earned from other bid items, 50 percent of the mobilization item, or 5 percent of the original contract amount, whichever is less, will be paid.
(c) When 10 percent of the original contract amount is earned from other bid items, 100 percent of the mobilization item, or 10 percent of the original contract amount, whichever is less, will be paid.
(d) Any portion of the mobilization item in excess of 10 percent of the original contract amount will be paid after final acceptance.
ITEM 2. — REMOVAL OF PIPE CULVERT
Description. This work consists of removing and disposing of the damaged culvert.
Disposing of Material. Dispose of debris, unsuitable material, and excess material as follows:
(a) Remove from project. Recycle or dispose of material legally off the project. Submit a statement documenting the nature and quantity of material processed or sold for recycling.
Otherwise, submit a signed copy of the disposal agreement before disposal begins.
Acceptance. Removal of pipe culvert will be evaluated based on visual inspection of the work.
ITEM 3. — REMOVAL OF PAVEMENT 4-INCH DEPTH
Description. This work consists of excavation of pavement from the roadway for the removal and installation of a pipe culvert.
Removing Material. Saw cut pavement in damaged culvert area. Remove asphalt debris material from the Park .
ITEM 4. —EMBANKMENT CONSTRUCTION
Embankment:
Borrow material other than washed gravel or crushed aggregate that is imported from outside the Park must come from a site inspected by a Park ecologist for noxious weeds. Coordinate inspection with the
CO.
A-14
Page | 10
Material. Furnish granular borrow material free of excess moisture, muck, frozen lumps, roots, sod, or other deleterious material conforming to the following:
(a) Maximum particle size 4 inches
(b) Soil classification, AASHTO M 145 A-1 or A-2-4
Embankment Construction. Construct embankments as follows:
At the end of each day's operations, shape to drain and compact the embankment surface to a uniform cross-section. Eliminate all ruts and low spots that could hold water.
Backfill eroded areas with embankment material to the level of the surrounding ground and compact material to the required specifications. During all stages of construction, route and distribute hauling and leveling equipment over the width and length of each layer of material.
Compact embankment side slopes with a tamping foot roller, by walking with a dozer, or by over-building the fill and then removing excess material to the final slope line. For slopes 1V:1¾H or steeper, compact the slopes as embankment construction progresses.
Place embankment material in horizontal layers not exceeding 6 inches in compacted thickness.
Incorporate rock fragments into the 6-inch layers by reducing them in size or placing them individually.
Compact as follows:
Adjust the moisture content to a level suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Use compression-type rollers at speeds less than 6 feet per second and vibratory rollers at speeds less than 3 feet per second. Compact each layer of material full width with to at least 95% of the maximum dry density as determined by AASHTO T-99.
Measurement. Measure embankment construction by the cubic yard in its final position. Include the volume of material used to backfill subexcavated areas, holes, pits, and other depressions.
Acceptance. Acceptance of embankment is by visual inspection and measured or tested for conformance.
Provide sampling and testing per the Table below:
A-15
Page | 11
T a b le
E m b a n k m en t
S a m p li n g a n d
T es ti n g R eq u ir em en ts
R ep o rt in g im e
B ef o re u si n in w o rk ef o re p la ci ex t la y er ef o re p la ci ex t la
(1
M in im u m o f p o in ts p er p ro ct r.
S p li t m le
Y es w h re q u es te d
P in t o f
S a m p li u rc e f
M at er ia l
In -p la ce
In -p m p li
F q u cy er s o il t y p e p er s o il t y p e b u t n ss t h an
,0 y er y d b u t n ss t h an p er l ay er y t M et h o d s
S p ec if ic a ti o n s
A A
S H
T O
M
A
S H
T O
T m et h o d D
(1 ) o r T m et h o d C
(1
A A
S H
T O
T r th er a p p ro v ed ro ce d u re s
A A
S H
T O
T er a p p ro v ed ce d u re s
C a te g ry
C a ra ct er is ti c ss if ic at io is tu re d en si ty m p ac ti m p ac ti p e o f
A cc ep ta
(S u b se c ti o n
M ea su re d a n d t es fo co n fo rm an ea su re d a n d t es fo co n fo rm an te r ia l o r
P ro d ct
E b an k m en t
T o p o f su b g ra e
A-16
Page | 12
ITEM 5. – EARTHWORK GEOTEXTILE, TYPE IV-C
Description. This item includes placing geotextile fabric underneath the rip rap apron as shown in the plans.
Material. Use long-chain, synthetic polymers, composed at least 95 percent by mass of polyolefins or polyesters, to manufacture geotextile or the threads used to sew geotextile. Form the geotextile, including selvedges, into a stable network such that the filaments or yarns retain their dimensional stability relative to each other.
A-17
Page | 13 y si ca l
R eq u ir em en ts f o r
P er m a n en t
E ro si o n
C o n tr o l
G eo te x ti ec if ic a ti o n s
(1
T y p e
IV
-F
/7
/6
(3
) /2
/2
/1
.1
.2
(2 a ft er h o u rs o f ex p o su
(1
T h e fi rs t v al u es i n a c o lu m n a p p ly t o g eo te x ti le s th at b re ak a t p er ce n t el o n g at io n
A
S T
M D e se co n d v al u es i n a c o lu m n a p p ly t o g eo te x ti le s th at b re ak a t e lo n g at io n
A
S T
M D
(2
M ax im u m a v er ag e ro ll v al e.
(3
T h e m in im u m a v er ag e ro ll t ea r st re n g th f o r w o v en m o n o fi la m en t g eo te x ti le i s
N
T y p e
-E
/7
/6
(3
) /2
/2
/1
(2
T y p e
-D
/7
/6
(3
) /2
/2
/1
.7
.4
(2
T y p e
-C
/9
/8
/3
/3
/1
.1
(2
T y p e
-B
/9
/8
/3
/3
/1
(2
T y p e
-A
/9
/8
/3
/3
/1
.7
.4
(2
U n it s
N k s-1 t
M et h
D p ty
G ra b s tr en ew n s ea m s tr en ea r st re n n ct u re s tr en rs t st re n m it ti v it p ar en t o p en in g s iz e
U lt ra v io le t st ab il it
Physical requirements. Conform to the table for Type IV-C geotextile specified for permanent erosion control.
All property values, with the exception of apparent opening size (AOS), in this statement of work represents minimum average roll values in the weakest principal direction (i.e., average test results of any roll in a lot sampled for conformance or quality assurance testing shall meet or exceed the specified values). Values for AOS represent maximum average roll values.
A-18
Page | 14
Elevate and protect rolls with a waterproof cover if stored outdoors. When using a geotextile for a permanent installation, limit the geotextile exposure to ultraviolet radiation to less than 10 days.
Acceptance Geotextile will be evaluated by certification. Furnish a commercial certification including the name of the manufacturer, product name, style number, chemical composition of the filaments or yarns, and other pertinent information to fully describe the geotextile.
ITEM 6. – PLACED RIPRAP, CLASS 3
Description. This work consists of furnishing and placing riprap for bank protection, slope protection, drainage structures, and erosion control. Riprap classes are designated as shown in Table below.
General. Dress the slope to produce a smooth surface. Place earthwork geotextile.
Placed Riprap. Placed riprap is rock placed on a prepared surface to form a well-graded mass.
Place riprap to its full thickness in one operation to avoid displacing the underlying material. Do not place riprap material by methods that cause segregation or damage to the prepared surface. Place or rearrange individual rocks by mechanical or hand methods to obtain a dense uniform blanket with a reasonably smooth surface.
Riprap Rock. Furnish hard, durable, angular rock that is resistant to weathering and water action and free of organic or other unsuitable material. Angular rock is characterized by sharp, clean edges at the intersections of relatively flat surfaces. Furnish rock with width and thickness of individual rock at least one-third its length (dimension of longest axis). Do not use shale, rock with shale seams, or other fissile or fissured rock that may break into smaller pieces in the process of handling and placing. Conform to the following:
(a) Apparent specific gravity, AASHTO T 85 2.40 min.
(b) Absorption, AASHTO T 85 4.0% max.
(c) Sodium Sulfate Soundness Loss (5 cycles), 12% max.
AASHTO T 104
(d) Los Angeles abrasion, AASHTO T 96 50% max.
(e) Riprap class Table below
Table
Gradation Requirements for Riprap (1)
Class
Percent of Rock
Equal or
Smaller by
Count, Dx
Range of
Intermediate
Dimension, (2)
(inches)
Range of Rock
Weight, (3)
(pounds)
100 12.0 140
85 8.0 – 9.5 39 – 64
50 5.5 – 7.0 15 – 27
15 3.5 – 5.0 4 – 12
A-19
Page | 15
100 18.0 470
85 11.5 – 14.0 130 – 220
50 8.5 – 10.5 51 – 90
15 5.5 – 8.0 13 – 39
100 24.0 1100
85 15.5 – 18.5 310 – 510
50 11.5 – 14.0 120 – 210
15 7.5 – 10.5 32 – 93
100 30.0 2200
85 19.5 – 23.0 600 – 1000
50 14.5 – 17.5 240 – 420
15 9.5 – 13.0 62 – 180
100 36.0 3800
85 23.5 – 27.5 1050 – 1750
50 17.0 – 20.5 410 – 720
15 9.5 – 13.0 110 – 310
100 42.0 6000
85 27.5 – 32.5 1650 – 2800
50 20.0 – 24.0 650 – 1150
15 13.0 – 18.5 170 – 500
100 48.0 9000
85 31.0 – 37.0 2500 – 4100
50 23.0 – 28.0 950 – 1700
15 15.0 – 21.0 260 – 740
100 60.0 17,600
85 39.0 – 46.0 4800 – 8000
50 29.0 – 35.0 1900 – 3300
15 19.0 – 26.0 500 – 1450
100 72.0 30,400
85 47.0 – 56.0 8300 – 13,900
50 34.0 – 42.0 3300 – 5800
15 22.0 – 32.0 860 – 2500
100 84.0 48,200
85 55.0 – 65.0 13,200 – 22,000
50 40.0 – 49.0 5200 – 9200
15 26.0 – 37.0 1350 – 4000 (1)
Include spalls and rock fragments to provide a stable dense mass.
(2)
Intermediate dimension measured as the shortest straight-line distance from one side of the rock or rock particle to the other on the maximum projection plane (plane of rock or rock particle with the largest projected surface area).
(3)
Weights based on a specific gravity of 2.65.
Acceptance. Rock material will be evaluated by visual inspection and certification.
Placement of riprap will be evaluated by visual inspection and measured or tested for conformance.
A-20
Page | 16
ITEM 7. —ROADWAY AGGREGATE, METHOD 2
Description. This work consists of furnishing and placing crushed aggregate for bedding, backfill, and roadway aggregates on a prepared surface.
Crushed Aggregate. Furnish hard, durable particles or fragments of crushed stone or gravel conforming to the size and quality requirements for crushed aggregate material normally used locally in the construction and maintenance of highways by Federal or state agencies. Furnish crushed aggregate with a maximum size of 1 inch (25 millimeters) as determined by AASHTO T 27 and AASHTO T 11. Furnish crushed aggregate uniformly graded from coarse to fine and free of organic matter, lumps or balls of clay, and other deleterious material.
Preparing Surface. Shape, compact, and finish the surface to the required lines, grade, elevation, and cross-section. Match existing width.
Placing Crushed Aggregate. Mix the aggregate and adjust the moisture content to obtain a uniform mixture. Adjust the moisture content to obtain proper compaction. Spread and shape in uniform layers not to exceed 6 inches (150 millimeters) compacted thickness.
Compacting. Determine the maximum density of the mixture according to AASHTO T 180, Method D.
Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road.
Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.
Compact each layer to at least 95.0 percent of maximum density. Determine the in-place density and moisture content according to AASHTO T 310 or other approved test procedures.
Finishing. Shape the surface to the required template and check the surface with a 10-foot (3-meter) straightedge. Defective areas are surface deviations in excess of ½ inch (13 millimeters) in 10 feet (3 meters) between two contacts of the straightedge with the surface.
Correct defective areas by loosening the material, adding or removing material, reshaping, and compacting.
Acceptance. See table for sampling, testing, and acceptance requirements.
Submit a production certification including gradation and quality properties for each source.
A-21
Page | 17
Crushed Aggregate
Sampling, Testing, and Acceptance Requirements
Material or
Product
(Subsection)
Type of
Acceptance
(Subsection)
Characteristic Category Test Methods
Specifications
Sampling
Frequency
Point of
Sampling
Split
Sample
Reporting
Time
Remarks
Production
Crushed aggregate
Measured and tested for conformance
Moisture-density
− AASHTO
T 180, Method D
1 per aggregate supplied
Production output or stockpile
No 4 hours
Density − AASHTO
T310 or other approved procedures
1 per
500 tons
(450 metric tons)
In-place after compaction
" End of shift
For
Method 2 compaction only
Crushed aggregate
Process control
Moisture content
(in-place)
Finished Product
Crushed aggregate
Measured and tested for conformance
Surface tolerance
& grade
− Described in
‘Finishing’ above
Determined by the CO
Surface of final course
No Before placement of next layer or as requested
(1) Minimum of 5 points per proctor.
A-22
Page | 18
ITEM 8. —ASPHALT CONCRETE PAVEMENT
Description. This work consists of constructing asphalt concrete pavement using a hot or warm mix asphalt (HMA or WMA).
Composition of Mix (JMF). Conform to current state department of transportation material specifications for asphalt concrete.
Provide a mix composed of crushed stone or gravel and asphalt binder mixed in an approved plant. Use an aggregate gradation and asphalt binder of a quality conforming to those normally used locally by either Federal or state agencies for the type of work being constructed.
Submit the strength, quality, and gradation specifications for the asphalt concrete mix. Include copies of laboratory test reports that demonstrate aggregate, asphalt binder, additive, and mix properties meet
Federal, state or local government agency specifications.
Submit the maximum specific gravity (density) of the mix as determined by AASHTO T 209.
Production Start-Up Procedures. In a start-up phase meeting, review the contract requirements and the processes for constructing the work with the personnel who will be performing the work. Review the planned testing, inspection, and reporting requirements with the quality control personnel responsible for the testing and inspection. Explain the reporting procedures to be used when defective work is identified.
Mixing Plant. Use mixing plants conforming to AASHTO M 156.
Surface Preparation. Clean the existing surface of loose material, dirt, or other deleterious material by approved methods.
Weather…