Bid_Tabs.pdf
PDF 106 KB Posted
- Attached to
- NM FLAP 11299(1), Drippin Springs Road Federal contract opportunity
- Solicitation number
- DTFH6815B00034
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| NM_FLAP_CR11299(1) _Dripping_Springs_and_Baylor_Canyon_Road_Bid_Summary_11_19_15.xlsx | XLSX spreadsheet | |
| NM_FLAP_CR11299(1) _Dripping_Springs_and_Baylor_Canyon_Road_Bid_Summary_11_19_15.xlsx | XLSX spreadsheet | |
| QA_11-17-15.pdf | ||
| Amendment_A003.pdf | ||
| QA_11-12-15.pdf | ||
| Amendment_A002.pdf | ||
| Amendment_A001.pdf | ||
| QA_11-6-15.pdf | ||
| MASTER_CFLHD_NM_FLAP_11299_Drainage_Report_2015-08-25.pdf | ||
| NM_FLAP_CR11299(1)_DSBC_100__Final_Pavement_Report.pdf | ||
| DTFH6815B00034.pdf | ||
| Cross_Sections.pdf | ||
| Plans.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T A B U L A T I O N O F B I D S Schedule A Total of Bid Items: 5,304,665.00$ -53.9% 2,445,184.20$ Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Roads CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
15101-0000 Line A0020 ALL LPSM 550,000.00$ 550,000.00$ 135,000.00$
15206-0000 Line A0040 256.000 STA 125.00$ 32,000.00$ 24,576.00$
15215-3000 Line A0060 3 EACH 1,500.00$ 4,500.00$ 5,400.00$
15216-2000 Line A0080 512.000 STA 80.00$ 40,960.00$ 70,656.00$
15301-0000 Line A0100 ALL LPSM 150,000.00$ 150,000.00$ 62,000.00$
15401-0000 Line A0120 ALL LPSM 50,000.00$ 50,000.00$ 56,000.00$
15501-0000 Line A0140 ALL LPSM 4,000.00$ 4,000.00$ 1,600.00$
15705-0100 Line A0160 6,800 LNFT 5.00$ 34,000.00$ 8,296.00$
15705-1400 Line A0180 3,210 LNFT 10.00$ 32,100.00$ 15,729.00$
15705-1500 Line A0200 1,050 LNFT 7.50$ 7,875.00$ 2,887.50$
15706-0200 Line A0220 70 EACH 150.00$ 10,500.00$ 9,730.00$
15706-1600 Line A0240 2 EACH 3,000.00$ 6,000.00$ 3,200.00$
15802-0000 Line A0260 ALL LPSM 20,000.00$ 20,000.00$ 20,000.00$
SURVEY AND STAKING, GRADE FINISHING STAKES
138.00$
MOBILIZATION
SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
SURVEY AND STAKING, DRAINAGE STRUCTURE
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, SEDIMENT LOG
SOIL EROSION CONTROL, SEDIMENT WATTLE
SOIL EROSION CONTROL, CHECK DAM
SOIL EROSION CONTROL, STABILIZED CONSTRUCTION ENTRANCE
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
WATERING FOR DUST CONTROL
Mountain States Constructors
96.00$
135,000.00$
62,000.00$
1,800.00$
1.22$
1,600.00$
56,000.00$
2.75$
4.90$
1,600.00$
139.00$
20,000.00$
Engineer's Estimate
12/10/2015 Page 1 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Roads CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Mountain States ConstructorsEngineer's Estimate
20101-0000 Line A0280 24.0 ACRE 3,000.00$ 72,000.00$ 31,200.00$
20301-0600 Line A0300 3 EACH 2,000.00$ 6,000.00$ 12,150.00$
20301-1900 Line A0320 6 EACH 2,000.00$ 12,000.00$ 4,800.00$
20301-2400 Line A0340 7 EACH 200.00$ 1,400.00$ 385.00$
20302-0700 Line A0360 4,985 LNFT 2.00$ 9,970.00$ 2,492.50$
20420-0000 Line A0380 65,200 CUYD 23.50$ 1,532,200.00$ 570,500.00$
21101-1000 Line A0400 4,600 SQYD 5.00$ 23,000.00$ 4,922.00$
25101-2000 Line A0420 5 CUYD 150.00$ 750.00$ 800.00$
25101-3000 Line A0440 15 CUYD 200.00$ 3,000.00$ 1,920.00$
25101-4000 Line A0460 40 CUYD 300.00$ 12,000.00$ 4,280.00$
25302-1000 Line A0480 130 CUYD 300.00$ 39,000.00$ 23,400.00$
25305-1000 Line A0500 1,780 SQYD 250.00$ 445,000.00$ 142,400.00$
30101-0000 Line A0520 13,500 TON $- $- 183,600.00$
REMOVAL OF PIPE CULVERT
REMOVAL OF SIGN
REMOVAL OF FENCE
REVET MATTRESS, GALVANIZED OR ALUMINIZED COATED
AGGREGATE BASE
EMBANKMENT CONSTRUCTION
ROADWAY OBLITERATION, METHOD 1
PLACED RIPRAP, CLASS 2
PLACED RIPRAP, CLASS 3
PLACED RIPRAP, CLASS 4
GABIONS, GALVANIZED OR ALUMINIZED COATED
CLEARING AND GRUBBING
REMOVAL OF CATTLE GUARD
1,300.00$
800.00$
4,050.00$
0.50$
55.00$
1.07$
8.75$
128.00$
160.00$
180.00$
107.00$
13.60$
80.00$
12/10/2015 Page 2 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Roads CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Mountain States ConstructorsEngineer's Estimate
30110-0000 Line A0540 17,600 TON 60.00$ 1,056,000.00$ 239,360.00$
30602-0000 Line A0560 47,630 SQYD 4.00$ 190,520.00$ 204,809.00$
40101-0500 Line A0580 1,220 TON 135.00$ 164,700.00$ 91,500.00$
40105-3000 Line A0600 15 TON 275.00$ 4,125.00$ 1,755.00$
40920-1000 Line A0620 5 TON 750.00$ 3,750.00$ 3,000.00$
41103-0000 Line A0640 7,200 SQYD 1.50$ 10,800.00$ 5,040.00$
41201-1000 Line A0660 5 TON 800.00$ 4,000.00$ 3,000.00$
60201-0800 Line A0680 20 LNFT 200.00$ 4,000.00$ 1,180.00$
60201-1000 Line A0700 110 LNFT 300.00$ 33,000.00$ 8,690.00$
60201-1200 Line A0720 80 LNFT 400.00$ 32,000.00$ 9,280.00$
60210-0800 Line A0740 1 EACH 1,000.00$ 1,000.00$ 300.00$
60210-1000 Line A0760 2 EACH 1,200.00$ 2,400.00$ 1,280.00$
60210-1200 Line A0780 2 EACH 1,700.00$ 3,400.00$ 2,400.00$
ANTISTRIP ADDITIVE, TYPE 3
END SECTION FOR 24-INCH PIPE CULVERT
END SECTION FOR 36-INCH PIPE CULVERT
END SECTION FOR 48-INCH PIPE CULVERT
FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H
PRIME COAT
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
24-INCH PIPE CULVERT
36-INCH PIPE CULVERT
48-INCH PIPE CULVERT
AGGREGATE SURFACE COURSE
DUST PALLIATIVE APPLICATION
SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL
4.30$
13.60$
117.00$
75.00$
0.70$
600.00$
59.00$
600.00$
116.00$
79.00$
640.00$
300.00$
1,200.00$
12/10/2015 Page 3 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Roads CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Mountain States ConstructorsEngineer's Estimate
61102-1200 Line A0800 110 LNFT 20.00$ 2,200.00$ 1,210.00$
61801-0000 Line A0820 2,470 LNFT 40.00$ 98,800.00$ 52,611.00$
61901-0900 Line A0840 4,850 LNFT 5.00$ 24,250.00$ 14,550.00$
61902-2500 Line A0860 3 EACH 550.00$ 1,650.00$ 990.00$
61903-1500 Line A0880 3 EACH 40,000.00$ 120,000.00$ 73,500.00$
62201-0250 Line A0900 20 HOUR 110.00$ 2,200.00$ 1,820.00$
62201-0950 Line A0920 20 HOUR 110.00$ 2,200.00$ 3,200.00$
62201-2800 Line A0940 20 HOUR 180.00$ 3,600.00$ 3,200.00$
62201-3350 Line A0960 20 HOUR 240.00$ 4,800.00$ 3,800.00$
62301-0000 Line A0980 60 HOUR 50.00$ 3,000.00$ 2,880.00$
62302-1000 Line A1000 40 HOUR 130.00$ 5,200.00$ 7,600.00$
62302-1100 Line A1020 40 HOUR 130.00$ 5,200.00$ 6,405.20$
62510-2000 Line A1040 22.0 ACRE 1,600.00$ 35,200.00$ 25,850.00$
1 1/2-INCH WATERLINE, POLYVINYL CHLORIDE (PVC)
CONCRETE BARRIER
FENCE, BARBED WIRE, 4 STRAND
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
SEEDING, HYDRAULIC METHOD
GATE, BARBED WIRE, 4-STRAND
CATTLE GUARD, 40 FEET
DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
MOTOR GRADER, 8 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
11.00$
3.00$
21.30$
24,500.00$
330.00$
160.00$
91.00$
190.00$
160.00$
190.00$
48.00$
1,175.00$
160.13$
12/10/2015 Page 4 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Roads CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Mountain States ConstructorsEngineer's Estimate
62515-2000 Line A1060 22.0 ACRE 2,400.00$ 52,800.00$ 12,540.00$
63301-0000 Line A1080 37 EACH 200.00$ 7,400.00$ 12,210.00$
63308-3000 Line A1100 46 EACH 120.00$ 5,520.00$ 2,944.00$
63309-0900 Line A1120 260 EACH 96.00$ 24,960.00$ 9,620.00$
63502-0700 Line A1140 40 EACH 50.00$ 2,000.00$ 1,280.00$
63502-1300 Line A1160 100 EACH 75.00$ 7,500.00$ 4,800.00$
63502-2000 Line A1180 2 EACH 7,500.00$ 15,000.00$ 4,400.00$
63503-0300 Line A1200 24 LNFT 100.00$ 2,400.00$ 5,760.00$
63503-1000 Line A1220 2,380 LNFT 7.00$ 16,660.00$ 3,808.00$
63504-1000 Line A1240 343 SQFT 25.00$ 8,575.00$ 5,488.00$
63506-0500 Line A1260 3,600 HOUR 45.00$ 162,000.00$ 115,200.00$
63506-0600 Line A1280 1,200 HOUR 50.00$ 60,000.00$ 64,800.00$
63610-3010 Line A1300 90 LNFT 40.00$ 3,600.00$ 2,430.00$ 27.00$
54.00$
32.00$
16.00$
MULCHING, HYDRAULIC METHOD
SIGN SYSTEM
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
CONDUIT, 4-INCH, HDPE
OBJECT MARKER, TYPE 3
DELINEATOR, TYPE FLEXIBLE
TEMPORARY TRAFFIC CONTROL, CONE
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
330.00$
570.00$
37.00$
64.00$
48.00$
32.00$
1.60$
240.00$
2,200.00$
12/10/2015 Page 5 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Roads CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Mountain States ConstructorsEngineer's Estimate
63702-0000 Line A1320 1 EACH 15,000.00$ 15,000.00$ 28,500.00$
64603-1200 Line A1340 2 EACH 2,500.00$ 5,000.00$ 4,270.00$ 2,135.00$
28,500.00$
FIELD LABORATORY
FIXTURE, WAYSIDE EXHIBIT
12/10/2015 Page 6 of 36
Schedule A Total of Bid Items:
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line A0020 ALL LPSM
15206-0000 Line A0040 256.000 STA
15215-3000 Line A0060 3 EACH
15216-2000 Line A0080 512.000 STA
15301-0000 Line A0100 ALL LPSM
15401-0000 Line A0120 ALL LPSM
15501-0000 Line A0140 ALL LPSM
15705-0100 Line A0160 6,800 LNFT
15705-1400 Line A0180 3,210 LNFT
15705-1500 Line A0200 1,050 LNFT
15706-0200 Line A0220 70 EACH
15706-1600 Line A0240 2 EACH
15802-0000 Line A0260 ALL LPSM
SURVEY AND STAKING, GRADE FINISHING STAK
MOBILIZATION
SLOPE, REFERENCE, AND CLEARING AND GRUBB
SURVEY AND STAKING, DRAINAGE STRUCTURE
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, SEDIMENT LOG
SOIL EROSION CONTROL, SEDIMENT WATTLE
SOIL EROSION CONTROL, CHECK DAM
SOIL EROSION CONTROL, STABILIZED CONSTR
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
WATERING FOR DUST CONTROL
-46.5% 2,838,072.71$ -22.6% 4,104,650.00$
Unit Price Amount Unit Price Amount
242,171.63$ 588,000.00$
14,924.80$ 76,800.00$
2,238.66$ 9,000.00$
14,924.80$ 76,800.00$
45,172.00$ 100,000.00$
84,206.50$ 100,000.00$
765.96$ 10,000.00$
13,804.00$ 68,000.00$
9,244.80$ 38,520.00$
3,024.00$ 15,750.00$
11,127.90$ 35,000.00$
3,587.14$ 6,000.00$
107,921.80$ 50,000.00$
29.15$ 150.00$
242,171.63$ 588,000.00$
Mesa Verde Enterprises, Inc. RBK Construction, Inc.
45,172.00$ 100,000.00$
58.30$ 300.00$
746.22$ 3,000.00$
2.03$ 10.00$
765.96$ 10,000.00$
84,206.50$ 100,000.00$
2.88$ 15.00$
2.88$ 12.00$
1,793.57$ 3,000.00$
158.97$ 500.00$
107,921.80$ 50,000.00$
12/10/2015 Page 7 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
20101-0000 Line A0280 24.0 ACRE
20301-0600 Line A0300 3 EACH
20301-1900 Line A0320 6 EACH
20301-2400 Line A0340 7 EACH
20302-0700 Line A0360 4,985 LNFT
20420-0000 Line A0380 65,200 CUYD
21101-1000 Line A0400 4,600 SQYD
25101-2000 Line A0420 5 CUYD
25101-3000 Line A0440 15 CUYD
25101-4000 Line A0460 40 CUYD
25302-1000 Line A0480 130 CUYD
25305-1000 Line A0500 1,780 SQYD
30101-0000 Line A0520 13,500 TON
REMOVAL OF PIPE CULVERT
REMOVAL OF SIGN
REMOVAL OF FENCE
REVET MATTRESS, GALVANIZED OR ALUMINIZE
AGGREGATE BASE
EMBANKMENT CONSTRUCTION
ROADWAY OBLITERATION, METHOD 1
PLACED RIPRAP, CLASS 2
PLACED RIPRAP, CLASS 3
PLACED RIPRAP, CLASS 4
GABIONS, GALVANIZED OR ALUMINIZED COATE
CLEARING AND GRUBBING
REMOVAL OF CATTLE GUARD
-46.5% 2,838,072.71$ -22.6% 4,104,650.00$
Unit Price Amount Unit Price Amount
Mesa Verde Enterprises, Inc. RBK Construction, Inc.
55,503.84$ 120,000.00$
7,770.36$ 6,000.00$
14,883.36$ 3,000.00$
293.79$ 1,400.00$
2,442.65$ 24,925.00$
808,480.00$ 782,400.00$
9,246.00$ 9,200.00$
481.30$ 1,000.00$
1,289.70$ 3,750.00$
3,299.20$ 10,800.00$
16,282.50$ 32,500.00$
79,708.40$ 117,480.00$
205,335.00$ 324,000.00$
2,312.66$ 5,000.00$
2,480.56$ 500.00$
2,590.12$ 2,000.00$
0.49$ 5.00$
41.97$ 200.00$
2.01$ 2.00$
12.40$ 12.00$
85.98$ 250.00$
96.26$ 200.00$
125.25$ 250.00$
82.48$ 270.00$
15.21$ 24.00$
44.78$ 66.00$
12/10/2015 Page 8 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
30110-0000 Line A0540 17,600 TON
30602-0000 Line A0560 47,630 SQYD
40101-0500 Line A0580 1,220 TON
40105-3000 Line A0600 15 TON
40920-1000 Line A0620 5 TON
41103-0000 Line A0640 7,200 SQYD
41201-1000 Line A0660 5 TON
60201-0800 Line A0680 20 LNFT
60201-1000 Line A0700 110 LNFT
60201-1200 Line A0720 80 LNFT
60210-0800 Line A0740 1 EACH
60210-1000 Line A0760 2 EACH
60210-1200 Line A0780 2 EACH
ANTISTRIP ADDITIVE, TYPE 3
END SECTION FOR 24-INCH PIPE CULVERT
END SECTION FOR 36-INCH PIPE CULVERT
END SECTION FOR 48-INCH PIPE CULVERT
FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1
PRIME COAT
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR S
24-INCH PIPE CULVERT
36-INCH PIPE CULVERT
48-INCH PIPE CULVERT
AGGREGATE SURFACE COURSE
DUST PALLIATIVE APPLICATION
SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAX
-46.5% 2,838,072.71$ -22.6% 4,104,650.00$
Unit Price Amount Unit Price Amount
Mesa Verde Enterprises, Inc. RBK Construction, Inc.
273,328.00$ 457,600.00$
85,734.00$ 23,815.00$
141,141.80$ 244,000.00$
2,761.95$ 10,500.00$
4,123.30$ 3,500.00$
6,192.00$ 7,200.00$
4,123.30$ 3,500.00$
1,230.00$ 3,000.00$
7,144.50$ 27,500.00$
7,968.80$ 32,000.00$
449.50$ 500.00$
1,368.96$ 1,200.00$
2,452.82$ 1,600.00$
1.80$ 0.50$
15.53$ 26.00$
184.13$ 700.00$
115.69$ 200.00$
0.86$ 1.00$
824.66$ 700.00$
61.50$ 150.00$
824.66$ 700.00$
99.61$ 400.00$
64.95$ 250.00$
684.48$ 600.00$
449.50$ 500.00$
1,226.41$ 800.00$
12/10/2015 Page 9 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
61102-1200 Line A0800 110 LNFT
61801-0000 Line A0820 2,470 LNFT
61901-0900 Line A0840 4,850 LNFT
61902-2500 Line A0860 3 EACH
61903-1500 Line A0880 3 EACH
62201-0250 Line A0900 20 HOUR
62201-0950 Line A0920 20 HOUR
62201-2800 Line A0940 20 HOUR
62201-3350 Line A0960 20 HOUR
62301-0000 Line A0980 60 HOUR
62302-1000 Line A1000 40 HOUR
62302-1100 Line A1020 40 HOUR
62510-2000 Line A1040 22.0 ACRE
1 1/2-INCH WATERLINE, POLYVINYL CHLORIDE
CONCRETE BARRIER
FENCE, BARBED WIRE, 4 STRAND
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
SEEDING, HYDRAULIC METHOD
GATE, BARBED WIRE, 4-STRAND
CATTLE GUARD, 40 FEET
DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPAC
WHEEL LOADER, 3 CUBIC YARD MINIMUM RATE
MOTOR GRADER, 8 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMU
-46.5% 2,838,072.71$ -22.6% 4,104,650.00$
Unit Price Amount Unit Price Amount
Mesa Verde Enterprises, Inc. RBK Construction, Inc.
1,117.60$ 2,200.00$
174,703.10$ 247,000.00$
16,393.00$ 48,500.00$
3,314.25$ 3,000.00$
68,527.80$ 90,000.00$
2,062.20$ 2,000.00$
1,964.00$ 2,400.00$
2,209.60$ 3,000.00$
3,977.20$ 3,000.00$
1,178.40$ 3,000.00$
1,227.60$ 8,000.00$
1,571.20$ 8,000.00$
15,933.06$ 24,200.00$
10.16$ 20.00$
3.38$ 10.00$
70.73$ 100.00$
22,842.60$ 30,000.00$
1,104.75$ 1,000.00$
98.20$ 120.00$
103.11$ 100.00$
198.86$ 150.00$
110.48$ 150.00$
30.69$ 200.00$
19.64$ 50.00$
724.23$ 1,100.00$
39.28$ 200.00$
12/10/2015 Page 10 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
62515-2000 Line A1060 22.0 ACRE
63301-0000 Line A1080 37 EACH
63308-3000 Line A1100 46 EACH
63309-0900 Line A1120 260 EACH
63502-0700 Line A1140 40 EACH
63502-1300 Line A1160 100 EACH
63502-2000 Line A1180 2 EACH
63503-0300 Line A1200 24 LNFT
63503-1000 Line A1220 2,380 LNFT
63504-1000 Line A1240 343 SQFT
63506-0500 Line A1260 3,600 HOUR
63506-0600 Line A1280 1,200 HOUR
63610-3010 Line A1300 90 LNFT
MULCHING, HYDRAULIC METHOD
SIGN SYSTEM
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
CONDUIT, 4-INCH, HDPE
OBJECT MARKER, TYPE 3
DELINEATOR, TYPE FLEXIBLE
TEMPORARY TRAFFIC CONTROL, CONE
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, PORTABLE CHA
TEMPORARY TRAFFIC CONTROL, BARRICADE TY
-46.5% 2,838,072.71$ -22.6% 4,104,650.00$
Unit Price Amount Unit Price Amount
Mesa Verde Enterprises, Inc. RBK Construction, Inc.
18,390.46$ 19,800.00$
15,834.89$ 18,500.00$
3,049.34$ 4,600.00$
10,532.60$ 19,500.00$
982.00$ 4,000.00$
6,138.00$ 15,000.00$
39,280.00$ 2,000.00$
920.64$ 9,600.00$
3,855.60$ 14,280.00$
3,790.15$ 3,430.00$
70,704.00$ 57,600.00$
40,512.00$ 24,000.00$
2,331.00$ 1,800.00$ 25.90$ 20.00$
33.76$ 20.00$
19.64$ 16.00$
11.05$ 10.00$
427.97$ 500.00$
835.93$ 900.00$
40.51$ 75.00$
66.29$ 100.00$
61.38$ 150.00$
24.55$ 100.00$
1.62$ 6.00$
38.36$ 400.00$
19,640.00$ 1,000.00$
12/10/2015 Page 11 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
63702-0000 Line A1320 1 EACH
64603-1200 Line A1340 2 EACH
FIELD LABORATORY
FIXTURE, WAYSIDE EXHIBIT
-46.5% 2,838,072.71$ -22.6% 4,104,650.00$
Unit Price Amount Unit Price Amount
Mesa Verde Enterprises, Inc. RBK Construction, Inc.
25,286.50$ 20,000.00$
6,137.50$ 20,000.00$ 3,068.75$ 10,000.00$
25,286.50$ 20,000.00$
12/10/2015 Page 12 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line A0020 ALL LPSM
15206-0000 Line A0040 256.000 STA
15215-3000 Line A0060 3 EACH
15216-2000 Line A0080 512.000 STA
15301-0000 Line A0100 ALL LPSM
15401-0000 Line A0120 ALL LPSM
15501-0000 Line A0140 ALL LPSM
15705-0100 Line A0160 6,800 LNFT
15705-1400 Line A0180 3,210 LNFT
15705-1500 Line A0200 1,050 LNFT
15706-0200 Line A0220 70 EACH
15706-1600 Line A0240 2 EACH
15802-0000 Line A0260 ALL LPSM
SURVEY AND STAKING, GRADE FINISHING STAK
MOBILIZATION
SLOPE, REFERENCE, AND CLEARING AND GRUBB
SURVEY AND STAKING, DRAINAGE STRUCTURE
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, SEDIMENT LOG
SOIL EROSION CONTROL, SEDIMENT WATTLE
SOIL EROSION CONTROL, CHECK DAM
SOIL EROSION CONTROL, STABILIZED CONSTR
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
WATERING FOR DUST CONTROL
-31.4% 3,636,560.87$ -36.1% 3,388,312.16$
Unit Price Amount Unit Price Amount
358,000.00$ 294,234.26$
78,080.00$ 49,804.80$
3,600.00$ 5,480.13$
94,208.00$ 77,992.96$
26,308.00$ 24,356.13$
68,452.00$ 64,576.44$
5,000.00$ 2,018.71$
16,320.00$ 19,516.00$
11,556.00$ 11,716.50$
3,780.00$ 3,832.50$
25,760.00$ 19,527.20$
2,848.00$ 3,746.58$
28,351.00$ 50,207.41$
184.00$ 152.33$
358,000.00$
Sedona Contracting, Inc. Smith & Aguire Construction Co., Inc.
26,308.00$ 24,356.13$
294,234.26$
305.00$ 194.55$
1,200.00$ 1,826.71$
2.40$ 2.87$
5,000.00$ 2,018.71$
68,452.00$ 64,576.44$
3.60$ 3.65$
3.60$ 3.65$
1,424.00$ 1,873.29$
368.00$ 278.96$
28,351.00$ 50,207.41$
12/10/2015 Page 13 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
20101-0000 Line A0280 24.0 ACRE
20301-0600 Line A0300 3 EACH
20301-1900 Line A0320 6 EACH
20301-2400 Line A0340 7 EACH
20302-0700 Line A0360 4,985 LNFT
20420-0000 Line A0380 65,200 CUYD
21101-1000 Line A0400 4,600 SQYD
25101-2000 Line A0420 5 CUYD
25101-3000 Line A0440 15 CUYD
25101-4000 Line A0460 40 CUYD
25302-1000 Line A0480 130 CUYD
25305-1000 Line A0500 1,780 SQYD
30101-0000 Line A0520 13,500 TON
REMOVAL OF PIPE CULVERT
REMOVAL OF SIGN
REMOVAL OF FENCE
REVET MATTRESS, GALVANIZED OR ALUMINIZE
AGGREGATE BASE
EMBANKMENT CONSTRUCTION
ROADWAY OBLITERATION, METHOD 1
PLACED RIPRAP, CLASS 2
PLACED RIPRAP, CLASS 3
PLACED RIPRAP, CLASS 4
GABIONS, GALVANIZED OR ALUMINIZED COATE
CLEARING AND GRUBBING
REMOVAL OF CATTLE GUARD
-31.4% 3,636,560.87$ -36.1% 3,388,312.16$
Unit Price Amount Unit Price Amount
Sedona Contracting, Inc. Smith & Aguire Construction Co., Inc.
137,280.00$ 121,933.68$
5,604.00$ 9,264.00$
3,894.00$ 2,831.28$
1,141.00$ 1,413.09$
26,619.90$ 30,308.80$
692,424.00$ 650,696.00$
18,308.00$ 16,652.00$
1,535.00$ 1,466.65$
4,605.00$ 4,399.95$
7,240.00$ 6,680.80$
23,530.00$ 21,712.60$
144,536.00$ 135,475.80$
310,770.00$ 288,225.00$
5,720.00$ 5,080.57$
649.00$ 471.88$
1,868.00$ 3,088.00$
5.34$ 6.08$
163.00$ 201.87$
3.98$ 3.62$
10.62$ 9.98$
307.00$ 293.33$
307.00$ 293.33$
181.00$ 167.02$
181.00$ 167.02$
23.02$ 21.35$
81.20$ 76.11$
12/10/2015 Page 14 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
30110-0000 Line A0540 17,600 TON
30602-0000 Line A0560 47,630 SQYD
40101-0500 Line A0580 1,220 TON
40105-3000 Line A0600 15 TON
40920-1000 Line A0620 5 TON
41103-0000 Line A0640 7,200 SQYD
41201-1000 Line A0660 5 TON
60201-0800 Line A0680 20 LNFT
60201-1000 Line A0700 110 LNFT
60201-1200 Line A0720 80 LNFT
60210-0800 Line A0740 1 EACH
60210-1000 Line A0760 2 EACH
60210-1200 Line A0780 2 EACH
ANTISTRIP ADDITIVE, TYPE 3
END SECTION FOR 24-INCH PIPE CULVERT
END SECTION FOR 36-INCH PIPE CULVERT
END SECTION FOR 48-INCH PIPE CULVERT
FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1
PRIME COAT
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR S
24-INCH PIPE CULVERT
36-INCH PIPE CULVERT
48-INCH PIPE CULVERT
AGGREGATE SURFACE COURSE
DUST PALLIATIVE APPLICATION
SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAX
-31.4% 3,636,560.87$ -36.1% 3,388,312.16$
Unit Price Amount Unit Price Amount
Sedona Contracting, Inc. Smith & Aguire Construction Co., Inc.
428,736.00$ 413,424.00$
72,397.60$ 70,016.10$
123,500.60$ 104,700.40$
1,936.65$ 1,880.25$
6,128.60$ 5,892.85$
7,200.00$ 5,544.00$
3,980.00$ 4,006.35$
856.20$ 878.80$
7,018.00$ 6,506.50$
5,866.40$ 3,950.40$
580.00$ 555.37$
600.00$ 572.42$
2,620.00$ 2,416.18$
1.52$ 1.47$
24.36$ 23.49$
129.11$ 125.35$
101.23$ 85.82$
1.00$ 0.77$
1,225.72$ 1,178.57$
42.81$ 43.94$
796.00$ 801.27$
73.33$ 49.38$
63.80$ 59.15$
300.00$ 286.21$
580.00$ 555.37$
1,310.00$ 1,208.09$
12/10/2015 Page 15 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
61102-1200 Line A0800 110 LNFT
61801-0000 Line A0820 2,470 LNFT
61901-0900 Line A0840 4,850 LNFT
61902-2500 Line A0860 3 EACH
61903-1500 Line A0880 3 EACH
62201-0250 Line A0900 20 HOUR
62201-0950 Line A0920 20 HOUR
62201-2800 Line A0940 20 HOUR
62201-3350 Line A0960 20 HOUR
62301-0000 Line A0980 60 HOUR
62302-1000 Line A1000 40 HOUR
62302-1100 Line A1020 40 HOUR
62510-2000 Line A1040 22.0 ACRE
1 1/2-INCH WATERLINE, POLYVINYL CHLORIDE
CONCRETE BARRIER
FENCE, BARBED WIRE, 4 STRAND
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
SEEDING, HYDRAULIC METHOD
GATE, BARBED WIRE, 4-STRAND
CATTLE GUARD, 40 FEET
DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPAC
WHEEL LOADER, 3 CUBIC YARD MINIMUM RATE
MOTOR GRADER, 8 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMU
-31.4% 3,636,560.87$ -36.1% 3,388,312.16$
Unit Price Amount Unit Price Amount
Sedona Contracting, Inc. Smith & Aguire Construction Co., Inc.
2,890.80$ 1,862.30$
119,054.00$ 110,853.60$
56,163.00$ 59,073.00$
4,386.00$ 4,566.78$
108,747.00$ 115,829.37$
1,900.00$ 1,652.40$
2,100.00$ 1,849.00$
2,500.00$ 2,312.40$
2,560.00$ 2,033.80$
1,995.00$ 1,856.40$
2,184.80$ 2,139.60$
2,184.80$ 5,921.60$
130,020.00$ 120,562.86$
26.28$ 16.93$
11.58$ 12.18$
48.20$ 44.88$
36,249.00$ 38,609.79$
1,462.00$ 1,522.26$
105.00$ 92.45$
95.00$ 82.62$
128.00$ 101.69$
125.00$ 115.62$
54.62$ 53.49$
33.25$ 30.94$
5,910.00$ 5,480.13$
54.62$ 148.04$
12/10/2015 Page 16 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
62515-2000 Line A1060 22.0 ACRE
63301-0000 Line A1080 37 EACH
63308-3000 Line A1100 46 EACH
63309-0900 Line A1120 260 EACH
63502-0700 Line A1140 40 EACH
63502-1300 Line A1160 100 EACH
63502-2000 Line A1180 2 EACH
63503-0300 Line A1200 24 LNFT
63503-1000 Line A1220 2,380 LNFT
63504-1000 Line A1240 343 SQFT
63506-0500 Line A1260 3,600 HOUR
63506-0600 Line A1280 1,200 HOUR
63610-3010 Line A1300 90 LNFT
MULCHING, HYDRAULIC METHOD
SIGN SYSTEM
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
CONDUIT, 4-INCH, HDPE
OBJECT MARKER, TYPE 3
DELINEATOR, TYPE FLEXIBLE
TEMPORARY TRAFFIC CONTROL, CONE
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, PORTABLE CHA
TEMPORARY TRAFFIC CONTROL, BARRICADE TY
-31.4% 3,636,560.87$ -36.1% 3,388,312.16$
Unit Price Amount Unit Price Amount
Sedona Contracting, Inc. Smith & Aguire Construction Co., Inc.
144,672.00$ 133,958.88$
11,248.00$ 10,608.64$
8,602.00$ 8,938.26$
21,418.80$ 23,462.40$
1,395.20$ 1,218.00$
6,952.00$ 6,515.00$
49,948.00$ 43,475.70$
3,089.52$ 3,215.04$
9,996.00$ 9,686.60$
12,828.20$ 12,111.33$
83,952.00$ 81,072.00$
53,100.00$ 51,156.00$
1,657.80$ 2,072.70$ 18.42$ 23.03$
44.25$ 42.63$
23.32$ 22.52$
37.40$ 35.31$
304.00$ 286.72$
6,576.00$ 6,089.04$
82.38$ 90.24$
187.00$ 194.31$
69.52$ 65.15$
34.88$ 30.45$
4.20$ 4.07$
128.73$ 133.96$
24,974.00$ 21,737.85$
12/10/2015 Page 17 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
63702-0000 Line A1320 1 EACH
64603-1200 Line A1340 2 EACH
FIELD LABORATORY
FIXTURE, WAYSIDE EXHIBIT
-31.4% 3,636,560.87$ -36.1% 3,388,312.16$
Unit Price Amount Unit Price Amount
Sedona Contracting, Inc. Smith & Aguire Construction Co., Inc.
17,000.00$ 15,745.93$
12,846.00$ 16,149.68$ 6,423.00$ 8,074.84$
17,000.00$ 15,745.93$
12/10/2015 Page 18 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line A0020 ALL LPSM
15206-0000 Line A0040 256.000 STA
15215-3000 Line A0060 3 EACH
15216-2000 Line A0080 512.000 STA
15301-0000 Line A0100 ALL LPSM
15401-0000 Line A0120 ALL LPSM
15501-0000 Line A0140 ALL LPSM
15705-0100 Line A0160 6,800 LNFT
15705-1400 Line A0180 3,210 LNFT
15705-1500 Line A0200 1,050 LNFT
15706-0200 Line A0220 70 EACH
15706-1600 Line A0240 2 EACH
15802-0000 Line A0260 ALL LPSM
SURVEY AND STAKING, GRADE FINISHING STAK
MOBILIZATION
SLOPE, REFERENCE, AND CLEARING AND GRUBB
SURVEY AND STAKING, DRAINAGE STRUCTURE
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, SEDIMENT LOG
SOIL EROSION CONTROL, SEDIMENT WATTLE
SOIL EROSION CONTROL, CHECK DAM
SOIL EROSION CONTROL, STABILIZED CONSTR
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
WATERING FOR DUST CONTROL
-0.6% 5,275,175.00$ -14.5% 4,537,845.00$
Unit Price Amount Unit Price Amount
710,000.00$ 452,992.00$
28,160.00$ 51,200.00$
4,950.00$ 3,675.00$
23,040.00$ 18,432.00$
46,000.00$ 120,000.00$
230,000.00$ 77,500.00$
12,650.00$ 1,700.00$
40,800.00$ 27,200.00$
25,680.00$ 12,037.50$
8,400.00$ 2,835.00$
12,250.00$ 21,000.00$
4,400.00$ 4,300.00$
115,000.00$ 56,000.00$
45.00$ 36.00$
1,225.00$
Steve Manning Construction, Inc. J. Star Enterprises, Inc.
46,000.00$ 120,000.00$
710,000.00$ 452,992.00$
110.00$ 200.00$
1,650.00$
6.00$ 4.00$
12,650.00$ 1,700.00$
230,000.00$ 77,500.00$
8.00$ 2.70$
8.00$ 3.75$
2,200.00$ 2,150.00$
175.00$ 300.00$
115,000.00$ 56,000.00$
12/10/2015 Page 19 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
20101-0000 Line A0280 24.0 ACRE
20301-0600 Line A0300 3 EACH
20301-1900 Line A0320 6 EACH
20301-2400 Line A0340 7 EACH
20302-0700 Line A0360 4,985 LNFT
20420-0000 Line A0380 65,200 CUYD
21101-1000 Line A0400 4,600 SQYD
25101-2000 Line A0420 5 CUYD
25101-3000 Line A0440 15 CUYD
25101-4000 Line A0460 40 CUYD
25302-1000 Line A0480 130 CUYD
25305-1000 Line A0500 1,780 SQYD
30101-0000 Line A0520 13,500 TON
REMOVAL OF PIPE CULVERT
REMOVAL OF SIGN
REMOVAL OF FENCE
REVET MATTRESS, GALVANIZED OR ALUMINIZE
AGGREGATE BASE
EMBANKMENT CONSTRUCTION
ROADWAY OBLITERATION, METHOD 1
PLACED RIPRAP, CLASS 2
PLACED RIPRAP, CLASS 3
PLACED RIPRAP, CLASS 4
GABIONS, GALVANIZED OR ALUMINIZED COATE
CLEARING AND GRUBBING
REMOVAL OF CATTLE GUARD
-0.6% 5,275,175.00$ -14.5% 4,537,845.00$
Unit Price Amount Unit Price Amount
Steve Manning Construction, Inc. J. Star Enterprises, Inc.
142,560.00$ 72,000.00$
7,500.00$ 12,000.00$
9,000.00$ 9,000.00$
1,050.00$ 700.00$
6,979.00$ 24,925.00$
1,369,200.00$ 1,304,000.00$
9,200.00$ 10,350.00$
2,500.00$ 650.00$
7,500.00$ 1,650.00$
8,400.00$ 4,800.00$
45,500.00$ 29,250.00$
192,240.00$ 133,500.00$
405,000.00$ 425,250.00$
5,940.00$ 3,000.00$
1,500.00$ 1,500.00$
2,500.00$ 4,000.00$
1.40$ 5.00$
150.00$ 100.00$
2.00$ 2.25$
21.00$ 20.00$
500.00$ 110.00$
500.00$ 130.00$
350.00$ 225.00$
210.00$ 120.00$
30.00$ 31.50$
108.00$ 75.00$
12/10/2015 Page 20 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
30110-0000 Line A0540 17,600 TON
30602-0000 Line A0560 47,630 SQYD
40101-0500 Line A0580 1,220 TON
40105-3000 Line A0600 15 TON
40920-1000 Line A0620 5 TON
41103-0000 Line A0640 7,200 SQYD
41201-1000 Line A0660 5 TON
60201-0800 Line A0680 20 LNFT
60201-1000 Line A0700 110 LNFT
60201-1200 Line A0720 80 LNFT
60210-0800 Line A0740 1 EACH
60210-1000 Line A0760 2 EACH
60210-1200 Line A0780 2 EACH
ANTISTRIP ADDITIVE, TYPE 3
END SECTION FOR 24-INCH PIPE CULVERT
END SECTION FOR 36-INCH PIPE CULVERT
END SECTION FOR 48-INCH PIPE CULVERT
FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1
PRIME COAT
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR S
24-INCH PIPE CULVERT
36-INCH PIPE CULVERT
48-INCH PIPE CULVERT
AGGREGATE SURFACE COURSE
DUST PALLIATIVE APPLICATION
SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAX
-0.6% 5,275,175.00$ -14.5% 4,537,845.00$
Unit Price Amount Unit Price Amount
Steve Manning Construction, Inc. J. Star Enterprises, Inc.
519,200.00$ 572,000.00$
142,890.00$ 166,705.00$
195,200.00$ 172,020.00$
7,200.00$ 2,625.00$
4,500.00$ 3,625.00$
10,800.00$ 7,920.00$
4,500.00$ 4,350.00$
5,000.00$ 2,000.00$
33,000.00$ 7,150.00$
32,000.00$ 6,800.00$
300.00$ 1,300.00$
800.00$ 7,000.00$
1,000.00$ 8,000.00$
3.00$ 3.50$
29.50$ 32.50$
480.00$ 175.00$
160.00$ 141.00$
1.50$ 1.10$
900.00$ 725.00$
250.00$ 100.00$
900.00$ 870.00$
400.00$ 85.00$
300.00$ 65.00$
400.00$ 3,500.00$
300.00$ 1,300.00$
500.00$ 4,000.00$
12/10/2015 Page 21 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
61102-1200 Line A0800 110 LNFT
61801-0000 Line A0820 2,470 LNFT
61901-0900 Line A0840 4,850 LNFT
61902-2500 Line A0860 3 EACH
61903-1500 Line A0880 3 EACH
62201-0250 Line A0900 20 HOUR
62201-0950 Line A0920 20 HOUR
62201-2800 Line A0940 20 HOUR
62201-3350 Line A0960 20 HOUR
62301-0000 Line A0980 60 HOUR
62302-1000 Line A1000 40 HOUR
62302-1100 Line A1020 40 HOUR
62510-2000 Line A1040 22.0 ACRE
1 1/2-INCH WATERLINE, POLYVINYL CHLORIDE
CONCRETE BARRIER
FENCE, BARBED WIRE, 4 STRAND
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
SEEDING, HYDRAULIC METHOD
GATE, BARBED WIRE, 4-STRAND
CATTLE GUARD, 40 FEET
DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPAC
WHEEL LOADER, 3 CUBIC YARD MINIMUM RATE
MOTOR GRADER, 8 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMU
-0.6% 5,275,175.00$ -14.5% 4,537,845.00$
Unit Price Amount Unit Price Amount
Steve Manning Construction, Inc. J. Star Enterprises, Inc.
2,200.00$ 1,705.00$
348,270.00$ 185,250.00$
24,250.00$ 17,702.50$
900.00$ 2,175.00$
75,000.00$ 92,250.00$
2,300.00$ 2,500.00$
3,000.00$ 2,600.00$
4,200.00$ 3,600.00$
3,800.00$ 2,500.00$
3,000.00$ 2,100.00$
7,200.00$ 4,400.00$
7,200.00$ 10,000.00$
28,600.00$ 28,600.00$
20.00$ 15.50$
5.00$ 3.65$
141.00$ 75.00$
25,000.00$ 30,750.00$
300.00$ 725.00$
150.00$ 130.00$
115.00$ 125.00$
190.00$ 125.00$
210.00$ 180.00$
180.00$ 110.00$
50.00$ 35.00$
1,300.00$ 1,300.00$
180.00$ 250.00$
12/10/2015 Page 22 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
62515-2000 Line A1060 22.0 ACRE
63301-0000 Line A1080 37 EACH
63308-3000 Line A1100 46 EACH
63309-0900 Line A1120 260 EACH
63502-0700 Line A1140 40 EACH
63502-1300 Line A1160 100 EACH
63502-2000 Line A1180 2 EACH
63503-0300 Line A1200 24 LNFT
63503-1000 Line A1220 2,380 LNFT
63504-1000 Line A1240 343 SQFT
63506-0500 Line A1260 3,600 HOUR
63506-0600 Line A1280 1,200 HOUR
63610-3010 Line A1300 90 LNFT
MULCHING, HYDRAULIC METHOD
SIGN SYSTEM
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
CONDUIT, 4-INCH, HDPE
OBJECT MARKER, TYPE 3
DELINEATOR, TYPE FLEXIBLE
TEMPORARY TRAFFIC CONTROL, CONE
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, PORTABLE CHA
TEMPORARY TRAFFIC CONTROL, BARRICADE TY
-0.6% 5,275,175.00$ -14.5% 4,537,845.00$
Unit Price Amount Unit Price Amount
Steve Manning Construction, Inc. J. Star Enterprises, Inc.
13,750.00$ 38,500.00$
18,500.00$ 10,730.00$
2,760.00$ 6,670.00$
13,000.00$ 20,280.00$
1,280.00$ 1,600.00$
5,000.00$ 5,500.00$
17,000.00$ 56,300.00$
1,200.00$ 3,840.00$
4,760.00$ 7,140.00$
14,406.00$ 7,546.00$
162,000.00$ 115,200.00$
60,000.00$ 54,000.00$
2,250.00$ 2,565.00$ 25.00$ 28.50$
50.00$ 45.00$
45.00$ 32.00$
42.00$ 22.00$
500.00$ 290.00$
625.00$ 1,750.00$
50.00$ 78.00$
60.00$ 145.00$
50.00$ 55.00$
32.00$ 40.00$
2.00$ 3.00$
50.00$ 160.00$
8,500.00$ 28,150.00$
12/10/2015 Page 23 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
63702-0000 Line A1320 1 EACH
64603-1200 Line A1340 2 EACH
FIELD LABORATORY
FIXTURE, WAYSIDE EXHIBIT
-0.6% 5,275,175.00$ -14.5% 4,537,845.00$
Unit Price Amount Unit Price Amount
Steve Manning Construction, Inc. J. Star Enterprises, Inc.
20,000.00$ 3,150.00$
5,000.00$ 11,000.00$ 2,500.00$ 5,500.00$
20,000.00$ 3,150.00$
12/10/2015 Page 24 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line A0020 ALL LPSM
15206-0000 Line A0040 256.000 STA
15215-3000 Line A0060 3 EACH
15216-2000 Line A0080 512.000 STA
15301-0000 Line A0100 ALL LPSM
15401-0000 Line A0120 ALL LPSM
15501-0000 Line A0140 ALL LPSM
15705-0100 Line A0160 6,800 LNFT
15705-1400 Line A0180 3,210 LNFT
15705-1500 Line A0200 1,050 LNFT
15706-0200 Line A0220 70 EACH
15706-1600 Line A0240 2 EACH
15802-0000 Line A0260 ALL LPSM
SURVEY AND STAKING, GRADE FINISHING STAK
MOBILIZATION
SLOPE, REFERENCE, AND CLEARING AND GRUBB
SURVEY AND STAKING, DRAINAGE STRUCTURE
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, SEDIMENT LOG
SOIL EROSION CONTROL, SEDIMENT WATTLE
SOIL EROSION CONTROL, CHECK DAM
SOIL EROSION CONTROL, STABILIZED CONSTR
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
WATERING FOR DUST CONTROL
-16.7% 4,418,756.13$ -16.1% 4,449,469.60$
Unit Price Amount Unit Price Amount
36,637.50$ 421,200.00$
30,914.56$ 37,376.00$
842.07$ 4,260.00$
59,422.72$ 189,440.00$
111,455.55$ 88,473.60$
100,488.76$ 86,544.72$
30,398.40$ 46,400.00$
30,056.00$ 22,032.00$
47,700.60$ 12,133.80$
23,530.50$ 3,969.00$
27,857.20$ 14,000.00$
6,375.82$ 3,888.00$
87,385.82$ 91,200.00$
116.06$
280.69$ 1,420.00$
IDEALS, Inc. Ultimate Concrete LLC
111,455.55$ 88,473.60$
36,637.50$ 421,200.00$
120.76$ 146.00$
370.00$
4.42$ 3.24$
30,398.40$ 46,400.00$
100,488.76$ 86,544.72$
22.41$ 3.78$
14.86$ 3.78$
3,187.91$ 1,944.00$
397.96$ 200.00$
87,385.82$ 91,200.00$
12/10/2015 Page 25 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
20101-0000 Line A0280 24.0 ACRE
20301-0600 Line A0300 3 EACH
20301-1900 Line A0320 6 EACH
20301-2400 Line A0340 7 EACH
20302-0700 Line A0360 4,985 LNFT
20420-0000 Line A0380 65,200 CUYD
21101-1000 Line A0400 4,600 SQYD
25101-2000 Line A0420 5 CUYD
25101-3000 Line A0440 15 CUYD
25101-4000 Line A0460 40 CUYD
25302-1000 Line A0480 130 CUYD
25305-1000 Line A0500 1,780 SQYD
30101-0000 Line A0520 13,500 TON
REMOVAL OF PIPE CULVERT
REMOVAL OF SIGN
REMOVAL OF FENCE
REVET MATTRESS, GALVANIZED OR ALUMINIZE
AGGREGATE BASE
EMBANKMENT CONSTRUCTION
ROADWAY OBLITERATION, METHOD 1
PLACED RIPRAP, CLASS 2
PLACED RIPRAP, CLASS 3
PLACED RIPRAP, CLASS 4
GABIONS, GALVANIZED OR ALUMINIZED COATE
CLEARING AND GRUBBING
REMOVAL OF CATTLE GUARD
-16.7% 4,418,756.13$ -16.1% 4,449,469.60$
Unit Price Amount Unit Price Amount
IDEALS, Inc. Ultimate Concrete LLC
47,549.76$ 38,556.00$
5,254.11$ 1,620.00$
3,565.32$ 648.00$
754.95$ 75.60$
26,270.95$ 26,919.00$
1,127,308.00$ 1,302,696.00$
29,532.00$ 208,656.00$
1,570.20$ 477.90$
3,531.75$ 1,498.50$
10,787.60$ 4,168.80$
37,958.70$ 21,130.20$
168,121.00$ 151,300.00$
397,845.00$ 338,580.00$
1,981.24$ 1,606.50$
594.22$ 108.00$
1,751.37$ 540.00$
5.27$ 5.40$
107.85$ 10.80$
6.42$ 45.36$
17.29$ 19.98$
235.45$ 99.90$
314.04$ 95.58$
291.99$ 162.54$
269.69$ 104.22$
29.47$ 25.08$
94.45$ 85.00$
12/10/2015 Page 26 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
30110-0000 Line A0540 17,600 TON
30602-0000 Line A0560 47,630 SQYD
40101-0500 Line A0580 1,220 TON
40105-3000 Line A0600 15 TON
40920-1000 Line A0620 5 TON
41103-0000 Line A0640 7,200 SQYD
41201-1000 Line A0660 5 TON
60201-0800 Line A0680 20 LNFT
60201-1000 Line A0700 110 LNFT
60201-1200 Line A0720 80 LNFT
60210-0800 Line A0740 1 EACH
60210-1000 Line A0760 2 EACH
60210-1200 Line A0780 2 EACH
ANTISTRIP ADDITIVE, TYPE 3
END SECTION FOR 24-INCH PIPE CULVERT
END SECTION FOR 36-INCH PIPE CULVERT
END SECTION FOR 48-INCH PIPE CULVERT
FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1
PRIME COAT
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR S
24-INCH PIPE CULVERT
36-INCH PIPE CULVERT
48-INCH PIPE CULVERT
AGGREGATE SURFACE COURSE
DUST PALLIATIVE APPLICATION
SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAX
-16.7% 4,418,756.13$ -16.1% 4,449,469.60$
Unit Price Amount Unit Price Amount
IDEALS, Inc. Ultimate Concrete LLC
517,616.00$ 401,984.00$
144,795.20$ 50,011.50$
212,341.00$ 136,139.80$
13,621.35$ 2,187.00$
6,297.75$ 4,455.00$
23,976.00$ 6,696.00$
6,297.75$ 4,455.00$
3,542.00$ 972.00$
11,137.50$ 6,949.80$
15,379.20$ 7,369.60$
1,883.21$ 776.52$
3,016.44$ 2,516.40$
3,720.10$ 4,857.84$
3.04$ 1.05$
29.41$ 22.84$
908.09$ 145.80$
174.05$ 111.59$
3.33$ 0.93$
1,259.55$ 891.00$
177.10$ 48.60$
1,259.55$ 891.00$
192.24$ 92.12$
101.25$ 63.18$
1,508.22$ 1,258.20$
1,883.21$ 776.52$
1,860.05$ 2,428.92$
12/10/2015 Page 27 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
61102-1200 Line A0800 110 LNFT
61801-0000 Line A0820 2,470 LNFT
61901-0900 Line A0840 4,850 LNFT
61902-2500 Line A0860 3 EACH
61903-1500 Line A0880 3 EACH
62201-0250 Line A0900 20 HOUR
62201-0950 Line A0920 20 HOUR
62201-2800 Line A0940 20 HOUR
62201-3350 Line A0960 20 HOUR
62301-0000 Line A0980 60 HOUR
62302-1000 Line A1000 40 HOUR
62302-1100 Line A1020 40 HOUR
62510-2000 Line A1040 22.0 ACRE
1 1/2-INCH WATERLINE, POLYVINYL CHLORIDE
CONCRETE BARRIER
FENCE, BARBED WIRE, 4 STRAND
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
SEEDING, HYDRAULIC METHOD
GATE, BARBED WIRE, 4-STRAND
CATTLE GUARD, 40 FEET
DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPAC
WHEEL LOADER, 3 CUBIC YARD MINIMUM RATE
MOTOR GRADER, 8 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMU
-16.7% 4,418,756.13$ -16.1% 4,449,469.60$
Unit Price Amount Unit Price Amount
IDEALS, Inc. Ultimate Concrete LLC
7,067.50$ 653.40$
233,909.00$ 174,999.50$
90,016.00$ 148,216.00$
10,715.76$ 2,592.00$
53,775.93$ 61,620.00$
1,402.20$ 1,786.40$
1,461.40$ 1,916.00$
1,852.20$ 1,849.40$
1,806.40$ 1,325.20$
2,512.20$ 1,492.80$
12,632.40$ 5,400.00$
12,632.40$ 5,400.00$
79,871.44$ 40,172.00$
64.25$ 5.94$
18.56$ 30.56$
94.70$ 70.85$
17,925.31$ 20,540.00$
3,571.92$ 864.00$
73.07$ 95.80$
70.11$ 89.32$
90.32$ 66.26$
92.61$ 92.47$
315.81$ 135.00$
41.87$ 24.88$
3,630.52$ 1,826.00$
315.81$ 135.00$
12/10/2015 Page 28 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
62515-2000 Line A1060 22.0 ACRE
63301-0000 Line A1080 37 EACH
63308-3000 Line A1100 46 EACH
63309-0900 Line A1120 260 EACH
63502-0700 Line A1140 40 EACH
63502-1300 Line A1160 100 EACH
63502-2000 Line A1180 2 EACH
63503-0300 Line A1200 24 LNFT
63503-1000 Line A1220 2,380 LNFT
63504-1000 Line A1240 343 SQFT
63506-0500 Line A1260 3,600 HOUR
63506-0600 Line A1280 1,200 HOUR
63610-3010 Line A1300 90 LNFT
MULCHING, HYDRAULIC METHOD
SIGN SYSTEM
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
CONDUIT, 4-INCH, HDPE
OBJECT MARKER, TYPE 3
DELINEATOR, TYPE FLEXIBLE
TEMPORARY TRAFFIC CONTROL, CONE
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, PORTABLE CHA
TEMPORARY TRAFFIC CONTROL, BARRICADE TY
-16.7% 4,418,756.13$ -16.1% 4,449,469.60$
Unit Price Amount Unit Price Amount
IDEALS, Inc. Ultimate Concrete LLC
79,943.60$ 49,896.00$
17,453.64$ 15,984.00$
14,915.96$ 1,689.12$
37,047.40$ 5,616.00$
5,277.20$ 7,200.00$
28,337.00$ 18,000.00$
73,025.70$ 18,144.00$
6,192.24$ 1,382.40$
16,065.00$ 10,281.60$
19,753.37$ 3,704.40$
110,520.00$ 72,000.00$
45,336.00$ 36,000.00$
10,513.80$ 2,575.80$ 116.82$ 28.62$
37.78$ 30.00$
30.70$ 20.00$
57.59$ 10.80$
471.72$ 432.00$
3,633.80$ 2,268.00$
142.49$ 21.60$
324.26$ 36.72$
283.37$ 180.00$
131.93$ 180.00$
6.75$ 4.32$
258.01$ 57.60$
36,512.85$ 9,072.00$
12/10/2015 Page 29 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
63702-0000 Line A1320 1 EACH
64603-1200 Line A1340 2 EACH
FIELD LABORATORY
FIXTURE, WAYSIDE EXHIBIT
-16.7% 4,418,756.13$ -16.1% 4,449,469.60$
Unit Price Amount Unit Price Amount
IDEALS, Inc. Ultimate Concrete LLC
8,313.85$ 6,480.00$
19,668.20$ 6,480.00$ 9,834.10$ 3,240.00$
8,313.85$ 6,480.00$
12/10/2015 Page 30 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line A0020 ALL LPSM
15206-0000 Line A0040 256.000 STA
15215-3000 Line A0060 3 EACH
15216-2000 Line A0080 512.000 STA
15301-0000 Line A0100 ALL LPSM
15401-0000 Line A0120 ALL LPSM
15501-0000 Line A0140 ALL LPSM
15705-0100 Line A0160 6,800 LNFT
15705-1400 Line A0180 3,210 LNFT
15705-1500 Line A0200 1,050 LNFT
15706-0200 Line A0220 70 EACH
15706-1600 Line A0240 2 EACH
15802-0000 Line A0260 ALL LPSM
SURVEY AND STAKING, GRADE FINISHING STAK
MOBILIZATION
SLOPE, REFERENCE, AND CLEARING AND GRUBB
SURVEY AND STAKING, DRAINAGE STRUCTURE
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, SEDIMENT LOG
SOIL EROSION CONTROL, SEDIMENT WATTLE
SOIL EROSION CONTROL, CHECK DAM
SOIL EROSION CONTROL, STABILIZED CONSTR
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
WATERING FOR DUST CONTROL
-45.5% 2,888,577.00$ -4.5% 5,065,320.69$
Unit Price Amount Unit Price Amount
50,719.00$ 370,637.88$
49,152.00$ 43,128.32$
3,465.00$ 4,915.68$
48,640.00$ 218,598.40$
88,750.00$ 102,091.12$
109,200.00$ 99,865.35$
3,917.00$ 99,698.36$
13,600.00$ 25,432.00$
6,420.00$ 13,995.60$
2,100.00$ 4,578.00$
19,320.00$ 16,154.60$
4,080.00$ 4,486.42$
125,854.00$ 105,237.16$
Morrow Enterprises, Inc. Milcon Construction, Inc.
370,637.88$
168.47$
1,638.56$
426.95$
102,091.12$
99,865.35$
99,698.36$
3.74$
4.36$
4.36$
230.78$
2,243.21$
105,237.16$
50,719.00$
192.00$
1,155.00$
95.00$
88,750.00$
109,200.00$
3,917.00$
2.00$
2.00$
2.00$
276.00$
2,040.00$
125,854.00$
12/10/2015 Page 31 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
20101-0000 Line A0280 24.0 ACRE
20301-0600 Line A0300 3 EACH
20301-1900 Line A0320 6 EACH
20301-2400 Line A0340 7 EACH
20302-0700 Line A0360 4,985 LNFT
20420-0000 Line A0380 65,200 CUYD
21101-1000 Line A0400 4,600 SQYD
25101-2000 Line A0420 5 CUYD
25101-3000 Line A0440 15 CUYD
25101-4000 Line A0460 40 CUYD
25302-1000 Line A0480 130 CUYD
25305-1000 Line A0500 1,780 SQYD
30101-0000 Line A0520 13,500 TON
REMOVAL OF PIPE CULVERT
REMOVAL OF SIGN
REMOVAL OF FENCE
REVET MATTRESS, GALVANIZED OR ALUMINIZE
AGGREGATE BASE
EMBANKMENT CONSTRUCTION
ROADWAY OBLITERATION, METHOD 1
PLACED RIPRAP, CLASS 2
PLACED RIPRAP, CLASS 3
PLACED RIPRAP, CLASS 4
GABIONS, GALVANIZED OR ALUMINIZED COATE
CLEARING AND GRUBBING
REMOVAL OF CATTLE GUARD
-45.5% 2,888,577.00$ -4.5% 5,065,320.69$
Unit Price Amount Unit Price Amount
Morrow Enterprises, Inc. Milcon Construction, Inc.
15,864.00$ 44,490.48$
12,654.00$ 1,869.33$
20,730.00$ 747.72$
910.00$ 87.22$
9,970.00$ 31,056.55$
586,800.00$ 1,503,512.00$
4,600.00$ 240,764.00$
500.00$ 551.45$
1,710.00$ 1,729.20$
4,400.00$ 4,810.40$
15,730.00$ 24,382.80$
153,080.00$ 174,582.40$
243,000.00$ 390,690.00$
1,853.77$
623.11$
124.62$
12.46$
661.00$
4,218.00$
3,455.00$
130.00$
2.00$ 6.23$
9.00$
1.00$
23.06$
52.34$
100.00$
114.00$
110.29$
115.28$
110.00$
121.00$
120.26$
187.56$
86.00$
18.00$
98.08$
28.94$
12/10/2015 Page 32 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
30110-0000 Line A0540 17,600 TON
30602-0000 Line A0560 47,630 SQYD
40101-0500 Line A0580 1,220 TON
40105-3000 Line A0600 15 TON
40920-1000 Line A0620 5 TON
41103-0000 Line A0640 7,200 SQYD
41201-1000 Line A0660 5 TON
60201-0800 Line A0680 20 LNFT
60201-1000 Line A0700 110 LNFT
60201-1200 Line A0720 80 LNFT
60210-0800 Line A0740 1 EACH
60210-1000 Line A0760 2 EACH
60210-1200 Line A0780 2 EACH
ANTISTRIP ADDITIVE, TYPE 3
END SECTION FOR 24-INCH PIPE CULVERT
END SECTION FOR 36-INCH PIPE CULVERT
END SECTION FOR 48-INCH PIPE CULVERT
FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1
PRIME COAT
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR S
24-INCH PIPE CULVERT
36-INCH PIPE CULVERT
48-INCH PIPE CULVERT
AGGREGATE SURFACE COURSE
DUST PALLIATIVE APPLICATION
SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAX
-45.5% 2,888,577.00$ -4.5% 5,065,320.69$
Unit Price Amount Unit Price Amount
Morrow Enterprises, Inc. Milcon Construction, Inc.
387,200.00$ 463,936.00$
95,260.00$ 57,632.30$
145,180.00$ 157,099.40$
1,965.00$ 2,523.60$
5,325.00$ 5,140.70$
14,400.00$ 7,704.00$
10,225.00$ 5,140.70$
1,040.00$ 1,121.60$
7,810.00$ 8,019.00$
10,880.00$ 8,504.00$
2,663.00$ 896.04$
5,886.00$ 2,903.72$
6,988.00$ 5,605.54$
22.00$
2.00$
26.36$
1.21$
119.00$
131.00$
128.77$
168.24$
1,065.00$
2.00$
1,028.14$
1.07$
2,045.00$
52.00$
1,028.14$
56.08$
71.00$
136.00$
72.90$
106.30$
2,663.00$
2,943.00$
896.04$
1,451.86$
3,494.00$ 2,802.77$
12/10/2015 Page 33 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
61102-1200 Line A0800 110 LNFT
61801-0000 Line A0820 2,470 LNFT
61901-0900 Line A0840 4,850 LNFT
61902-2500 Line A0860 3 EACH
61903-1500 Line A0880 3 EACH
62201-0250 Line A0900 20 HOUR
62201-0950 Line A0920 20 HOUR
62201-2800 Line A0940 20 HOUR
62201-3350 Line A0960 20 HOUR
62301-0000 Line A0980 60 HOUR
62302-1000 Line A1000 40 HOUR
62302-1100 Line A1020 40 HOUR
62510-2000 Line A1040 22.0 ACRE
1 1/2-INCH WATERLINE, POLYVINYL CHLORIDE
CONCRETE BARRIER
FENCE, BARBED WIRE, 4 STRAND
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
SEEDING, HYDRAULIC METHOD
GATE, BARBED WIRE, 4-STRAND
CATTLE GUARD, 40 FEET
DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPAC
WHEEL LOADER, 3 CUBIC YARD MINIMUM RATE
MOTOR GRADER, 8 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMU
-45.5% 2,888,577.00$ -4.5% 5,065,320.69$
Unit Price Amount Unit Price Amount
Morrow Enterprises, Inc. Milcon Construction, Inc.
1,540.00$ 753.50$
197,600.00$ 201,922.50$
29,100.00$ 171,011.00$
2,268.00$ 2,990.94$
75,291.00$ 71,104.32$
1,760.00$ 2,061.40$
1,480.00$ 2,211.00$
3,140.00$ 2,134.00$
1,680.00$ 1,529.20$
1,500.00$ 1,722.60$
3,520.00$ 6,231.20$
6,720.00$ 6,231.20$
13,398.00$ 46,355.10$
14.00$ 6.85$
80.00$
6.00$
81.75$
35.26$
756.00$
25,097.00$
996.98$
23,701.44$
88.00$
74.00$
103.07$
110.55$
157.00$
84.00$
106.70$
76.46$
25.00$
88.00$
28.71$
155.78$
168.00$
609.00$
155.78$
2,107.05$
12/10/2015 Page 34 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
62515-2000 Line A1060 22.0 ACRE
63301-0000 Line A1080 37 EACH
63308-3000 Line A1100 46 EACH
63309-0900 Line A1120 260 EACH
63502-0700 Line A1140 40 EACH
63502-1300 Line A1160 100 EACH
63502-2000 Line A1180 2 EACH
63503-0300 Line A1200 24 LNFT
63503-1000 Line A1220 2,380 LNFT
63504-1000 Line A1240 343 SQFT
63506-0500 Line A1260 3,600 HOUR
63506-0600 Line A1280 1,200 HOUR
63610-3010 Line A1300 90 LNFT
MULCHING, HYDRAULIC METHOD
SIGN SYSTEM
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
CONDUIT, 4-INCH, HDPE
OBJECT MARKER, TYPE 3
DELINEATOR, TYPE FLEXIBLE
TEMPORARY TRAFFIC CONTROL, CONE
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, PORTABLE CHA
TEMPORARY TRAFFIC CONTROL, BARRICADE TY
-45.5% 2,888,577.00$ -4.5% 5,065,320.69$
Unit Price Amount Unit Price Amount
Morrow Enterprises, Inc. Milcon Construction, Inc.
15,730.00$ 57,575.76$
18,685.00$ 18,444.13$
2,622.00$ 1,949.02$
9,100.00$ 6,479.20$
1,080.00$ 8,308.00$
5,600.00$ 20,770.00$
19,110.00$ 20,936.66$
816.00$ 1,595.28$
2,380.00$ 11,852.40$
3,430.00$ 4,273.78$
82,800.00$ 83,088.00$
45,600.00$ 41,544.00$
2,610.00$ 2,972.70$
10,468.33$
66.47$
4.98$
12.46$
23.08$
34.62$
33.03$
9,555.00$
34.00$
1.00$
10.00$
23.00$
38.00$
29.00$
715.00$
505.00$
2,617.08$
498.49$
57.00$
35.00$
42.37$
24.92$
27.00$
56.00$
207.70$
207.70$
12/10/2015 Page 35 of 36
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs and Baylor Canyon Road CQ = "Contract Quantity"
Item No. Quantity Unit
63702-0000 Line A1320 1 EACH
64603-1200 Line A1340 2 EACH
FIELD LABORATORY
FIXTURE, WAYSIDE EXHIBIT
-45.5% 2,888,577.00$ -4.5% 5,065,320.69$
Unit Price Amount Unit Price Amount
Morrow Enterprises, Inc. Milcon Construction, Inc.
48,300.00$ 7,477.38$
1,730.00$ 7,477.38$
7,477.38$
3,738.69$
48,300.00$
865.00$
12/10/2015 Page 36 of 36
Option X Total of Bid Items: 1,497,850.00$ -58.1% 627,215.00$
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs Rd & Baylor Cyn Rd CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
15101-0000 Line X0020 ALL LPSM 150,000.00$ 150,000.00$ 10,500.00$
15301-0000 Line X0040 ALL LPSM 50,000.00$ 50,000.00$ 10,500.00$
15401-0000 Line X0060 ALL LPSM 30,000.00$ 30,000.00$ 17,000.00$
15501-0000 Line X0080 ALL LPSM 1,000.00$ 1,000.00$ 530.00$
40101-0500 Line X0100 7,970 TON 135.00$ 1,075,950.00$ 510,080.00$
40105-3000 Line X0120 80 TON 275.00$ 22,000.00$ 9,360.00$
40920-1000 Line X0140 20 TON 750.00$ 15,000.00$ 12,000.00$
41103-0000 Line X0160 45,100 SQYD 1.50$ 67,650.00$ 31,570.00$
41201-1000 Line X0180 20 TON 800.00$ 16,000.00$ 12,000.00$
62202-1000 Line X0200 ALL LPSM 50,000.00$ 50,000.00$ 7,600.00$
63401-0300 Line X0220 40,500 LNFT 0.50$ 20,250.00$ 6,075.00$
CONSTRUCTION SCHEDULE
530.00$
MOBILIZATION
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H
PRIME COAT
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
MATERIALS TRANSFER VEHICLE
PAVEMENT MARKINGS, TYPE B, SOLID
SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL
ANTISTRIP ADDITIVE, TYPE 3
Mountain States Constructors, Inc.
10,500.00$
10,500.00$
64.00$
17,000.00$
0.70$
600.00$
117.00$
7,600.00$
600.00$
0.15$
Engineer's Estimate
12/10/2015 Page 1 of 6
Option X Total of Bid Items:
Project No: NM FLAP 11299(1)
Project Name: Dripping Springs Rd & Baylor Cyn Rd CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line X0020 ALL LPSM
15301-0000 Line X0040 ALL LPSM
15401-0000 Line X0060 ALL LPSM
15501-0000 Line X0080 ALL LPSM
40101-0500 Line X0100 7,970 TON
40105-3000 Line X0120 80 TON
40920-1000 Line X0140 20 TON
41103-0000 Line X0160 45,100 SQYD
41201-1000 Line X0180 20 TON
62202-1000 Line X0200 ALL LPSM
63401-0300 Line X0220 40,500 LNFT
CONSTRUCTION SCHEDULE
MOBILIZATION
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1
PRIME COAT
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR S
MATERIALS TRANSFER VEHICLE
PAVEMENT MARKINGS, TYPE B, SOLID
SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAX
ANTISTRIP ADDITIVE, TYPE 3
-40.0% 898,297.82$ -46.3% 803,925.00$
Unit Price Amount Unit Price Amount
16,378.40$ 10,000.00$
5,428.00$ 20,000.00$
12,891.50$…
This is the start of the file's text. The full file is on GovTribe.