Amendment_A001.pdf

PDF 3 MB Posted

Attached to
NM FLAP 11299(1), Drippin Springs Road Federal contract opportunity
Solicitation number
DTFH6815B00034
Issued by
Department of Transportation Federal Highway Administration

About this file

Amendment A001.

View the file

Other files for this federal contract opportunity

Other files attached to NM FLAP 11299(1), Drippin Springs Road, newest first.
File Type Posted
Bid_Tabs.pdf PDF
NM_FLAP_CR11299(1) _Dripping_Springs_and_Baylor_Canyon_Road_Bid_Summary_11_19_15.xlsx XLSX spreadsheet
NM_FLAP_CR11299(1) _Dripping_Springs_and_Baylor_Canyon_Road_Bid_Summary_11_19_15.xlsx XLSX spreadsheet
QA_11-17-15.pdf PDF
Amendment_A003.pdf PDF
QA_11-12-15.pdf PDF
Amendment_A002.pdf PDF
QA_11-6-15.pdf PDF
MASTER_CFLHD_NM_FLAP_11299_Drainage_Report_2015-08-25.pdf PDF
NM_FLAP_CR11299(1)_DSBC_100__Final_Pavement_Report.pdf PDF
DTFH6815B00034.pdf PDF
Cross_Sections.pdf PDF
Plans.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

A-1

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration or Repair)

1. SOLICITATION NO.

DTFH6815B00034

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

10./19/2015

PAGE OF

PAGES

IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

NM FLAP CR11299(1)

7. ISSUED BY:

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS DIVISION

12300 WEST DAKOTA AVENUE, SUITE 167

LAKEWOOD, COLORADO 80228

CODE: 69050001 8. ADDRESS OFFER TO:

Jeremiah Rogers, Contract Specialist Federal Highway Administration Central Federal Lands Division Office 12300 W. Dakota Avenue Lakewood, CO 80228

9. FOR INFORMATION CALL

SEE PAGE A-3

A. NAME:

SEE PAGE A-3

B. TELEPHONE NO. (Include area code)

SEE PAGE A-3

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:

CONSTRUCT THE NM FLAP CR11299(1) ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH:

1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)

2. DEPARTMENT OF LABOR, DAVIS BACON MINIMUM WAGE RATES

3. SPECIAL CONTRACT REQUIREMENTS

4. PLANS

5. BID SCHEDULE

6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY

PROJECTS, FP-03, U.S. CUSTOMARY UNITS

7. SUBCONTRACTING PLAN (IF APPLICABLE)

See Subsection 104.04 of the FP-03 for governing order of precedence

11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. *Refer to Subsection 108.01 as amended in the Special Contract Requirements.

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m. (hour) local time on 11/17/15 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is is not required.

C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-102 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53-236-1(e)

X

X

X

X

X

Amendment A001 11/9/15

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text 11/18/15

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

Pay Item No. Description Quantity Unit Unit Price Amount 15101-0000

ALL LPSM $ $

15206-0000

256. STA $ $

15215-3000

3. EACH $ $

15216-2000

512. STA $ $

15301-0000

ALL LPSM $ $

15401-0000

ALL LPSM $ $

15501-0000

ALL LPSM $ $

15705-0100

6,800. LNFT $ $

15705-1400

3,210. LNFT $ $

15705-1500

1,050. LNFT $ $

15706-0200

70. EACH $ $

15706-1600

2. EACH $ $

15802-0000

ALL LPSM $ $

20101-0000

24. ACRE $ $

20301-0600

3. EACH $ $

20301-1900

6. EACH $ $

20301-2400

7. EACH $ $

20302-0700

4,985. LNFT $ $

20420-0000

67,000. CUYD $ $

21101-1000

4,600. SQYD $ $

25101-2000

5. CUYD $ $

25101-3000

15. CUYD $ $

Schedule A Bid Schedule

PLACED RIPRAP, CLASS 2

PLACED RIPRAP, CLASS 3

REMOVAL OF PIPE CULVERT

REMOVAL OF SIGN

REMOVAL OF FENCE

EMBANKMENT CONSTRUCTION

ROADWAY OBLITERATION, METHOD 1

SOIL EROSION CONTROL, CHECK DAM

SOIL EROSION CONTROL, STABILIZED CONSTRUCTION ENTRANCE

WATERING FOR DUST CONTROL

CLEARING AND GRUBBING

REMOVAL OF CATTLE GUARD

CONTRACTOR TESTING

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, SILT FENCE

SOIL EROSION CONTROL, SEDIMENT LOG

SOIL EROSION CONTROL, SEDIMENT WATTLE

MOBILIZATION

SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE

SURVEY AND STAKING, DRAINAGE STRUCTURE

SURVEY AND STAKING, GRADE FINISHING STAKES

CONTRACTOR QUALITY CONTROL

A-6

_____________65,200 CUYD (A001)

Amendment A001 11/9/15

Station to Station

LENGTH OF PROJECT

(ft)

Roadway

See plans for locations of curves and superelevations

METHOD OF SUPERELEVATION ON CURVES

NOTE:

Min. superelevation 2% 6% Max. superele vation

Normal crown -2% -2% Normal crown grade

Profile superelevation

Pivot point for

DETAIL A

concrete pavement

Superpave asphalt base

Aggregate

30° - 35° sides of roadway)

(Detail applies to both right and left

Shoulder up with aggregate base

Construct 30° - 35° pavement edge (safety edge)

NO SCALE

Existing ground

A6 A8

108+00 to 228+00 12,000

6" to 1'; average depth is 6" with sand and silt. Depth varies from consisting of poorly graded gravel

Existing gravel/natural ground from 36 ft to 45 ft

Existing width varies

Average 42 ft

TOTAL (mi)

TOTALS (ft)

13,574

25,574

4.84

2.

1.

1:6

1:4

Cut slope2.

point

Hinge pavement)

(top of

Profile grade

11' 5'5' 11' point

Hinge

1:6

See Detail AShldr. Traveled way Traveled way Shldr.

Clear zone

11'

Clear zone

11'

Clearing and construction limits

2% 2%

Fill slope

2.

399+25.94 to 535+00

108+00 to 228+00

DRIPPING SPRINGS ROAD

EXISTING TYPICAL SECTION

Varies

Varies

(SCHEDULE A/OPTION X)

TYPICAL SECTIONS

Option X in 2 equal lifts) concrete pavement (Placed

3" Superpave asphalt

Schedule A

4" Aggregate base

Option X asphalt lifts)

(applied between

Tack coat

Option X first asphalt lift)

(applied prior to

Prime coat

Option X top asphalt lift)

(applied to

Fog seal

108+00 to 228+00

DRIPPING SPRINGS ROAD

OPTION X - 3" SUPERPAVE PAVEMENT

SCHEDULE A - 4" AGGREGATE BASE

TYPICAL SECTION

Seeding limits Seeding limits

3.

2" Topsoil

3.2" Topsoil

See Detail B

DETAIL B

REVISED 11/6/2015

3.

214+50 to 218+50 RT

204+00 to 209+00 RT

170+50 to 174+25 RT

Conserve topsoil locations:

c o n s tr u c ti o n l im it s

C le a r in g a n d directed by CO. Conserve topsoil locations may be adjusted by the CO.

embankment slopes or in other approved locations. Provide drainage openings as

Stockpile conserved topsoil in windrows immediately beyond the limits of cut and

See the cross sections for cut and fill slope ratios.

slope ratios may be adjusted by the CO to assure adequate drainage and stability.

The gradient and width of roadway ditches and the excavation and embankment

Windrow topsoil material limit of embankment

Slope stake limit of cut

Slope stake

2" Topsoil3.

AMENDMENT 001 Identified conserve topsoil locations

REG STATE PROJECT

NO.

SHEET

SHEETS

TOTAL

P

M c p w w o r k in g o m a d T

Y P D

S B

C

A .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U

S E

R

NM

DRIPPING SPRINGS & BAYLOR CANYON ROADS

NM FLAP CR11299(1)

COUNTY

DONA ANA

NOTE:

DETAIL A

concrete pavement

Superpave asphalt base

Aggregate

30° - 35° sides of roadway)

(Detail applies to both right and left

Shoulder up with aggregate base

Construct 30° - 35° pavement edge (safety edge)

NO SCALE

from 36 ft to 45 ft Existing width varies

A7 A8

6" to 1'; average depth is 6" with sand and silt. Depth varies from consisting of poorly graded gravel

Existing gravel/natural ground

Average 42 ft

399+25.94 to 535+00

BAYLOR CANYON ROAD

EXISTING TYPICAL SECTION

1:6

(SCHEDULE A)

TYPICAL SECTIONS

531+35.00 to 532+80.00479+55.00 to 481+00.00

521+80.00 to 522+95.00467+40.00 to 468+65.00

513+15.00 to 515+10.00453+80.00 to 455+95.00

503+80.00 to 505+05.00447+90.00 to 449+45.00

491+20.00 to 492+40.00438+05.00 to 440+55.00

486+30.00 to 487+90.00412+20.00 to 413+80.00

TYPICAL SECTION - PAVED LOW WATER CROSSING

BAYLOR CANYON ROAD

See Detail A

Shldr.

Flow

Existing ground

2% (Typ) 2% (Typ)

1:6

6'

Flow

11'

Clear zone

11' top asphalt lift)

(applied to

Fog seal in 2 equal lifts) concrete pavement (Placed

3" Superpave asphalt

4" Aggregate base

11'5' 11' 5'

32'Clear zone

Apply tack coat 3.

pavement)

(top of

Profile grade first asphalt lift)

(applied prior to

Prime coat

Traveled wayTraveled way Shldr.

Varies

Varies

Clearing and construction limits limit stake

Slope limit stake

Slope details Low Water Crossing See sheet G2 for

2.

Tack coat (applied between asphalt lifts)

4.

4.

3.

2.

1.

5.2" Topsoil

DETAIL B

1:4

Cu t s lop e2.

point

Hinge

11'5' 5'11' point

Hinge

1:6

Shldr.Traveled wayTraveled wayShldr.

Clear zone

11'

Clear zone

11'

2%2%

Fil l s lop e2.

Varies

Varies

7" Aggregate surface course surfacing)

(top of aggregate

Profile grade

Seeding limits Seeding limits

2" Topsoil

See Detail B

5.

481+00.00 to 486+30.00

532+80.00 to 535+00.00468+65.00 to 479+55.00

522+95.00 to 531+35.00455+95.00 to 467+40.00

515+10.00 to 521+80.00449+45.00 to 453+80.00

505+05.00 to 513+15.00440+55.00 to 447+90.00

492+40.00 to 503+80.00413+80.00 to 438+05.00

487+90.00 to 491+20.00399+25.94 to 412+20.00

TYPICAL SECTION

BAYLOR CANYON ROAD

Existing ground

5.

REVISED 11/6/2015

526+50 to 531+50 LT

515+65 to 521+90 LT

505+20 to 513+30 LT

492+65 to 503+80 LT

488+00 to 491+30 LT

456+00 to 486+50 LT

440+40 to 448+00 LT

429+00 to 433+50 LT

399+75 to 412+00 LT/RT

Conserve topsoil locations:c o n s tr u c ti o n l im it s

C le a r in g a n d directed by CO. Conserve topsoil locations may be adjusted by the CO.

embankment slopes or in other approved locations. Provide drainage openings as

Stockpile conserved topsoil in windrows immediately beyond the limits of cut and pavement limits.

See sheet G2 for Baylor Canyon Road typical plan for low water crossing revet mattress and concrete barrier cutoff wall at the low water crossings.

Superpave asphalt concrete pavement extends 20 ft beyond each end of the

Apply tack coat to concrete barrier at edge of pavement (subsidiary to tack coat.)

See the cross sections for cut and fill slope ratios.

slope ratios may be adjusted by the CO to assure adequate drainage and stability.

The gradient and width of roadway ditches and the excavation and embankment

Windrow topsoil material limit of cut

Slope stake of embankment

Slope stake limit

Clearing and construction limits

AMENDMENT 001 Identified conserve topsoil locations

2" Topsoil5.

REG STATE PROJECT

NO.

SHEET

SHEETS

TOTAL

P

M c p w w o r k in g o m a d T

Y P D

S B

C

A .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U

S E

R

NM

DRIPPING SPRINGS & BAYLOR CANYON ROADS

NM FLAP CR11299(1)

COUNTY

DONA ANA

Sheet and Description

B4 B5-B6 B7 B8 B9-B10 B11-B13

Earthwork Summary

Surfacing Summary

Drainage Summary

Erosion Control

Summaries

Miscellaneous Summaries

Signing and Pavement Marking

Summaries

Allowance Bid Schedule

A0001 15101-0000 MOBILIZATION LPSM ALL

A0011 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE STA 255.741 0.259 256.000

A0021 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE EACH 3 3

A0031 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES STA 511.481 0.519 512.000

A0041 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

A0051 15401-0000 CONTRACTOR TESTING LPSM ALL

A0061 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0071 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 6,440 360 6,800

A0081 15705-1400 SOIL EROSION CONTROL, SEDIMENT LOG LNFT 2,910 300 3,210

A0091 15705-1500 SOIL EROSION CONTROL, SEDIMENT WATTLE LNFT 1,050 1,050

A0101 15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 70 70

A0111 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION ENTRANCE EACH 2 2

A0121 15802-0000 WATERING FOR DUST CONTROL LPSM ALL

A0131 20101-0000 CLEARING AND GRUBBING ACRE 22.5 1.5 24.0

A0141 20301-0600 REMOVAL OF CATTLE GUARD EACH 3 3

A0151 20301-1900 REMOVAL OF PIPE CULVERT EACH 6 6

A0161 20301-2400 REMOVAL OF SIGN EACH 7 7

A0171 20302-0700 REMOVAL OF FENCE LNFT 4,744 241 4,985

1 A0181 20420-0000 EMBANKMENT CONSTRUCTION CUYD 59,254 5,946 65,200

A0191 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 4,362 238 4,600

A0201 25101-2000 PLACED RIPRAP, CLASS 2 CUYD 4 1 5

A0211 25101-3000 PLACED RIPRAP, CLASS 3 CUYD 13 2 15

A0221 25101-4000 PLACED RIPRAP, CLASS 4 CUYD 36 4 40

A0231 25302-1000 GABIONS, GALVANIZED OR ALUMINIZED COATED CUYD 115 15 130

A0241 25305-1000 REVET MATTRESS, GALVANIZED OR ALUMINIZED COATED SQYD 1,482 158 1,640

A0251 30101-0000 AGGREGATE BASE TON 12,388 1,112 13,500

A0271 30110-0000 AGGREGATE SURFACE COURSE TON 16,761 839 17,600

A0291 30602-0000 DUST PALLIATIVE APPLICATION SQYD 45,360 2,270 47,630

A0301 40101-0500 SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE,

<0.3 MILLION ESAL TON 1,160 60 1,220

A0321 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 12 3 15

A0341 40920-1000 FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR

SS-1H TON 3 2 5

A0351 41103-0000 PRIME COAT SQYD 6,791 409 7,200

A0361 41201-1000 TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H TON 3 2 5

A0371 60201-0800 24-INCH PIPE CULVERT LNFT 17 3 20

A0381 60201-1000 36-INCH PIPE CULVERT LNFT 104 6 110

A0391 60201-1200 48-INCH PIPE CULVERT LNFT 70 10 80

A0401 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT EACH 1 1

A0411 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT EACH 2 2

SUMMARY OF QUANTITIES - Schedule A 7-

N ov

-2

8:

P

M W

\N M

_F

LA

P_

2-

(1

Q ua nt iti es

N M

F

LA

P

9(

1) S um m ar y of Q ua nt iti es

S he et _A

1.

xl sm

]S he e t

MileStone: A001 Date Completed: 11/07/15 Report Date: 11/07/15

A M E N D

Line Item No.

Pay Item Number

Remarks and/or Determination of Estimated QuantityPay Item Description Unit

Estimated Quantities

REG STATE PROJECT

NM FLAP 11299(1)

DRIPPING SPRINGS &

B1NM

NO.

SHEET

DONA

ANA

B13

SHEETS

TOTAL

B4 B13

(SCHEDULE A)

EARTHWORK SUMMARY

NOTE:

material used for embankment construction and material used for backfill of topsoil stripping under fills.

shrink/swell of 0.9. Adjusted estimated quantities include: material available from roadway excavation, Estimated unclassified borrow quantity calculated using volumes adjusted for estimated material source performed.

The quantities shown herein are approximations. Payment will be made for the actual quantities of work

CCY = Compacted cubic yard - one cubic yard of material after it has been compacted to specification density.

BCY = Bank cubic yard - one cubic yard of material as it lies in the natural state.

Embankment construction volume does not include backfill for topsoil stripping in fills.

Do not measure backfill for topsoil stripping under fills include work in embankment construction.

Estimated quantites calculated using volumes adjusted for shrink/swell of 0.9

Various material generated onsite includes topsoil stripping under fills.

Unavailable material includes topsoil stripping in cuts.

REVISED 11/6/2015

AMENDMENT 001 Revised grading summary and added topsoil summary

4.

3.

2.

1.

7.

6.

5.

REG STATE PROJECT

NO.

SHEET

SHEETS

TOTAL

P

M c p w w o r k in g o m a d S

U M D

S B

C

A .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U

S E

R

NM

DRIPPING SPRINGS & BAYLOR CANYON ROADS

NM FLAP CR11299(1)

COUNTY

DONA ANA

E-55

Dripping Springs and Baylor Canyon Roads

Section 253. - GABIONS AND REVET MATTRESSES

Construction Requirements

253.03 General. Delete the first sentence and substitute the following:

Survey according to Section 152 and verify the limits of the structure.

253.05 Structure Erection. Add the following to the first paragraph:

For gabion structures, grade the foundation for a width equal to the width of the gabion plus 2 feet. Where gabions are set on rocky foundations, place 6 inches of select granular backfill under the baskets. Section 253.03 (which refers to section 209) discusses foundation preparation.

Measurement

253.10 Add the following:

Do not measure excavation for gabions or revet mattresses for payment. Do not measure granular backfill for payment.

Section 301. - UNTREATED AGGREGATE COURSES

301.03 General. Delete the third paragraph and substitute the following:

For base course set target values within the gradation ranges shown in Table 703-2, grading C, D, or E.

For surface course aggregate set target values within the gradation range shown in Table 703-3.

Section 306. – DUST PALLIATIVE

Material

306.02 Conform to the following Subsections. Delete the text of the Subsection and substitute the following:

Magnesium chloride 725.02 Water 725.01(c)

11/9/15

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text foundation fill

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

E-57

Delete Section 401 and substitute the following:

Section 401. - SUPERPAVE ASPHALT CONCRETE PAVEMENT

Description

401.01 This work consists of constructing one or more courses of asphalt concrete pavement using hot or warm mix asphalt (HMA or WMA).

The mix design method is designated as Superpave. Superpave HMA and WMA asphalt concrete pavement nominal maximum size aggregate size is designated as shown in Tables 401-

1. Equivalent single axle loads (ESAL) or number of gyrations at design (NDesign) is designated as shown in Tables 401-1.

A minimum of one percent lime is required in the asphalt concrete mixture.

For Schedule A, pavement roughness is Type V as shown in Subsection 401.16.

For Option X, pavement roughness is type IV as shown in Subsection 401.16.

Asphalt binder grade is PG 70-16. The Pressure Aging Vessel test temperature shall be 230°F.

401.02 Conform to the following Subsections:

Material

Aggregate 703.07 Antistrip additive 702.08 Asphalt binder 702.01 Mineral filler 725.05 Recycled asphalt pavement 703.19

401.03 Composition of Mix (Job-Mix Formula). Furnish mixes of aggregate, asphalt binder, recycled asphalt pavement (RAP), and additives that meet the applicable material requirements and the appropriate design parameters in Table 401-1 and are capable of being placed and compacted as specified.

Compact specimens with the gyratory effort corresponding to the design ESAL level of <0.3 million. Volumetric mix properties will be determined at Ndesign according to AASHTO T 312 and R 35. Use a gyratory compactor which meets the internal angle requirement according to

AASHTO T 312.

If more than 1.0 percent hydrated lime is proposed in the JMF provide AASHTO T 283 tests results showing the additional lime is necessary to meet the minimum tensile strength ratio requirements in Table 401-1.

E-69 used for the control strip will not be included in the evaluation for payment according to Subsection 106.05. When a control strip is verified and accepted, full production may begin.

Use these start-up procedures when producing material from a different plant or when resuming production after a termination of production due to unsatisfactory quality according to Subsection 106.05.

401.13 Placing and Finishing. Do not use mixes produced from different plants unless the mixes are produced according to the same JMF, use material from the same sources, and are approved.

Construct control strips according to Subsection 401.12 for each plant from which production is intended.

Place mix at a temperature conforming to Subsection 401.07. Measure temperature of the mix in the hauling vehicle just before dumping into spreader or measure it in the windrow immediately before pickup.

Place the asphalt concrete mix with a paver conforming to Subsection 401.05. Control horizontal alignment using a reference line. Automatically control the grade and slope from reference lines, a ski and slope control device, or dual skis. Use skis having a minimum length of 20 feet.

In areas where mechanical spreading and finishing is impractical, place and finish the mix with alternate equipment to produce a uniform surface closely matching the surface obtained when using a mechanical paver.

The CO will designate the JMF to be used for wedge and leveling courses at each location. Place wedge and leveling courses in maximum 3-inch lifts. Complete the wedge and leveling before starting normal paving operations.

401.14 Compacting. For Option X, furnish at least three rollers. Furnish one roller each for breakdown, intermediate, and finish rolling. At least one roller will be pneumatic-tired. For Schedule A, furnish one or more rollers. Size the rollers to achieve the required results. Operate rollers according to the recommendation of the manufacturer. Diesel fuel will not be used as a release agent with any roller used to compact the asphalt mix. Do not cause cracking, shoving, or undue displacement. Continue rolling until all roller marks are eliminated, all cracks are sealed, and the required density is obtained. For HMA, do not roll the mix after the surface cools below 175 °F.

Monitor the compaction process with nuclear density gauges calibrated to the control strip core density test results. Cut six-inch diameter core samples from the compacted pavement. Fill and compact the core holes with asphalt concrete mixture. Label the cores and protect them from damage due to handling or temperature during storage.

Along forms, curbs, headers, walls, and other places not accessible to the rollers, compact the mix with alternate equipment to obtain the required compaction.

Full Appendix B.pdf
APPENDIX B.pdf
subcontractingplan
Amendment AA01 NV FTNP LAKE 114(1) Plan Sheets.pdf
A01_TTL w-DDR-006.pdf
A05_TYP_01-001.pdf
A06_TYP_02-002.pdf
A07_TYP_03-003.pdf
A08_TYP_04-004.pdf
A09_TYP_05-005.pdf
NM FLAP 11299(1) Sheets A6_A7_B1_B4 for A001.pdf
TYP(DSBC)_01_A001
TYP(DSBC)_02_A001
SUM(DSBC)_03_A001
b4.pdf
SUM(DSBC)_03_A001
NM FLAP 11299(1) Sheets A6_A7_B1_B4 for A001.pdf
TYP(DSBC)_01_A001
TYP(DSBC)_02_A001
SUM(DSBC)_03_A001
b4.pdf
SUM(DSBC)_03_A001
Text1:
Text2:
0: 1
1: 10
Text3:
0: A001
1: 11/9/2015
2:
0:
1: NM FLAP CR11299(1)
Text4:
0:
0: FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 WEST DAKOTA AVENUE, SUITE 360

LAKEWOOD, COLORADO 80228

ATTENTION: JEREMIAH ROGERS

1:

1:
0:
Text6:
0: DTFH6815B00036 Dripping Springs
1: 10/19/2015
2:
3:
Check Box7:
0: Yes
2: Off
1:
0:
0: Yes
1: Off
2: Yes
Check Box9:
1: Off
2: Off
0:
0: Off
1: Off
Text10: 0*
Text11:
0:
1:
Text12: * See Item 14 Below
Text13: INVITATION FOR BID- A-Section

Remove old page A-1 and replace with new A-1. The bid opening is extended 1 day, with new bid opening on 11/18/15.

Remove old page A-6 and replace with new page A-6. A quantity change for 20420-0000 was made.

INVITATION FOR BID- E-Section Remove old page E-55 and replace with new E-55. Changes were made to 253, Gabions. Foundation requirements are already in the FP-03 under section 209.

Remove old pages E-57 and E-69 and replace with new pages E-57 and E-69. Roughness and compactoin requirements were changed to reflect the diffence between Schedule A and Option X paving requirements.

PLANS

Remove old plan pages A6, A7, B1, and B4, and replace with new plan pages A6, A7, B1, and B4. Topsoil notes and changes were added to each page.

*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)

Text14:
0:
1: Jeremiah Rogers
Text15:
1:
0:
1:
0:
0:
1:
Text16:
0:
1:
Text17:
Text5:
0: 6905001
1:
Check Box1:
0: Yes
1: Off

File details come from the government source that posted it. Updated .