CARE_A004.pdf

PDF 307 KB Posted

Attached to
UT PRA CARE 10(1), Capitol Reef Route 10, Scenic Drive
Solicitation number
DTFH68-11-B-00002
Issued by

About this file

Invitation for Bid - Remove page E-23 and replace with new E-23. Removed the words at a time from the 108.01 Zone 2 closure requirements. The intent of the specification is to allow one closure of up to 2 weeks during the time frame specified to work on Low Water Crossings.

View the file

Other files

File Type Posted
CARE_A003.pdf PDF
CARE_A002.pdf PDF
CARE_A001.pdf PDF
UT PRA CARE 10(1) Final IFB.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E-23 PRA-CARE 10(1)

SCENIC DRIVE

PMIS NO. 57955

Section 108. - PROSECUTION AND PROGRESS

108.01 Commencement, Prosecution, and Completion of Work: Add the following:

Scenic Drive consists of two zones of differing conditions and restrictions.

Zone 1; SR 24 (Sta. 100+12.32) to the Fee Station (Sta. 186+00.00): Restrict work to the hours of 8 am to 6 pm. Maintain a minimum of one lane of traffic at all times during construction.

Zone 2; Fee Station (Sta. 186+00.00) to the parking area at Capitol Gorge (Sta.

521+19.45): Perform construction operations during the hours of daylight (½ hour after sunrise to ½ hour before sunset). Maintain a minimum one lane of traffic at all times except when a full closure is allowed. Between April 1st and October 15th the road may be closed completely for a period of 2 weeks at a time to work on low water crossings upon prior approval by the CO after consultation with the park. Between October 15th and April 1st the road may be closed for a continuous 2 month duration upon approval by the CO after consultation with the park. The contractor shall maintain one-lane of traffic, and temporary access to approach roads, during all times when a full road closure is not allowed. Detour routes are not available from SR 24.

Work will not be allowed on weekends, Friday 6 pm through Monday 8am, between May 1 and September 30. Night work will not be allowed.

Perform no work except to maintain traffic control devices, erosion control devices, the roadway driving surface, and to control dust during weekends and the listed Federal holidays and surrounding days:

Memorial Day Weekend: 12:00 Noon Friday to 8:00 am Tuesday.

Independence Day: 12:00 Noon July 3 to 8:00 am July 5.

If July 4 falls on a weekend, Friday, or Monday, do not work the weekend.

Utah Pioneer Day: 12:00 Noon July 23 to 8:00 am July 25. If July 24 falls on a Saturday:

12:00 Noon July 22 to 8:00 am July 26. If July 24 falls on a Sunday,: 12:00 Noon July22 to 8:00 am July 26. If July 24 falls on a Friday Monday, do not work the weekend.

Labor Day Weekend: 12:00 Noon Friday to 8:00 am Tuesday.

Thanksgiving: 12:00 Noon Wednesday to 8:00 am Monday.

Christmas/New Year’s Holiday: 12:00 Noon December 23 to 8:00 am January 2.

If December 23 or January 1 falls on a Monday, do not work the adjacent weekend and do not work on December 23. If January 1 falls on a Friday, do not work the weekend.

Revised 11/18/2010 Amendment A004

Untitled

Text1:
Text2:
0: 1
1: 2
Text3:
0: A004
1: 11/18/2010
2:
0:
1: UT PRA CARE 10(1), Scenic Dr.
Text4:
0:
0: FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 WEST DAKOTA AVENU, SUITE 360

LAKEWOOD, COLORADO 80228

ATTENTION: LORI KLIETHERMES

1:

1:
0:
Text6:
0: DTFH68-11-B-00002
1: 10/21/2010
2:
3:
Check Box7:
0: Yes
2: Yes
1:
0:
0: Off
1: Off
2: Off
Check Box9:
1: Off
2: Off
0:
0: Off
1: Off
Text10: *
Text11:
0:
1:
Text12: * See Below
Text13: INVITATION FOR BID

Invitation for Bid - Remove page E-23 and replace with new E-23. Removed the words "at a time" from the 108.01 "Zone 2" closure requirements. The intent of the specification is to allow one closure of up to 2 weeks during the time frame specified to work on Low Water Crossings.

Refer to the Q&A section of CFLHD's website (http://www.cflhd.gov/contracting/construction/advertisedprojects.cfm) under the project name for further information.

*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO SF-1442, PAGE A-2, OF THE SOLICITATION)

Text14:
0:
1:
Text15:
1:
0:
1:
0:
0:
1:
Text16:
0:
1:
Text17:
Text5:
0: 6905001
1:
Check Box1:
0: Yes
1: Off

File details come from the government source that posted it. Updated .