Pay Item No.
Estimated Quantity Unit Bid Price Amount Bid
A- 12
63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
LNFT $_______________ $___________________
63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
LNFT $_______________ $___________________
63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
SQFT $_______________ $___________________
63505-1000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
53.0
MILE $_______________ $___________________
63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
9,000
HOUR $_______________ $___________________
63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
1,750
HOUR $_______________ $___________________
63510-0100 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
WEEK $_______________ $___________________
63602-6020 SYSTEM INSTALLATION, TRAFFIC DETECTOR WIRE LOOP
EACH $_______________ $___________________
63610-0000 CONDUIT
6,400
LNFT $_______________ $___________________
$_____________________TOTAL
Submitted by:
Name of Bidder
Project: CO PRA MEVE 10(9)
MAIN ENTRANCE ROAD
Bid Schedule A
BID SCHEDULE A ALTERNATIVE BID
ITEM 15401-0000, CONTRACTOR TESTING,
USING GOVERNMENT FURNISHED FIELD
LABORATORY $_________________
Amendment A001 April 22, 2009
E-23
CO PRA MEVE 10(9)
Main Entrance Road
NPS PMIS NO.: 127018
(m) Square yard. Delete the text and substitute the following:
(m) Square yard. 9 square feet. Measure on a plane parallel to the surface being measured. No deductions from the area computation will be made for individual fixtures having an area of 9 square feet or less. Do not measure overlaps.
109.06 Pricing of Adjustments Add the following:
ASPHALT CEMENT PRICE ADJUSTMENT PROVISION
GENERAL The Asphalt Cement Price Adjustment Provision contained herein provides for a price adjustment in the form of payment to the Contractor or a rebate to the Government for fluctuations in the cost of asphalt cement consumed in the performance of applicable construction work for CO PRA MEVE 10(9). The price adjustment provisions are applicable only to the asphalt cement, as defined in Section 702.01, and incorporated in the following eligible contract pay items:
• 40101 Superpave pavement
• 40102 Superpave pavement, wedge and leveling course
• 40201 Hot asphalt concrete pavement, Marshall or Hveem test
• 40202 Hot asphalt concrete pavement, Marshall or Hveem test, wedge and leveling course
• 40301 Hot asphalt concrete pavement
• 40302 Hot asphalt concrete pavement, wedge and leveling course
• 40501 Open-graded asphalt friction course
• 41804 Asphalt Binder AC-10
The price adjustment provisions are also applicable to these eligible pay items when the Government adds extra work to the Contract.
The provision will remain in effect throughout the duration of the contract. Enactment of the Asphalt Cement Price Adjustment Provision will only be considered when the increase or decrease in the price of asphalt cement as defined herein exceeds 10 percent.
The Asphalt Cement Price Adjustment Provision is intended to reduce but not eliminate the cost effects of price uncertainty to the Contractor and the Government for asphalt cement used in the construction of this contract. It provides for sharing by the Government in a portion of the Contractor’s risk, which could result from unusual price fluctuations. The provision is not intended to compensate the Contractor for normal day-to-day fluctuations and seasonal changes or to serve as a guarantee of full compensation for asphalt cement price fluctuations.
PRICE INDEXES The Government will post a monthly performance price index at http://www.cflhd.gov/procurement/construction/price-indexes. for asphalt cement using price data obtained from Poten and Partners, Inc. (PPI), which publishes a weekly report (Asphalt Weekly Monitor) on high and low selling prices for states in five regions throughout the
E-25
CO PRA MEVE 10(9)
Main Entrance Road
NPS PMIS NO.: 127018
BPI = Base Price Index that is established immediately preceding the bid opening.
Q = Quantity in tons of asphalt cement for eligible pay items that were used on the project during the progress payment period. The quantity will be calculated using the asphalt content of the approved mix design and the following formula:
Q = Asphalt Concrete Pavement tons placed x (% Asphalt/100)
PRICE ADJUSTMENT COMPENSATION Monthly adjustments will be accrued. The final price adjustment will be paid, or rebated, after completion of all work for eligible pay items. The Contractor may request in writing a partial price adjustment payment once every 12 months, or when the unpaid accrued increase exceeds $10,000. The Government will take a rebate when the deductive accrual exceeds $10,000.
No price adjustments will be made for work performed beyond the Government-approved Contract completion date.
The maximum allowable monthly and final price adjustment to the Contractor or rebate to the Government is limited to a (MPPI/BPI) ratio of 1.6 and 0.4, respectively.
109.08 Progress Payments.
(b) Closing date and invoice submittal date. Delete the last sentence and substitute the following:
Submit invoices to the designated billing office by the 7th day after the closing date. Invoices received by the designated billing office after the 16th day following the closing date will not be accepted for payment processing that month. Include late, unprocessed invoice submittals in the following month's invoice.
The closing date for progress payments on contracts where funding is associated with the American Recovery and Reinvestment Act (ARRA) will be the 8th day of each month.
Include work performed after the closing date in the following month’s invoice.
(c) Invoice Requirements Add the following:
(9) As required by the American Recovery and Reinvestment Act of 2009 (ARRA), provide data and information related to labor utilization for the prime contractor as well as any and all lower tier subcontracts used in connection with the work. Use form ARRA 109-1 FHWA-1589 (Rev. 3-25) to report this information. This form can be found at our webpage at:
http://www.cflhd.gov/procurement/construction/reference-links.cfm
Initial information is to be provided within 15 days of contract award. Follow-up and recurring reports will be due with each monthly invoice. The monthly progress payment will not be made until the required ARRA information and data has been received and is current.
Sheet 1 of 2
CONVENTIONAL PLAN
SYMBOLS AND ABBREVIATIONS
U.S. CUSTOMARY
A2
Revision: 4-22-2009
UDUDXXXXXXXXXXXXXXX
DI
XXXXXXUDXXXXXXXXXXXX
SPRING
D
REG STATE PROJECT
SHEET
NO.
TOTAL
SHEETS
CO
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
IMR
MESA VERDE NP
NPS PMIS NO.: 127018 DWG. NO. 307/41933
A15
PRA MEVE 10(9)
XXXXX
DI
XXXXXXUD
SPRING
SHEET TOTAL
B4 B6-B9 B10 & B13 B14 B15-B16 B17 B18 NO. SHEETS
PRA MEVE 10(9)
Mesa Verde NP
60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH LNFT 4358 4358 4,400
60905-1000 GUTTER, CONCRETE LNFT 286 286 286
60908-1000 PAVED DITCH, ASPHALT SQYD 6500 6500 6,500
61701-1950 GUARDRAIL SYSTEM G4, TYPE 4, CLASS B STEEL POSTS LNFT 18972 18972 18,975
61702-0800 TERMINAL SECTION TYPE TANGENT EACH 41 41 41
61708-1000 REMOVE AND RESET, GUARDRAIL LNFT 19157 19,200
62201-0150 DUMP TRUCK, 7 CUBIC YARD MINIMUM CAPACITY HOUR 40 40
62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 40 40
62201-2750 MOTOR GRADER HOUR 40 40
62301-0000 GENERAL LABOR HOUR 80 80
62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 60 60
62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 100 100
62407-0000 PLACING CONSERVED TOPSOIL CUYD 1943 1,943 2,200
62510-2000 SEEDING, HYDRAULIC METHOD ACRE 14.28 14.28 15.0
63301-0000 SIGN SYSTEM EACH 73 73 73
63308-0000 OBJECT MARKER EACH 167 167 167
63313-0000 RUMBLE STRIP LNFT 55,244 55,244
63316-1000 REMOVE AND RESET SIGN EACH 1 1 1
63316-1000 REMOVE AND RESET SIGN, MASONRY EACH 1 1 1
63404-0200 PAVEMENT MARKINGS, TYPE B GAL 737 737 740
63406-0000 RAISED PAVEMENT MARKER EACH 32 32 32
63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 150 150 150
63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 150 150 150
63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 8 8 8
63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN EACH 2 2 2
63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 LNFT 100 100 100
63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE LNFT 712 712 712
63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 452 483 452 483 460 490
63505-1000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS MILE 53 53 53
63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 9000 9,000 9,000
63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 1750 1,750 1,750
63510-0100 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR WEEK 29 29 29
63602-6020 SYSTEM INSTALLATION, TRAFFIC DETECTOR WIRE LOOP EACH 1 1 1
63610-0000 CONDUIT LNFT 6400 6,400 6,400
*For Options X, Y & Z Summaries of Quantities, see Sheet B3 127018
SUMMARY OF QUANTITIES
Sheet 2 of 2*
Revision: 4-22-2009
PROJECT
ESTIMATED
QUANTITIES
B18IMR CO B2
The following quantities are approximate unless noted as a contract quantity. Payment will be made for the actual quantities of work performed and accepted or for materials furnished according to the contract.
DWG. NO. 307/41933 NPS PMIS No.
Main Entrance Road
N
C O
\m ev e1 (9
R oa d w a y\ sh ee ts \B
-S u m m
B B -s h ee ts S ti m u lu s.
xl s] B -T
E M
P T R A
FF
IC
/2
/0
:5 A
M
ITEM NO. ITEM DESCRIPTION UNIT
Place at Cultural Center Access Road
STATEREG
BID
REMARKS AND/OR DETERMINATION OF
ESTIMATED QUANTITY
PLAN
PAVEMENT
MARKING
SUMMARY
MISCELLANEOUS
SUMMARIES
PERMANENT
SIGNS
SUMMARY
Sheet Number and Description
See Typical Sections and Section 617 of the SCR's
CURB AND
GUARDRAIL
SUMMARY
SURFACING
SUMMARIES
GRADING
SUMMARY
TEMPORARY
TRAFFIC
CONTROL
SUMMARY
ITEM NO.
63504-1000
SQFT EACH SQFT
W20-1 ROAD WORK AHEAD 36 X 36 9 6 54
W16-8 MAIN ENTRANCE ROAD 48 X 12 4 2 8
G20-1 ROAD WORK NEXT 10 MILES 36 X 18 4.5 3 13.5
SPECIAL 11 EXPECT DELAYS 90 X 18 11.25 2 22.5
W20-1 ROAD WORK 500 FT 36 X 36 9 2 18
G20-2 END ROAD WORK 36 X 18 4.5 5 22.5
W14-3 NO PASSING ZONE 5.6 2 11.2
W8-12 NO CENTER STRIPE 36 X 36 9 2 18
R4-1 DO NOT PASS 24 X 30 5 2 10
R4-2 PASS WITH CARE 24 X 30 5 2 10
W3-4 BE PREPARED TO STOP 36 X 36 9 3 27
W20-7a FLAGGER (SYMBOL) 36 X 36 9 3 27
W16-2 500 FEET 24 X 18 3 3 9
W20-4 ONE LANE ROAD AHEAD 36 X 36 9 2 18
W13-1 25 MPH 18 X 18 2.25 4 9
G20-4 PILOT CAR FOLLOW ME 36 X 18 4.5 1 4.5
W1-4 REVERSE CURVE (SYMBOL) 30 X 30 6.25 2 12.5
W21-2 FRESH OIL 30 X 30 6.25 2 12.5
W8-3 PAVEMENT ENDS 30 X 30 6.25 4 25
W8-7 LOOSE GRAVEL 30 X 30 6.25 5 31.25
SPECIAL 12
MOTORCYCLES
ROUGH ROAD
LOOSE GRAVEL
NEXT 10 MILES 66 X 48 22.13 4 89
PORTABLE CHANGEABLE MESSAGE SIGN:
"CONSTRUCTION ON MESA VERDE MAIN ENTRANCE
ROAD, EXPECT DELAYS"
ARRA SIGN ASSEMBLY 66 X 66 30.43 1 31
452 483
63502-0700 EACH 150 150 0
63502-1300 EACH 150 150 0
63502-1600 EACH 8 0 0
63502-2000 EACH 2 0 0
63503-0300 LNFT 100 0 0
63504-1000 SQFT 452 483 0 0
63505-1000 MILE 53 10 0
63506-0500 HOUR 9000 250 100
63506-0600 HOUR 1750 80 0
63510-0100 WEEK 29 0 0
Revision: 4-22-2009
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL SUMMARY
UNIT
OPTION X
TOTAL
PROJECT
TOTALS
OPTION Y
TOTAL
ITEM NUMBER
TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
TOTAL
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
TEMPORARY TRAFFIC CONTROL, CONE
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
DESCRIPTION
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, DRUM
Place Portable Changeable Message Signs on Eastbound HWY 160 and Westbound HWY 160 ramps to the Mesa Verde Park Entrance
TOTAL AREA
QUANTITY
Place 500 feet prior to Park Entrance Station with a G20-1 on the same post
Place at various locations as directed by the CO.
Place at various locations as directed by the CO.
TEMPORARY TRAFFIC CONTROL SIGNS SUMMARY
MUTCD CODE DESCRIPTION
PANEL
DIMENSIONS
(INCHES X
INCHES)
AREA LOCATIONS OR COMMENTS
Place one of these signs 500 feet prior to Park Entrance Station
36 X 48 X 48
As directed by the CO
TEMPORARY TRAFFIC CONTROL, PILOT CAR
Place signs on ramps from Eastbound & Westbound HWY 160 as well as prior to the Park Entrance Station
Place at various locations as directed by the CO.
PRA MEVE 10(9)
Mesa Verde NP B18CO
/0
/2
:5
:5
A
M N
C O
\m ev e1 (9
R o ad w ay
\s h ee ts \B
-S u m m
B B -s h ee ts S ti m u lu s.
xl s] B -T
E M
P
IMR B18
DWG NO 307/41933 NPS PMIS No. 127018
609B
CONCRETE ITEMS
AND WATERWAY DETAILS
T14
Revision: 04-22-2009
REG STATE PROJECT
SHEET
NO.
TOTAL
SHEETS
CO
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
SPECIAL
U.S. CUSTOMARY SPECIAL
IMR
MESA VERDE NP
NPS PMIS NO.: 127018 DWG. NO. 307/41933
T32
PRA MEVE 10(9)
TO WORK
PUTTING AMERICA
PROJECT FUNDED BY THE
American Recovery
& Reinvestment Act
PROJECT FUNDED BY THE
American Recovery
& Reinvestment Act
TO WORK
PUTTING AMERICA
ARRA
SIGN ASSEMBLY
REG STATE PROJECT
SHEET
NO.
TOTAL
SHEETS
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
SPECIAL
635A
U.S. CUSTOMARY SPECIAL
T24A T32
Revision: 04-22-2009
COIMR
MESA VERDE NP
NPS PMIS NO.: 127018 DWG. NO. 307/41933
PRA MEVE 10(9)
Untitled
| Text1: |
| Text2: |
| 0: 1 |
| 1: 9 |
| Text3: |
| 0: A001 |
| 1: April 22, 2009 |
| 2: |
| 0: |
| 1: CO PRA MEVE 10(9) |
| Text4: |
| 0: |
| 0: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: TIFFANY ATCHISON
1:
| 1: |
| 0: |
| Text6: |
| 0: DTFH68-09-B-00015 |
| 1: 04/02/2009 |
| 2: |
| 3: |
| Check Box7: |
| 0: Yes |
| 2: Yes |
| 1: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box9: |
| 1: Off |
| 2: Off |
| 0: |
| 0: Off |
| 1: Off |
| Text10: 1* |
| Text11: |
| 0: |
| 1: |
| Text12: * See Item 11 Above |
| Text13: INVITATION FOR BID |
Remove page A-12 and replace with revised page A-12, dated April 22, 2009. Incorporates ARRA sign into bid item 63504-1000.
Remove pages E-23 and E-25 and replace with revised pages E-23 and E-25, dated April 22, 2009. Amends Subsections 109.06 and 109.08
PLAN SHEETS
Remove sheet A2 and replace with revised sheet A2, dated April 22, 2009. Incorporates sheet T24A in the Index to Sheets.
Remove sheets B2 and B18 and replace with revised sheets B2 and B18, dated April 22, 2009. Incorporates ARRA sign.
Remove sheet T14 and replace with revised sheet T14, dated April 22, 2009. Corrects concrete gutter detail.
Add sheet T24A, dated April 22, 2009. ARRA sign detail.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
| Text14: |
| 0: |
| 1: |
| Text15: |
| 1: |
| 0: |
| 1: |
| 0: |
| 0: |
| 1: |
| Text16: |
| 0: |
| 1: |
| Text17: |
| Text5: |
| 0: 6905001 |
| 1: |
| Check Box1: |
| 0: Yes |
| 1: Off |
File details come from the government source that posted it. Updated .