Exhibit_J.1_-_COST_PRICE_PROPOSAL_WORKSHEET.xls
XLS spreadsheet 39 KB Posted
- Solicitation number
- DTFH6117R00029
About this file
Exhibit J.1 - COST PRICE PROPOSAL WORKSHEET
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule 1
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | |
| Direct Labor | Direct Labor | Direct Labor | Direct Labor | Direct Labor | |
| Labor Category | Rate/Hr | Rate/Hr | Rate/Hr | Rate/Hr | Rate/Hr |
| Onsite Program Manager (PM) | |||||
| Asphalt Engineer / ABML Manager (AE/ALM) | |||||
| Asphalt Materials Engineer - 2 | |||||
| Asphalt Binder Mixture Technicians | |||||
| Junior ABML Technician | |||||
| Pavement Test Facility Operations Engineer | |||||
| Pavement Test Facility Operations Technician | |||||
| Pavement Test Facility Senior Research Technician | |||||
| Chemistry Laboratory Contract Research Manager | |||||
| Research Chemist Cement | |||||
| Research Chemist Asphalt and Aggregates | |||||
| Research Chemist - analytical methods | |||||
| Chemistry Laboratory Technician | |||||
| Senior Chemist / Corrosion Engineer / CCL Manager | |||||
| Senior Chemist / Coatings Engineer | |||||
| Coatings & Corrosion Technician | |||||
| Geologist/Petrographer /APL Manager | |||||
| Materials Technician | |||||
| Concrete Materials Engineer / Concrete Lab Manager | |||||
| Concrete Materials Engineer - 2 | |||||
| Concrete Structural Engineer - 2 | |||||
| Concrete Lab Operations Manager | |||||
| Senior Materials Testing Technician - Concrete | |||||
| Concrete Materials Research Technologist | |||||
| Junior Concrete Technician | |||||
| Support Labor | |||||
| Direct Labor Fringe Rate | |||||
| Direct Labor Overhead Rate | |||||
| G&A Rate | |||||
| Profit/Fee | |||||
| ODC/Travel | $400,000.00 | $400,000.00 | $400,000.00 | $400,000.00 | $400,000.00 |
| The Contractor shall modify the Cost/Price Proposal Template as needed to provided the required information. | |||||
| The direct labor rates are based on the actual rates as of (insert date) and escalated by (insert percentage) percent each year. | |||||
| The supporting data and rate calculations are located in file _____________________________and is available immediately upon request. | |||||
| The Indirect Rates (fringe, Labor Overhead, Material Overhead and G&A) are based on our current Forward Pricing Rate Agreement (FPRA). | |||||
| The FPRA is attached to the proposal. | |||||
| ODCs shall be reimbursed at cost. |
&CExhibit J.1 COST/PRICE PROPOSAL WORKSHEET &L&"Times New Roman,Regular"&A
File details come from the government source that posted it. Updated .