RFP_DTFH6117R00022_6192017.pdf
PDF 504 KB Posted
- Attached to
- Leveraging Augmented Reality for Highway Construction Federal contract opportunity
- Solicitation number
- DTFH6117R00022
About this file
The objective of this study is to identify the availability, accessibility, and reliability of using AR for construction inspection and review, QA, training, and improved project management through real-time information in a real world environment. AR has a potential to reduce the construction cost, improve the delivery time, and assist with overall management of a construction project. The study shall document potential advantages, limitations, shortcomings, and cost of using AR as well as issues which.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_1_Q-A_DTFH6117R00022.pdf | ||
| Amendment_2_RFP_DTFH6117R00022_7112017.pdf | ||
| J.2_Disclose_of_Lobbying_Activity_DTFH6117R00022.pdf | ||
| J.1_Shipping_Label_DTFH6117R00022.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD
1. THIS CONTRACT IS NOT A RATED ORDER
UNDER DPAS (15 CFR 700)
RATING
PAGE OF PAGES
1 | 42
2. CONTRACT NUMBER
3. SOLICITATION NUMBER
DTFH6117R00022
4. TYPE OF SOLICITATION
SEALED BID (IFB)
X NEGOTIATED (RFP)
5. DATE ISSUED
June 19, 2017
6. REQUISITION/PURCHASE NO.
HRDI011700000018PR
7. ISSUED BY CODE HCFA-22 8. ADDRESS OFFER TO (If other than Item 7)
Federal Highway Administration
Office of Acquisition Management
1200 New Jersey Ave. S.E. Rm E62-204
Washington, DC 20590
Federal Highway Administration
Office of Acquisition Management
1200 New Jersey Ave. S.E. Rm E62-204, Washington, DC 20590
ATTN: Tamiko Aikens NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”
SOLICITATION
9. Sealed offers in original and 4 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the depository located in 1200 New Jersey Avenue, SE, E62-204 until July 20, 2017 local time 12:00 pm __.
CAUTION LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation. THIS PROCUREMENT IS ISSUED USING FULL AND OPEN COMPETITION.
THIS IS A FULL AND OPEN COMPETITION REQUIREMENT
10. FOR A. NAME B. TELEPHONE (NO COLLECT CALLS) C. E-MAIL ADDRESS
INFORMATION
CALL:
Primary Contact: Tamiko Aikens
Secondary Contact: Robin Hobbs
AREA CODE
NUMBER
366-3092
366-4004
EXT.
Tamiko.Aikens@dot.gov.
Robin.Hobbs@dot.gov.
11. TABLE OF CONTENTS
() SEC. DESCRIPTION PAGE(S) () SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
X A SOLICITATION/CONTRACT FORM 1 X I CONTRACT CLAUSES 20
X B SUPPLIES OR SERVICES AND PRICE/COST 2 PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.
X C DESCRIPTION/SPECS./WORK STATEMENT 3 X J LIST OF ATTACHMENTS 26
X D PACKAGING AND MARKING 7 PART IV - REPRESENTATIONS AND INSTRUCTIONS
X E INSPECTION AND ACCEPTANCE 8 X K REPRESENTATIONS, CERTIFICATIONS 27
X F DELIVERIES OR PERFORMANCE 9 AND OTHER STATEMENTS OF OFFERORS
X G CONTRACT ADMINISTRATION DATA 11 X L INSTRS., CONDS., AND NOTICES TO OFFERORS 33
X H SPECIAL CONTRACT REQUIREMENTS 15 X M EVALUATION FACTORS FOR AWARD 40
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within 180 calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
10 CALENDAR DAYS
20 CALENDAR DAYS
30 CALENDAR DAYS
CALENDAR DAYS
14. ACKNOWLEDGMENT OF AMENDMENTS AMENDMENT NO. DATE AMENDMENT NO. DATE
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. NAME CODE FACILITY 16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
AND OFFER (Type or print)
ADDRESS
OF
OFFEROR
15B. TELEPHONE NUMBER 15C. CHECK IF REMITTANCE 17. SIGNATURE 18. OFFER DATE
AREA CODE
NUMBER
EXT.
ADDRESS IS DIFFERENT FROM ABOVE -
ENTER SUCH ADDRESS IN SCHEDULE.
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED
20. AMOUNT
21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c)( )
23. SUBMIT INVOICES TO ADDRESS SHOWN
IN (4 copies unless otherwise specified)
ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
26. NAME OF CONTRACTING OFFICER (Type or print)
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
IMPORTANT – Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
mailto:Tamiko.Aikens@dot.gov mailto:Robin.Hobbs@dot.gov
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 CONTRACT SUMMARY
CONTRACT AMOUNT
The Contractor shall furnish all materials and personnel necessary to provide the Federal
Highway Administration (FHWA) with non-personal technical support for “Leveraging
Augmented Reality for Highway Construction”, as described in Section C below.
The Government anticipates award of a Firm-Fixed-Price (FFP) Contract.
The maximum potential dollar value of this FFP Contract is $TBD, with Cost Reimbursable
ODCs, as delineated in B.2.
B.2 SCHEDULE OF SERVICES
CLIN
Contract Line
Item Number
Description
Type
Price
00001
Summary Task 2 Report
FFP
00002
Summary Task 3 Report
00003
Summary Task 4 Report
00004
Final Report and TechBrief
00005
National Webinar
00006
FHWA published report and
TechBrief
00007
ODCs: Supplies/Printing
Cost
$3,500
(Not to Exceed)
Total:
SECTION C
Description/Specifications
C.1 BACKGROUND
Some of the challenges in construction management and any field operations are the lack of real-time and integrated information, gaps between planned solutions and practical implementations, quality assurance (QA), and communications between project participants. As a result of the rapid advancement in computer interface design and hardware, Augmented Reality (AR) may be a tool to help overcome some of these challenges.
AR is an immersive technology which combines virtual computer-generated information with the real environment in the real-time performance, enhancing the user’s perception of reality and enriching the provided information content. Such information can assist project managers and engineers with the delivery and accuracy of their construction projects, safer and in a timely manner resulting in greater efficiency. With the capability of navigating through all phases of a construction project, managers would be able to catch any errors or mistakes before they present themselves or change and augment the design and construction details. They may also be able to use these tools for training or project outreach. Considering its benefits and success in the entertainment and video game industries, leveraging AR could be the next big development in construction management of highway infrastructure assets.
C.2 CONTRACT SCOPE
This requirement is to conduct a comprehensive study to investigate available AR technology, its reliability and practical application and how this technology can be applied for construction management.
C.3 OBJECTIVE
The objective of this study is to identify the availability, accessibility, and reliability of using AR for construction inspection and review, QA, training, and improved project management through real-time information in a real world environment. AR has a potential to reduce the construction cost, improve the delivery time, and assist with overall management of a construction project.
The study shall document potential advantages, limitations, shortcomings, and cost of using AR as well as issues which could represent new challenges for the future. The study shall also document methodologies used to store, retrieve, and archive big data information obtained through the use of AR and how it is integrated into highway agency business processes. The project shall conduct case studies of AR application to assist in encouraging wider usage of AR in construction management of highway infrastructure.
C.4 STATEMENT OF WORK
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform this work.
Under this contract, the contractor shall address the following tasks:
Note: Please assume a 14 day review period by the COR if not specified in Tasks.
Task 1 – Kickoff Meeting/Project Management
Within 30 days after contract award, the Contractor shall coordinate and conduct a kickoff meeting, either through web conference or in person, with the Contracting Officer’s
Representative (COR), Contract Specialist (CS), and others as appropriate, to review the statement of work (SOW), delivery schedule, delineate roles and responsibilities, and establish communication protocols. Following the meeting, the Contractor shall submit a written summary of discussions, decisions, and action items.
NOTE: If the kickoff meeting is held in person, it shall be at FHWA in the Washington DC metro area.
Task 2 - Market Review
The Contractor shall conduct an extensive literature search and comprehensive review of current state of the art in AR technology with a focus on technology that could have applications in construction management. Of particular interest is how AR can be coupled with the use of 3D design and construction models. This search shall identify various AR systems and explore applications of AR in related industries. The Contractor shall also search and review reliability, ease of set up and use, project and user costs, and archival of the big data associated with AR.
AR is an emerging technology, it is recognized that a thorough review will necessitate outreach that extends beyond what can be found in the literature.
Upon completion of this task, the Contractor shall submit a draft Market Review report to the
COR for review and comments no later than 3 months after contract award. The Contractor shall report all of the findings for the work completed in Task 2, in the final report.
Task 3 - Characteristics of Available AR Systems
The Contractor shall document the characteristic of available AR systems, including user interface, sensing, and portability. In addition, the Contractor shall document reliability, applicability, strengths, weaknesses, challenges and issues of available AR systems in construction applications based on their characteristics. The Contractor shall also discuss hardware and software requirements, cost, issues related to integration with highway agency IT systems, and provide recommendations to overcome some of the identified challenges and limitations. AR systems deal with vast amounts of information in reality and usually obtain a lot of information. The Contractor shall document methodologies used to store, retrieve, and archive big data information.
Upon completion of this task, the Contractor shall submit a draft AR Systems report to the COR for review and comments no later than 6 months after contract award. The Contractor shall report all of the findings for the work completed in Task 3, in the final report.
Task 4 - AR for Construction Management, Including Inspection and Training
The Contractor shall use the information from Tasks 1 and 2 to identify top AR technologies which have potential for use in construction management, including its application for training and inspection purposes. The Contractor shall identify and document case studies of how AR is being used preferably in highway construction, if not, in related industries and educational settings. The case studies can include both successful and unsuccessful applications, and shall include the use and level of difficulties for training personnel, number of hours and costs associated with integrating AR technology in standard business practices, and the feedback from those using AR to accomplish their jobs. The Contractor shall also identify and document future directions and areas requiring further research, including but not limited to overcoming the existing limitations with the technology.
Upon completion of this task, the Contractor shall submit a draft AR technologies report to the
COR for review and comments no later than 8 months after contract award. The Contractor shall report all of the findings for the work completed in Task 4, in the final report.
Task 5 - Final Report, TechBrief and Presentation
The Contractor shall prepare a draft final report and draft techbrief describing all of the work completed in Tasks 2-4 of this contract. The draft final report and draft techbrief shall be approved by the COR and shall meet all of the requirements of FHWA’s Communications
Reference Guide (https://www.fhwa.dot.gov/publications/research/general/15058/). The draft final report and draft techbrief shall be submitted in electronic format (in Microsoft WORD format) to the COR for approval within 12 months after contract award. The COR has 1 month to review the draft final report and draft techbrief. After receiving any comments from the COR, the Contractor shall submit the final report and final techbrief to the COR within 1 month of receipt of comments from the COR.
The Contractor shall market the report and implement its findings to various user groups
(managers, construction personnel, etc.) through at least 3 national conference presentations, a technical paper and a national webinar presentation within 14 months after contract award. The
COR must approve the national conferences. The Contractor shall provide the COR a copy of the presentations. FHWA will provide the webinar capability; the Contractor shall provide the content and make the presentation.
C.5 FIXED PRICE PROGRESS REPORTS
The Contractor shall submit progress reports to the Contracting Officer’s Representative (COR) and the Contract Specialist (CS). These reports shall be prepared on a quarterly basis and submitted by the 10th of the month following the reporting period. The reports shall be in format as directed by the COR and, at a minimum, include the following items:
(a) A clear account of the work performed during the reporting period.
(b) A description of any problem encountered or anticipated that will affect the completion of any work within the timeframe set, together with recommended solutions to such problems; or, a statement that no problems were encountered.
SECTION D
Packaging and Marking
D.1 PACKAGING
Preservation, packing, and packaging of items for shipment shall be in accordance with best commercial practices and adequate for acceptance by common carrier for safe transportation at the most economical rates.
The Contractor shall clearly mark each shipment with the company name, the contract number, Task Order number (if applicable), and as appropriate, the item identification, quantity of items, and notice of partial or final delivery.
SECTION E
Inspection and Acceptance
E.1 52.246-4 INSPECTION OF SERVICES - FIXED-PRICE (AUG 1996)
E.2 ACCEPTANCE
Acceptance of the final deliverables shall be made in writing by the Contracting Officer’s
Representative.
E.3 GOVERNMENT ACCEPTANCE PERIOD
Unless stated elsewhere, the COR will have 14 calendar days to review draft deliverables and make comments. The Contractor shall have 10 calendar days to make corrections and return the corrected deliverable to the government. Upon receipt of the final deliverables, the COR will have 14 calendar days for final review prior to acceptance or providing documented reasons for non-acceptance.
SECTION F
Deliveries or Performance
F.1 52.242-15 STOP-WORK ORDER. (AUG 1989)
F.2 52.242-17 GOVERNMENT DELAY OF WORK. (APR 1984)
F.3 52.247-34 F.O.B. DESTINATION. (NOV 1991)
F.4 PERIOD OF PERFORMANCE
All work and services required under this contract shall be completed on or before 20 months from the effective date of the Contract. There are no option periods under the contract.
F.5 DELIVERABLE/DELIVERY SUMMARY
Deliverable Frequency # of Copies Medium/Format Submit To Due Date
Summary
Task 2 report
Once through the period of performance
Word document
COR
3 months from effective date of the contract
Summary
Task 3 report
Once through the period of
6 months effective date of the contract
Summary
Task 4 report
Once through the period of
8 months effective date of the contract
Draft Report and
TechBrief
Once through the period of
12 months effective date of the contract
Final Report and
TechBrief
Once through the period of
Word document, including 508 captions and copyright releases
COR, CS
14 months from the effective date of the contract
National Once PowerPoint COR 14 months
Deliverable Frequency # of Copies Medium/Format Submit To Due Date webinar presentation from the effective date of the contract
FHWA
published report and
TechBrief
Once at the end of project
3 Conference
Presentations
N/A 20 months from the effective date of the contract
Progress
Report
Quarterly 1 Word document
COR, CS On or before the
10th day of the month following the quarter being reported
F.6 PLACE OF DELIVERY
All deliverables be delivered to the COR at the following address:
Fill-in at Award
The annual and quarterly progress reports shall also be delivered to the Contract Specialist at the following address:
Fill-in Name
Fill-in E-mail Address at Award
F.7 PLACE OF PERFORMANCE
The work to be performed under this contract shall be performed at Contractor’s facility unless otherwise stated in Section C.
SECTION G
Contract Administration Data
G.1 PAYMENT- (FFP)
Payment of the prices delineated in Section B.2 to be made after FHWA acceptance in writing, of the deliverables and receipt of a proper invoice.
G.2 SUBCONTRACTS – ADVANCE NOTIFICATION AND CONSENT
Under this contract, the requirement of FAR 44.2, Consent to Subcontracts, has been fulfilled for the following subcontracts:
[APPROVED SUBCONTRACTOR NAME]
Any future change or revision to the Statement of Work or other applicable aspects of this contract shall include the subcontract(s) only to the extent that performance of the subcontract(s) is directly affected by the change or revision.
G.3 INVOICES
Submit all invoices to one of the following invoice addresses:
All invoices and required supporting documents shall be sent via e-mail to the following e-mail address: 9-AMC-AMZ-FHWA-Invoices@faa.gov.
(a) Include the invoice as an attached PDF document
(b) Include in the e-mail subject line the following:
(1) Invoice No.
(2) Contract Number
(3) Name of your Company/Organization
(4) Attention: Contract Specialist
Example: Invoice No. 35 – DTFH6117C000XX – Contractor Name – Attention: Contract
Specialist
If the invoice and supporting documents exceed 8 MB as an e-mail attachment, the Contractor must select one of the other submission options presented below:
Invoices submitted via an overnight service must use the following physical address:
MMAC
FHWA/AMZ-150
6500 S. MacArthur Blvd
Oklahoma City, OK 73169
Attention: Contract Specialist
Express Delivery Point of Contact: Lead Accounting Technician, 405-954-8252
Invoices may be submitted via regular U.S. Postal Service to the following address:
Federal Highway Administration
Markview Processing
P.O. Box 268865
Oklahoma City OK 73126-8865
Attention: Contract Specialist
An invoice submitted to an address other than those identified will be returned to the vendor as non-conforming.
G.4 TECHNICAL DIRECTION
Performance of the work under this contract is subject to the Technical Direction of the COR.
The term “Technical Direction” is defined to include, without limitation, the following:
(a) Direction to the Contractor which redirects the efforts, shifts work emphasis between work areas, requires pursuit of certain lines of inquiry, fills in details or otherwise serves to accomplish the statement of work;
(b) Provision of information to the Contractor that assists in the interpretation of drawings, specifications or technical portions of the work description; and,
(c) Review and approval/rejection of technical reports, drawings, specifications and technical information to be delivered by the Contractor.
All Technical Direction must be within the general scope of work stated in the contract. The
COR does not have the authority to and may not issue any Technical Direction that:
(i) constitutes an assignment of additional work outside the general scope of the base contract;
(ii) constitutes a change as defines in the base contract clause entitled “Changes”;
(iii) in any manner causes an increase or decrease in prices set forth in Section B; or
(iv) changes any of the expressed terms, conditions or specifications of the contract.
All Technical Direction must be issued in writing, or shall be confirmed in writing by the COR within 3 working days after issuance. The Contractor shall proceed promptly with the performance of duly issued Technical Directions. However, if in the opinion of the Contractor, the direction issued but the COR is within one of the prescribed categories in (i) through (iv) above, the Contractor shall not proceed, but shall notify the Contracting Officer in writing, within 3 working days after receipt of any such direction. The Contracting Officer will determine if the Technical Direction is proper, or if a contract modification would be required to properly implement the direction. Failure of the parties to agree upon the nature of the direction or upon the contract action to be taken with respect thereto shall be subject to the clause included in Section I entitled “Disputes.”
G.5 CONTRACTING OFFICER’S REPRESENTATIVE (COR)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work delivered under this contract.
(b) The Contracting Officer shall designate a Contracting Officer’s Representative by written notice to the Contractor. The COR’s responsibilities shall include technical monitoring of the
Contractor’s performance and inspecting and accepting deliveries under the contract.
The COR shall be appointed in writing, at which time ALL of the responsibilities of the COR shall be detailed, and a copy of the appointment memorandum shall be furnished to the
Contractor. Any changes to the COR delegation shall be made in writing, either by changes to the existing memorandum, or by issuance of a new appointment memorandum. Copies of any changes shall be provided to the Contractor.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to any modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor’s right to proceed, or issue any order causing the
Contractor to stop work; or
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction
(written or oral) that the Contractor considers to exceed the COR’s appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer’s response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the
Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the
COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting
Officer or the COR acting within his or her appointment, shall be at the Contractor’s risk.
G.6 CONTRACTOR SUPERVISION
The Contractor shall provide total supervision of its staff. Government personnel are not authorized or permitted to supervise any contractor personnel. The contractor's Project Manager
(PM) for this contract is:
[Fill-in at Award].
The PM shall communicate with the COR to determine the Government's work requirements as set forth in the Statement of Work and shall assure that these requirements are fulfilled. In the event the designated Project Manager is incapacitated due to illness or injury or otherwise is to be removed by the Contractor during the contract performance, replacement of the incumbent
Project Manager shall be subject to the approval of the CO.
G.7 TRAVEL AND PER DIEM
The Contractor shall obtain COR/CO approval before scheduling any travel unless specifically stated otherwise in the contract. Travel and Per Diem authorized under this contract shall be reimbursed in accordance with the Government Travel Regulations currently in effect.
Travel requirements under this contract shall be met using the most economical form of transportation available. If economy class transportation is not available, the request for payment voucher must be submitted with justification for use of higher class travel indicating dates, times, and flight numbers. All travel shall be scheduled sufficiently in advance to take advantage of offered discount rates, unless authorized by the COR.
The following web site provides information on current Per Diem rates:
http://www.gsa.gov/portal/category/100120 http://www.gsa.gov/portal/category/100120
SECTION H
Special Contract Requirements
H.1 REQUIREMENTS FOR IMPLEMENTING SECTION 508 STANDARDS
The following applies to all FHWA Contracts issued on or after June 25, 2001, for Preparation of
Technical reports or other documents that FHWA plans to post on a website.
In addition to the work requirements specified in this statement of work, vendors must ensure that all electronic documents that they prepare will meet the requirements of Section 508 of the
Rehabilitation Act. The act requires that all electronic products prepared for the Federal
Government be accessible to persons with disabilities, including those with vision, hearing, cognitive, and mobility impairments. Vendors can view Section 508 of the Rehabilitation Act
(http://www.access-board.gov/508.htm) and the Federal IT Accessibility Initiative (Home Page)
(http://section508.gov/) for detailed information.
Applicable Standards:
The following standards have been determined to be applicable to this contract.
______ 1194.21 Software applications and operating systems.
____X_ 1194.22 Web-based intranet and Internet information and applications.
_____ 1194.23 Telecommunications products.
_____ 1194.24 Video and multimedia products.
_____ 1194.25 Self-contained, closed products.
_____ 1194.26 Desktop and portable computers.
The standards are available at http://www.access-board.gov/508.htm. The standards do not require the installation of specific accessibility-related software or the attachment of an assistive technology device, but merely require that the Electronic and Information Technology (EIT) be compatible with such software and devices so that it can be made accessible, if so required by the agency, in the future.
The following paragraphs summarize the requirements for preparing FHWA reports in conformance with Section 508 for eventual posting by FHWA to an FHWA-sponsored website.
If you have further questions, please contact the FHWA Contracting Officer’s Representative listed in this statement of work.
Electronic documents with images:
Provide a text equivalent for every non-text element in all publications prepared in electronic format. Use descriptions (such as, "alt" and "longdesc") for all non-text images or place them in element content. For all documents prepared, vendors must prepare one standard HTML format
(as described in this statement of work) AND one text format that includes descriptions for all non-text images. “Text equivalent” means text sufficient to reasonably describe the image. For example, an image that is merely decorative requires only a very brief “text equivalent” description. However, if the image conveys information that is important to the content of the report, then text sufficient to reasonably describe that image and its purpose within the context of the report must be provided.
Electronic documents with complex charts or data tables:
When preparing tables that are heavily designed, provide adequate alternate information so that assistive technologies can read them out. Identify row and column headers for data tables.
Provide the information in a non-linear form. Markup shall be used to associate data cells and header cells for data tables that have two or more logical levels of row or column headers.
Electronic documents with forms:
When electronic forms are designed to be completed on-line, the form shall allow people using assistive technology to access the information, field elements, and functionality required for completion and submission of the form, including all directions and cues.
All web-based deliverables shall conform to the Minimum Requirements for FHWA Web Pages and be compatible with the current FHWA web platform of Adobe ColdFusion (version 10 compatible) and Microsoft SQL (server 2012 or higher compatible). Deliverables will be evaluated for Section 508 compliance, including graceful degradation when JavaScript is disabled and color contrast tests. Deliverables shall meet W3C coding standards
(http://www.w3.org/), FHWA coding standards, and conform to DOT Secure Web Application standards to prevent cross-site scripting (XSS) and SQL Injection.
H.2 POST AWARD EVALUATION OF CONTRACTOR PERFORMANCE
Contractor Performance Evaluations
(a) Interim and final evaluations of Contractor performance will be prepared on this contract in accordance with FAR 42.1502 and TAM 1242.1502. The final performance evaluations will be prepared at the time of completion of work.
(b) The Contractor can elect to review the evaluation and submit additional information or a rebuttal statement. The Contractor will be permitted 60 calendar days to respond. Contractor response is voluntary. If the Contractor does not respond within 60 days, the Government will presume that the Contractor has no comment. Any disagreement between the parties regarding an evaluation will be referred to an individual at a level above the Contracting Officer, whose decision is final.
(c) Copies of the evaluations, Contractor responses, and review comments, if any, will be retained as part of the contract file, and may be used to support future award decisions.
The Federal Highway Administration utilizes the Contractor Performance Assessment Reporting
System (CPARS) to record and maintain past performance information. CPARS is used to document Contractor performance information that is required by Federal Regulations.
CPARS reference material can be accessed at http://www.cpars.gov/.
The registration process requires the Contractor to identify an individual that will serve as a primary contact. This individual will be authorized access to the evaluation for review and comment. In addition, the Contractor is encouraged to identify a secondary contact in the event the primary contact is unavailable to process the evaluation within the required 60-day time period. After the FHWA Contract Specialist registers the contract in CPARS, the Contractor will receive a system generated e-mail notifying him/her that the contract is registered. A system generated e-mail will also provide the Contractor with a User ID if the person does not already have a CPARS User ID.
Once a performance evaluation has been prepared and is ready for comment, the Contractor representative will receive a system generated e-mail notification that the performance evaluation is electronically available for review and comment. The Contractor representative will receive an automated e-mail whenever an assessment is completed and can subsequently retrieve the completed assessment from CPARS.
Contractors may access evaluations at http://www.cpars.gov/ for review and comment in
CPARS.
H.3 GOVERNMENT FURNISHED OR CONTRACTOR ACQUIRED PROPERTY
Equipment provided by the Government or acquired by the Contractor for the performance of work under this contract shall be maintained and accounted for in accordance with the provisions of FAR Part 45. At the conclusion of the contract, all equipment provided by the Government to the Contractor shall be returned to the Government in the same condition as when provided to the Contractor, less normal wear and tear. The Contractor is responsible for transporting all equipment to FHWA, F.O.B Destination, at the conclusion of the contract.
H.4 PROTECTION OF INFORMATION
(a) It is anticipated that in performance of this contract, the Contractor through its employees may have access to, or be in receipt of, certain confidential and proprietary information of
Government Contractors, and/or data relating to FHWA's plans, programs, technical requirements, budgetary matters, and such other information, the disclosure of which may give the Contractor a competitive advantage or be adverse to the interests of the Government. The
Contractor shall not disclose such information acquired to anyone, other than the Government, including Contractor’s other employees, without the prior written consent of the Contracting
Officer.
(b) To the extent that the work under this contract requires access to proprietary, business confidential, or financial data of other companies, and provided such data is marked “Proprietary and Confidential,” the Contractor shall protect such information from unauthorized use and disclosure and agrees not to use it to compete against such companies.
(c) For these purposes, “Proprietary and Confidential” information shall mean any information reasonably so designated that is not generally available to the public; but not information that becomes available on a non-confidential basis from another source, or was known to Contractor on a non-confidential basis prior to its disclosure to Contractor in the performance of this contract.
(d) The Contractor shall include the substance of this confidentiality agreement in all subcontracts and Consultant agreements for performance of work under this contract unless excused in writing by the Contracting Officer.
H.5 DISSEMINATION OF CONTRACT INFORMATION
The Contractor shall not publish, permit to be published, or distribute information, oral or written, concerning the results or conclusions made pursuant to the performance of this contract, without the prior written consent of the Contracting Officer. The COR and the Contracting
Officer shall be afforded the opportunity to review all Contractor communications and/or correspondence with the media regarding this effort at least 72 hours prior to public release. An electronic copy of any material proposed to be published or distributed shall be submitted to the
Contracting Officer, and the COR.
H.6 ACKNOWLEDGEMENT OF SUPPORT AND DISCLAIMER
An acknowledgment of FHWA support and a disclaimer must appear in any publication of any material, whether copyrighted or not, based on or developed under this contract in the following terms:
“This material is based upon work supported by the Federal Highway Administration under contract number [To Be Determined]
Additionally, all materials must contain the following statement:
“Any opinions, findings and conclusions or recommendations expressed in this publication are those of the author(s) and do not necessarily reflect the views of the Federal Highway
Administration.
H.7 NON-PERSONAL SERVICES CONTRACT
This contract is a non-personal services contract as defined in the FAR at subpart 37.101. It is understood and agreed that the Contractor and/or Contractor’s employees and subcontractors:
(1) shall perform the services specified herein as independent contractors, not as employees of the government; (2) shall be responsible for their own management and administration of the work required and bear sole responsibility for complying with any and all technical, schedule, or financial requirements or constraints attendant to the performance of this contract; (3) shall be free from supervision or control by any government employee with respect to the manner or method of performance of the services specified; but (4) shall, pursuant to the government’s right and obligation to inspect, accept or reject the work, comply with such general direction of the Contracting Officer, or the duly authorized representative of the Contracting Officer, as is necessary to ensure accomplishment of the contract objectives.
H.8 PROCUREMENT AUTHORITY
The Federal Highway Administration, Office of Acquisition and Grants Management, is the only agency that is authorized to modify, suspend, or terminate performance under this Contract.
SECTION I
Contract Clauses
I.1 CLAUSES INCORPORATED BY REFERENCE
52.252-2 CLAUSES INCORPORATED BY REFERENCE. (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.acquisition.gov
52.202-1 DEFINITIONS. (NOV 2013)
52.203-3 GRATUITIES. (APR 1984)
52.203-5 COVENANT AGAINST CONTINGENT FEES. (MAY 2014)
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT.
(SEP 2006)
52.203-7 ANTI-KICKBACK PROCEDURES. (MAY 2014)
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR
ILLEGAL OR IMPROPER ACTIVITY. (MAY 2014)
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY.
(MAY 2014)
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS. (OCT 2010)
52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND
REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER
RIGHTS. (APR 2014)
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENT OR STATEMENTS. (JAN 2017)
52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER
CONTENT PAPER. (MAY 2011)
52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL
(JAN 2011)
http://www.acquisition.gov/
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER
SUBCONTRACT AWARDS. (OCT 2016)
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE. (OCT 2016)
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE.
(JUL 2016)
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS. (DEC 2014)
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN
SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED,
OR PROPOSED FOR DEBARMENT. (OCT 2015)
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS. (JUL 2013)
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS. (NOV 2015)
52.215-2 AUDIT AND RECORDS - NEGOTIATION. (OCT 2010)
52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT. (OCT 1997)
52.215-14 INTEGRITY OF UNIT PRICES (OCT 2010)
52.215-19 NOTIFICATION OF OWNERSHIP CHANGES. (OCT 1997)
52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA
OTHER THAN CERTIFIED COST OR PRICING DATA - MODIFICATIONS.
(OCT 2010)
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS. (NOV 2016)
52.222-3 CONVICT LABOR. (JUN 2003)
52.222-17 NONDISPLACEMENT OF QUALIFIED WORKERS. (MAY 2014)
52.222-21 PROHIBITION OF SEGREGATED FACILITIES. (APR 2015)
52.222-26 EQUAL OPPORTUNITY. (SEP 2016)
52.222-35 EQUAL OPPORTUNITY FOR VETERANS. (OCT 2015)
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES. (JUL 2014)
(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the
Secretary, so that such provisions will be binding upon each subcontractor or vendor. The
Contractor shall act as specified by the Director, Office of Federal Contract Compliance
Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
(End of clause)
52.222-37 EMPLOYMENT REPORTS ON VETERANS. (FEB 2016)
52.222-38 COMPLIANCE WITH VETERAN’S EMPLOYMENT REPORTING
REQUIREMENTS. (SEP 2010)
52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR
RELATIONS ACT. (DEC 2010)
52.222-41 SERVICE CONTRACT LABOR STANDARDS. (MAY 2014)
52.222-43 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT LABOR
STANDARDS-PRICE ADJUSTMENT (MULTIPLE YEAR AND OPTION
CONTRACTS). (MAY 2014)
52.222-50 COMBATING TRAFFICKING IN PERSONS. (MAR 2015)
52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION. (OCT 2015)
52.222-60 PAYCHECK TRANSPARENCY (EXECUTIVE ORDER 13673) OCT 2016)
52.222-61 ARBITRATION OF CONTRACTOR EMPLOYEE CLAIMS (EXECUTIVE
ORDER 13673) (DEC 2016)
52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706) (JAN 2017)
52.223-6 DRUG-FREE WORKPLACE. (MAY 2001)
52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING
WHILE DRIVING. (AUG 2011)
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES. (JUN 2008)
52.227-1 AUTHORIZATION AND CONSENT. (DEC 2007)
52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT
INFRINGEMENT. (DEC 2007)
52.227-3 PATENT INDEMNITY (APR 1984)
52.227-14 RIGHTS IN DATA-GENERAL (MAY 2014)
52.229-3 FEDERAL, STATE, AND LOCAL TAXES. (FEB 2013)
52.232-1 PAYMENTS. (APR 1984)
52.232-8 DISCOUNTS FOR PROMPT PAYMENT. (FEB 2002)
52.232-11 EXTRAS. (APR 1984)
52.232-17 INTEREST. (MAY 2014)
52.232-23 ASSIGNMENT OF CLAIMS. (MAY 2014)
52.232-25 PROMPT PAYMENT. (JAN 2017)
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR
AWARD MANAGEMENT. (JUL 2013)
52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS. (JUN 2013)
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS. (DEC 2013)
52.233-1 DISPUTES. (MAY 2014)
52.233-3 PROTEST AFTER AWARD. (AUG 1996)
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM. (OCT 2004)
52.242-13 BANKRUPTCY. (JUL 1995)
52.243-1 CHANGES - FIXED-PRICE. (AUG 1987)
52.245-1 GOVERNMENT PROPERTY. (JAN 2017)
https://www.acquisition.gov/sites/default/files/current/far/html/52_227.html#wp1139081
52.245-9 USE AND CHARGES (APR 2012)
52.246-25 LIMITATION OF LIABILITY - SERVICES. (FEB 1997)
52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-
PRICE). (APR 2012)
52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE). (APR 1984)
52.253-1 COMPUTER GENERATED FORMS. (JAN 1991)
1252.223-73 SEAT BELT USE POLICIES AND PROGRAMS. (APR 2005)
1252.242-72 DISSEMINATION OF CONTRACT INFORMATION. (OCT 1994)
1252.245-70 GOVERNMENT PROPERTY REPORTS. (OCT 1994)
I.2 CLAUSES INSERTED IN FULL TEXT
PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN
INTERNAL CONFIDENTIALITY AGREEMENTS (FEB 2015)
52.217-8 OPTION TO EXTEND SERVICES. (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The
Contracting Officer may exercise the option by written notice to the Contractor within the period of performance of this contract.
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT. (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within the period of performance of the contract; provided that the Government gives the
Contractor a preliminary written notice of its intent to extend any time before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 26 months.
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES. (APR 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR
Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any Transportation Acquisition Regulation (48 CFR
Chapter 12) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
1252.237.73 KEY PERSONNEL (APR 2005)
(a) The personnel as specified below are considered essential to the work being performed under this contract and may, with the consent of the contracting parties, be changed from time to time during the course of the contract by adding or deleting personnel, as appropriate.
(b) Before removing, replacing, or diverting any of the specified individuals, the Contractor shall notify the contracting officer, in writing, before the change becomes effective. The
Contractor shall submit information to support the proposed action to enable the Contracting
Officer to evaluate the potential impact of the change on the contract. The Contractor shall not remove or replace personnel under this contract until the Contracting Officer approves the change.
The Key Personnel under this Contract are:
Position Staff Member Name
SECTION J
LIST OF ATTACHMENTS
J.1 Standard Form LLL
J.2 Shipping Label
SECTION K
Representations, Certifications, and Other Statements of Bidders
K.1 FEDERAL PROCUREMENT DATA
Provide the information requested below:
a. DUNS Number:
b. Taxpayer Identification Number:
c. Home Office Congressional District
d. Business size & type [e.g. HUBZone, SDVOSB, WOSB etc.]
e. Most recent filing of VETS-4212 Report
K.2 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS. (JAN 2017)
(a)(1) The North American Industry classification System (NAICS) code for this acquisition is
541330.
(2) The small business size standard is $4.5 million.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the System for Award Management (SAM), and has completed the
Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
□ (i) Paragraph (d) applies.
□ (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part
13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1137850 https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1137850 https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1137583 https://www.acquisition.gov/sites/default/files/current/far/html/FARTOCP13.html#wp271421 https://www.acquisition.gov/sites/default/files/current/far/html/FARTOCP13.html#wp271421
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain
Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal
Confidentiality Agreements or Statements-Representation. This provision applies to all solicitations.
(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(vi) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations—
Representation.
(vii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(viii) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a
Felony Conviction under any Federal Law. This provision applies to all solicitations.
(ix) 52.214-14, Place of Performance—Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the
Government.
(x) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(xi) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(xii) 52.219-2, Equal Low…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .