Amendment 1 signed.pdf
PDF 670 KB Posted
- Attached to
- SAFETY PILOT MODEL DEPLOYMENT OF VEHICLE TO VEHICLE AND VEHICLE TO INFRASTRUCTURE SAFETY APPLICATIONS
- Solicitation number
- DTFH61-11-R-00006
About this file
Amendment 1. PowerPoint slides from the Safety Pilot Test Conductor Pre-Proposal Conference.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 3 signed.pdf | ||
| Amendment 2 signed.pdf | ||
| Pre-Proposal Conference.pdf | ||
| RFP Attachments 1-4.pdf | ||
| RFP Safety Pilot 2-14.pdf | ||
| RFP Attachments 6-12.pdf | ||
| RFP Attachment 5.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1U.S. Department of Transportation
Today’s Agenda
9:00 – 9:15 am Opening Remarks 9:15-12:00 pm Pilot Test Conductor RFP Break 1:00-2:30 pm Aftermarket Safety Devices RFA Break 3:00-4:30 pm Road Side Equipment RFQ
Safety Pilot Test Conductor Solicitation
ITS Joint Bidders Conference February 22, 2011 Washington, DC
3U.S. Department of Transportation
Safety Pilot Test Conduct Solicitation
Background Model Deployment Objectives Solicitation Scope Break Delineation of Work Other contractual elements Contact Information Q & A
4U.S. Department of Transportation
Po lic y Te ch no lo gy
Ap pl ic at io ns
Harmonization of International Standards & Architecture Human Factors Systems Engineering Certification Test Environments
Safety
V2V V2I Safety Pilot
Mobility
Real Time Data Capture &
Management
Dynamic Mobility
Applications
Environment
AERIS
Road
Weather Applications
Deployment Scenarios Financing & Investment Models Operations & Governance Institutional Issues
ITS Research Program Components
5U.S. Department of Transportation
Step One – Accelerate V to V Safety Develop a Core Set of Applications Conduct Benefits Assessment Develop Driver Vehicle Interface
Guidelines Define Globally Harmonized
Standards Assess Security Issues Accelerate V to V DSRC Devices
□ Basic Safety Message Broadcast
Devices (Here I am)
□ Aftermarket Safety Devices Prepare for 2013 NHTSA Agency decision for light vehicles and 2014 decision for heavy vehicles
Human Factors
6U.S. Department of Transportation
Step Two - Demonstrate Safety
Safety Pilot
• Major road test and real world implementation taking place 2011 – 2013 involving:
• Multiple vehicle types
• Fully integrated systems and aftermarket devices
• Also to test
• Prototype security mechanisms
• Certification processes
7U.S. Department of Transportation
Safety Pilot continued
• Goals
• Support real world V2V and V2I applications with a data rich environment
• Establish benefits data in support of NHTSA 2013 Agency Decision on V2V Communications with Real World Field Data
• Create Public Awareness & Determine User Acceptance
• Outcomes
• Benefits and user acceptance data for supporting future federal actions
• Archived road network data for supporting mobility, environmental, and other industry research
• Multiple supplier sources for devices and infrastructure (Qualified product Lists for Here I am, Roadside Equipment and Aftermarket Safety)
• Better understanding of the operational policy issues associated with the deployment of V2V and V2I
8U.S. Department of Transportation
Safety Program Activities Provide Cross-cutting Support
Real Time Data Capture &
Management (database; non-real time)
Live Operating Environment Open to Industry
DSRC –based technologies
V2V
Infrastructure Communications
Dynamic Mobility
Applications
Road Network Data
AERIS
Dynamic Mobility Applications
AERIS (environment)
Safety
V2I
Safety Pilot
(Signal Phase and Timing, Positioning, Mapping, Communications)
AERIS, Road Weather
(“Here I Am” and Signal Phase and Timing)
Industry Research
Dynamic Mobility
Safety (crash prevention)
V2 I
(Data security, scalability, data sets, etc.)
9U.S. Department of Transportation
Step Three – Define the System and Establish a Testing Environment
User Needs
Concept of Operation
System Requirements
System Architecture
Aug./Sept. 2010 Oct. to Dec. 2010 Jan. to March 2011 Summer 2011
“In the street – running Jan 2011”
CA
Testbed
FL
Testbed
NY
Testbed
FHWA
Turner Fairbank Testbed
10U.S. Department of Transportation
Step Four - Build V to I Safety, Mobility, and AERIS Data Environments and Applications
V to I for Safety – Accelerate Signal Phase and Timing (SPAT) Based Applications, Smart Roadside, and Transit Prototype the Data Environment of the Future – All Vehicles as Probes and Open Data Prototype, Field Test and
Analyze Mobility Applications
□ Use Open Source Software
Approach to accelerate deployment
Define and Test AERIS Applications
Signal Systems Transit Management Freight R.E.S.C.U.E.M.E
ATIS
Speed Harmonization
11U.S. Department of Transportation
Step Five – Build a Reference Implementation
Reflect the System Architecture Utilize Harmonized International Standards Implement a Certification Process Implement a Governance Process Implement a Security Process
12U.S. Department of Transportation
Step Six - Conduct Regional Pilots
Multiple Implementation Areas Opportunity to Pilot a variety of applications per area’s need (Sites choose from a suite of field tested applications) Seeds Implementation Uses Lessons Learned from Safety Pilot Builds on a Stakeholder Defined Architecture Accelerates DSRC for Safety Leverages Available Wireless Communications for
Mobility and Environment Applications Leverages Private Sector Investments Occurring Now
13U.S. Department of Transportation
EN
V.
TE
C
H
FOUNDATIONAL
ANALYSIS
PROGRAM
AREA
Major Milestones
Safety V2I
Safety V2V
AERIS
Data Capture
Dynamic Mobility
Apps.
Safety Pilot
Testbed
RESEARCH, DEVELOPMENT
& TESTING
PILOT
IMPLEMENTATIONS
Sys. Eng.
Security
Standards
7/09 7/11 7/13 7/151/11
V2V NHTSA Agency Decision
Mobility and Environment
Workshop Mobility Benefits
Testbed Launch
Upgraded Testbed Launch
Revised Architecture
Released
V2I Apps Defined
Regional Pilots
High-Priority AERIS Applications Selected
Safety Workshop
AERIS
Benefit
Safety Pilot
Safety Benefits Assessment Completed
High-Priority Mobility Apps Announced
Qualified Product Lists (QPLs)
M O
BI
LI
TY
SA
FE
TY
B
B
B
V to V Apps
Data Environments
Apps Develop
Initial Aftermarket V to I Apps
P ol ic y Certification
Governance Prototype Certification Process
Prototype Governance Structure
Prototype Security Process
14U.S. Department of Transportation
Safety Pilot Program: Background
Safety Pilot Model Deployment of V2V and V2I Safety Applications—Five Major Stages:
□ Device Development
□ Driver Clinics
□ Pre-Model Deployment Testing
□ Model Deployment
□ Post-Model Deployment Evaluation
ITS Safety Pilot Program Roadmap
CY 2010 CY 2011 CY 2012
Q1
Independent Evaluation of Testing Activities
CY 2013
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
NHTSA Agency Decision (LV)
Pre-Model Deployment
LV Driver Clinics
V eh ic le
B ui ld s
D ri ve r C lin ic s Re al W or ld
Te st in g Ev al ua ti on
Be ne fit s
V2V Benefits Assessment
Integrated LV Builds
Model Deployment
HIA Device
TV Driver Clinics
Integrated HV Builds HV Driver Clinics
Device QPL
A/M Safety Device - LV Device QPL
Roadside Equipment
RSE QPL
World Congress
Retrofit Safety Device - TV
D ev ic e
D ev el op m en t an d Q ua lif ic at io n
Li st s
Device QPL
Safety Pilot DVI Criteria Legend:
LV – Light Vehicle HV – Heavy Vehicle TV – Transit Vehicle HIA – “Here I Am” A/M - Aftermarket QPL – Qualified Product List RSE – Roadside Equipment V2V – Vehicle-to-Vehicle
Controller interface defined
HV Retrofit Safety Device -
Issue RFP
Issue RFP
Issue RFP
Issue RFP
Issue RFP
NHTSA Agency Decision (HV) 2014
Post-Model Deployment
16U.S. Department of Transportation
Safety Pilot Model Deployment Test Conductor Solicitation
Test Conductor role is to:
□ Establish the test site (vehicles, infrastructure, security, interoperability, etc.)
□ Perform as the test conductor and facilitator for the pre-model deployment and model deployment phases of the Safety Pilot Program, and
□ Develop and operate the Showcase activities
□ Provide data and support post model deployment surveys and focus groups
Note: this contract requires extensive coordination with other Safety Pilot program contractors
17U.S. Department of Transportation
Coordination with Other Organizations is Critical!
Crash Avoidance Metrics Partnership (CAMP) Heavy Vehicle Contractor (to-be-selected) Transit Vehicle Contractor (to-be-selected) Suppliers of HIA devices (Multiple Providers) Suppliers of Aftermarket Safety Devices (to-be-selected) Suppliers of RSE devices (to-be-selected) The Independent Evaluator (Volpe Center) Test Bed Contractor (SAIC) USDOT staff and support contractors
…along with team partners and subcontractors.
18U.S. Department of Transportation
Major Objectives of Model Deployment
1. Demonstrate V2V and V2I safety-related applications in a real-world environment using multiple vehicles (minimum: light & heavy vehicles and buses)
2. Collect data to project potential safety benefits of V2V applications
3. Assess options for accelerating the safety benefits through the use of HIA, aftermarket, and retrofit safety devices
4. Evaluate the scalability, security, and interoperability of devices using DSRC 5.9 GHz technology
19U.S. Department of Transportation
Objectives (continued)
5. Test the use of Signal Phase and Timing (SPaT) messages in the V2I safety-related applications
6. Provide industry access to HIA and SPaT messaging in a live operation environment, for use by additional applications
7. Collect and store data (e.g., HIA messages, vehicle-based sensor data, SPaT messages) for later use by other researchers, including universities and private industry
20U.S. Department of Transportation
Device Types
Device Types are:
HIA Devices (all vehicle types)
□ Limited in capability, these devices only broadcast and do not receive messages
□ Broadcast a single type of message in the form of the Basic Safety Message (BSM) (SAE standard J2735, Dedicated Short Range Communications (DSRC) Message Set Dictionary)
□ Does not have a working human-machine interface (HMI)
Aftermarket Safety Device (light vehicles)
□ A device safely installed in the vehicle such that it does not distract the driver, cannot void the vehicle’s warranty, or cause harmful effects to the vehicle
□ The device provides working safety applications (continued)
21U.S. Department of Transportation
Aftermarket Safety Device (continued)
□ Has a working Human Machine Interface (HMI)
□ Broadcasts and receives safety messages
□ Can process the content of received messages to provide warnings and/or alerts to the driver of the vehicle in which installed
Retrofit Safety Device (kit) (truck and transit vehicles)
□ A device (kit) installed in vehicles after the manufacturing process by reps of the OEM or authorized service provider (retrofit)
□ Connects to proprietary data ports
□ Can provide highly accurate information from in-vehicle sensors
□ The retrofit device has a working HMI
□ Broadcasts and receives SAE J2735 messages, and
□ Can process messages received to provide warnings and/or alerts to the driver of the vehicle in which installed
22U.S. Department of Transportation
Integrated (safety) Device
□ A device inserted into vehicles during vehicle production at an OEM’s factory
□ Connect to proprietary data ports
□ Can provide highly accurate information from in-vehicle sensors
□ Has a working HMI
□ Broadcasts and receives SAE J2735 messages
□ Can process the content of received messages to provide warnings and/or alerts to the driver of the vehicle in which installed
Note: only one type of device shall be inserted into any vehicle
23U.S. Department of Transportation
Pre-Model Deployment and Testing Stage
Purpose:
To ensure that all of the hardware and software components needed for Model Deployment are:
□ Installed properly
□ Operate according to their design specifications, and
□ Interoperate effectively
Three major phases:
1. Planning (for both remaining Safety Pilot stages)
2. Preparation and Installation of Required Components
3. Execution of the Pre-Model Deployment tests
24U.S. Department of Transportation
1. Planning During the planning phase, the Test Conductor shall prepare:
□ Updated Model Deployment Site Plan (initially submitted with the Offeror’s proposal) to reflect the planned locations for physical components
□ Safety/Threat Plan (in accordance with ISO 26262)
□ Experiment Plan (in conjunction with Independent Evaluator)
□ Logistics Plan (identifies how the logistical support will be provided)
□ System Interoperability Test Plan (to address the actual tests that the
Test Conductor intends to execute during the Pre-Model Deployment Test)
□ Driver Training Plan (to address how the all of the volunteer drivers will be trained and the preparation of the training material)
□ Obtain the required approvals from appropriate Institutional Review Board for the use of human subjects in an experiment
25U.S. Department of Transportation
2. Preparation & Installation of Required Components During this phase, the Test Conductor shall:
□ Acquire or develop all of the hardware and software components needed for the Model Deployment,
□ Install the components in the appropriate locations
□ Recruit all drivers participating in the Safety Pilot
USDOT will provide to the Test Conductor as GFE:
□ Sixty integrated light vehicles (eight of these will be provided in time for use in the Pre-Model Deployment Tests)
□ Two-to-Three integrated heavy vehicles for use in the Model
Deployment (one, if available, for use in the Pre-Model Deployment Tests)
□ Three retrofit device transit vehicles for use in Model Deployment
26U.S. Department of Transportation
2. Preparation & Installation of Required Components For the Model Deployment, the Test Conductor shall:
□ Recruit 2,500-3,000 volunteer drivers of light vehicles (recruitment over 3,000 volunteers will not be subsidized by USDOT)
▪ The preference is to recruit a combination of operators of light vehicle fleets and drivers who volunteer to drive their personal vehicles
▪ The Test Conductor shall train the drivers
□ For the Model Deployment, CAMP will select 128 drivers from the identified pool
□ Arrange with one or more local truck fleet companies, the use of at least 58 medium and/or heavy duty vehicles
▪ The preference is medium/heavy vehicles from fleets covering various vehicle configurations (e.g., class 8 tractor-trailers, class 8 straight trucks, various medium-duty configurations)
▪ Note: an additional 2-3 heavy vehicles will be supplied by USDOT as integrated heavy vehicles.
27U.S. Department of Transportation
2. Preparation & Installation of Required Components For the Model Deployment, the Test Conductor shall
(continued):
□ Arrange with one or more transit agencies to provide at least 10 transit vehicles to be equipped with HIA devices
□ Equip each integrated light and heavy duty vehicle and each retrofitted heavy and transit vehicle with a data acquisition system
□ Provide 125 light vehicles: 110 with HIA devices, 15 with aftermarket safety devices; CAMP will provide 8 integrated vehicles
□ Arrange with at least one local traffic agency to upgrade or install 12 traffic signal controllers capable of transmitting SPaT data to an RSE,
□ Install 2 RSEs at each of 3 Curve Over-Speed locations; and 1 RSE at 5
Actuated Traffic Signal Controller
28U.S. Department of Transportation
3. Execution of the Pre-Model Deployment Test The Test Conductor shall conduct all of the interoperability tests defined in the System Interoperability Test Plan, after:
□ Installation of the infrastructure components
□ Availability of the requisite number and types of vehicles, with trained drivers The Test Conductor shall analyze the results of these tests and determine whether any recommendations for modifications or enhancements to any hardware or software components are required before beginning the Model Deployment stage Based on current interoperability activities by CAMP, additional modifications may be required for devices and infrastructure With the approval of the COTR, Model Deployment Stage begins
29U.S. Department of Transportation
Model Deployment Stage
The Model Deployment stage shall exhibit operational capability and is not intended to be an engineering field test Some of the safety applications that will run on the vehicle fleet during this stage will be prototype applications All of the safety applications operating on integrated light vehicles are considered to be pre-production safety applications
30U.S. Department of Transportation
The Model Deployment stage will begin when:
The entire vehicle fleet is equipped and ready, All necessary drivers are trained, All of the infrastructure elements of the Model
Deployment are in place (including the data storage system(s) needed to accumulate the necessary data), and The USDOT authorizes its onset
□ A jointly developed model deployment start checklist will be established
31U.S. Department of Transportation
Once underway, the Test Conductor shall ensure that:
All elements are maintained and refreshed (upgraded) as necessary, Data are downloaded from vehicle and other equipment logs, Data are stored and subjected to the appropriate quality controls, The quality-controlled data are delivered to the
Independent Evaluator and to designated Real-Time Data Capture and Management representatives at the Turner-Fairbank Highway Research Center
32U.S. Department of Transportation
Post-Model Deployment Stage
At the completion of the Model Deployment, the Test Conductor shall:
Decommission (remove) all equipment installed in all light vehicles volunteered for the Model Deployment and in all heavy and transit vehicles provided by local organizations (public or private) for use in the Model Deployment Dispose of the equipment used in the Model
Deployment as directed by the USDOT
33U.S. Department of Transportation
Post-Model Deployment Stage
At the completion of the Model Deployment, the Test Conductor shall:
Prepare its final report on the Model Deployment stage, listing the lessons learned and recommendations for:
□ Enhancements or modifications to the RSE devices and certificate and security management systems
□ Enhancements or modifications to the descriptions and requirements for applications
□ Additions or modifications to standards
Conduct focus groups and administer questionnaires to drivers using vehicles equipped with aftermarket safety devices
34U.S. Department of Transportation
Delineation of Work
Task Area 1 – Program Management Extends over the entire period of performance Test Conductor shall prepare:
□ Program Management Plan (PMP) that describes all of the activities required to perform work described in tasks 2 through 8
□ A detailed Master Project Schedule containing a work breakdown structure (WBS) to three levels
□ Property Management Plan (as an appendix)
□ Configuration Management Plan (as an appendix)
□ Risk Management Plan (as an appendix)
□ System Interoperability Test Plan
□ Monthly Progress Reports
35U.S. Department of Transportation
Task Area 2 – Safety Pilot Planning Subtask 2.1, Finalize Model Deployment Site Plan Subtask 2.2, Finalize Security Management Operating
Concept Subtask 2.3, Develop Safety/Threat Plan and
Experiment Plan Subtask 2.4, Address other Applications Subtask 2.5, Obtain Human Use Approval for Pre-Model
Deployment and Model Deployment Subtask 2.6, Develop Driver Training Materials Subtask 2.7, Coordinate Logistic Support for Pre-Model
Deployment and Model Deployment
36U.S. Department of Transportation
Task Area 3 – Coordination and Preparation of Vehicle Fleets and Drivers Subtask 3.1, Coordinate Integrated Vehicle Fleet Subtask 3.2, Recruit Drivers of Safety Pilot Test
Vehicles Subtask 3.3, Prepare HIA Device Vehicle Fleet Subtask 3.4, Prepare Aftermarket Safety Device Vehicle
Fleet
37U.S. Department of Transportation
Task Area 3 – Coordination and Preparation of Vehicle Fleets and Drivers Subtask 3.5, Train Vehicle Drivers
□ Subtask 3.5.1, Train Pre-Model Deployment Volunteer Drivers
□ Subtask 3.5.2, Train Model Deployment Volunteer Drivers
Subtask 3.6, Incorporate Integrated Heavy Vehicles and Retrofit Kits Subtask 3.7, Incorporate Retrofit Device Transit Vehicles
38U.S. Department of Transportation
Task Area 4 – Infrastructure Preparation Subtask 4.1, Purchase and Install Roadside Equipment Subtask 4.2, Implement Local Certificate Distribution
System
39U.S. Department of Transportation
Task Area 5 – Pre-Model Deployment Testing Subtask 5.1, Conduct Pre-Model Deployment Tests Subtask 5.2, Recommend Modifications to Safety Pilot
Elements Subtask 5.3, Refresh Devices, Vehicles, and
Infrastructure
40U.S. Department of Transportation
Task Area 6 – Model Deployment Subtask 6.1, Maintain Devices, Vehicles, and
Infrastructure Subtask 6.2, Introduce Other Applications Subtask 6.3, Collect, Store, Process, and Transfer Data
41U.S. Department of Transportation
Task Area 7 – Model Deployment Closeout Subtask 7.1, Post-Safety Pilot Surveys and Focus
Groups Subtask 7.2, Report on Safety Pilot Methodology and
Experience Subtask 7.3, Decommission Model Deployment
Equipment
42U.S. Department of Transportation
Task Area 8 – Outreach and Showcase The Test Conductor shall:
□ Have a presence at the ITS World Congress 2011
□ Coordinate with the various organizations demonstrating products and programs
□ Present the program, plans, and operations concept
□ Have a graphical representation of the model deployment geographical area
□ Have a presence at all ITS America Annual Meetings for the duration of the contract period of performance
□ Develop and implement an outreach plan
□ Prepare a detailed showcase plan
43U.S. Department of Transportation
Period of Performance
Pre-Model Deployment Testing – 12 months
□ Preparation for System Interoperability (~7 months)
□ Execution of System Interoperability Tests (~3 months)
□ Development of Recommendations for Enhancements and
Modifications to Safety Pilot Elements (~2 months)
Model Deployment– 10-12 months
Post Model Deployment Activities – 6 months
44U.S. Department of Transportation
Fee & Cost Share Profit/Fee: Since there is a cost-share requirement, in accordance with FAR 16.303, Offerors shall not propose any profit or fee.
Cost Share:
Offerors are required to provide a cost share of at least 20 percent.
Items being proposed for cost share are subject to approval by USDOT. Guidance regarding Subtasks 2.4 and 6.2 :
□ Subtask 2.4: The USDOT will consider, as cost share, costs associated with demonstrating applications to interested parties. Such cost may include the costs of any equipment (including RSEs) and/or vehicles needed to demonstrate the Offeror’s applications as part of the Showcase (see Task 8).
b. Subtask 6.2:
□ i. If the Test Conductor is supplying vehicles as part of this task, the cost of those vehicles (but not the cost of developing the applications nor the cost of devices within the vehicle on which the applications run) can be considered cost share for this contract.
□ ii. For the Test Conductor’s own “other” applications, the cost of equipment acquisition and installation can be considered cost share for this contract.
Cost share is not limited to Subtasks 2.4 and 6.2.
Cost share may include labor (including driver’s time), fringe benefits, indirect costs, overhead, other direct costs, travel, equipment, materials, and services provided by the prime contractor, subcontractors, or consultants, that are not being funded by another federal source (unless authorized by statute). All cost share is subject to USDOT approval.
45U.S. Department of Transportation
Award Procedure This contract will be awarded using a two phase selection procedure.
Phase I In this phase the Government will evaluate an Offeror’s capabilities based on the written proposal, using the criteria listed in section M of this RFP.
Based on this evaluation, the Government intends establish a competitive range of capable Offerors.
Phase II Offerors that are included in the competitive range will be invited to conduct a site visit for USDOT representatives. The specifics of the site visit are described later in Section L. At the conclusion of the site visit, the Government may discuss with Offerors any technical or cost/business issues.
46U.S. Department of Transportation
Evaluation Factors
Factors are listed in descending order of importance:
□ Technical Approach
□ Management and Staffing Approach
□ Experience and Corporate Capabilities
Cost
□ Evaluated for reasonableness, appropriateness, and acceptability
□ Cost will not be ranked/scored
□ Cost will be considered in establishing the competitive range
Past Performance
□ Past Performance will not be ranked/scored
□ Past performance will be considered in establishing the competitive range
47U.S. Department of Transportation
Contact Information
Contact Information:
□Contracting Officer, Daniel Confer – 202-366-0730, Daniel.Confer@dot.gov mailto:Daniel.Confer@dot.gov�
| Amendment 1 slides.pdf |
| Today’s Agenda |
| Safety Pilot Test Conductor Solicitation |
| Safety Pilot Test Conduct Solicitation |
| ITS Research Program Components |
| Step One – Accelerate V to V Safety |
| Step Two - Demonstrate Safety |
| Safety Pilot continued |
| Slide Number 8 |
| Step Three – Define the System and Establish a Testing Environment |
| Step Four - Build V to I Safety, Mobility, and AERIS Data Environments and Applications |
| Step Five – Build a Reference Implementation |
| Step Six - Conduct Regional Pilots |
| Slide Number 13 |
| Safety Pilot Program: Background |
| ITS Safety Pilot Program Roadmap |
| Safety Pilot Model Deployment Test Conductor Solicitation |
| Coordination with Other Organizations is Critical! |
| Major Objectives of Model Deployment |
| Objectives (continued) |
| Device Types |
| Device Types |
| Device Types |
| Pre-Model Deployment and Testing Stage |
| Pre-Model Deployment and Testing Stage |
| Pre-Model Deployment and Testing Stage |
| Pre-Model Deployment and Testing Stage |
| Pre-Model Deployment and Testing Stage |
| Pre-Model Deployment and Testing Stage |
| Model Deployment Stage |
| Model Deployment Stage |
| Model Deployment Stage |
| Post-Model Deployment Stage |
| Post-Model Deployment Stage |
| Delineation of Work |
| Delineation of Work |
| Delineation of Work |
| Delineation of Work |
| Delineation of Work |
| Delineation of Work |
| Delineation of Work |
| Delineation of Work |
| Delineation of Work |
| Period of Performance |
| Fee & Cost Share |
| Award Procedure |
| Evaluation Factors |
| Contact Information |
File details come from the government source that posted it. Updated .