RFO DTFAWN-16-R-00097 R4 Section B.doc
DOC document 27 KB Posted
- Solicitation number
- DTFAWN-16-R-00097
About this file
RFO DTFAWN-16-R-00097 R4 Section B (doc)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFO DTFAWN-16-R-0097 R4 Sections L and M.doc | DOC document | |
| RFO DTFAWN-16-R-00097 R4 Section K.doc | DOC document | |
| RFO DTFAWN-16-R-00097 R4 Sections C.doc | DOC document | |
| RFO DTFAWN-16-R-00097 R4 Sections I J.doc | DOC document | |
| TIA-222-G.pdf | ||
| RFO DTFAWN-16-R-00097 R4 Section A.doc | DOC document | |
| RFO DTFAWN-16-R-00097 R4 Sections D E F G H.doc | DOC document | |
| TIA-222-G.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I - SECTION B
SUPPLIES/SERVICES & PRICE/COST
Contract
Line Item
No. (CLIN) Description and Price/Cost
Qnty
Unit
Amount
B0001 Design, Fabricate, Package and Crate
B0001A The Contractor shall furnish all labor, tools, parts, materials, production shop and facilities necessary to design, and fabricate two (2) – thirty (30) foot self-supporting antenna towers plus a rigid (type 1) safety climbing devices with all required brackets, guides and clamps as required by the scope of work, specifications, drawings, all attachments, contract clauses and provisions, Prepare for shipping by packaging and crating to arrive at destination undamaged and ready for construction/erection .
Job
B0002 Deliver and Off Loading at Destination B0002A Furnish all labor, materials, equipment, transportation, insurance, notifications, licenses, permits, fees and supervision necessary to package, deliver and off load 2 – 30 foot towers and safety climbing device at destination.
Job
B0003 Total Price (Aggregate of B0001A and B0002A) Lump Sum
Notice to Offerors: Price/Cost must include All Applicable State and Local Taxes.
All Contract items shall encompass all costs related to (a) direct and indirect labor, fringe benefits, overhead, G&A expenses, profit, material, equipment, other direct costs, insurance, freight, handling, transportation, inspection, testing, operation and maintenance manuals, bonds, etc., (b) federal, state, and local taxes, (c) all applicable fees permits, licenses, and (d) any miscellaneous charges.
An offeror is required to provide a price for each contract line item (CLIN). Failure to comply may result in the rejection of the subject offer. A single award is anticipated shall be made. There shall be no split award. In the event that the CLIN price for any line item is materially unbalanced, the entire offer may be rejected without discussion with the offeror.
In the event of any disparity between the CLIN price and the total offered price, the CLIN price shall be deemed correct, and the total offered amount shall be revised accordingly, unless available information indicates otherwise.
Effective April 1, 1996, the Federal Aviation Administration (FAA) began operating under the new FAA Acquisition Management System. The l996 DOT Appropriation Act, Public Law 104-50, mandated that the FAA rewrite its acquisition regulations and granted legislative relief from certain laws. The Federal Acquisition Regulations (FAR), Federal Acquisition Streamlining Act of 1994, Small Business Act, and Competition in Contracting Act, are four of these laws.