RFODTFASA17R00849.pdf

PDF 432 KB Posted

Attached to
HVAC Replacement at the Boston Consolidated TRACON (BCT), Merrimack, NH
Solicitation number
DTFASA-17-R-00849
Issued by

About this file

RFODTFASA17R00849 (pdf)

View the file

Other files

File Type Posted
a90-e-traco-s301.pdf PDF
amendment0003.pdf PDF
a90-1404557-5.16.17.pdf PDF
amendement002.pdf PDF
A90 HVAC PKG 2001 reduced size.pdf PDF
A90 HOT WATER ALTERNATE.pdf PDF
specification.pdf PDF
amendment0004.pdf PDF
RFODTFASA17R00849.pdf PDF
NHWAGERATE.pdf PDF
FAA BCT A90 - DDC DESIGN DRAWINGS - COMPLETE BID SET 0228 2017.pdf PDF
PreBid Signin Sheet.pdf PDF
amendment0001.pdf PDF
specification.pdf PDF
A90 HOT WATER ALTERNATE.pdf PDF
amendement002.pdf PDF
FAA BCT A90 - DDC DESIGN DRAWINGS - COMPLETE BID SET 0228 2017.pdf PDF
NHWAGERATE.pdf PDF
a90-e-traco-s301.pdf PDF
RFODTFASA17R00849.pdf PDF
PreBid Signin Sheet.pdf PDF
amendment0001.pdf PDF
amendment0003.pdf PDF
a90-1404557-5.16.17.pdf PDF
A90 HVAC PKG 2001 reduced size.pdf PDF
amendement002.pdf PDF
a90-1404557-5.16.17.pdf PDF
NHWAGERATE.pdf PDF
RFODTFASA17R00849.pdf PDF
FAA BCT A90 - DDC DESIGN DRAWINGS - COMPLETE BID SET 0228 2017.pdf PDF
amendment0001.pdf PDF
a90-e-traco-s301.pdf PDF
PreBid Signin Sheet.pdf PDF
A90 HOT WATER ALTERNATE.pdf PDF
A90 HVAC PKG 2001 reduced size.pdf PDF
specification.pdf PDF
a90-e-traco-s301.pdf PDF
RFODTFASA17R00849.pdf PDF
FAA BCT A90 - DDC DESIGN DRAWINGS - COMPLETE BID SET 0228 2017.pdf PDF
a90-1404557-5.16.17.pdf PDF
PreBid Signin Sheet.pdf PDF
A90 HVAC PKG 2001 reduced size.pdf PDF
NHWAGERATE.pdf PDF
specification.pdf PDF
amendment0001.pdf PDF
RFODTFASA17R00849.pdf PDF
NHWAGERATE.pdf PDF
A90 HVAC PKG 2001 reduced size.pdf PDF
specification.pdf PDF
FAA BCT A90 - DDC DESIGN DRAWINGS - COMPLETE BID SET 0228 2017.pdf PDF
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

Screening Information Request (SIR) Request for Offer

SOLICITATION PACKAGE

For: HVAC Replacement at the Boston Consolidated

TRACON

Location: Merrimack, NH

Solicitation # DTFASA-17-R-00849

Issue Date: August 18, 2017

Submit Offers To: DOT/Federal Aviation Administration

Attn: Susan Newcomb, Contracting Officer FAA, Eastern Logistics (AAQ-540 Boston) Acquisition Management Branch 1200 District Avenue Burlington, MA 01803

Submit By: 5:00 PM Local Time on September 13, 2017

Special Features:

• Insurance is required

• Payment and Performance Bonds are required

• Estimated Range $1 million - $3 million

This acquisition is [X] conducted under the FAA’s Acquisition Mgmt System [X] conducted under Screening Information Request (SIR)

Request for Offer (RFO) procedures [X] Full and open Competition [X} North American Industry Classification System (NAICS) code 238220 - $15 Million

SOLICITATION, OFFER

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

8-18-2017

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

A. NAME B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder"

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED BID (RFP)

ES-17-02146

FEDERAL AVIATION ADMINISTRATION

EASTERN SERVICE AREA

AAQ-510-BOS ACQUISITION GROUP

1200 DISTRICT AVENUE

AAQ510BOS-AFN

BURLINGTON MA 01803

Susan Newcomb 781-238-7659 x 45

PURCHASE REQUEST NO.

DTFASA-17-R-00849

10. THE CONTRACT AUTHORITY REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

SCOPE: Provide all labor, materials, equipment and supervision necessary for the

HVAC Replacement at the Boston Consolidated TRACON (BCT), Merrimack, NH

In addition to your price proposal on Page #2 of this Request for Offer (RFO), you must also submit a Schedule of Values (SOV), consisting of a complete breakdown of your proposal and how you calculated it. In addition to labor and material, you must also show all G&A/Overhead & Profit percentages.

The FAA, as the Federal Government, is tax exempt. The awarded contractor will be responsible for any/all local, state, and/or federal taxes.

All submittals must be submitted electronically in PDF format.

11. The Contractor shall begin performance within

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award notice to proceed. The performance period is mandatory, negotiable. (See ________________________________________________ .)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and is not required.is, B. An offer guarantee

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers must be publicly opened at that time . Sealed envelopes containing offers shall be marked to show the offeror's name and address. The solicitation number, and the date and time offers are due.

D. Offers providing less than

12B. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in item 12B.)

0 120 calendar days and complete it within ________________ ________________ calendar days after receiving

09/13/2017 x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Contract Authority acceptance after the date offers are due will not be considered and will _________________ be rejected.

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Contract Authority in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13D. Failure to insert any number means the offeror accepts the minimum in item 13D.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (MUST BE FULLY COMPLETED BY OFFEROR)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Contract Authority)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Contract Authority solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE 31B. CONTRACT AUTHORITY 31C. AWARD DATE

BY

2PAGE OF

FEDERAL AVIATION ADMINISTRATION

EASTERN SERVICE AREA

AAQ-510-BOS ACQUISITION GROUP

1200 DISTRICT AVENUE

AAQ510BOS-AFN

BURLINGTON MA 01803

Susan Newcomb

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.)

Continued...

See Section B - Lump Sum (including Options ) $___________________________

DTFASA-17-R-00849

Section B - Supplies or Services/Prices

Section B

SCOPE: Provide all labor, materials, equipment and supervision necessary for the HVAC Replacement at the Boston Consolidated TRACON (BCT), Merrimack, NH

Merrimack HVAC 1 JOB $_______________

Option #001 – Replace hot water pumps 1 JOB $_________________

Option #0002 – Remove the pump 1 JOB $__________________ Housekeeping pads

In order to be responsive you must provide a price on the Base and two options. The FAA intends to award all three line items if funding is available. Award will be based on the lowest price for the aggregate of all line items. This is a competitively negotiated procurement that will result in a firm fixed price contract which will be awarded to a single contractor.

A site visit has been scheduled on Tuesday August 29, 2017 at 9:00 am. offerors are strongly urged and expected to attend. Due to security requirements, all attendees must have a valid photo ID., i.e. state driver’s license. All prospective attendees must submit a list of attendance 48 prior to the site visit to STEVEN.BERUBE@faa.gov

The Prime Contractor is responsible for all the items of work identified in the attached FAA Specifications and provision of the Contract as described in Section J.

Note to Vendor: Funds are presently not available for this contract.

The remainder of this page has been intentionally left blank.

Section C - Description/Specifications

Scope of Work

SPECIFICATIONS: HVAC Equipment Replacement Boston Consolidated TRACON (A90), Merrimack, NH dated May 2017

DRAWING as listed as attached to Specification

Section D - Packaging and Marking

Clause List

Section E - Inspection and Acceptance

Clause List

3.10.4-10 INSPECTION OF CONSTRUCTION (SEP 2009)

(a) 'Work' includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not--

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) below.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

(e) The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer.

The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless the Government determines that it is in the public interest to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may:

(1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or

(2) terminate for default the Contractor's right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

(j) In the absence of any formal disputes, a project will be deemed physically and financially complete within one year after final acceptance and excess funds will be deobligated at that time.

(End of clause)

Section F - Deliveries or Performance

Clause List

3.10.1-11 GOVERNMENT DELAY OF WORK (APR 1996)

3.10.1-24 NOTICE OF DELAY (MAR 2009)

Section G - Contract Administration Data

Clause List

3.10.1-22 CONTRACTING OFFICER'S REPRESENTATIVE (APR 2012)

(a) The Contracting Officer may designate other Government personnel (known as the Contracting Officer's Representative) to act as his or her authorized representative for contract administration functions which do not involve changes to the scope, price, schedule, or terms and conditions of the contract. The designation will be in writing, signed by the Contracting Officer, and will set forth the authorities and limitations of the representative(s) under the contract. Such designation will not contain authority to sign contractual documents, order contract changes, modify contract terms, or create any commitment or liability on the part of the Government different from that set forth in the contract.

(b) The Contractor shall immediately contact the Contracting Officer if there is any question regarding the authority of an individual to act on behalf of the Contracting Officer under this contract.

(End of Clause)

G.1 INDEX FOR SPECIFICATIONS

If an index or table of contents is furnished in connection with specifications, it is understood that such index or table of contents is for convenience only. Its accuracy and completeness is not guaranteed, and it is not to be considered as part of the specification. In case of discrepancy between the index or table of contents and specifications, the specifications shall govern.

G.2 PAYMENTS

The Contractor shall submit an application for payment monthly, or at more frequent intervals if determined by the Contracting Officer. The application for payment shall be submitted to the COR for approval. The COR will forward the payment application to the Contracting Officer for payment processing. The application for payment shall be broken down to include a schedule of values. Also, in accordance with Clause no. 3.3.1-2 entitled “Payments under Fixed Price Construction Contracts”, applications for payments submitted require the certification stated in paragraph (c) of this clause. Requests for payment that do not contain the required certification will not be processed for payment

Section H - Special Contract Requirements

Clause List

3.1.9-1 ELECTRONIC COMMERCE AND SIGNATURE (JUL 2013)

(a) The Electronic Signatures in Global and National Commerce Act (E-SIGN) establishes a legal equivalence between:

(1) Contracts written on paper and contracts in electronic form;

(2) Pen-and-ink signatures and electronic signatures; and

(3) Other legally-required written records and the same information in electronic form.

(b) With the submission of an offer, the offeror acknowledges and accepts the utilization of electronic commerce as part of the requirements of this solicitation and the resultant contract.

(c) Certain documents may need to be provided or maintained in original form, such as large scale drawings impractical to convert to electronic format or a document with a raised seal signifying authenticity. This clause does not change or affect any other requirements that a document must be in paper format to satisfy legal requirements such as for certain real estate transactions.

(d) The use of electronic signature technology is authorized under this solicitation and the resulting contract.

Contractors may use the following means of electronic signature technology digital signature.

(End of Clause)

H.1 WAGE RATE DETERMINATION

In accordance with Clause No. 3.6.2-18 entitled “Davis-Bacon Act”, for any laborer or mechanic that is employed in a classification that is not listed in the following wage determination, after contract award the contractor is required to submit to the Contracting Officer, Standard Form 1444, Request for Authorization of Additional Classification and Rate. The request shall contain the proposed additional classification and minimum wage rate including any fringe benefit payments.

The applicable Wage Rate determination is U.S. Department of Labor General Decision Number NH170012 including Modification 0- dated 01/6/2017, Hillsborough County (Building), attached hereto, and made a part thereof.

Section I - Contract Clauses

Clause List

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2011)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

http://conwrite.faa.gov.

(End of clause)

3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (AUG 1997)

3.2.2.3-33 ORDER OF PRECEDENCE (MAR 2009)

3.2.2.3-42 DIFFERING SITE CONDITIONS (JUL 2004)

3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (JUL 2004)

3.2.2.3-45 MATERIAL AND WORKMANSHIP (JUL 2004)

3.2.2.3-46 SUPERVISING THE CONTRACT WORK (JUL 2004)

3.2.2.3-47 PERMITS AND RESPONSIBILITIES (JUL 2004)

3.2.2.3-48 OTHER CONTRACTS (MAR 2009)

3.2.2.3-49 PROTECTING EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS (JUL 2004)

3.2.2.3-50 PROPERTY PROTECTION (OCT 2014)

3.2.2.3-51 OPERATIONS AND STORAGE AREAS (APR 2012)

3.2.2.3-52 USE AND POSSESSION BEFORE THE PROJECT IS COMPLETE (JUL 2004)

3.2.2.3-53 CLEANING UP AND ROADWAY MAINTENANCE (JUL 2004)

3.2.2.3-54 PREVENTING ACCIDENTS (JUL 2004)

3.2.2.3-56 SCHEDULES FOR CONSTRUCTION CONTRACTS (JUL 2004)

3.2.2.3-60 SPECIFICATIONS, DRAWINGS, AND MATERIAL OFFERS (MAR 2009)

3.2.2.3-64 DISMANTLING AND DEMOLISHING OF PROPERTY (JUL 2004)

3.2.2.3-66 CONTRACTOR'S DAILY LOG (JUL 2004)

3.2.2.3-68 SAFETY AND HEALTH (OCT 2014)

3.2.2.3-83 PROHIBITION AGAINST CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS

(OCT 2015)

3.2.2.7-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (APR 2011)

3.2.2.7-8 DISCLOSURE OF TEAM ARRANGEMENTS (APR 2008)

3.2.5-1 OFFICIALS NOT TO BENEFIT (APR 1996)

3.2.5-3 GRATUITIES OR GIFTS (JAN 1999)

3.2.5-4 CONTINGENT FEES (OCT 1996)

3.2.5-5 ANTI-KICKBACK PROCEDURES (OCT 2010)

3.2.5-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE FAA (APR 1996)

3.2.5-8 WHISTLEBLOWER PROTECTION FOR CONTRACTOR EMPLOYEES (APR 1996)

3.3.1-2 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (APR 1996)

3.3.1-9 INTEREST (SEP 2009)

3.3.1-15 ASSIGNMENT OF CLAIMS (APR 1996)

3.3.1-19 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017)

3.3.1-20 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS (OCT

2012)

3.3.1-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER- SYSTEM FOR AWARD MANAGEMENT

(AUG 2012)

3.4.1-6 ADDITIONAL BOND SECURITY (APR 1996)

3.4.1-7 NOTICE TO PROCEED (APR 1996)

3.4.1-9 DEPOSIT OF ASSETS INSTEAD OF SURETY BONDS (APR 1996)

3.4.2-6 TAXES - CONTRACTS PERFORMED IN U.S. POSSESSIONS OR PUERTO RICO (OCT 1996)

3.4.2-8 FEDERAL, STATE, AND LOCAL TAXES - FIXED-PRICE CONTRACT (APR 2013)

3.5-4 PATENT INDEMNITY - CONSTRUCTION CONTRACTS (JAN 2009)

3.6.1-3 UTILIZATION OF SMALL, SMALL DISADVANTAGED AND WOMEN-OWNED, AND

SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS CONCERNS (MAR 2009)

3.6.1-4 SMALL, SMALL DISADVANTAGED, WOMEN-OWNED AND SERVICE-DISABLED VETERAN

OWNED SMALL BUSINESS SUBCONTRACTING PLAN (AUG 2012)

3.6.2-1 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT-OVERTIME COMPENSATION

(JAN 2012)

3.6.2-2 CONVICT LABOR (APR 1996)

3.6.2-9 EQUAL OPPORTUNITY (AUG 1998)

3.6.2-12 EQUAL OPPORTUNITY FOR VETERANS (JAN 2011)

3.6.2-13 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (OCT 2010)

3.6.2-16 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (APR 1996)

3.6.2-18 DAVIS BACON ACT (APR 2017)

3.6.2-19 WITHHOLDING-LABOR VIOLATIONS (APR 1996)

3.6.2-20 PAYROLLS AND BASIC RECORDS (APRIL 2017)

3.6.2-21 APPRENTICES, TRAINEES, AND HELPERS (APRIL 2017)

3.6.2-22 SUBCONTRACTS (LABOR STANDARDS) (APRIL 2017)

3.6.2-23 CERTIFICATION OF ELIGIBILITY (APRIL 2017)

3.6.2-35 PREVENTION OF SEXUAL HARASSMENT (AUG 1998)

3.6.2-39 TRAFFICKING IN PERSONS (OCT 2015)

3.6.2-44 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS

ACT (JAN 2012)

3.6.3-7 WASTE MANAGEMENT AND POLLUTION PREVENTION (APRIL 2017)

3.6.3-13 AFFIRMATIVE PROCUREMENT OF RECYCLED CONTENT AND PRODUCTS UNDER

SERVICE AND CONSTRUCTION CONTRACTS (OCT 2016)

3.6.3-14 USE OF ENVIRONMENTALLY PREFERABLE PRODUCTS (OCT 2016)

3.6.3-16 DRUG FREE WORKPLACE (MAR 2009)

3.6.3-17 EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (OCT 2016)

3.6.3-19 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND

CONSTRUCTION CONTRACTS (OCT 2016)

3.6.3-23 DELIVERY OF ELECTRONIC AND PAPER DOCUMENTS (OCT 2016)

3.6.3-24 ASBESTOS NESHAP COMPLIANCE (OCT 2015)

3.6.3-25 AEROSOLS (OCT 2016)

3.6.3-26 FOAMS (OCT 2016)

3.6.4-5 BUY AMERICAN - STEEL AND MANUFACTURED PRODUCTS (JUL 2010)

3.6.4-10 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JAN 2010)

3.6.5-1 UTILIZATION OF INDIAN ORGANIZATIONS AND INDIAN OWNED ECONOMIC

ENTERPRISES (MAR 2009)

3.9.1-1 CONTRACT DISPUTES (OCT 2011)

3.9.1-2 PROTEST AFTER AWARD (AUG 1997)

3.10.1-7 BANKRUPTCY (APR 1996)

3.10.1-8 SUSPENSION OF WORK (SEP 1998)

3.10.1-15 CHANGES-CONSTRUCTION, DISMANTLING, DEMOLITION, OR REMOVAL OF

IMPROVEMENTS (JUL 1996)

3.10.1-16 CHANGES AND CHANGED CONDITIONS (APR 1996)

3.10.1-20 WARRANTY-CONSTRUCTION (JUL 1996)

3.10.1-25 NOVATION AND CHANGE-OF-NAME AGREEMENTS (OCT 2007)

3.10.2-1 SUBCONTRACTS (FIXED-PRICE CONTRACTS) (APR 1996)

3.10.4-23 CONTRACTOR AND SUBCONTRACTOR COMPLIANCE WITH FASTENER ACT (NOV 1997)

3.10.6-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) (OCT 1996)

3.10.6-6 DEFAULT (FIXED PRICE CONSTRUCTION) (OCT 1996)

3.10.6-7 EXCUSABLE DELAYS (OCT 1996)

3.13-5 SEAT BELT USE BY CONTRACTOR EMPLOYEES (OCT 2001)

3.13-11 PLAIN LANGUAGE (JUL 2006)

3.13-13 CONTRACTOR POLICY TO BAN TEXT MESSAGING WHILE DRIVING (JAN 2011)

3.2.2.3-41 PERFORMING WORK (JUL 2004)

The Contractor (you) must perform, using your own organization, work equivalent to at least 25% percent of the total amount of work under the contract on the site. The CO may modify this contract to reduce this percentage if you request a reduction and the CO determines that it would be to the Government's advantage to do so.

(End of clause)

3.2.2.3-60 SPECIFICATIONS, DRAWINGS, AND MATERIAL OFFERS (MAR 2009) - ALTERNATE I

(MAR 2009)

(a) If either the specifications or the drawings (but not both) mention tasks, the Contractor (you) must assume that the tasks are in both. If the drawings and specifications differ, the specifications govern. If there is a discrepancy in the figures, in the drawings, or in the specifications, submit the matter promptly to the Contracting Officer (CO), who will promptly determine which governs, and notify you in writing. Any adjustment you make without the CO's determination is at your own risk and expense. From time to time the CO will provide necessary detailed drawings and other information, unless otherwise provided.

(b) Wherever in the specifications or the drawings FAA (we, our) uses "directed," "required," "ordered," "designated," "prescribed," or similar words, they refer to the CO's requirements. Similarly, "approved," "acceptable," "satisfactory," or similar words refer to the CO's approval, unless otherwise expressly stated. You must have a complete set of plans and specifications on site and available for our use.

(c) Where we use "as shown," "as indicated," "as detailed," or similar words, they refer to the drawings accompanying this contract, unless stated otherwise. The word "provided" means "provided and installed."

(d) Omissions from the drawings and specifications or the erroneous description of details of work which are necessary to carry out the intent of the drawings and specifications, or which are customarily performed, does not relieve you from performing those omitted or erroneously described details of the work. You must perform them as if fully and correctly set forth and described in the drawings and specifications.

(e) You must check all drawings we provide to you before starting work and must promptly notify the CO of any discrepancies. In general you should follow figures marked on drawings, rather than scale measurements. In general, large scale drawings have precedence over small scale drawings. You must compare all drawings and verify the figures before laying out the work. If you do not verify the figures, you will be responsible for any errors you might have avoided had you verified them.

(f) "Shop drawings" means drawings, you or any subcontractor submit to us under a construction contract, showing in detail the proposed fabrication and assembly of structural elements and the installation (that is, form, fit, and attachment details) of materials or equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials you provided to explain in detail specific portions of the work the contract requires.

FAA may duplicate, use, and disclose in any manner and for any purpose shop drawings you deliver under this contract.

(g) If this contract requires material offers (for example, shop drawings, catalog cuts, certificates of conformance), you must coordinate all of your offers, and review them for accuracy, completeness, and compliance with contract requirements. You must provide evidence that you approve the submittals. If you submit materials to us without this evidence, we may return them and ask you to resubmit them. The CO will indicate whether he or she approves or disapproves your offer, and if the CO does not approve it as submitted, will indicate our reasons for rejecting it. Any work done before the CO's approval is at your risk. The CO's approval does not relieve you from responsibility for any errors or omissions in the submittals, nor from responsibility for complying with the contract requirements, except as described under (h).

(h) If you submittals vary from the contract requirements, you must describe the variations in writing, separate from the submittal, when you submit them. Send this description, a copy of the offer, and a proposal to incorporate it into the contract directly to the CO. If the CO approves a variation, the CO must issue an appropriate contract modification, unless the variation is minor or does not involve a change in price or in time of performance.

(i) You must submit to the CO for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications. The CO will keep three sets (unless otherwise indicated) of all offers and will return one set to you.

(j) You must insert this clause, with appropriate changes in the designation of the parties, in all subcontracts.

(k) When you finish the work under this contract, you must provide [CO insert number] complete reproducible sets of all shop drawings as we finally approve them. These drawings must show all changes and revisions made up to the time you finish the work and we accept it.

(End of clause)

3.2.2.3-62 PRECONSTRUCTION CONFERENCE (JUL 2004)

The successful offeror must attend a pre-construction conference at a site the Contracting Officer designates before starting the work.

(End of clause)

3.2.2.3-71 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (JUL 2004)

The Contractor (you) must

(a) begin work under this contract within 10 calendar days after the date you receive the notice to proceed,

(b) perform the work diligently, and

(c) complete the entire work ready for use not later than 120 calendar days. The time allowed for completion must include final cleanup of the premises.

(End of clause)

3.2.2.3-71 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (JUL 2004) -

ALTERNATE I (JUL 2004)

The Contractor (you) must

(a) begin work under this contract within 10 calendar days after the date you receive the notice to proceed,

(b) perform the work diligently, and

(c) complete the entire work ready for use not later than 120 days after NTP . The time allowed for completion must include final cleanup of the premises.

(d) The completion date assumes that the successful offeror will receive the notice to proceed by June 15, 2017. The CO will extend the completion date by the number of calendar days after the above date that you receive the notice to proceed, except to the extent that the delay in issuing the notice to proceed results from your failure to execute the contract and give the required performance and payment bonds to FAA within the time specified.

3.4.1-2 DEPOSIT OF ASSETS REQUIREMENTS (JAN 2017)

(a) Except for payment bonds required for construction contracts, any offeror required to submit a surety bond as a result of this Screening Information Request may instead deposit assets in a form acceptable to the Federal Aviation Administration in an amount of 100 percent of the contract.

(b) When assets are deposited, the offeror must execute the bond form made a part of this SIR. Failure to deposit assets acceptable to the Federal Aviation Administration may be cause for termination of the contract for default.

(End of clause)

3.4.1-4 PERFORMANCE BOND REQUIREMENTS (JAN 2017)

(a) The contractor is required to submit a performance bond in a penal amount equal to 100 percent of the contract price, but for this contract the amount required by the Contracting Officer is [ ].

(b) The bond must be executed on specified forms, and sureties must be acceptable to the Federal Aviation Administration. Corporate sureties must appear on the list in Treasury Circular 570, and the amount of the bond may not exceed the underwriting limit stated for the surety on that list.

(c) Failure to submit an acceptable bond may be cause for termination of the contract for default.

(End of clause)

3.4.1-5 PAYMENT BOND REQUIREMENTS (JAN 2017)

(a) The contractor is required to submit a payment bond in the penal amount of [ ] within the time required by the Contracting Officer.

(b) The bond must be executed on the forms attached to this SIR, and sureties must be acceptable to the Federal Aviation Administration. Corporate sureties must appear on the list in Treasury Circular 570, and the amount of the bond may not exceed the underwriting limit stated for the surety on that list.

(c) Failure to submit an acceptable bond may be cause for termination of the contract for default.

3.4.1-10 INSURANCE - WORK ON A GOVERNMENT INSTALLATION (JUL 1996)

(a) The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the "Schedule" or elsewhere in the contract.

(b) Before commencing work under this contract, the Contractor shall certify to the Contracting Officer in writing by letter or certificate of insurance, reflecting the FAA's contract number, that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Federal Aviation Administration's interest shall not be effective:

(1) for such period as the laws of the State in which this contract is to be performed prescribe, or

(2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.

(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the "Schedule" or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors' proofs of required insurance, and shall make copies (reflecting the FAA's contract number to ensure proper filing of documents) available to the Contracting Officer upon request.

(End of clause)

3.4.1-12 INSURANCE (JUL 1996)

(a) During the term of this contract and any extension, the contractor shall maintain at its own expense the insurance required by this clause. Insurance companies shall be acceptable to the Federal Aviation Administration. Policies shall include all terms and provisions required by the Federal Aviation Administration.

(b) The contractor shall maintain and furnish evidence of the following insurance, with the stated minimum limits:

(1) Worker's Compensation and Employer's Liability. The contractor shall comply with applicable Federal and State workers' compensation and occupational disease statutes. The contractor shall maintain employer's liability coverage of at least $100,000, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.

(2) General Liability. The contractor shall maintain bodily injury general liability insurance written on a comprehensive form of policy of at least $100,000* per person and $500,000* per occurrence. Property damage limits, if any, will be set forth elsewhere in the "Schedule."

(3) Automobile Liability. If automobiles will be used in connection with performance of this contract, the contractor shall maintain automobile liability insurance written on a comprehensive form of policy with coverage of at least $200,000* per person and $500,000* per occurrence for bodily injury and $20,000* per occurrence for property damage.

(4) Aircraft Liability. If aircraft will be used in connection with performance of this contract, the contractor shall maintain aircraft public and passenger liability insurance with coverage of at least $200,000* per person and $500,000* per occurrence for bodily injury other than passenger liability, and $200,000* per occurrence for property damage. Coverage for passenger liability bodily injury shall be at least $200,000* multiplied by the number of seats or passengers, whichever is greater. N/A

(5) Watercraft Liability When watercraft will be used in connection with performing the contract, the contractor shall provide watercraft liability insurance. Limits shall be at least $1,000,000* per occurrence. The policy shall include coverage for owned, non-owned and hired watercraft. N/A

(6) Environmental Impairment Liability. When the contract may involve hazardous wastes, the contractor shall provide environmental impairment liability insurance with coverage of at least $1,000,000* bodily injury per occurrence and $1,000,000* property damage per occurrence. Such insurance shall include coverage for the clean up, removal, storage, disposal, transportation, and use of pollutants.

(7) Medical Malpractice. When the contract will involve health care services, the contractor shall maintain medical malpractice liability insurance with coverage of at least $500,000* per occurrence. N/A

(c) Each policy shall include substantially the following provision:

"It is a condition of this policy that the company furnish written notice to the U.S. Federal Aviation Administration 30 days in advance of the effective date of any reduction in or cancellation of this policy."

(d) The contractor shall furnish a certificate of insurance or, if required by the Contracting Officer, true copies of liability policies and manually countersigned endorsements of any changes, including the FAA's contract number to ensure proper filing of documents. Insurance shall be effective, and evidence of acceptable insurance furnished, before beginning performance under this contract. Evidence of renewal shall be furnished not later than five days before a policy expires.

(e) The maintenance of insurance coverage as required by this clause is a continuing obligation, and the lapse or termination of insurance coverage without replacement coverage being obtained will be grounds for termination for default.

*Unless modified in the "Schedule"

(End of clause)

3.6.2-14 EMPLOYMENT REPORTS ON VETERANS (JAN 2011)

(a) Unless the contractor is a State or local government agency, the contractor must report at least annually, as required by the Secretary of Labor, on:

(1) The total number of employees in the contractor's workforce, by job category and hiring location, who are disabled veterans, other protected veterans, Armed Forces service medal veterans, and recently separated veterans,

(2) The total number of new employees hired during the period covered by the report, and of the total, the number of disabled veterans, other protected veterans, Armed Forces service medal veterans, and recently separated veterans;

and

(3) The maximum number and minimum number of employees of the Contractor or subcontractor at each hiring location during the period covered by the report.

(b) The above items must be reported by completing the form titled 'Federal Contractor Veterans' Employment Report VETS-100A.'

(c) Reports shall be submitted no later than September 30 of each year.

(d) The employment activity report required by paragraph (a)(2) of this clause must reflect total hires during the most recent 12-month period as of the ending date selected for the employment profile report required by paragraph (a)(1) of this clause. Contractors may select an ending date: (1) As of the end of any pay period during the period January through March 1st of the year the report is due, or (2) as of December 31, if the contractor has previous written approval from the Equal Employment Opportunity Commission to do so for purposes of submitting the Employer Information Report EEO-1 (Standard Form 100).

(e) The count of veterans reported according to paragraph (a) of this clause must be based on data known to the contractor when completing the VETS-100A. .The Contractor's knowledge of veterans status may be obtained in a variety of ways, including an invitation to applicants to self-identify (in accordance with 41 CFR 60-300.42), voluntary self-disclosure by employees, or actual knowledge of veteran status by the contractor. This paragraph does not relieve the employer of liability for a determination under 38 U.S.C. 4212.

(f) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order of $100,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor.

(End of clause)

3.6.2-24 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (OCT 2010)

(a) Definitions.

(1) "Employer identification number," as used in this clause, means the last four digits of the Federal Social Security number used on the employer's quarterly federal tax return, U.S. Treasury Department Form 941.

(2) "Minority," as used in this clause, means

(i) Black (all persons having origins in any of the black African racial groups not of Hispanic origin);

(ii) Hispanic (all persons of Mexican, Puerto Rican, Cuban, Central or South American, or other Spanish culture or origin, regardless of race);

(iii) Asian and Pacific Islander (all persons having origins in any of the original peoples of the Far East, Southeast Asia, the Indian Subcontinent, or the Pacific Islands); and

(iv) American Indian or Alaskan Native (all persons having origins in any of the original peoples of North America and maintaining identifiable tribal affiliations through membership and participation or community identification).

(b) If the Contractor, or a subcontractor at any tier, subcontracts a portion of the work involving any construction trade, each such subcontract in excess of $10,000 shall include this clause, including the goals for minority and female participation stated herein.

(c) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate work force in each trade on all construction work in the covered area, are as follows:

Goals for minority participation: .7% Goals for female participation: 6.9%

Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Office of Federal Contract Compliance Programs (OFCCP) area office within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this screening information request. The notification shall list the:

(1) Name, address, and telephone number of the subcontractor,

(2) Employer identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) The Contractor shall implement the affirmative action procedures in subparagraphs (f)(1) through (7) of this clause. The goals stated in this contract are expressed as percentages of the total hours of employment and training of minority and female utilization that the Contractor should reasonably be able to achieve in each construction trade in which it has employees in the covered area. If the contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for the geographical area where that work is actually performed. The Contractor is expected to make substantially uniform progress toward its goals in each craft.

(f) The contractor shall take affirmative action steps at least as extensive as the following:

(1) Ensure a working environment free of harassment, intimidation, and coercion at all sites, and in all facilities where the Contractor's employees are assigned to work. The Contractor, if possible, will assign two or more women to each construction project. The Contractor shall ensure foremen, superintendents, and other on-site supervisory personnel are aware of and carry out the Contractor's obligation to maintain such a working environment, with specific attention to minority or female individuals working at these sites or facilities.

(2) Immediately notify the OFCCP area office when the union or unions, with which the Contractor has a collective bargaining agreement, has not referred back to the Contractor a minority or woman sent by the Contractor, or when the Contractor has other information that the union referral process has impeded the Contractor's efforts to meet its obligations.

(3) Develop on-the-job training opportunities and/or participate in training programs for the area that expressly include minorities and women, including upgrading programs and apprenticeship and trainee programs relevant to the Contractor's employment needs, especially those programs funded or approved by the Department of Labor. The Contractor shall provide notice of these programs to the sources compiled under subparagraph (f)(2) above.

(4) Review, at least annually, the Contractor's equal employment policy and affirmative action obligations with all employees having responsibility for hiring, assignment, layoff, termination, or other employment decisions. Conduct reviews of this policy with all on-site supervision, personnel prior to initiation of construction work at a job site. A written record shall be made and maintained identifying the time and place of these meetings, persons attending, subject matter discussed, and disposition of the subject matter.

(5) Disseminate the Contractor's equal employment policy externally by including it in any advertising in the news media, specifically including minority and female news media. Provide written notification to, and discuss this policy with, other Contractors and subcontractors with which the Contractor does or anticipates doing business.

(6) Conduct, at least annually, an inventory and evaluation at least of all minority and female personnel for promotional opportunities. Encourage these employees to seek or to prepare for, through appropriate training, etc., opportunities for promotion.

(7) Maintain a record of solicitations for subcontracts for minority and female construction contractors and suppliers, including circulation of solicitations to minority and -female contractor associations and other business associations.

(g) The Contractor is encouraged to participate in voluntary associations that may assist in fulfilling one or more of the affirmative action obligations contained in subparagraphs (f)(1) through (7). The efforts of a contractor association, joint contractor-union, contractor-community, or similar group of which the contractor is a member and participant, may be useful in achieving one or more of its obligations under subparagraphs (f)(1) through (7).

(h) A single goal for minorities and a separate single goal for women shall be established. The Contractor is required to provide equal employment opportunity and to take affirmative action for all minority groups, both male and female, and all women, both minority and non-minority. Consequently, the Contractor may be in violation of Executive Order 11246, as amended, if a particular group is employed in a substantially disparate manner.

(i) The contractor shall not use goals or affirmative action standards to discriminate against any person because of race, color, religion, sex, or national origin.

(j) The Contractor shall not enter into any subcontract with any person or firm debarred from Government contracts under Executive Order 11246, as amended.

(k) The Contractor shall carry out such sanctions and penalties for violation of this clause and of the Nondiscrimination and Affirmative Action clause, including suspension, termination, and cancellation of existing subcontracts, as may be imposed or ordered under Executive Order 11246, as amended, and its implementing regulations, by the OFCCP. Any failure to carry out these sanctions and penalties as ordered shall be a violation of this clause and Executive Order 11246, as amended.

(l) Nothing contained herein shall be construed as a limitation upon the application of other laws that establish different standards of compliance.

(End of clause)

3.6.3-12 ASBESTOS – FREE CONSTRUCTION (April 2017)

(a) In performing this contract, the Contractor must not use asbestos or asbestos-containing building materials during construction, renovation, and/or modernization of this facility.

(b) The Contractor must provide to the Contracting Officer (CO) a signed statement 10 days indicating that no asbestos or asbestos-containing building materials were used during construction, renovation, and/or modernization of this facility. The Contractor's certification under this clause is considered to be a material requirement of the contract and the FAA may withhold payment pending submittal and receipt of an acceptable certification.

(c) The FAA retains the right to conduct sampling of contractor building materials used during construction, renovation, and/or modernization of this facility to verify that they are asbestos-free. If asbestos-containing material is found, the Contractor must bear the expense of the sampling conducted by the FAA, remove and replace the asbestos-containing material and decontaminate the site of asbestos contamination caused by the Contractor at no additional cost to the Government. In addition, the Contractor must bear the expense of all testing (bulk sampling and air sampling conducted by the contactor and the FAA) to determine that the asbestos removal and site decontamination are satisfactorily completed. The Contractor must follow all applicable federal, state, and local asbestos regulatory requirements as well as applicable FAA Orders with respect to asbestos abatement when the Contractor is required to remove asbestos materials they have installed.

3.6.3-22 CONSTRUCTION WASTE MANAGEMENT (April 2017)

(a) In performance of this contract, the Contractor must establish a program to minimize waste generation, as well as recycle, reuse, and salvage construction and demolition (C&D) debris generated to the maximum extent possible.

The Contractor must divert at least 50 percent weight of the total non-hazardous solid waste generated by the work from landfills and incinerators. Before commencing work, the Contractor must submit a Waste Management Plan to the Contracting Officer within 15 days after contract award prior to the start of construction activities. This plan must address the following:

(1) General: Provide an overall strategy for managing C&D debris associated with the project.

(2) Waste Identification: Indicate anticipated types and quantities by weight of demolition, site-clearing and construction waste generated by the Project. Include estimated quantities by weight and assumptions for estimates.

A site assessment may be necessary to estimate the types of materials that will be generated during construction and/or demolition. If a site visit is needed, the Contractor must notify the FAA of this as soon as possible, with the FAA arranging in turn for the contractor site visit to take place as soon as possible.

(3) Waste Reduction Work Plan: List each type of waste and whether it will be salvaged, recycled, or disposed of in landfill or incinerator. Include points of waste generation, estimated total weight of each type of waste, final disposition for each waste type, and handling and transportation procedures.

(4) Salvaged Materials: For each type of material that is salvaged or recycled, describe the type of material, source, estimated quantity, and receiving entity. Include names, addresses, and telephone numbers for the receiving individuals and/or organizations.

(5) Disposed Materials: Indicate how and where materials will be disposed of. Include name, address, and telephone number of each landfill and incinerator facility.

(6) Handling and Transportation Procedures: Include method that will be used for separating recyclable waste including sizes of containers, container labeling, and designated location on Project site where materials separation will be located.

(b) This plan must be found acceptable by the FAA Contracting Officer's Representative (COR) or the COR's designated representative prior to the Contractor receiving a Notice-to-Proceed.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .