AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return

ORDER NO. IN ITEM 10A.

1 1

000002 05/03/2017

FEDERAL AVIATION ADMINISTRATION

WESTERN SERVICE AREA

1601 LIND AVE SW

AAQ-530-ANM ACQUISITION GROUP

AAQ530ANM-AFN

RENTON WA 98057

x separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x

DTFASA-17-R-00370

1 copies to the issuing office.

03/21/2017

(x)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Cynthia A. Tjelde

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SEE ATTACHED LIST OF QUESTIONS RECEIVED AND APPLICABLE ANSWERS.

DEADLINE DATE IS BEING EXTENDED ONE WEEK - OFFERS DUE BY 5:00 PM WEDNESDAY, MAY 10, 2017.

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ZOA ARTCC RESTROOM RFI’s

1. SpecSection074570–CementitiousPanels–Thissectionisforexteriorcementboard
sidingnotforcementboardunderceramictile.Ican’tfindwherethiswouldgoonthe
plansbutdidseethatyouwantcementboardundertheceramictile.Shouldthissectionbe

deleted?

Response:PerDrawing–A177Note1,“Install5‐1/2”MetalStudstotheCMUwallat
16”oncenter,5/8”thickHardieBackerboards……..
Note:ThisisforInteriorUseforuseonthewallsoftheareasidentifiedinthe
drawing.SinceHardiedoesnotmake5/8”,use7/16”HardieBackerboardsmounted
tothe5‐1/2”metalstuds.HardieBackercannotbesupportedwithalesserthickness
than20gaugemetalstuds.
2. Whatisthelengthoftheplankthatisrequiredandwhatwillitbesupportedon?Please
providedetailsonthisscope.
Response:Drawing–A177Notestates,“Installnewnon‐slipsteelplanksoverthe
ceilingsupportedbytheexistingconcretewalls.Approx.75linearfeet.Fieldverify
andcoordinatewiththeHangersandotherceilingitemsofthenewGWBceiling.
Submittalrequired.SeeSpecifications.SpecificationSection055300providesmore

information.

3. Pleaseclarifywhatflooringwillneedtobereplaced.Thereisaflooringspec,butthe
bathroomwillbeceramictile,correct?WhereistheVCTlocated?
Response:OnDrawing–A177itstates:
Note23–“InMensandWomensRestroominstallfloortileDaltite,P686,12”x24”.
Fieldtoberunningboardpattern.Grouttobedarkcolor.Matchcolorinexisting
restroom1024.Submittalrequiredforapproval.Note24–“InJanitor’sRoominstall
newvinyltile.–VCTwith4”covebase.

4. Please confirm that on the lighting Fixture Schedule the A and C fixtures have been reversed.

Response: Yes, A and C are reversed.

5. All the walls are existing block. All conduit and boxes will be surface mounted?

Response:ConduitsandJ‐BoxfortheHandicapDoorOpenerwillneedtobesurface‐
mountedasshownontheCMUwall.

6. Can we do our own acceptance testing?

Response:Theacceptancetestingwillbeajointeffortbetweenthecontractorand
theFAA.AcceptancetestingmustbeapprovedbytheFAAandinparticulartheZOA
facility.IfyouareaskingpertainingtoACMtherewillbeanindependentIH
contractorhiredbytheFAAtoverifyclearances.
7. NotsureifbecausefederalbutthestalllayoutsdonotmeetCAADAlegal.ADAstallisnot
deepenoughtoswingdoorin.Youwouldneed56”+34”+thicknessofmaterialtoswing
thedoorinwithawall‐mountedtoilet,and3”morethanthatiffloormountedtoilet–for
stalldepth.Youcouldswingthedooroutnormally,butyouwouldn’thavetheclearances
neededforthateither.Roomistoosmallandtryingtogettoomanyfixturesinthere.
Architectshouldbeabletolayitoutwithsomechanges…
Response:Becausethisisafederalfacility,weareboundbytheAmericanBarriers
ActandtheADA,asspecifiedinthecontract.TheAmericanBarriersActstatesthat
thedesigncomplieswiththeprojectdesign.Detailedinthefollowingfigures:

8. The stalls are called out to be ceiling hung. There is nothing to hang them on is it ok to use floor mounted?

Response: Floor mounting of the stalls is acceptable.

9. Specsmentioncustomcoloronthepartitionspossibly.Thereareonlyacoupleofstalls
whichwillincreasethepricesignificantly.Canwedostandardcolors?

Response: Standard colors are acceptable, but must be approved by the facility as a submittal.

10. Shelvesmentionedforunderthemirrors/overthesinks–normallynotabletobemounted
thereandhavethesinkstilloperablewithADAcodesbeingmet.
Response:ThishasbeendonebeforewithABA/ADAcodesbeingmet.Submittal
requiredshowingexactplacementandclearances.Perexistinglayouttheshelfis
mountedtothebottomofthemirrors.Checkyourphotos.
DTFASA-17-R-00370 Amendment 2
Q and A