Part I. PROJECT INITIATION

Part II. PROJECT REVALIDATION

Part III. PROJECT APPROVAL

REGIONAL CAPITALIZATION TEAM (RCT) CHECKLIST

DELPHI Project No 1217SO0063 DELPHI Status: Approved Approp. Code: 12982A0170 RCT STATUS: FINAL

JCN: 1001936 BLI: 2A07A0 ProjCD: 25210502 Workplan ID: PM: Beasley, George

JCN DESC: LRR F&E FY17 - 1001936 PIT ARSR Elevator Modernization

LOCID: PIT CITY, ST: PITTSBURGH, PA FAC: ARSR

Companion JCN: None

Companion Project No: 1212SO0423

Project Type: Standard Budget

PA# DATED TOTAL FUNDS AUTHORIZED

2017-007036 01/17/17 325,000

This PA is for an Existing Project - If new assets are required, continue through approval process, Part III.

PROJECT SCOPE OF WORK

The existing freight elevator is over 48 years old. This provides funding to replace the existing elevator with a new elevator machine, hoist motor, deflector sheave, control system, elector system, drive system and governor at Pittsburgh, PA (PIT ARSR). This is a LRR improvement project included on the NPCT determination list under CIP S040203. All charges should be expensed. 1217SO0063.00.WB40xx.xxxxx.SO8GESA000.DD-MMM-YYYY.12982A0170.2A07A0

� Equipment is not Washington Funded � NPCT determination - Expensed � Does not meet or exceed the Capitalization Threshold of $100,000

FSEP Verification: Yes New Facility: No

FAC Contraction (Facility Type in FSEP): ARSR Existing Facility: Yes

FAC TYPE (Facility Code FSEP): SB00 Temporary Facility: No

COST CENTER CODE: EA84CB0000

GSA ADDRESS: 2431

CONG. DISTRICT: 20

ASSET TASK ASSET NAME WBS NAME WBS DESCRIPTION

00 Expense WB4020 Engineering

00 Expense WB4050 Construction

00 Expense WB4070 JAI/Comm/Closeout

RCT MEETING PARTICIPANTS

LEAD ENGINEER Signature: LAU, DAVID Date: 01/18/17

NPI COORDINATOR Signature: Date: 01/18/17

PROGRAMS MANAGER Signature: BEASLEY, GEORGE Date: 01/18/17

PROGRAM ANALYST Signature: MILLINGS, MICHELLE Date: 01/18/17

LOGISTICS Signature: COOMBS, PHYLLIS Date: 01/19/17

Page 1 of 1RCT Checklist - v2.3.2

1/19/2017http://saapps.faa.gov/WebApps/RctChecklistORA/RecordView.cfm?DELPHI_PROJNO=...

david lau Highlight david lau Highlight

File details come from the government source that posted it. Updated .