2017-04-14_CLT FOTS DRAWINGS_Issued for Bid.pdf
PDF 9 MB Posted
- Solicitation number
- DTFASA-17-R-00320
About this file
2017-04-14_CLT FOTS DRAWINGS_Issued for Bid (pdf)
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FO
TNEMT
R A
P E
D
N
OI
T
AT
RO
PSNART
U N
IT
E
D
STATES OF
AM
ER
I C A
COVER SHEET
739.85GPS 73
748.47GPS 74
750.33GPS 75
761.36GPS 76
736.48PHPED736.79FOHH
1002736.58
1003736.58MOFO B1004736.81MOFO E1005736.52MOFO B
1006736.81MOFO
1007736.89MOFO 1008737.13MOFO 1009737.08MOFO
737.33MOFO
736.63MOFO
737.78MOFO
738.49MOFO
738.97MOFO
739.51MOFO
740.14MOFO
740.54MOFO 740.49MOFO
740.69MOFO
1020740.10MOFO
740.06MOFO 1022740.87MOFO
1023741.54MOFO
1024741.98MOFO
1025742.47MOFO 1026743.47MOFO 1027745.10MOFO 1028744.96MOFO 1029744.60MOFO 1030746.15MOFO 747.64MOFO 1032748.33MOFO 1033748.00MOFO 1034748.73MOFO 1035750.70MOFO 1036752.99MOFO 1037754.24MOFO 1038755.80MOFO 1039757.20MOFO
1040757.54MOFO758.11MOFO
1042758.91MOFO
1043759.89MOFO E
1044760.01PHPED
1045764.61MOFO B
1046764.64CONTS
1047765.66MOFO
1048748.08FOHH
1049749.89EC B
1050749.87
749.88EC CLS
1052749.88MOFO B
1053747.99MOFO
1054747.10MOFO
1055747.09MOFO 1056747.09PHPED
1057748.01MOFO
1058747.82MOFO
1059746.92MOFO
1060746.87MOFO
746.54MOFO1062746.72MOFO
1063747.74MOFO1064747.57MOFO1065747.56MOFO
1066747.98MOFO
1067749.15MOFO
1068750.17MOFO
1069750.17MOFO
1070750.78MOFO
750.58MOFO1072751.33MOFO1073750.62MOFO1074749.89MOFO
1075750.21MOFO
1076750.68MOFO
1077751.08MOFO
1078751.65MOFO
1079752.14MOFO
1080753.13MOFO
754.57MOFO
1082755.01MOFO
1083754.79MOFO
1084754.98MOFO
1085755.40MOFO
1086754.61MOFO
1087754.92MOFO
1088758.92MOFO
762.13MOFO
759.33MOFO E CONNECT
764.46MOFO1
761.48MOFO1760.81MOFO1 759.77MOFO1
756.50MOFO1
755.06MOFO1
751.35MOFO1
750.08MOFO1
1122748.61MOFO1
1123747.24MOFO1
1124745.00MOFO1
1125744.24MOFO1
1126744.30MOFO1
1127744.35MOFO11128744.40MOFO1 1129744.34MOFO1 744.09MOFO1
743.67MOFO1 E
1132743.69CONTS
1133767.11PHPED
1134767.11FOHH
1135767.11MOFO2 B
1136767.02MOFO2
1137766.82MOFO2
1138766.59MOFO2
1139766.37MOFO2
766.26MOFO2
766.15MOFO2
1142766.03MOFO2
1143765.32MOFO2
1144764.90MOFO2
1145764.82MOFO2
1146764.68MOFO2
1147764.35MOFO2
2000764.55
2001762.02
737.16
TH6
737.41
TH5 2010
738.52
TH4
N o rf o lk S o u th e rn
R a il ro a d
Norfolk-Southern Railroad
Norfolk -Sou thern Rail road
Norf olk -S ou the rn
Ra ilro ad
INTERMODAL SITE
D r
O ak
MORRI
S
FI
ELD
DRI
VE
Larkmoore C t
S iru s L a n e
BYRUM DR
T im b e rl e y P l
B e lle -O a k s D r
Ce ss na R d C o m m a n d e r R d
Pipe r Ln
Oak Lake
Bv
Horseshoe Ln
B e e c h c ra ft
T U
N N
E L
EXPRESS DR.
OLD DOWD ROAD
B
IL
L Y G
R A
H A
M P
A R
K W
A Y
H A
R L E
E A
V E
S T E
E L E C
R E
E K R
O A
D
Sylvan Way
BYRUM D
RIV
E
P in ey T op D riv e
OLD DOWD RD.
L
IT
T L E R
O C
K R
D
Dixie River Rd
Ir is h L n
W A
L L
A C
E N
E E
L R
O A
D
P A
R K
W A
Y
B
IL
L Y
G R
A H
A M
Y o rkm o n t R d
Y O
R K
M O
N T R
D
MINUTEMAN W
AY
B O
Y E R S
T
C h u rc h R d
M o u n t O liv e
WES
T B
LVD.
WEST BLVD.
R E
N T
A L C
A R R
O A
D
HANGAR ROAD
T R
A
IN
IN
G L
A N
E
Y O
R K
M O
N T R
D
H A
R L E
E A
V E
J O
S H
B I
R M I
N G
H
A M
P
A R
K W
A Y
O L D D
O W
D R
D
O L D D
O W
D R
O A
D
B
IL
L Y G
R A
H A
M P
A R
K W
A Y
BYRUM DRIVE
R O
A D
W E S T B
L V
D
WES
T B
LVD.
R d
P A
R K
W A
Y
B
IL
L Y
G R
A H
A M
OLD DOW
D ROAD
W A
L L
A C
E N
E E
L R
O A
D
R o c k w o o d R d
Wilkinson Blvd.
W ilkinson Blvd.
A
IR
R
A M
P R
O A
D
A R
F F R
O A
D
A
IR
P O
R T O
V E
R L
O O
K R
D
8" DIP
8" VCP
ME
TA
L
24" INV OUT 690.4924" INV IN 690.79
VC
P
10" VCP
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
ME
TA
L
OR
IGI
N
UN
KN
OW
N 8" S
AN
ITA
RY
S
EW
ER
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SANITARY SEWER MANHOLE
24" FORCE MAIN
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
24" PAW CREEK SAN FORCE MAIN
APPROXIMATE LOCATION
FM
FM
FM
FM
FM
FM
FM
FM
24" DIP
S
.0
"W
S
.9
E .0
.0
S
.3
E
S
.8
E .0
S
.0
E .0
.0
S
.5
E .0
+0
+0
1+
0+
1+
0+
1+
0+
1+
0+
1+
0+
0+
I n v
F E
S
.5
T e r m in u s
U n k n o w n
S-11
VICINITY MAP
BILLY GRAHAM PKWY
HWY
ANDREW JACKSON
I-485
PROJECT
GENERAL
C000
FAA ATO
APRIL 14, 2017
ISSUED FOR BID
CHARLOTTE ATCT FIBER OPTIC TRANSMISSION SYSTEM (FOTS)
Suite 500
Tel. No (678)808-8800
Atlanta, Georgia 30309
Fax. (678)808-8400
DISCIPLINE: CIVIL
CLT-D-FOTS-
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
03/28/2017
COURTNEY NOLAN WILLIAM PRICE
ENGINEERING CENTER
ATLANTA TERMINAL
ISSUED FOR BID
JAL
AAB
JAL
04/14/2017
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
DATE
APPROVED
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES. PAGE OF
CHARLOTTE CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT (CLT) NC
1103700
1103700
EASTERN SERVICE AREA ATLANTA, GEORGIA
P
P r o j e c t s
L e g a c y
T U
C
N
D r iv e c a d f il e s
C h a r lo t t e
T
D s ig n
D r a w in g s
M ic r o s t a t io n il e s
F O
T S F ib r
O p t ic s u g u s t
:3
:5
P
M P lo t t d
B y a d a m .b o r s c h
NAME : Jeffrey A. Lowe
REG. #: 27078
1360 Peachtree St NE
CHARLOTTE ATCT FIBER OPTICS TRANSMISSION SYSTEM (FOTS)
C100
CIVIL NOTES (1 OF 1)
CIVIL
AIRFIELD NOTES
SCOPE OF WORK
DRAWING INDEX
ABBREVIATIONS
CONSTRUCTION NOTES
SUPPLIES REQUIRED TO COMPLETE THE WORK.
5. CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, TRANSPORTATION, AND
2. EACH CABLE SHALL BE TAGGED IN ACCORDANCE WITH FAA-C-1391b.
BY THE NATIONAL ELECTRICAL CODE OR BY CABLE MANUFACTURER.
1. THE BEND RADIUS OF THE VARIOUS CABLES SHALL NOT BE LESS THAN THE MINIMUM RADIUS SPECIFIED
CLOSURES AND SHALL BE CARRIED OUT DURING NIGHT TIME HOURS 10:00PM TO 6:00AM NEXT MORNING.
ALL DUCTBANK CONSTRUCTION/CABLE PULLING WITHIN SAFETY AREAS WILL REQUIRE TAXIWAY/RUNWAY
IMMEDIATE VICINITY OF EXISTING FAA FACILITIES WILL BE CONTINUOUSLY MONITORED BY THE COR.
APPROVED IN ADVANCE BY AIRPORT OPERATIONS AND THE ATCT. ALL WORK INSIDE AND IN THE
24. CONSTRUCTION ACTIVITIES WITHIN BOTH RSA/ROFA AND TSA/TOFA MUST BE CLOSELY COORDINATED AND
ALSO RESPONSIBLE FOR PENETRATING EXISTING SHELTERS. ALL PENETRATIONS TO BE SEALED.
OF ENCASED DUCT, PLACEMENT OF ELECTRONIC MARKERS, AND CONCRETE MARKERS. CONTRACTOR IS
4. CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF MANHOLES/HANDHOLES, TRENCHING, PLACEMENT
MOUNTED ON A SADDLE RACK LOOSELY TIED.
6. COIL 30 FEET OF CABLE IN EACH MANHOLE AND HANDHOLE. COIL TO BE THREE FEET IN DIAMETER
LIDS, CABLE RACKS, PULLING IRONS AND GROUNDING SYSTEM. SEE DRAWING C955.
7. MANHOLES AND HANDHOLES SHALL BE PRE-CAST CONCRETE WITH CAST IRON COVERS, RINGS, COLLARS, FOTS NOTES
TSA TAXIWAY SAFETY AREA
TOFA TAXIWAY OBJECT FREE AREA
RWSL RUNWAY STATUS LIGHTS
RVR RUNWAY VISUAL RANGE
RTR REMOTE TRANSMITTER RECEIVER
RSA RUNWAY SAFETY AREA
RUNWAY OBJECT FREE AREAROFA
RGSC RIGID GALVANIZED STEEL CONDUIT
R/W RUNWAY
OTDR OPTICAL TIME DOMAIN REFLECTOMETER
MH MANHOLE
LWAS LOW-LEVEL WIND SHEAR ALERT SYSTEM
LOC LOCALIZER
ILS INSTRUMENT LANDING SYSTEM
GS GLIDE SLOPE
GRS GALVANIZED RIGID STEEL
GFM GOVERNMENT-FURNISHED MATERIAL
FOTS FIBER OPTIC TRANSMISSION SYSTEM
FO FIBER OPTIC
EMT ELECTRICAL METAL TUBING
COR CONTRACTING OFFICER'S REPRESENTATIVE
ATCT AIR TRAFFIC CONTROL TOWER
ASR AIRPORT SURVEILLANCE RADAR
ASDE AIRPORT SURFACE DETECTION RADAR EQUIPMENT
ARP AIRPORT REFERENCE POINT
AOA AIRPORT OPERATIONS AREA
ALSF APPROACH LIGHTING SYSTEM WITH SEQUENCED FLASHING LIGHTS
ALS APROACH LIGHTING SYSTEM
BETWEEN EXISTING FAA MANHOLES AND AIRPORT MANHOLES.
2. THIS PROJECT INVOLVES USING EXISTING DUCTBANK AS WELL AS INSTALLING NEW DUCTBANK
FIELD CABLES TO THE NEW AIR TRAFFIC CONTROL TOWER IN CHARLOTTE, NC.
1. THE INTENT OF THIS PROJECT IS TO INSTALL A SYSTEM OF DUCTBANKS THAT WILL CONNECT NEW
OF THE 2 CONDUITS SHALL REQUIRE INNERDUCTS.
INNERDUCTS AS SHOWN ON SHEET C961. WHERE 2 WAY CONDUIT DUCTBANKS ARE INSTALLED, ONLY 1
4. WHERE NEW FIBER OPTIC CABLE IN CONDUIT IS SHOWN, THE CONTRACTOR SHALL INSTALL (3) 1.25"
8. DUCT BANK INSTALLATION TOLERANCES SHALL INCLUDE THE FOLLOWING:
A. DUCTBANKS SHALL BE INSTALLED IN STRAIGHT LINE SEGMENTS
B. CONDUIT JOINTS SHALL BE GLUED JOINTS
C. DUCTBANKS SHALL NOT TURN 90 DEGREES OR GREATER WITHOUT THE INSTALLATION OF A MANHOLE.
D. MANHOLES AND DUCTBANKS SHALL BE INSTALLED AT THE SAME TIME.
5. FOTS SUBMITTALS ARE REQUIRED FOR THE FOLLOWING ITEMS:
A. SCHEDULE: INCLUDING THE CONSTRUCTION SEQUENCE IN A SYSTEMATIC ORDER
B. BORING LOCATIONS
C. MANHOLES, HANDHOLES, AND CONFINED SPACE PROCEDURES
D. DUCTBANK, SPACERS, AND DETECTABLE TAPE
E. CABLES AND INNERDUCT
9. CONTRACTOR SHALL COORDINATE FINAL INTERIOR BUILDING EQUIPMENT LOCATIONS WITH RE.
OBTAINING FAA APPROVAL PRIOR TO CONTRACTOR'S USE OF ANY ELEVATED EQUIPMENT
THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING ALL NECESSARY FORMS TO THE CITY AND
27. FAA REGULATION FOR USE OF CRANES AND OTHER ELEVATED EQUIPMENT WILL BE STRICTLY ENFORCED.
FOR STAGING, STORAGE, CONCRETE BATCHING, AND PORTABLE TOILETS.
26. CONTRACTOR MAY USE AREA SPECIFIED BY COR AT THE PRE-CONSTRUCTION CONFERENCE
MUST BE FILLED-IN, SANDBAGGED, STEEL-PLATED, OR SOME OTHER ACCEPTABLE METHOD.
NOT BE ALLOWED ONCE THE TAXIWAY/RUNWAY IS RE-OPENED; EXCAVATIONS WITH UNFINISHED WORK
SATISFACTION OF AIRPORT OPERATIONS AND THE COR. OPEN EXCAVATIONS INSIDE SAFETY AREAS WILL
SHALL BE BARRICADED AND MARKED DURING THE DAY AND FLASHING RED LIGHTS AT NIGHT TO THE
25. TAXIWAY CLOSURES, OPEN EXCAVATIONS, EQUIPMENT AND STRUCTURES LEFT UNATTENDED ON THE AOA
WITH DUCT SEAL OR POLYSTYRENE FOAM WITH BACKER MATERIAL.
SHARED MANHOLES. PROVIDE PULL STRINGS IN ALL SPARE DUCTS AND SEAL ALL DUCT OPENINGS
23. MAINTAIN SEPARATION BETWEEN NEW FO CABLES AND ANY EXISTING COPPER CABLES INSIDE EXISTING
PROTECT ALL PRIOR TO TRENCHING.
MARKED CABLES, UTILITIES, ETC. AND IN THOSE AREAS NOTED TO POSITIVELY IDENTIFY AND
APPROXIMATE AND MUST BE FIELD VERIFIED. CONTRACTOR SHALL HAND-DIG WITHIN 5' OF ALL
AND FLAG THEIR EXISTING CABLES, UTILITIES, ETC. LOCATIONS SHOWN ON DRAWINGS ARE
22. CONTRACTOR SHALL NOTIFY THE CITY, COUNTY DEPARTMENT OF AIRPORTS AND FAA AFSSC TO MARK
REQUIRED.
21. DE-WATERING OF MANHOLES SHOULD BE ANTICIPATED, WITH PROPER REMOVAL OF WASTEWATER WHERE
GUARANTEED.
BECOMES EFFECTIVE. APPROVAL OF ANY PARTICULAR SCHEDULE OR SCHEDULE CHANGE IS NOT
SCHEDULE CHANGE SHALL BE SUBMITTED AT LEAST SEVENTY-TWO (72) HOURS BEFORE THE SCHEDULE
WITH AND REQUIRE THE APPROVAL OF THE FAA COR. EACH WORK SCHEDULE OR PROPOSED
20. ALL WORK SCHEDULES INCLUDING OVERTIME, SHIFT WORK, AND HOLIDAY WORK SHALL BE COORDINATED
SAFETY NOTES
ENGINEER AND/OR AIRPORT OPERATIONS.
15. ALL COMMUNICATION WITH THE AIR TRAFFIC CONTROL TOWER OR OTHER ELEMENTS OF THE AIRPORT SHALL BE THROUGH THE RESIDENT
TO THE WORK SITE MAY BE APPROVED BY THE RE AND/OR AIRPORT OPERATIONS.
14. TRUCK HAUL ROUTES ON THE AIRFIELD SHALL BE DELINEATED WITH LIGHTED BARRICADES. OTHER MEANS TO CLEARLY MARK THE ROUTES
TO ADDRESS CASES OF ABNORMAL FAILURES OR UNEXPECTED DISASTERS.
13. THE CONTRACTOR SHALL PREPARE A SAFETY PLAN SPECIFIC TO NIGHTTIME CONSTRUCTION OPERATIONS, AS WELL AS A CONTINGENCY PLAN
ORDER WILL BE ISSUED DUE TO THESE DELAYS. HOWEVER, THERE WILL BE NO ADJUSTMENTS IN CONTRACT PRICE DUE TO THESE DELAYS.
THE SITE IN ORDER TO ENABLE AIRCRAFT OPERATIONS. NECESSARY EXTENSIONS IN CONTRACT TIME WILL BE GRANTED OR A STOP WORK
THE BEST INTEREST OF AIRPORT OPERATIONS OR SAFETY. THE CONTRACTOR MAY BE DIRECTED TO REMOVE EQUIPMENT AND/OR EVACUATE
12. CONSTRUCTION DURING THE PROJECT MAY BE HALTED AT ANY TIME BY RE AND/OR AIRPORT AUTHORITY IF IT IS DETERMINED TO BE IN
AIRPORT PAVEMENTS USING HOT-MIX ASPHALT" KBCIA GUIDELINES FOR AIRFIELD SAFETY DURING CONSTRUCTION.
USED ON AIRPORTS "150/5370-2C" OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION "150/5370-13" OFF PEAK CONSTRUCTION OF
MAINTENANCE ACTIVITIES "150/5200-18B" AIRPORT SAFETY-SELF INSPECTION "150/5210-5B" PAINTING, MARKING & LIGHTING OF VEHICLES
MATERIALS AND FAA ADVISORY CIRCULARS. FAA ORDER"SAFETY REQUIREMENT ON AIRPORTS DURING AGENCY FUNDED CONSTRUCTION AND
11. THE CONTRACTOR IS DIRECTED TO COMPLY WITH AND ACQUAINT HIS/HER EMPLOYEES WITH THE FOLLOWING SAFETY GUIDELINES, RELATED
ROUTE BY THE CONTRACTOR.
OR TAXIWAY THAT HAS BEEN CLOSED FOR WORK, ON OR ADJACENT THERETO, OR THAT HAS BEEN USED FOR A CROSSING POINT OR HAUL
10. THE RESIDENT ENGINEER WILL ARRANGE WITH AIRPORT OPERATIONS FOR INSPECTION PRIOR TO OPENING FOR AIRCRAFT USE ANY RUNWAY
AIRCRAFT MOVEMENT AREAS, THEY WILL BE REMOVED IMMEDIATELY AND/OR CONTINUOUSLY DURING CONSTRUCTION.
JET ENGINES SHALL NOT BE ALLOWED ON ACTIVE AIRCRAFT MOVEMENT AREAS. IF THESE MATERIALS ARE OBSERVED TO BE ON ACTIVE
9. DEBRIS, WASTE AND LOOSE MATERIAL CAPABLE OF CAUSING DAMAGE TO AIRCRAFT LANDING GEARS, PROPELLERS OR BEING INGESTED IN
BY APPROVED LIGHT UNITS DURING HOURS OF RESTRICTED VISIBILITY AND DARKNESS.
8. OPEN TRENCHES, EXCAVATIONS AND STOCKPILED MATERIAL LOCATED IN THE AOA SHALL BE PROMINENTLY MARKED WITH FLAGS AND LIGHTED
FROM MOVING ONTO THE AIRFIELD PAVEMENTS.
OBJECT FREE AREAS. IN ADDITION, STOCKPILED MATERIAL SHALL HAVE SILT FENCE LOCATED AROUND THE MATERIAL TO PREVENT FOD
CONDITIONS IN EXCESS OF TEN KNOTS. STOCKPILE HEIGHT SHALL BE LESS THAN 15 FEET, AND OUTSIDE THE RUNWAY AND TAXIWAY
7. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT MOVEMENT RESULTING FROM AIRCRAFT JET BLAST OR WIND
TAKEN AND THE PROCEDURE APPROVED BY THE RE AND/OR AIRPORT RESCUE AND FIRE FIGHTING (ARFF).
6. OPEN FLAME WELDING OR TORCH CUTTING OPERATIONS ARE PROHIBITED UNLESS ADEQUATE FIRE AND SAFETY PRECAUTIONS HAVE BEEN
TAXIWAY, UNLESS OTHERWISE APPROVED BY AIRPORT OPERATIONS. CLOSURE REQUIRES THE SAME PROVISIONS AS PARAGRAPH NO. 4 ABOVE.
EXCAVATIONS IN EXCESS OF THREE INCHES DEEP WITHIN THE ABOVE AREAS, WILL REQUIRE CLOSURE OF THE AFFECTED RUNWAY OR
5. ANY CONSTRUCTION ACTIVITY WITHIN 175 FEET OF AN ACTIVE RUNWAY EDGE OR 50 FEET FROM AN ACTIVE TAXIWAY EDGE OR OPEN
WITH AIRPORT ADMINISTRATION.
NOTICE (2 BUSINESS DAYS) REQUESTING CLOSING SHALL BE DIRECTED TO THE RESIDENT ENGINEER WHO WILL COORDINATE THE REQUEST
NECESSARY "NOTICES TO AIRMEN" (NOTAM) OR ADVISORIES TO AIRPORT SERVICES OR TENANTS. A MINIMUM OF 48 HOURS WRITTEN
4. NO RUNWAY, TAXIWAY, APRON OR AIRPORT ROADWAY SHALL BE CLOSED WITHOUT APPROVAL OF AIRPORT OPERATIONS. TO ENABLE
MONITOR. ALL AIRCRAFT TRAFFIC ON RUNWAYS, TAXIWAYS AND APRONS SHALL HAVE PRIORITY OVER CONTRACTOR'S TRAFFIC.
RADIO. EQUIPPED VEHICLES SHALL VERIFY WITH THE AIRPORT AUTHORITY THE GROUND CONTROL FREQUENCY AND CONTINUOUSLY
BE MARKED AND LIGHTED AS DESCRIBED IN PARAGRAPH NO. 2 ABOVE AND SHALL BE EQUIPPED WITH AN APPROVED AVIATION BAND
VEHICLE. ESCORT VEHICLES, OPERATORS, AND RADIO EQUIPMENT SHALL BE APPROVED BY THE AIRPORT. ESCORT VEHICLES SHALL
APRONS AND RUNWAY APPROACH AND PROTECTION ZONES SHALL DO SO UNDER THE DIRECT CONTROL OF A RADIO EQUIPPED ESCORT
3. ALL NON-RADIO EQUIPPED CONTRACTOR VEHICLES THAT ARE REQUIRED TO OPERATE ON OR ACROSS ACTIVE RUNWAYS; TAXIWAYS, MOUNTED ON TOP OF THE VEHICLE AND OF SUCH INTENSITY TO CONFORM TO LOCAL CODES FOR MAINTENANCE AND EMERGENCY VEHICLES.
IN THE ACTIVE AOA DURING THE HOURS OF DARKNESS SHALL BE EQUIPPED WITH A FLASHING AMBER (YELLOW) DOME LIGHT, THE CONTROL OF ONE CONTRACTOR MOBILE (TWO-WAY) RADIO OPERATOR ON THE JOB AT ALL TIMES. ANY VEHICLE OPERATING
OR LARGER ORANGE AND WHITE CHECKERBOARD FLAG. EACH CHECKERBOARD COLOR BEING 1-FOOT SQUARE AND ESCORTED UNDER
(AOA) SHALL DISPLAY IN FULL VIEW A FLASHING AMBER (YELLOW) DOME-TYPE LIGHT OR ABOVE THE VEHICLE A 3' X 3'
ALL CONTRACTOR VEHICLES THAT ARE AUTHORIZED TO OPERATE ON THE AIRPORT IN THE ACTIVE AIRCRAFT OPERATIONS AREA
2. ALL CONTRACTORS' DRIVERS ON THE AOA SHALL ATTEND AND PASS THE AIRPORT AUTHORITY DRIVER'S TRAINING PROGRAM.
ROUTINE AND EMERGENCY AIR TRAFFIC REQUIREMENTS AND GUIDELINES ON SAFETY AS SPECIFIED IN PARAGRAPH NO. 11 BELOW.
ARE INHERENT TO THIS ACTIVE AIRPORT AND SHALL CONDUCT THE CONSTRUCTION ACTIVITIES TO CONFORM TO ALL
1. THE CONTRACTOR SHALL ACQUAINT HIS SUPERVISORS AND EMPLOYEES OF THE AIRPORT ACTIVITY AND OPERATIONS THAT
PRYMIAN / DRAKA CABLE PART NUMBER F-DXPCB-12-ES-024-E1 OR FAA APPROVED EQUIVALENT.
PLANS. FIBER CABLE SHALL BE RESISTANT TO JET FUEL AND AIRCRAFT DE-ICING CHEMICALS. USE
7. INSTALL 24-STRAND, LOOSE TUBE, SINGLE MODE, OSP FIBER CABLE IN DUCTBANKS INDICATED IN
FAA-APPROVED CABINET EQUALS.
6-CONNECTOR PANELS, P/N CCH-CP06-19T FOR CORNING ENCLOSURES OR BE COMPATIBLE WITH THE
RACK-MOUNTED INSTALLATIONS. CONNECTOR PANELS USED IN THE CCH AND WCH UNITS SHALL BE ST, INSTALLATIONS AND CORNING CCH-04U-CLASSIC AND CSH-03U OR FAA-APPROVED EQUALS FOR
WCH-12P-CLASSIC TERMINATION CABINETS OR FAA-APPROVED EQUALS FOR WALL-MOUNTED
FACILITIY INTERIOR WALLS OR IN INTERIOR EQUIPMENT RACKS AS REQUIRED. USE CORNING
CONNECTORS. COMPLETED CABLES SHALL BE CONNECTED TO FIBER TERMINATION CABINETS MOUNTED ON
SHALL BE TERMINATED USING COLOR-CODED, FUSION-SPLICED PIGTAILS EQUIPPED WITH MALE, ST
9. CONTRACTOR SHALL TERMINATE ALL FIBERS IN EACH CABLE SEGMENT AT BOTH ENDS. EACH FIBER
SHALL HAVE BEEN CERTIFIED WITHIN THE PAST 12 MONTHS.
METERS SHALL BE USED BETWEEN THE OTDR AND THE FIBER UNDER TEST. ALL TEST EQUIPMENT USED
DIRECTION AND BIDIRECTIONALLY BY THE TEST INSTRUMENT. LAUNCH/TAIL CABLES OF AT LEAST 200
USED AS THE FINAL LOSS READING FOR EACH FIBER. THE OTDR READINGS SHALL BE AVERAGED IN EACH
BE DONE BIDIRECTIONALLY AT 1310 NM. THE HIGHEST OF THE BIDIRECTIONAL LS/PM READINGS SHALL BE
A. TESTS SHALL CONSIST OF OTDR AND LIGHT SOURCE/POWER METER (LS/PM) READINGS. BOTH TESTS SHALL dB/km.
MAXIMUM STAND-ALONE FUSION SPLICE LOSS (IF APPLICABLE) IS 0.1 dB. MAXIMUM FIBER LOSS IS 0.4
B. OTDR RESULTS LIMITS: MAXIMUM ALLOWABLE FUSION-SPLICED CONNECTOR PAIR READING IS 0.75 dB.
WHEN ADDED UP FOR EACH FIBER SEGMENT'S PARTICULAR CONFIGURATION.
C. LS/PM READING LIMITS: FAIL LIMIT FOR EACH FIBER SHALL BE BASED ON THE ABOVE LIMIT NUMBERS
SHALL BE REPAIRED AND RETESTED UNTIL THEY PASS.
D. ANY FIBERS THAT FAIL THE INDIVIDUAL CONNECTOR OR MANHOLE FUSION SPLICE LOSS (IF APPLICABLE)
EXPENSE.
BE ACCEPTED. CABLE SEGMENTS THAT HAVE THESE CONDITIONS SHALL BE REPLACED AT THE CONTRACTOR'S
E. NO BROKEN OR DEFECTIVE FIBERS OR FUSION-SPLICED CONNECTOR PIGTAILS IN A CABLE SEGMENT WILL
(3 COPIES, UNLESS IT IS AVAILABLE FOR FREE FROM THE VENDOR'S WEBSITE).
EACH). THE APPLICABLE OTDR READER SOFTWARE SHALL BE PROVIDED AT NO CHARGE TO THE GOVERNMENT
F. CONTRACTOR SHALL SUPPLY FIBER TEST RESULTS IN HARD COPY BINDERS AND SOFT COPIES (3 COPIES
ENCAPSULANT.
APPROVED EQUAL, SPLICE CLOSURE KITS WILL BE USED AND FILLED WITH RE-ENTERABLE
UNDERGROUND FIBER SPLICES ARE REFERENCED IN THIS SET OF PLANS, UCB2 CICADA, OR
COMPATIBLE WITH THE ENCLOSURES OR CLOSURES INTO WHICH THEY ARE INSTALLED. WHERE
HEAT-SHRINK FUSION AND STORED IN COMPATIBLE SPLICE TRAYS. SPLICE TRAYS SHALL BE
1. CONTRACTOR SHALL PERFORM ALL FIBER AND COPPER SPLICES. ALL FIBER SPLICES SHALL BE
PIGTAILS.
F. FIBER TERMINATION CABINETS AND ACCESSORIES, SPLICE CLOSURES, AND PRETERMINATED CONNECTOR
MAINTAINED IN THE FIELD WHEN FIBER CABLES ARE IN SEPARATE DUCTBANKS.
FIBER DUCTS ENTERING ANY BUILDING OR SHELTER FOR CRITICAL FACILITIES AND SHALL ALSO BE
6. 25 FEET SEPARATION, OR THE MAXIMUM POSSIBLE DISTANCE, SHALL BE MAINTAINED BETWEEN THE TWO
SOLID POLYOLEFIN INSULATION IN CONDUIT AS INDICATED ON PLANS.
8. WHERE NEW COPPER IS REFERENCED IN THIS PLAN SET, INSTALL 19 AWG GOPIC-F (RDUP PE-39), PANELS. TESTING REQUIREMENTS INCLUDE THE FOLLOWING:
THEY HAVE BEEN TERMINATED AND INSTALLED IN THE ENDPOINT FIBER TERMINATION CABINET
10. ALL FIBERS IN THE NEWLY INSTALLED FIBER SEGMENTS SHALL BE TESTED BY THE CONTRACTOR AFTER
WAY OR RUNWAY MAY BE CLOSED AT ANY ONE TIME.
DAYS PRIOR TO THE REQUESTED CLOSURE DATE. IF THE REQUEST IS APPROVED, ONLY ONE TAXI
THROUGH THE FAA COR. EACH REQUEST SHALL BE PRESENTED AT LEAST SEVEN (7)
19. CONTRACTOR SHALL REQUEST ANY NECESSARY RUNWAY OR TAXIWAY CLOSURE, IN WRITING, ASSIGNMENTS WITH AIR TRAFFIC. AIRPORT OPERATIONS MAY HAVE TO PROVIDE ESCORT.
CONTRACTOR TO FURNISH HIS OWN RADIOS. FAA COR TO COORDINATE FREQUENCY
18. RADIO COMMUNICATIONS ON FREQUENCIES ASSIGNED BY AIR TRAFFIC CONTROL ARE REQUIRED;
AREAS UNLESS DIRECTED OTHERWISE BY THE FAA COR.
17. CONTRACTOR SHALL REMAIN CLEAR OF ALL TAXIWAYS, RUNWAYS, AND AIRCRAFT MOVEMENT
OF EACH MANHOLE.
LATITUDE AND LONGITUDE TO SUBMETER ACCURACY. FAA COR APPROVAL IS REQUIRED PRIOR TO INSTALLATION
16. CONTRACTOR SHALL FIELD LOCATE THE FINAL POSITION OF EACH MANHOLE, BY AIRPORT GRID AND
15. MANHOLES/HANDHOLES REQUIRE USE OF CONFINED SPACE PROCEDURES FOR ENTRY.
SEED, FERTILIZER, WATER, LABOR AND EQUIPMENT NECESSARY TO ESTABLISH THE GROUND COVER.
COVER TO OR BETTER THAN CONDITIONS OF THE IMMEDIATE AREA. CONTRACTOR SHALL SUPPLY THE
14. UPON COMPLETION OF TRENCH BACKFILL OPERATIONS, CONTRACTOR SHALL RE-ESTABLISH GROUND
13. NOTE DELETED.
PRIOR TO INSTALLATION OF EACH BOX.
TASKS AND EXPERIENCE TO DO SO. FINAL LOCATION OF EACH BOX SHALL BE APPROVED BY THE FAA COR
JOURNEYMAN ELECTRICIAN SHALL BE ON SITE AND SHALL HAVE THE REQUIRED TOOLS TO PERFORM REQUIRED
12. WHILE EXCAVATING IN THE VICINITY OF CABLES, DUCTS, OR UNDERGROUND STRUCTURES, A
THE MARKER SHALL BE 3" MINIMUM FROM THE EDGE OF THE MARKER.
ORIENTATION IS TO BE IMPRESSED INTO THE SURFACE OF THE MARKER. ALL ITEMS IMPRESSED IN
TWO FEET SQUARE AND SIX INCHES THICK. LETTERING IDENTIFYING THE CABLE MARKED AND
EVERY 200 FEET ALONG TRENCHES AND AT EVERY CHANGE IN TRENCH DIRECTION. MARKERS ARE TO BE
11. CONCRETE CABLE MARKERS AS SPECIFIED IN FAA-C-1391b SHALL BE INSTALLED BY THE CONTRACTOR
UNDERGROUND STRUCTURES.
10. HAND DIGGING IS REQUIRED WITHIN FIVE FEET OF ALL KNOWN EXISTING UNDERGROUND CABLES AND
MAINTAINED BETWEEN THE TRENCHER AND ALL MARKED AND KNOWN CABLES.
9. IF A MACHINE TRENCHER IS USED, A MINIMUM OF 5 FEET PARALLEL SEPARATION SHALL BE
KNOWN CABLES HAVE BEEN MARKED.
8. TRENCHING SHALL BEGIN ONLY AFTER THE FAA COR HAS CONFIRMED THAT ALL
CONDITION FOR SAFE OPERATION OF AIRCRAFT AND OTHER VEHICLES.
AND VACATE THE AIRPORT OPERATIONS AREA EACH DAY LEAVING THE AIRPORT OPERATIONS AREA IN
HOURS. SUFFICIENT TIME SHALL BE ALLOWED BY THE CONTRACTOR TO CLOSE ALL OPEN EXCAVATIONS
OTHER EXCAVATED AREAS WILL BE PERMITTED TO REMAIN OPEN OVER NIGHT OR AFTER WORKING
7. SAFETY BARRICADES SHALL BE PLACED AROUND ALL OPEN EXCAVATIONS. NO OPEN TRENCHES OR
6. DISTANCES FROM TAXIWAYS/RUNWAYS ARE MEASURED FROM END OF THE TAXIWAY/RUNWAY SHOULDER.
COR APPROVAL PRIOR TO BEGINNING OF EXCAVATION OF THE TRENCH LINES.
APPROVED BY THE FAA COR. FINAL ROUTING OF TRENCHES REQUIRES FAA
FAA COR. TRENCH LINES MAY BE ADJUSTED, IF NECESSARY, AS DIRECTED AND
5. CONTRACTOR SHALL FIELD VERIFY THE TRENCH LOCATIONS IN CONJUNCTION WITH THE
COORDINATED BY THE FAA CONTRACTING OFFICER'S REPRESENTATIVE (COR).
4. SITE ACCESS SHALL BE AT A LOCATION OR LOCATIONS DETERMINED BY THE AIRPORT SPONSOR AND
OPERATION AREA (AOA).
3. ALL VEHICLES SHALL COMPLY WITH AIRPORT REQUIREMENTS FOR ACCESS TO THE AIRPORT
THE CONTRACTOR IS RESPONSIBLE FOR ALL FEES ASSOCIATED WITH MEETING THESE REQUIREMENTS.
AFTER FINGERPRINTING, COMPLETION OF COMPUTER BASED TRAINING, AND BACKGROUND CHECKS.
TO OBTAIN AN AIRPORT ISSUED IDENTITY BADGE. BADGES MAY BE ISSUED, FOR A FEE,
2. EACH CONTRACTOR EMPLOYEE WORKING ON THE AIRPORT OPERATIONS AREA (AOA) WILL BE REQUIRED
OF REQUIRED SAFETY CLASSES, DRIVING, EQUIPMENT, AND SECURITY REQUIREMENTS.
VEHICLE BADGES, PERMITS, EQUIPMENT OPERATOR'S LICENSES, EMPLOYEES SUCCESSFUL COMPLETION
1. THE CONTRACTOR SHALL COMPLY WITH ALL AIRPORT REQUIREMENTS FOR OBTAINING EMPLOYEE AND
CONDUIT AND PLUGS.
3. CONTRACTOR SHALL PROVIDE ALL MATERIAL AND EQUIPMENT INCLUDING CABLE, MANHOLES/HANDHOLES,
3. NOTE DELETED.
2. MARKER PLUGS SHALL BE INSTALLED AS SHOWN ON SHEETS C962.
TRENCHING DETAILS
FIBER OPTIC DUCTBANK DETAILS
MANHOLE AND HANDHOLE DETAILS
AIRFIELD EQUIPMENT & BUILDING DETAILS
ENLARGED AREA PLAN
ENLARGED AREA PLAN
ENLARGED AREA PLAN
ENLARGED AREA PLAN
ENLARGED AREA PLAN
ENLARGED AREA PLAN
ENLARGED AREA PLAN
ENLARGED AREA PLAN
ENLARGED AREA PLAN
OVERVIEW (KEY PLAN)
CIVIL NOTES (1 OF 1)
COVER SHEET
CLT-D-FOTS-C962
CLT-D-FOTS-C961
CLT-D-FOTS-C955
CLT-D-FOTS-C200
CLT-D-FOTS-C110
CLT-D-FOTS-C109
CLT-D-FOTS-C108
CLT-D-FOTS-C107
CLT-D-FOTS-C106
CLT-D-FOTS-C105
CLT-D-FOTS-C104
CLT-D-FOTS-C103
CLT-D-FOTS-C102
CLT-D-FOTS-C101
CLT-D-FOTS-C100
CLT-D-FOTS-C000
Suite 500
Tel. No (678)808-8800
Atlanta, Georgia 30309
DEPARTMENT OF TRANSPORTATION
03/28/2017
COURTNEY NOLAN WILLIAM PRICE
ENGINEERING CENTER
ATLANTA TERMINAL
ISSUED FOR BID
JAL
AAB
JAL
04/14/2017
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
DATE
APPROVED
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES. PAGE OF
CHARLOTTE CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT (CLT) NC
1103700
1103700
EASTERN SERVICE AREA ATLANTA, GEORGIA
P
P r o j e c t s
L e g a c y
T U
C
N
D r iv e c a d f il e s a r lo t s ig n
D r a w in g s
M ic r o s t a t e s
F O
T S F ib t ic g u s t
:3
:5
P
M P lo t t a d a m .b o r s c h
NAME : Jeffrey A. Lowe
REG. #: 27078
C102
C101
SCALE IN FEET
0 650 1300 2600
C103
C104
C106
C105
C107
C108 C109
C101 SCALE = 1" = 650' - 0"
OVERVIEW (KEY MAP)
LEGEND
HH121
EXISTING HANDHOLE
MH-100
EXISTING MANHOLE
NEW HANDHOLE
NEW MANHOLE
CONDUIT/DUCTBANK
NEW FIBER IN EXISTING
NEW CONDUIT/DUCTBANK & FIBER
EXISTING CONDUIT/DUCTBANK & FIBER
EXISTING CONDUIT/DUCTBANK
NEW FIBER FOR CUTOVER (IN EXISTING)
CONCRETE CABLE MARKER
EXISTING MARKER BALLMB
CM
MH-10
COPPER COMM CABLE
EXISTING ATCT
PROPOSED ATCT
OVERVIEW (KEY PLAN)
TWY V4
ILS ACTIVE
1W4
1W4
1W4
NOTES
VAULT
LOCALIZER 18L
18C G/S
CENTER VAULT
ASR
5C G/S
RR SITE
WEST VAULT
RT SITE
CABINET EQUALS.
FOR CORNING ENCLOSURES OR BE COMPATIBLE WITH THE FAA-APPROVED
AND WCH UNITS SHALL BE ST, 6-CONNECTOR PANELS, P/N CCH-CP06-19T
FOR RACK-MOUNTED INSTALLATIONS. CONNECTOR PANELS USED IN THE CCH
AND CORNING CCH-04U-CLASSIC AND CSH-03U OR FAA-APPROVED EQUALS
CABINETS OR FAA-APPROVED EQUALS FOR WALL-MOUNTED INSTALLATIONS
RACKS AS REQUIRED. USE CORNING WCH-12P-CLASSIC TERMINATION
MOUNTED ON FACILITIY INTERIOR WALLS OR IN INTERIOR EQUIPMENT
COMPLETED CABLES SHALL BE CONNECTED TO FIBER TERMINATION CABINETS
FUSION-SPLICED PIGTAILS EQUIPPED WITH MALE, ST CONNECTORS.
ENDS. EACH FIBER SHALL BE TERMINATED USING COLOR-CODED,
5. CONTRACTOR SHALL TERMINATE ALL FIBERS IN EACH CABLE SEGMENT AT BOTH
DB/KM @ 1310 NM.
CABLE INSTALLED; DOCUMENT CABLE RUN LOSSES NO GREATER THAN 0.4
HARD & SOFT COPIES OF EACH TRACE DEPICTING THE ENTIRE RUN OF
SUFFICIENT LENGTH (200M TYP) TO OVERCOME OTDR DEAD ZONE. PROVIDE
TEMPORARY MECHANICAL CONNECTORS OR TEST BOX & LAUNCH CABLES OF
INSTALLED IN DUCTS TO ENSURE CONTINUITY UTILIZING AN OTDR,
4. CABLES SHALL BE TESTED BOTH ON THE REELS &
BACKER MATERIAL.
SEAL ALL DUCT OPENINGS WITH DUCT SEAL OR POLYSTYRENE FOAM WITH
INSIDE SHARED MANHOLES. PROVIDE PULL STRINGS IN ALL SPARE DUCTS &
SEPARATION BETWEEN NEW FO CABLES AND ANY EXISTING COPPER CABLES
MINIMUM CABLE BEND RADIUS SHALL BE 9"; MAINTAIN
APPROXIMATELY 30' SLACK & SET ON SIDE RACKS.
3. CABLES SHALL BE LOOPED INSIDE EACH MANHOLE WITH
CFM/MIN.
FORCED-DRAFT VENTILATION, IF REQUIRED, SHOULD BE AT A MINIMUM 500
SET-UP, PROTECTION OF EXISTING CABLES & NIGHTTIME OPERATIONS.
SPACE INCLUDING, VENTILATION, FALL/SLIP PROTECTION LADDER/TRIPOD
APPROVED COMPANY SAFETY PRACTICES IN CONFINED
SHALL COMPLY WITH OSHA REGULATIONS AND
AND TEST FOR ANY SUSPECTED GASES. CONTRACTOR
CONTRACTOR SHALL PUMP OUT ACCUMULATED WATER
2. BEFORE ENTERING ANY NEW OR EXISTING MANHOLE,
TENSION RELEASE DEVICE SET NOT TO EXCEED 600 LBS.
CONTRACTOR SHALL HAND PULL CABLES USING APPROVED PULLING GRIP WITH
1. ALL FIBER OPTIC CABLES WILL BE DESIGNED FOR INSTALLATION IN DUCT.
C110 36R G/S
ASLF SHELTER
TWY N
x
MB1 MB2
HH1
MB3
HH2
x x
MB4
HH3
HH4
1-24 STRD F/O
P1
M
JB
M
M
M T
T
JB
T
3/0 #1/0
7.5KV
LOCALIZER
SHELTER
EG
LOC ANT
3/0 #1/0
7.5KV PWR
M
SECTIONALIZER
M
OLD DOWD RD
RAILROAD BED
MALSR PWR & CONTROL
STATION
LOC PWR
& CONTROL
3/0 #1/0
7.5KV PWR
DISCONNECT
R W
Y
C
C
C
L
1-25PR #19
3/C #1/0
7.2KV
P6
P5
P4
P3
P2
P1
M
M1
M
M3
M
M2
M
M4
M
M
2/C #1/0
7.2KV
PHASE A (RED)
IN/OUT
MALSR PWR
3/0 #1/0
7.5KV PWR
M
PARKING
x x x x x x x x x x x x x x
MB4
H H
M B
M B
MH1
MD
HH4
H H
M B
M
H H
HH8
T
HH6
M
M
HH3
HH2
HH1
M
CB
T
ASDE-X
RU-01
SPLICE RED PHASE
RT SITE
PWR
ASDE RU1
1-12 PR #19
2/C #10
7.2KV PWR
PHASE A (RED)
IN/OUT
x x
T
R T R
S
IT
(1-100PR #19)ABANDONED
STANDBY
R W
Y
C
C
C
L
TWY E
TWY E10
3/C #1/0
7.25 KV
1-25PR #19
MD
M
M
M
M
CB1
M
M
M M
MH1
T
ASOS
DISCONNECT
DISCONNECT
PAPI
PAPI PWR
GLIDE SLOPE
PAPI
M
RVR
SECTIONALIZERS
M H
2/C #1/0, 7.2KV PWR
2-24 STRD F/O
(1-100PR #19) ABANDONED
MAIN
ABANDONED
(1-100PR #19)
ABANDONED
(1-100PR #19)
T W
Y
T
V
TWY N
P1
P2
P3
M
M
M
M
M
MD
MH1
M
ASOS
PWR
1-12PR #19
F/0
ASOS
2/C #1/0
7.2KV &
1-50PR
(2-100PR RT) ABANDONED
1-50PR RR
(1-6PR RVR) ABANDONED
1-12PR #19 GS
1-50PR #19
(1-50PR #19)
ABANDONED
TWY V5
T
P1
P2
HOLD SHORT
LINE
PWR
2/C #1/0
7.2KV &
1-50PR
PWR
2/C #1/0
7.2KV &
1-50PR
T W
Y
E
T
TWY V4
T
TWY V4
P1
P2
TWY S
PWR
2/C #1/0
7.2KV &
1-50 PR
ABANDONED
R W
Y
C
C
C
L
TWY S
x x x x x x x x x x x
P1
MB
MD
HH1MB
HH2
P6
P7
MH1
RR SITE
MB7
P
P9
P3
RVR
CB
M
M B
M
M
M
M
MB1
HH3MB
P8
P4
P5
F/O
1-50
PR #19
RVR PWR &
1-6 PR#19
SECTIONALIZER
F/O
HOLD
SHORT
LINE
M
M
PWR
2/C #1/0
7.2KV &
1-50
PR
PHASE B
(BLUE)
X
X
X
X
PWR
2/C #1/0
7.2KV &
1-50 PR
PHASE B (BLUE)
RTR SITE
SECTIONALIZER
PWR
2/C #1/0
7.2KV
1-50 PR #19MAIN
ABANDONED
1-50 PR #19STANDBY
ABANDONED
T
TWY S
T x
HH1
HH2
HH3
HH4
HH5
T
R
Y
L
R
2-24 STRD F/O
2-2 4 S
TRD F
/O
T W
Y
S x x x x x x x x x
M B
M B
HH10
A
M
B HH1
M B
M B
M B
M B
M B
H H
M B
MB
MB
M B
M
BM
B
MB3
FENCE
FENCE
F/O
2-24 STRD F/O
R W
Y
C
C
C
L
T W
Y
A
R W
Y
-2
C L
M2
M
M
M
M
M D
M
M
M
MALS PWR
M
M
M
M
JB
MD
1-50PR #19
PWR
2/C #1/0
7.2KV
T W
Y
E
R W
Y
C
C
R W
Y
-2
C L
MALSR
SHELTER
MALS
DISTRIBUTION BOX
M
T
MM
LOCALIZER
SHELTER
M1
M
M
M2
M
M
1-25
PR#19
M
M
MM
M
M
MALSR
PWR
LOC COAX &
PWR &
CONTROL
M
L
N T E N
N A
M
M
M
FLASHER PWR
& CONTROL
1-50 PR#19
PWR
1/C #1/0
7.2KV
PWR
2/C #1/0
7.2KV
M
LOCALIZER
SHELTER
R O
A D
1-
P R
L O
C
P
M M
TWY E2
TWY E3
R W
Y
C
C
R W
Y
C
C
ASDE PWR
& 1-6 PR #19
M
M
M
M
M
M
HH4
HH5
HH6
HH7
HH8
HH9
M
RVR
T
GLIDE SLOPE
SHELTER
JB
HH3
HH2
M
M
M
1-25 PR #19
CB
HH1
PAPI PWR
2-25 PR #19
PAPI
1-50 PR #19
PWR
1/C #1/0,
7.2 KV PWR
STORAGE
SHELTER
TWY E
M
M
M
M
R W
Y
C
C
C
L
P1 H I V
O L T A G E
C A B L E
1 0 , 7
V
1-1/ C 1/
(IN
S T L
ASDE,RU-04
SENSOR
ASDE PWR
& 1-6 PR #19
M
H H
H H
TRANSFORMER
WEST B
LVD
FARFIELD
MARKER ANT
2-25PR #19
CONTR FOR
ALSF,IM,FFM,
& LOCALIZER
HH3
HH4
HH5
HH6
HH7
HH8
HH9
HH10
MH1
M
HH11
HH12
HH13
LOOP
ALSF PWR
HH15
HH16
M
HI VOLTAGE
7200V PWR
2-25 PR #19
MH2M
MM
MH5
MH4
M
M
MH3
M
M
DISCONNECT
PEP LOCALIZER SHELTER
MH7
MH8
M
M
M
M
MH6 7.2KV PWR
1-25 PR #19
LOC, FFM,
ANTENNA CABLES
1-25 PR #19
LOC, FFM,
COAX CABLES
INNER MARKER
ANT
NOT USED
1-25 PR #19
LOC
1-25 PR #19
ALSF
ALSF PWR
ALSF CONTROL 1-25 PR
HH14
x x x
FLASHER (TYE)
FLASHER PWR
& CONTROL
THRU PIPES
LOOP CABLE &
BOX 1, 2, & 3 (TYP)
THRU PIPES
ALSF PWR
ALSF CONTROL 1-25 PR
T
TWY E9
T
TWY V5
TWY N
TWY E11
R W
Y
C
C
R W
Y
C
C
T
B
M B
M
MS
MH2
MMS
MH1
M
MS M
2-24 STRD F/O
1-25 PR #19
1-100 PR RT
SPLICE
(1-100 PR #19)
1-25 PR #19
(1-50 PR #19)
(1-100 PR #19)
(2-50 PR #19)
1-25 PR #19
ABANDONED
ABANDONED
(2-100 PR #19)
(1-50 PR #19)
1-25 PR #19
(1-6 PR #19)
1-12 PR #19
2-24 STRD F/O
(1-6 PR #19)
(1-100 PR #19)
1-12 PR #19
ABANDONED
ABANDONED
TWY E14
T W
Y
E
TWY E12
TWY E13
TWY V5
T
R W
Y
C
C
M B
M B
M B
M B
(1-100 PR #19)
(2-50 PR #19)
1-25 PR #19
ABANDONED
ABANDONED
TWY E14
T
T W
Y
E
T
TWY V4
T
B
M H
M H
HH1
R W
Y
C
C
R W
Y
C
C
(1-100 PR #19)
(2-50 PR #19)
1-25 PR #19
ABANDONED
ABANDONED
ABANDONED
T
W
Y
-2
T
24 STRD
F/O
HH1 HH2MB1
MB2
MB3
MB4
TWY E11
xx xx x x x
MH11
MH12
MH1
M B
2-24 STRD F/O
(1-100 PR #19)
(2-50 PR #19)
1-25 PR #19
ABANDONED
ABANDONED
TWY E11
MH6
MH5 MH4 MH1
MH2
MH3
MH11
MH10
MH9
MH8
MH7
N
P
R K
IN
G
S T
R U
C T
U R
E
A T C T
2-24 STRD F/O
PROPOSED F/O RUN
ABANDONED
ABANDONED
ABANDONED
2-24 STRD F/O
(3-100 PR #19)
(2-50 PR #19)
(1-6 PR #19)
1-25 PR #19
1-12 PR #19
1-50 PR #19
MH1
EXISTING MH
IN APRON
EXISTING MH
IN APRON
B
B
B
B
B
B
B
2-24 STRD F/O
T
W
Y
B
T
MB
MH1
HH4
MB7HH3
MB5 MB6MB4MB3MB2
2-24 STRD
F/O
MB1
MB
HH2
MB
HH1
MB
MB
MHP1
MHC1
M B
M B
M B
M B
M
M D
M D
M
M T
M B
M B
M H P
M H
C
SB1
P W
R
PWR
1-
S T R D
F O
MD
ASR
2- P
R #1
3- P
R #1
(1-
PR
#1 9)
(1-100 PR #19)
ABANDONED
T
W
Y
B
TWY M2
T
W
Y
-2
M
P A P I
C B
M
G L
ID
E
S L O P E
M B
M
M
M
M
M
M
M D
M
M H P
MD
M H C
M B
M B2
PAPI PWR
S T R D
F
R
-2
P R
-2
P R
M B
M H C
M D
G L
ID
E
S L O P E
T
1-
P R
(1-
P R
1-
P R
(1-
P R
T
A B A N D D O N E D
A B A N D D O N E D
T W
Y
A
T
R W
Y
-2
M
M
M
M
M
M D
M D
M
M
M
-2
P R
M
M
S B
A B A N D D O N E D
1-
P R
(1-
P R
T W
Y
R W
Y
-2
3 M
M
M M
T
T
M
M
M
M
T
W
Y
D
T
R W
Y
R
L
MM
M M
M M
1-25 PR #19
1-12 PR #19
TWY C4
TWY D2
R W
Y
R
L
1-25 PR #19
1-12 PR #19
PAPI PWR
M
PAPI
M
JB-2A
CB
M
M
M
MD
M
M
M
M
M
JB-2
1-25 PR
IN /OUT
TWY C2
TWY C3
TWY C
R W
Y
R
L
1-25 PR #19
PWR
M
M
M
M
H H P
H H
C
JB-1B
H H P
H H
C
P
M MJ
B 1C
MM
1-25 PR #19
1-12 PR #19
HH1
T
DISCONNECT
RVR
GLIDE
SLOPE
1-12 PR #19
M
COAX
3-1/2" HELIAX
M
M
M
M
1-25 PR #19
TO LOC
1-25 PR #19
HHP1
HHC1
HHC2
HHP2
ALSF PWR & CONTROL
PWR
M M
HH5
T
DISCONNECT
IM & FFM
SHELTER
IM & FFM
COAX
1-12 PR #19
M
HH1
M
HH2
H H
H H
A S D E
R U -0
ASDE PWR &
CONTROL
ALSF SHELTER
M
M
M
JB-1
JB-1A M
3 PHASE
SECTIONALIZER
ALSF PWR &
CONTROL &
PWR
1/C #1/0
EG SHELTER
DUKE T
DISCONNECT & METER
T
LOAD BANK
M
M
M
M
M
M
M
M
M
M M
M
R W
Y
R
L
C
L
M M M M
M
M
T H H
C
LOOP
BOXES
M
M
M
FFM
FFM
IM
ALSF PWR
PWR
LOOP
BOX
HHC1
HHP1
T
M
JB-1A
ON SHELTER
DISCONNECT
VKO LOC
(RWY 18L)
SHELTER
DISCONNECT 2-RG333/U,
3/C #12 &
1-12 PR #19
TO LOC ANTENNA
VKO LOC
(RWY 18L)
SHELTER
1-25 PR #19
TO JB-1B
P W
R
JB
M
MMD
M x x xFENCE
R W
Y
L
R
C
L x x x x x x x x
STEP
RAILROAD BED
NEW RAILROAD BED
RW
Y
5-
C/ L x x xx
(1-50 PR #19)
(1-50 PR #19)
(1-6 PR #19)
RR STANDBY ABANDONED
ILS ACTIVE
ILS ACTIVE
RR STANDBY ABANDONED(1-50 PR #19)
(1-50 PR #19)
(1-6 PR #19)
E V
E V
P
E V
E V
711.7
718.8
709.1
700.6
722.3
CI 714.61'
Out 15" CP 710.91'
CI 711.77'
IN 15" CP 708.27'
CI 714.68'
Out 18" 710.53'
CI 713.63'
In 18" From West 709.93'
In 18" from North 709.33'
Out 24" 706.13'
Rim SDMH 715.50'
In 24" 704.50'
Out 30" 704.00'
Inv 36" FES
686.71'
CI 715.66'
Out 18" CP 712.11'
CI 694.78'
Out 36" 687.18'
CI 695.02'
Out 18" 688.02'
CI 700.36'
Out 15" 697.16'
CI 700.19'
In 15" from North 695.79'
In 24" form East 695.69'
Out 24" 695.39'
CI 712.21'
In 24" from North 699.22'
Out 24" 699.11'
CI 712.44'
Out 24" 700.00'
T
T
E
E
E
E
W
FO
FO
E DUCT BANK
E DUCT BANK
In 18" (N) 687.68'
In 24" (E) 687.28'
2-24 STRD F/O
TERMINAL BASEMENT CABLE
TRAY WITH RISER RATED
SPLIT CORRUGATED INNER DUCT
H
H
H
H
H
H
M
M
M
M
M
H
H
M
H
M
H
M
M
H
M
1-100 PR
100 PR
50 PR
25 PR
(1-50 PR #19)
(1-50 PR #19)
(1-6 PR #19)
1-25 PR #19
(1-6 PR #19) ABANDONED
Suite 500
Tel. No (678)808-8800
Atlanta, Georgia 30309
DEPARTMENT OF TRANSPORTATION
03/28/2017
COURTNEY NOLAN WILLIAM PRICE
ENGINEERING CENTER
ATLANTA TERMINAL
ISSUED FOR BID
JAL
AAB
JAL
04/14/2017
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
DATE
APPROVED
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES. PAGE OF
CHARLOTTE CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT (CLT) NC
1103700
1103700
EASTERN SERVICE AREA ATLANTA, GEORGIA
P
P r o j e c t s
L e g a c y
T U
C
N
D r iv e c a d f il e s a r lo t s ig n
D r a w in g s
M ic r o s t a t e s
F O
T S F ib t ic g u s t
:3
:5
P
M P lo t t a d a m .b o r s c h
NAME : Jeffrey A. Lowe
REG. #: 27078
C102
A
T C
H S
H E
E T C
T
C102
P R
P R
P R
P R
T x x x
TWY E
PARKING
x x x x x x x x x x x x x x
RTR SITE
x x
R T R
S
IT
E
C
L R
W Y
C
C
TWY E
TWY E10
TWY E9
PAPI
C
L R
W Y
C
C
T
T
TWY E9
TWY N
TWY V5
T
LINE
HOLD SHORT
R W
Y
C
C
TWY S
T W
Y
E
T
TWY V4
T
TWY S
T
L
R W
Y
C
C
TWY S
x x x x x x x x x x x
TWY S
LINE
SHORT
HOLD
X
X
X
X
TWY S
x
T W
Y
S x x x x x x x x x
FENCE
FENCE
C
L R
W Y
C
C
T
T W
Y
A
C L
R W
Y
-2
T W
Y
E
R W
Y
C
C
TWY E3
C L
R W
Y
-2
R O
A D
TWY E
TWY E2
TWY E3
R W
Y
C
C
R W
Y
C
C
PAPI
TWY E
C
L
C
C R
W Y
WEST B
LVD
x x
THRU PIPES
& CONTROL
FLASHER PWR
THRU PIPES
BOX 1, 2, & 3 (TYP)
LOOP CABLE &
T
T
TWY V5
TWY N
TWY E11
TWY E12
R W
Y
C
C
R W
Y
C
C
T
T W
Y
E
TWY E12
TWY E13
TWY V5
T
R W
Y
C
C
TWY E14
T
T W
Y
E
T
TWY V4
T
W
Y
C
C
R W
Y
C
C
T
T
W
Y
-2
R W
Y
C
C
T
T
T
TWY E11
xx xx x x x
TWY E11
S T
R U
C T
U R
E N
R K
IN
G
A T C T
TWY C11
TWY C12
T
B
B
B
B
B
B
T
W
Y
B
TWY M2
T
ASR
T
T
W
Y
B
TWY M2
T
W
Y
-2
R W
Y
-2
P A P I
T W
Y
A
T
T
TWY
M2
R W
Y
-2
R W
Y
-2
T W
Y
R W
Y
-2
R W
Y
-2
T W
Y
A
T
W
Y
R
T
G
W
Y
-2
R W
Y
-2
T W
Y
R
T
TWY D9
TWY D8
TWY C11
TWY C12
T
W
Y
R
L
C
L
R
L R
W Y R/R
TWY D8
T
T
L R
W Y
R
L
TWY C11
VASI
VASI
T
T
W
Y
-2
R W
Y
R
L
VASI
T W
Y
A
T
T
W
Y
-2
R W
Y
R
L
T
A S I
C L T
T
W
Y
A
T
C L
R W
Y
-2
R W
Y
-2
T
W
Y
A
T W
Y
A
T
TWY D6
T W
Y
R
TWY C9
R W
Y
R
L
T
T
T W
Y
D
T W
Y
R
T
T
TWY C7
T W
Y
R
R W
Y
R
L
T
TWY D2
T
T W
Y
D
TWY C4
T
T
R W
Y
R
L
TWY C4
TWY D2
R W
Y
R
L
PAPI
TWY C2
TWY C3
TWY C
R W
Y
R
L
TWY C
C
L
R
L R
W Y x x xFENCE
T W
Y
A
T W
Y
A
T W
Y
A
T W
Y
A
TWY C2
TWY C3
TWY C4
T
T
TWY C7
T W
Y
R
TWY C9
T
TWY
C9
TWY C
T
W
Y
G
T W
Y
G
TWY C8
T W
Y
A
T W
Y
A
T W
Y
A
T
TWY E
T
TWY E2
TWY E3
T W
Y
E
TWY S
T
W
Y
U
TWY N
C/ L
RW
Y
5-
C
L R
W Y
R
L x x x x x x x x
T
C/ L
RW
Y
5-
TWY C11
T
W
Y
R
T
W
Y
G
C104
C103
C105
SCALE IN FEET
0 100 200 400
C106
LEGEND
HH121
EXISTING HANDHOLE
MH-100
EXISTING MANHOLE
NEW HANDHOLE
NEW MANHOLE
CM
MH-10
CONDUIT/DUCTBANK
NEW FIBER IN EXISTING
NEW CONDUIT/DUCTBANK & FIBER
EXISTING CONDUIT/DUCTBANK & FIBER
EXISTING CONDUIT/DUCTBANK
NEW FIBER FOR CUTOVER (IN EXISTING)
CONCRETE CABLE MARKER
EXISTING MARKER BALLMB
COPPER COMM CABLE
NOTES
SCALE: 1" = 20'
18C G/S INSET
G/S 18C
ENLARGED AREA PLAN
SCALE IN FEET
0 20 40
EXISTING MH
#3
NEW FIBER
2-24F, 25 PR
(2) AND NEW
4" CONDUIT
NEW FIBER, 24F
(IN EXSTING
DUCTBANK)
C107
C108 C109
CABINET EQUALS.
FOR CORNING ENCLOSURES OR BE COMPATIBLE WITH THE FAA-APPROVED
AND WCH UNITS SHALL BE ST, 6-CONNECTOR PANELS, P/N CCH-CP06-19T
FOR RACK-MOUNTED INSTALLATIONS. CONNECTOR PANELS USED IN THE CCH
AND CORNING CCH-04U-CLASSIC AND CSH-03U OR FAA-APPROVED EQUALS
CABINETS OR FAA-APPROVED EQUALS FOR WALL-MOUNTED INSTALLATIONS
RACKS AS REQUIRED. USE CORNING WCH-12P-CLASSIC TERMINATION
MOUNTED ON FACILITIY INTERIOR WALLS OR IN INTERIOR EQUIPMENT
COMPLETED CABLES SHALL BE CONNECTED TO FIBER TERMINATION CABINETS
FUSION-SPLICED PIGTAILS EQUIPPED WITH MALE, ST CONNECTORS.
BOTH ENDS. EACH FIBER SHALL BE TERMINATED USING COLOR-CODED,
4. CONTRACTOR SHALL TERMINATE ALL FIBERS IN EACH CABLE SEGMENT AT
OPTIC CABLE FROM NEW 18C GS TO RT SITE.
COIL 30' OF CABLE FROM EACH DIRECTION. PROVIDE OUTBOUND FIBER
USE VACANT SLOTS IN PATCH PANEL FOR NEW 6 PORT PANEL CONNECTION.
INSTALL A NEW NODE AND A NEW INTERIOR WALL MOUNTED PATCH PANEL.
THROUGH NEW CONDUIT FROM AN EXISTING MH. TERMINATE FIBER AND
POINT ON THE 18C GS BUILDING IS ALONG THE EAST FACING WALL
3. SEE DETAIL 2 ON SHEET C200 FOR FIBER OPTIC FLOOR ENTRY. ENTRY
PORT PANEL CONNECTION. COIL 30' OF CABLE FROM EACH DIRECTION.
MOUNTED PATCH PANEL. USE VACANT SLOTS IN PATCH PANEL FOR NEW 6
TERMINATE ALL 24 FIBERS OF EACH CABLE INTO EXISTING INTERIOR WALL
THROUGH AN EXISTING CONDUIT AND FIBER OPTIC WALL MOUNTED BOX.
POINT ON THE RT BUILDING IS ALONG THE NORTHEASTERN FACING WALL
2. SEE DETAIL 1 ON SHEET C200 FOR FIBER OPTIC WALL ENTRY. ENTRY
1. SEE GENERAL NOTES AND CONSTRUCTION NOTES ON DRAWING C100.
C109
C110 x
HH1
MB3
HH2
x x
MB4
HH3
HH4
1-24 STRD F/O
PARKING
x x x x x x x x x x x x x x
MB4
H H
M B
M B
MH1
MD
HH4
H H
M B
M
H H
HH8
T
HH6
M
M
HH3
HH2
RT SITE
PWR
ASDE RU1
1-12 PR #19
(1-100PR #19)ABANDONED
STANDBY
R W
Y
C
C
C
L
TWY E10
3/C #1/0
7.25 KV
1-25PR #19
MD
M
M
M
M
CB1
M
M
M M
MH1
T
ASOS
DISCONNECT
DISCONNECT
PAPI
PAPI PWR
GLIDE SLOPE
PAPI
M
RVR
SECTIONALIZERS
M H
2/C #1/0, 7.2KV PWR
(1-100PR #19) ABANDONED
MAIN
ABANDONED
(1-100PR #19)
ABANDONED
(1-100PR #19)
TWY N
P1
P2
M
M
M
M
M
MD
MH1
M
ASOS
PWR
1-12PR #19
F/0
ASOS
(2-100PR RT) ABANDONED
1-50PR RR
(1-6PR RVR) ABANDONED
1-12PR #19 GS
1-50PR #19
TWY E9
TWY N
R W
Y
C
C
T
MS
MH2
MMS
MH1
M
MS M
2-24 STRD F/O
1-25 PR #19
1-100 PR RT
SPLICE
(1-100 PR #19)
1-25 PR #19
(1-50 PR #19)
(1-6 PR #19)
(1-100 PR #19)
1-12 PR #19
ABANDONED
A
X
IW
A Y E
C200
C200
NOTE 3)
FOR 18C G/S (SEE
NEW CONNECTION
FOR RT (SEE NOTE 2)
NEW CONNECTION
NEW FIBER AND
NEW 4" CONDUIT
(HAND DIG)
R O
F A
R S
A
R S
A
R O
F A
R O
F A
R S
A
R S
A
R O
F A
C
- 3
C
25 PR
25 PR
NEW DEB
SPLICE
(INTERIM)
NEW SPLICE IN
EXISTING MH-5
EX. MH-1
EX. MH-2
MH-3
EX.
EX. MH-4
MH-5
EX.
EX. MH-6
INSTALL NEW FIBER IN
EXSTING DUCTBANK
INSTALL NEW FIBER,
& NEW COPPER
(ATCT), IN EXSTING
DUCTBANK
INSTALL NEW FIBER,
& NEW 2-25 PR
(ATCT), IN EXISTING
DUCTBANK
Suite 500
Tel. No (678)808-8800
Atlanta, Georgia 30309
DEPARTMENT OF TRANSPORTATION
03/28/2017
COURTNEY NOLAN WILLIAM PRICE
ENGINEERING CENTER
ATLANTA TERMINAL
ISSUED FOR BID
JAL
AAB
JAL
04/14/2017
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
DATE
APPROVED
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES. PAGE OF
CHARLOTTE CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT (CLT) NC
1103700
1103700
EASTERN SERVICE AREA ATLANTA, GEORGIA
P
P r o j e c t s
L e g a c y
T U
C
N
D r iv e c a d f il e s a r lo t s ig n
D r a w in g s
M ic r o s t a t e s
F O
T S F ib t ic g u s t
:3
:5
P
M P lo t t a d a m .b o r s c h
NAME : Jeffrey A. Lowe
REG. #: 27078
C103
A
T C
H S
H E
E T C
MATCH SHEET C104
T
C102
P R
P R
P R
P R
T x x x
TWY E
PARKING
x x x x x x x x x x x x x x
RTR SITE
x x
R T R
S
IT
E
C
L R
W Y
C
C
TWY E
TWY E10
TWY E9
PAPI
C
L R
W Y
C
C
T
T
TWY E9
TWY N
TWY V5
T
HOLD SHORT
R W
Y
C
C
TWY S
T W
Y
E
T
TWY V4
T
TWY S
T
L
R W
Y
C
C
TWY S
x x x x x x x x x x x
TWY S
LINE
SHORT
HOLD
X
X
X
X
TWY S
x
T W
Y
S x x x x x x x x x
FENCE
FENCE
C
L R
W Y
C
C
T
T W
Y
A
C L
R W
Y
-2
T W
Y
E
R W
Y
C
C
TWY E3
C L
R W
Y
-2
R O
A D
TWY E
TWY E2
TWY E3
R W
Y
C
C
R W
Y
C
C
PAPI
TWY E
C
L
C
C R
W Y
WEST B
LVD
x x
THRU PIPES
& CONTROL
FLASHER PWR
THRU PIPES
BOX 1, 2, & 3 (TYP)
LOOP CABLE &
T
T
TWY V5
TWY N
TWY E11
TWY E12
R W
Y
C
C
R W
Y
C
C
T
T W
Y
E
TWY E12
TWY E13
TWY V5
T
R W
Y
C
C
TWY E14
T
T W
Y
E
T
TWY V4
T
W
Y
C
C
R W
Y
C
C
T
T
W
Y
-2
R W
Y
C
C
T
T
T xx xx x x x
TWY E11
S T
R U
C T
U R
E N
R K
IN
G
A T C T
TWY C11
TWY C12
T
B
B
B
B
B
B
T
W
Y
B
TWY M2
T
T
T
W
Y
B
TWY M2
T
W
Y
-2
R W
Y
-2
P A P I
T W
Y
A
T
T
TWY
M2
R W
Y
-2
R W
Y
-2
T W
Y
R W
Y
-2
R W
Y
-2
T W
Y
A
T
W
Y
R
T
W
Y
-2
R W
Y
-2
T W
Y
R
T
TWY D8
TWY C11
TWY C12
T
W
Y
R
L
C
L
R
L R
W Y R/R
TWY D8
T
T
L R
W Y
R
L
TWY C11
VASI
VASI
T
T
W
Y
-2
R W
Y
R
L
VASI
T W
Y
A
T
T
W
Y
-2
R W
Y
R
L
T
A S I
C L T
T
W
Y
A
T
C L
R W
Y
-2
R W
Y
-2
T
W
Y
A
T W
Y
A
T
TWY D6
T W
Y
R
TWY C9
R W
Y
R
L
T
T
T W
Y
D
T W
Y
R
T
T
TWY C7
T W
Y
R
R W
Y
R
L
T
T
T W
Y
D
TWY C4
T
T
R W
Y
R
L
TWY C4
TWY D2
R W
Y
R
L
PAPI
TWY C2
TWY C3
TWY C
R W
Y
R
L
TWY C
C
L
R
L R
W Y x x xFENCE
T W
Y
A
T W
Y
A
T W
Y
A
T W
Y
A
TWY C2
TWY C3
TWY C4
T
T
TWY C7
T W
Y
R
TWY C9
T
C9
TWY C
T
W
Y
G
T W
Y
G
TWY C8
T W
Y
A
T W
Y
A
T W
Y
A
T
T
TWY E3
T W
Y
E
TWY S
T
W
Y
U
TWY N
C/ L
RW
Y
5-
C
L R
W Y
R
L x x x x x x x x
T
C/ L
RW
Y
5-
TWY C11
T
W
Y
R
T
W
Y
G
C104
C103
C105
SCALE IN FEET
0 100 200 400
C106
LEGEND
HH121
EXISTING HANDHOLE
MH-100
EXISTING MANHOLE
NEW HANDHOLE
NEW MANHOLE
CM
MH-10
CONDUIT/DUCTBANK
NEW FIBER IN EXISTING
NEW CONDUIT/DUCTBANK & FIBER
EXISTING CONDUIT/DUCTBANK & FIBER
EXISTING CONDUIT/DUCTBANK
NEW FIBER FOR CUTOVER (IN EXISTING)
CONCRETE CABLE MARKER
EXISTING MARKER BALLMB
COPPER COMM CABLE
NOTES
ENLARGED AREA PLAN
C109C108
C107
THE FAA-APPROVED CABINET EQUALS.
CCH-CP06-19T FOR CORNING ENCLOSURES OR BE COMPATIBLE WITH
THE CCH AND WCH UNITS SHALL BE ST, 6-CONNECTOR PANELS, P/N
FOR RACK-MOUNTED INSTALLATIONS. CONNECTOR PANELS USED IN
CORNING CCH-04U-CLASSIC AND CSH-03U OR FAA-APPROVED EQUALS
FAA-APPROVED EQUALS FOR WALL-MOUNTED INSTALLATIONS AND
CORNING WCH-12P-CLASSIC TERMINATION CABINETS OR
WALLS OR IN INTERIOR EQUIPMENT RACKS AS REQUIRED. USE
FIBER TERMINATION CABINETS MOUNTED ON FACILITIY INTERIOR
ST CONNECTORS. COMPLETED CABLES SHALL BE CONNECTED TO
COLOR-CODED, FUSION-SPLICED PIGTAILS EQUIPPED WITH MALE,
AT BOTH ENDS. EACH FIBER SHALL BE TERMINATED USING
3. CONTRACTOR SHALL TERMINATE ALL FIBERS IN EACH CABLE SEGMENT
NEAR OR WITHIN THE CLT INSTALLED DUCTBANK.
2. CONTRACTOR TO COORDINATE WITH CLT REGARDING ANY NEW WORK
1. SEE GENERAL NOTES AND CONSTRUCTION NOTES ON DRAWING C100.
C110
TWY E11
(2-100 PR #19)
(1-50 PR #19)
1-25 PR #19
(1-6 PR #19)
1-12 PR #19
xx xx x x x
MH11
MH12
MH1
M B
(1-100 PR #19)
(2-50 PR #19)
1-25 PR #19
ABANDONED
ABANDONED
TWY E11
MH6
MH5 MH4 MH1
MH2
MH3
MH11
MH10
MH9
MH8
MH7
N
R K
IN
G
S T
R U
C T
U R
E
A T C T
2-24 STRD F/O
ABANDONED
ABANDONED
ABANDONED
2-24 STRD F/O
(3-100 PR #19)
(2-50 PR #19)
(1-6 PR #19)
1-25 PR #19
1-12 PR #19
1-50 PR #19
x x x x x
EXISTING ATCT2 WAY - 4" DUCTBANK
C961
EX MH-7 (WITH NEW
CONDUIT PENETRATION)
MH-9 (SHARED)
TOFA
TSA
T S
A
T O
F A
IN EXISTING DUCTBANK
INSTALL NEW FIBER
IN NEW DUCTBANK
INSTALL NEW FIBER
- 6-WAY 4" CLT COMM
- 15-WAY 6" DUKE POWER
CLT)
DUCTBANK (INSTALLED BY
NEW FIBER IN COMBINED CLT
ADD NEW INNERDUCT (3),
Suite 500
Tel. No (678)808-8800
Atlanta, Georgia 30309
DEPARTMENT OF TRANSPORTATION
03/28/2017
COURTNEY NOLAN WILLIAM PRICE
ENGINEERING CENTER
ATLANTA TERMINAL
ISSUED FOR BID
JAL
AAB
JAL
04/14/2017
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
DATE
APPROVED
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES. PAGE OF
CHARLOTTE CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT (CLT) NC
1103700
1103700
EASTERN SERVICE AREA ATLANTA, GEORGIA
P
P r o j e c t s
L e g a c y
T U
C
N
D r iv e c a d f il e s a r lo t s ig n
D r a w in g s
M ic r o s t a t e s
F O
T S F ib t ic g u s t
:3
:5
P
M P lo t t a d a m .b o r s c h
NAME : Jeffrey A. Lowe
REG. #: 27078
C104
MATCH SHEET C103
SCALE IN FEET
0 100 200 400
MATCH SHEET C106
LEGEND
HH121
EXISTING HANDHOLE
MH-100
EXISTING MANHOLE
NEW HANDHOLE
NEW MANHOLE
CM
MH-10
CONDUIT/DUCTBANK
NEW FIBER IN EXISTING
NEW CONDUIT/DUCTBANK & FIBER
EXISTING CONDUIT/DUCTBANK & FIBER
EXISTING CONDUIT/DUCTBANK
NEW FIBER FOR CUTOVER (IN EXISTING)
CONCRETE CABLE MARKER
EXISTING MARKER BALLMB
COPPER COMM CABLE
T
C102
P R
P R
P R
P R
T x x x
TWY E
PARKING
x x x x x x x x x x x x x x
RTR SITE
x x
R T R
S
IT
E
C
L R
W Y
C
C
TWY E
TWY E10
TWY E9
PAPI
C
L R
W Y
C
C
T
T
TWY E9
TWY N
TWY V5
T
HOLD SHORT
R W
Y
C
C
TWY S
T W
Y
E
T
TWY V4
T
TWY S
T
L
R W
Y
C
C
TWY S
x x x x x x x x x x x
TWY S
LINE
SHORT
HOLD
X
X
X
X
TWY S
x
T W
Y
S x x x x x x x x x
FENCE
FENCE
C
L R
W Y
C
C
T
T W
Y
A
C L
R W
Y
-2
T W
Y
E
R W
Y
C
C
TWY E3
C L
R W
Y
-2
R O
A D
TWY E
TWY E2
TWY E3
R W
Y
C
C
R W
Y
C
C
PAPI
TWY E
C
L
C
C R
W Y
WEST B
LVD
x x
THRU PIPES
& CONTROL
FLASHER PWR
THRU PIPES
BOX 1, 2, & 3 (TYP)
LOOP CABLE &
T
T
TWY V5
TWY N
TWY E11
TWY E12
R W
Y
C
C
R W
Y
C
C
T
T W
Y
E
TWY E12
TWY E13
TWY V5
T
R W
Y
C
C
TWY E14
T
T W
Y
E
T
TWY V4
T
W
Y
C
C
R W
Y
C
C
T
T
W
Y
-2
R W
Y
C
C
T
T
T xx xx x x x
TWY E11
S T
R U
C T
U R
E N
R K
IN
G
A T C T
TWY C11
TWY C12
T
B
B
B
B
B
B
T
W
Y
B
TWY M2
T
T
T
W
Y
B
TWY M2
T
W
Y
-2
R W
Y
-2
P A P I
T W
Y
A
T
T
TWY
M2
R W
Y
-2
R W
Y
-2
T W
Y
R W
Y
-2
R W
Y
-2
T W
Y
A
T
W
Y
R
T
W
Y
-2
R W
Y
-2
T W
Y
R
T
TWY D8
TWY C11
TWY C12
T
W
Y
R
L
C
L
R
L R
W Y R/R
TWY D8
T
T
L R
W Y
R
L
TWY C11
VASI
VASI
T
T
W
Y
-2
R W
Y
R
L
VASI
T W
Y
A
T
T
W
Y
-2
R W
Y
R
L
T
A S I
C L T
T
W
Y
A
T
C L
R W
Y
-2
R W
Y
-2
T
W
Y
A
T W
Y
A
T
TWY D6
T W
Y
R
TWY C9
R W
Y
R
L
T
T
T W
Y
D
T W
Y
R
T
T
TWY C7
T W
Y
R
R W
Y
R
L
T
T
T W
Y
D
TWY C4
T
T
R W
Y
R
L
TWY C4
TWY D2
R W
Y
R
L
PAPI
TWY C2
TWY C3
TWY C
R W
Y
R
L
TWY C
C
L
R
L R
W Y x x xFENCE
T W
Y
A
T W
Y
A
T W
Y
A
T W
Y
A
TWY C2
TWY C3
TWY C4
T
T
TWY C7
T W
Y
R
TWY C9
T
C9
TWY C
T
W
Y
G
T W
Y
G
TWY C8
T W
Y
A
T W
Y
A
T W
Y
A
T
T
TWY E3
T W
Y
E
TWY S
T
W
Y
U
TWY N
C/ L
RW
Y
5-
C
L R
W Y
R
L x x x x x x x x
T
C/ L
RW
Y
5-
TWY C11
T
W
Y
R
T
W
Y
G
C104
C103
C105 C106
NOTES
ENLARGED AREA PLAN
C109C108
C107
THE FAA-APPROVED CABINET EQUALS.
CCH-CP06-19T FOR CORNING ENCLOSURES OR BE COMPATIBLE WITH
THE CCH AND WCH UNITS SHALL BE ST, 6-CONNECTOR PANELS, P/N
FOR RACK-MOUNTED INSTALLATIONS. CONNECTOR PANELS USED IN
CORNING CCH-04U-CLASSIC AND CSH-03U OR FAA-APPROVED EQUALS
FAA-APPROVED EQUALS FOR WALL-MOUNTED INSTALLATIONS AND
CORNING WCH-12P-CLASSIC TERMINATION CABINETS OR
WALLS OR IN INTERIOR EQUIPMENT RACKS AS REQUIRED. USE
FIBER TERMINATION CABINETS MOUNTED ON FACILITIY INTERIOR
ST CONNECTORS. COMPLETED CABLES SHALL BE CONNECTED TO
COLOR-CODED, FUSION-SPLICED PIGTAILS EQUIPPED WITH MALE,
SEGMENT AT BOTH ENDS. EACH FIBER SHALL BE TERMINATED USING
3. CONTRACTOR SHALL TERMINATE ALL FIBERS IN EACH CABLE
NEAR OR WITHIN THE CLT INSTALLED DUCTBANK.
2. CONTRACTOR TO COORDINATE WITH CLT REGARDING ANY NEW WORK
1. SEE GENERAL NOTES AND CONSTRUCTION NOTES ON DRAWING C100.
C110
T
B
M B
(1-100 PR #19)
(2-50 PR #19)
1-25 PR #19
ABANDONED
ABANDONED
TWY E14
TWY E12
TWY E13
T
B
M B
M B
M B
(1-100 PR #19)
(2-50 PR #19)
1-25 PR #19
ABANDONED
ABANDONED
TWY E14
M B
(1-100 PR #19)
(2-50 PR #19)
1-25 PR #19
ABANDONED
ABANDONED
EXISTING MH
IN APRON
EXISTING MH
IN APRON
B
B
B
B
B
B
B
2-24 STRD F/O
T W
Y
B
MB
MH1
HH4
MB7
2-24 STRD
F/O
2-24 STRD F/O
TERMINAL BASEMENT CABLE
TRAY WITH RISER RATED
SPLIT CORRUGATED INNER DUCT
TOFA
TSA
TSA
TOFA
T O
F A
T S
A
- 6-WAY 4" CLT COMM
- 15-WAY 6" DUKE POWER
CLT)
DUCTBANK (INSTALLED BY
NEW FIBER IN COMBINED CLT
ADD NEW INNERDUCT (3),
Suite 500
Tel. No (678)808-8800
Atlanta, Georgia 30309
DEPARTMENT OF TRANSPORTATION
03/28/2017
COURTNEY NOLAN WILLIAM PRICE
ENGINEERING CENTER
ATLANTA TERMINAL
ISSUED FOR BID
JAL
AAB
JAL
04/14/2017
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
DATE
APPROVED
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES. PAGE OF
CHARLOTTE CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT (CLT) NC
1103700
1103700
EASTERN SERVICE AREA ATLANTA, GEORGIA
P
P r o j e c t s
L e g a c y
T U
C
N
D r iv e c a d f il e s a r lo t s ig n
D r a w in g s
M ic r o s t a t e s
F O
T S F ib t ic g u s t
:3
:5
P
M P lo t t a d a m .b o r s c h
NAME : Jeffrey A. Lowe
REG. #: 27078
C105
A
T C
H S
H E
E T C
LEGEND
HH121
EXISTING HANDHOLE
MH-100
EXISTING MANHOLE
NEW HANDHOLE
NEW MANHOLE
CM
MH-10
CONDUIT/DUCTBANK
NEW FIBER IN EXISTING
NEW CONDUIT/DUCTBANK & FIBER
EXISTING CONDUIT/DUCTBANK & FIBER
EXISTING CONDUIT/DUCTBANK
NEW FIBER FOR CUTOVER (IN EXISTING)
CONCRETE CABLE MARKER
EXISTING MARKER BALLMB
COPPER COMM CABLE
T
C102
P R
P R
P R
P R
T x x x
TWY E
PARKING
x x x x x x x x x x x x x x
RTR SITE
x x
R T R
S
IT
E
C
L R
W Y
C
C
TWY E
TWY E10
TWY E9
PAPI
C
L R
W Y
C
C
T
T
TWY E9
TWY N
TWY V5
T
HOLD SHORT
R W
Y
C
C
TWY S
T W
Y
E
T
TWY V4
T
TWY S
T
L
R W
Y
C
C
TWY S
x x x x x x x x x x x
TWY S
LINE
SHORT
HOLD
X
X
X
X
TWY S
x
T W
Y
S x x x x x x x x x
FENCE
FENCE
C
L R
W Y
C
C
T
T W
Y
A
C L
R W
Y
-2
T W
Y
E
R W
Y
C
C
TWY E3
C L
R W
Y
-2
R O
A D
TWY E
TWY E2
TWY E3
R W
Y
C
C
R W
Y
C
C
PAPI
TWY E
C
L
C
C R
W Y
WEST B
LVD
x x
THRU PIPES
& CONTROL
FLASHER PWR
THRU PIPES
BOX 1, 2, & 3 (TYP)
LOOP CABLE &
T
T
TWY V5
TWY N
TWY E11
TWY E12
R W
Y
C
C
R W
Y
C
C
T
T W
Y
E
TWY E12
TWY E13
TWY V5
T
R W
Y
C
C
TWY E14
T
T W
Y
E
T
TWY V4
T
W
Y
C
C
R W
Y
C
C
T
T
W
Y
-2
R W
Y
C
C
T
T
T xx xx x x x
TWY E11
S T
R U
C T
U R
E N
R K
IN
G
A T C T
TWY C11
TWY C12
T
B
B
B
B
B
B
T
W
Y
B
TWY M2
T
T
T
W
Y
B
TWY M2
T
W
Y
-2
R W
Y
-2
P A P I
T W
Y
A
T
T
TWY
M2
R W
Y
-2
R W
Y
-2
T W
Y
R W
Y
-2
R W
Y
-2
T W
Y
A
T
W
Y
R
T
W
Y
-2
R W
Y
-2
T W
Y
R
T
TWY D8
TWY C11
TWY C12
T
W
Y
R
L
C
L
R
L R
W Y R/R
TWY D8
T
T
L R
W Y
R
L
TWY C11
VASI
VASI
T
T
W
Y
-2
R W
Y
R
L
VASI
T W
Y
A
T
T
W
Y
-2
R W
Y
R
L
T
A S I
C L T
T
W
Y
A
T
C L
R W
Y
-2
R W
Y
-2
T
W
Y
A
T W
Y
A
T
TWY D6
T W
Y
R
TWY C9
R W
Y
R
L
T
T
T W
Y
D
T W
Y
R
T
T
TWY C7
T W
Y
R
R W
Y
R
L
T
T
T W
Y
D
TWY C4
T
T
R W
Y
R
L
TWY C4
TWY D2
R W
Y
R
L
PAPI
TWY C2
TWY C3
TWY C
R W
Y
R
L
TWY C
C
L
R
L R
W Y x x xFENCE
T W
Y
A
T W
Y
A
T W
Y
A
T W
Y
A
TWY C2
TWY C3
TWY C4
T
T
TWY C7
T W
Y
R
TWY C9
T
C9
TWY C
T
W
Y
G
T W
Y
G
TWY C8
T W
Y
A
T W
Y
A
T W
Y
A
T
T
TWY E3
T W
Y
E
TWY S
T
W
Y
U
TWY N
C/ L
RW
Y
5-
C
L R
W Y
R
L x x x x x x x x
T
C/ L
RW
Y
5-
TWY C11
T
W
Y
R
T
W
Y
G
C104
C103
C105 C106
NOTES
SCALE IN FEET
0 100 200 400
DRIVE
GRAVEL ACCESS
SECTIONALIZER
x x x x x x x x x
ENLARGED AREA PLAN
SCALE IN FEET
0 20 40
SCALE: 1" = 20'
WEST RWSL INSET
W E S T
R W
S L
W E S T
V A U
LT
x x x
SCALE IN FEET
0 20 40
EXISTING
MH-94B
W/ALUMINUM
HATCH
EX MH-90
RR
EX MH-89
SCALE: 1" = 20'
RR INSET
C955
NEW MH-94A
NEW RWSL 24F
FIBER IN EXISTING
DUCTBANK
NEW FIBER 2-24F
IN EXISTING
DUCTBANK
CONNECTOR PANELS. COIL 30' OF CABLE FROM EACH DIRECTION.
WALL MOUNTED PATCH PANEL. PROVIDE (4) NEW 6 PORT SC
FIBER OPTIC PULL BOX. TERMINATE FIBER AT EXISTING INTERIOR
SOUTHEAST FACING WALL THROUGH AN EXISTING WALL MOUNTED
ENTRY POINT ON THE WEST RWSL SHELTER IS ALONG THE
3. SEE DETAIL 1 ON SHEET C200 FOR FIBER OPTIC WALL ENTRY.
DIRECTION.
FACE OF THE BUILDING. COIL 30' OF CABLE FROM EACH
BUILDING IN EXISTING DUCT BANK EXITING ALONG THE NORTH
TERMINATIONS) FIBER (TO WEST RWSL SITE) THROUGH RR
AND NEW 6 PORT CONNECTOR PANEL. ROUTE SECOND FEED-THRU (NO
CORNING PANEL. PROVIDE (1) ADDITIONAL CCH PANEL (CCH-02U)
EXISTING OVERHEAD CABLE TRAY TO AN EXISTING RACK MOUNTED
MOUNTED BOX. ROUTE INBOUND FOTS AND RWSL FIBER THROUGH
WALL THROUGH AN EXISTING CONDUIT AND FIBER OPTIC WALL
ENTRY POINT ON THE RR BUILDING IS ALONG THE SOUTH FACING
2. SEE DETAIL 1 ON SHEET C200 FOR FIBER OPTIC WALL ENTRY.
1. SEE GENERAL NOTES AND CONSTRUCTION NOTES ON DRAWING C100.
C109C108
C107
NEW 4" CONDUIT
& NEW RWSL
FIBER
THE FAA-APPROVED CABINET EQUALS.
CCH-CP06-19T FOR CORNING ENCLOSURES OR BE COMPATIBLE WITH
THE CCH AND WCH UNITS SHALL BE ST, 6-CONNECTOR PANELS, P/N
FOR RACK-MOUNTED INSTALLATIONS. CONNECTOR PANELS USED IN
CORNING CCH-04U-CLASSIC AND CSH-03U OR FAA-APPROVED EQUALS
FAA-APPROVED EQUALS FOR WALL-MOUNTED INSTALLATIONS AND
CORNING WCH-12P-CLASSIC TERMINATION CABINETS OR
WALLS OR IN INTERIOR EQUIPMENT RACKS AS REQUIRED. USE
FIBER TERMINATION CABINETS MOUNTED ON FACILITIY INTERIOR
ST CONNECTORS. COMPLETED CABLES SHALL BE CONNECTED TO
COLOR-CODED, FUSION-SPLICED PIGTAILS EQUIPPED WITH MALE,
SEGMENT AT BOTH ENDS. EACH FIBER SHALL BE TERMINATED USING
4. CONTRACTOR SHALL TERMINATE ALL FIBERS IN EACH CABLE
C110
T W
Y
E
T
P2
TWY S
ABANDONED
R W
Y
C
C
C
L
TWY S
x x x x x x x x x
P1
MB
MD
HH1MB
HH2
P6
P7
MH1
RR SITE
MB7
P
P9
P3
RVR
CB
M
M B
M
M
MB1
HH3MB
P4
F/O
RVR PWR &
1-6 PR#19
SECTIONALIZER
F/O
HOLD
SHORT
LINE
M
M
2/C #1/0
7.2KV &
1-50
PR
PHASE B
(BLUE)
1-50 PR #19STANDBY
ABANDONED
x
T W
Y
S x x x x x x x x x
M B
M B
HH10
A
M
B HH1
M B
M B
M B
M B
M B
H H
M B
MB
MB
M B
M
BM
B
MB3
FENCE
FENCE
F/O
2-24 STRD F/O
JB
TWY S
T W
Y
E
HH1
R W
Y
C
C
ABANDONED
T
HH1 HH2MB1
MB2
x x xx
(1-50 PR #19)
(1-50 PR #19)
(1-6 PR #19)
RR STANDBY ABANDONED
ILS ACTIVE
ILS ACTIVE
RR STANDBY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .