Amend 2 - DTFASA-17-R-00153 Fresno CA ATCT Fire-Life Safety Upgrade (pdf)

View the file

Other files

File Type Posted
Tech Spec - DTFASA-17-R-00153 - Fresno CA ATCT FireLife Safety Upgrade (1-10-2017 FAT FLS SPECS).1-10-2017 FAT FLS SPECS —
Drawings - DTFASA-17-R-00153 - Fresno CA ATCT FireLife Safety Upgrade (1-10-2017 FAT FLS DWGs).1-10-2017 FAT FLS DWGs —
RFO - DTFASA-17-R-00153 - Fresno CA ATCT Fire-Life Safety Upgrade.pdf PDF
Amend 1 - DTFASA-17-R-00153 Fresno CA ATCT Fire-Life Safety Upgrade.pdf PDF
General Decision - CA170029 01-20-2017 CA29.pdf PDF
RFO - DTFASA-17-R-00153 - Fresno CA ATCT Fire-Life Safety Upgrade.pdf PDF
General Decision - CA170029 01-20-2017 CA29.pdf PDF
Amend 1 - DTFASA-17-R-00153 Fresno CA ATCT Fire-Life Safety Upgrade.pdf PDF
Drawings - DTFASA-17-R-00153 - Fresno CA ATCT FireLife Safety Upgrade (1-10-2017 FAT FLS DWGs).1-10-2017 FAT FLS DWGs —
Tech Spec - DTFASA-17-R-00153 - Fresno CA ATCT FireLife Safety Upgrade (1-10-2017 FAT FLS SPECS).1-10-2017 FAT FLS SPECS —
Drawings - DTFASA-17-R-00153 - Fresno CA ATCT FireLife Safety Upgrade (1-10-2017 FAT FLS DWGs).1-10-2017 FAT FLS DWGs —
RFO - DTFASA-17-R-00153 - Fresno CA ATCT Fire-Life Safety Upgrade.pdf PDF
Tech Spec - DTFASA-17-R-00153 - Fresno CA ATCT FireLife Safety Upgrade (1-10-2017 FAT FLS SPECS).1-10-2017 FAT FLS SPECS —
Amend 1 - DTFASA-17-R-00153 Fresno CA ATCT Fire-Life Safety Upgrade.pdf PDF
Tech Spec - DTFASA-17-R-00153 - Fresno CA ATCT FireLife Safety Upgrade (1-10-2017 FAT FLS SPECS).1-10-2017 FAT FLS SPECS —
RFO - DTFASA-17-R-00153 - Fresno CA ATCT Fire-Life Safety Upgrade.pdf PDF
Drawings - DTFASA-17-R-00153 - Fresno CA ATCT FireLife Safety Upgrade (1-10-2017 FAT FLS DWGs).1-10-2017 FAT FLS DWGs —
Drawings - DTFASA-17-R-00153 - Fresno CA ATCT FireLife Safety Upgrade (1-10-2017 FAT FLS DWGs).1-10-2017 FAT FLS DWGs —
Tech Spec - DTFASA-17-R-00153 - Fresno CA ATCT FireLife Safety Upgrade (1-10-2017 FAT FLS SPECS).1-10-2017 FAT FLS SPECS —
Tech Spec - DTFASA-17-R-00153 - Fresno CA ATCT FireLife Safety Upgrade (1-10-2017 FAT FLS SPECS).1-10-2017 FAT FLS SPECS —
Drawings - DTFASA-17-R-00153 - Fresno CA ATCT FireLife Safety Upgrade (1-10-2017 FAT FLS DWGs).1-10-2017 FAT FLS DWGs —
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB Control No. 2120-0595 (SF-30) FAA Template No. 11 (Reverse) (8/97)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 1

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0002 4/06/2017

6. ISSUED BY 7. ADMINISTRATED BY (If other than Item 6) Federal Aviation Administration Acquisition Management Branch, AAQ-530 1601 Lind Ave SW Renton WA 98057

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

9A. AMENDMENT OF SOLICITATION NO.

DTFASA-17-R-00153

9B. DATED (SEE ITEM 11)

January 20, 2017

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. AWARD DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is NOT extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation on as amended, by one of the following methods:

(a) By completing Item 8 and 15, and returning 1 copies of the amendment; (b) acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hours and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS

DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is required to sign this document and return 1 copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The above referenced solicitation for the Fresno Airport Air Traffic Control Tower (ATCT) Fire-Life-Safety Upgrades is amended to respond to questions from potential offerors, two total questions. There are no attachments to this amendment.

QUESTION No. 1. Can you specify if the existing FACP is to remain? The specification is a bit unclear [i.e., at RFO Section J, SA34 Technical Specification, SOW Section II - Fire Alarm System Upgrades Scope Of Work, A - Subtask 1], it asks to use the existing FACP, then shows on plans we are to remove a Siemens panel.

ANSWER: The Siemens panel will be removed. This project does require a new FACP be installed.

QUESTION No. 2. Amendment 1 lists four fire alarm manufacturers: EST, Notifier, Siemens, and Simplex. Will Gamewell‐FCI by Honeywell be considered an acceptable manufacturer for this project?

ANSWER: Yes, as long as it meets the performance requirements, Gamewell should be acceptable.

ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.

Except as provided herein, all terms and conditions of the referenced document in Item 9A or 10A, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16C. DATE SIGNED

(Signature of person authorized to sign)