Amend 2 - DTFASA-17-R-00152 - Portland ASSC.pdf
PDF 41 KB Posted
- Solicitation number
- DTFASA-17-R-00152
About this file
Amend 2 - DTFASA-17-R-00152 - Portland ASSC (pdf)
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB Control No. 2120-0595 (SF-30) FAA Template No. 11 (Reverse) (8/97)
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 1
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0002 10/19/2017
6. ISSUED BY 7. ADMINISTRATED BY (If other than Item 6) Federal Aviation Administration Acquisition Management Branch, AAQ-570 1601 Lind Ave SW Renton WA 98057
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
9A. AMENDMENT OF SOLICITATION NO.
DTFASA-17-R-00152
9B. DATED (SEE ITEM 11)
August 21, 2017
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. AWARD DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is NOT extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation on as amended, by one of the following methods:
(a) By completing Item 8 and 15, and returning 1 copies of the amendment; (b) acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hours and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS
DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The above referenced solicitation for the construction of Airport Surface Surveillance Capabilities (ASSC) System, Portland International Airport, OR, is amended as follows.
1. Add Addendum #2, providing changes to the technical specification: See Attachment 1, comprised of 15 total items on 3 total pages.
Note: As established by Amendment 1, the due date for receipt of offers is November 1, 2017, at 5:00 PM Pacific Time.
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Except as provided herein, all terms and conditions of the referenced document in Item 9A or 10A, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED
16C. DATE SIGNED
(Signature of person authorized to sign)
BY
(Signature of Contracting Officer)
Attachment 1 to Amendment No. 2
DTFANM-17-R-00152
10/19/2017
ADDENDUM #2
PORTLAND ASSC PROJECT - 1103419
PORTLAND, OR
THE FOLLOWING CHANGES SHALL BE INCORPORATED INTO THE
CONSTRUCTION DOCUMENTS, AND SHALL BECOME A PART OF THE
CONTRACT:
1. ACCESS TO/FROM WORK AREAS ACROSS AN ACTIVE TAXIWAY SURFACE
WILL BE SUBJECT TO RECEIVING CLEARANCE TO CROSS THAT SURFACE
BY THE DIRECTION OF A DESIGNATED FLAGGER. THE CONTRACTOR
SHALL AT ALL TIMES YIELD TO AN AIRCRAFT. NO CROSSING OF ACTIVE
RUNWAYS WILL BE ALLOWED.
2. CONTRACTOR ACCESS ALONG HAUL ROUTES WITHIN THE AOA MAY BE
SUBJECT TO DELAYS DUE TO AIRPORT OPERATIONS.
3. ALL PORTIONS OF THE HAUL ROUTE SHALL BE CONTINUOUSLY SWEPT BY
VACUUM SWEEPERS DURING ALL WORK HOURS. IN ADDITION, A DEDICATED
VACUUM SWEEPER SHALL BE ASSIGNED TO EACH LOCATION WHERE THE
HAUL ROUTE CROSSES AN ACTIVE TAXIWAY AND SHALL ROUTINELY SWEEP
THE CROSSING DURING ALL WORK HOURS AND AFTER ALL CONSTRUCTION
TRAFFIC FOR THIS PROJECT CROSSES THE AREA.
4. THE CONTRACTOR SHALL KEEP VACUUM SWEEPER TRUCK(S) AND
WATER TRUCK(S) ON SITE AT ALL TIMES DURING WORKING AND NON-
WORKING HOURS AND SHALL MAINTAIN THE SITES FREE FROM DUST AND
OBJECTIONABLE DEBRIS. DURING THE PERIODS OF TIME THAT THERE IS
NO CONSTRUCTION ACTIVITY (BETWEEN WORK SHIFTS), THE VACUUM
SWEEPER TRUCK AND WATER TRUCK MUST BE READY AND ON-SITE
WITH CONTRACTOR’S PERSONNEL AVAILABLE BY PHONE TO RESPOND
IMMEDIATELY TO A DUST OR DEBRIS PROBLEM AS IDENTIFIED BY THE
PORT. AT NO TIME SHALL THERE BE MORE THAN A 10-MINUTE RESPONSE
TIME TO CALLS CONCERNING DUST/DEBRIS PROBLEMS DURING WORK
HOURS AND A 90-MINUTE RESPONSE TIME AT ALL OTHER TIMES ON A 24-
HOUR BASIS.
5. THE CONTRACTOR SHALL PREVENT FOREIGN OBJECT DEBRIS (FOD) IN
AIRCRAFT OPERATIONAL AREAS AND SHALL CONTROL CONSTRUCTION
AREA GENERATED DUST ON A 24-HOUR BASIS.
6. THE EXISTING ROADS DESIGNATED AS CONTRACTOR HAUL ROUTES MAY
BE USED BY OTHER AIRPORT VEHICLES, CONTRACTORS AND THE
GENERAL PUBLIC (ALONG PUBLIC ROADS). THE CONTRACTOR SHALL
NOT INTERFERE WITH OTHER VEHICULAR TRAFFIC AND THE
CONTRACTOR SHALL PROVIDE ALL FLAGGING, SIGNING, LIGHTING, ETC.
REQUIRED BY THE PORT OF PORTLAND TO PROVIDE ALL REASONABLE
SAFETY MEASURES TO PROTECT ALL PERSONS UTILIZING THE HAUL
ROADS AND ALL PUBLIC ROADS USED BY THE CONTRACTOR. THE
CONTRACTOR SHALL OBEY ALL VEHICLULAR WEIGHT AND SPEED LIMITS
AS POSTED ON PORT PROPERTY OR PUBLIC STREETS. THE
CONTRACTOR SHALL CONTINUOUSLY SWEEP ALL ACCESS ROUTES TO
THE CONSTRUCTION AREAS AND EXISTING ADJACENT PAVED AREAS
AND AOA PAVEMENTS. THESE AREAS SHALL BE KEPT FREE OF
CONSTRUCTION DEBRIS AT ALL TIMES.
7. ALL DAMAGE ALONG THE CONTRACTOR ACCESS/HAUL ROUTES ON
EXISTING ROADS DUE TO THE CONTRACTOR’S USE SHALL BE REPAIRED
IMMEDIATELY. AT THE COMPLETION OF THE PROJECT, ALL PAVEMENTS
AND SURFACES ALONG THE ACCESS ROUTES THAT WERE EXISTING AT
THE START OF THE PROJECT SHALL BE RESTORED TO THE ORIGINAL
CONDITIONS. THE CONTRACTOR SHALL COORDINATE AND MEET THE
CLEANING AND REPAIR REQUIREMENTS SET BY THE FAA AND PORT OF
PORTLAND.
8. ALL VEHICLES AND EQUIPMENT SHALL BE KEPT WITHIN THE WORK
AREAS ESTABLISHED FOR THAT WORK SHIFT UNLESS TRAVELING TO OR
FROM THE SITE VIA APPROVED HAUL ROUTES. UNDER NO
CIRCUMSTANCES SHALL VEHICLES BE PARKED OR
EQUIPMENT/MATERIALS BE STORED OUTSIDE OF THESE AREAS. ALL
EQUIPMENT SHALL BE KEPT OUTSIDE OF THE RUNWAY SAFETY AND
TAXIWAY OBJECT FREE AREAS OF ACTIVE RUNWAYS AND TAXIWAYS.
9. ALL CONSTRUCTION VEHICLES AND EQUIPMENT OPERATING WITHIN THE
AOA SHALL BE EQUIPPED WITH YELLOW FLASHING BEACONS.
CONTRACTOR ESCORTS AND VEHICLES TALLER THAN 15 FEET SHALL
ALSO BE EQUIPPED WITH A STAFF MOUNTED 3’X3’ INTERNATIONAL
ORANGE AND WHITE CHECKERED FLAG. CHECKERED PATTERN TO BE
ONE FOOT SQUARE. THE BEACONS ON THE EQUIPMENT AND VEHICLES
SHALL BE ON AND OPERATIONAL AT ALL TIMES WHILE ON THE AOA.
VEHICLES WITHIN THE RESTRICTED AREA SHALL DISPLAY
PROFESSIONALLY MANUFACTURED COMPANY IDENTIFICATION
MARKINGS ON BOTH SIDES OF THE VEHICLE. IN ACCORDANCE WITH FAA
AC 150/5210-20, LETTERING SHALL BE AT LEAST 3 INCHES IN HEIGHT WITH
CONTRASTING BACKGROUND COLOR. VEHICLES SHALL ALSO BE
EQUIPPED WITH HEADLIGHTS, TAILLIGHTS, AND FLASHERS THAT SHALL
BE USED BETWEEN SUNSET AND SUNRISE, OR WHEN VISIBILITY IS LOW.
10. LIGHTING PROVIDED FOR ANY NIGHT WORK SHALL NOT INTERFERE WITH
AIR NAVIGATION LIGHTS. LIGHTS SHALL BE TRANSPORTED TO AND FROM
THE WORK AREAS WITH THE LIGHTS POINTED DOWN OR OFF.
11. THE CONTRACTOR MAY STORE LIMITED EQUIPMENT/MATERIALS
ASSOCIATED WITH CONSTRUCTION AT THE ESTABLISHED SITES OR AT
LOCATIONS DESIGNATED BY THE PORT OF PORTLAND AIRPORT
OPERATIONS. MOST WORK AREAS ARE LOCATED WITHIN THE AOA. THE
CONTRACTORS USE OF ANY STORAGE SITE WITHIN THE AOA IS
RESTRICTED TO STORAGE OF THE CONTRACTOR’S EQUIPMENT/
MATERIALS. STOCKPILE OF MATERIAL WITHIN THE AOA IS LIMITED TO A
HEIGHT OF 6 FEET UNLESS OTHERWISE APPROVED BY THE PORT OF
PORTLAND.
12. NO FIELD OFFICE FOR THE FAA, CONTRACTOR OR SUBCONTRACTORS
WILL BE ALLOWED WITHIN THE SECURED AREA. SPACE FOR THE
CONTRACTORS AND FAA’S FIELD OFFICE IS AVAILABLE AT THE LOCATION
SHOWN ON THE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
ALL PERMITTING AND UTILITY CONNECTIONS REQUIRED TO OPERATE
OUT OF THIS OR ANY LOCATION.
13. EMPLOYEE PARKING: PARKING OF EMPLOYEES’ PRIVATE VEHICLES IS
RESTRICTED TO PARKING AREAS OFF THE AOA. NO EMPLOYEE
VEHICLES OR FOOD VENDORS WILL BE ALLOWED ON THE AOA.
CONTRACTOR SHALL BE RESPONSIBLE FOR TRANSPORT OF EMPLOYEES
TO/FROM WORK AREAS IN PORT-APPROVED VEHICLES.
14. EQUIPMENT OPERATED ON ALL ROADS WITHIN THE AIRFIELD SHALL
CONFORM TO LEGAL LOAD LIMITS FOR PUBLIC HIGHWAYS. ROAD
SURFACES SHALL BE SMOOTH (NON-MILLED) AND DEBRIS FREE AT ALL
TIMES.
15. LIMIT EQUIPMENT HEIGHT TO 15’ UNLESS OTHERWISE ALLOWED BY THE
PORT. WITH PORT APPROVAL, EQUIPMENT BETWEEN HEIGHT OF 15’ AND
30’ MAY BE ALLOWED DEPENDING ON WHERE AND WHEN WORK IS TO
OCCUR AND IF WEATHER CONDITIONS ARE PROJECTED TO BE CLEAR
FOR THE ENTIRE WORK PERIOD.
END OF ADDENDUM #2
| Amend 2 - DTFANM-09-R-XXXXX (SF 30) questions y |
| GY's for Amend 2 - SB's 10-18-2017 eml - ADDENDUM 2 |
File details come from the government source that posted it. Updated .