Questions for DTFASA‐17‐R‐00145 – Santa Maria PAPI Project

003 ‐ Light Housing Assembly

1. Request for 1 ground 4‐0 around for LHA no termination or connection detail

Answer: Terminate to the ground counterpoise.

2. "GRMC" Stands for???

Answer: Galvanized Rigid Metallic Conduit

Light Housing assembly elevation view

3. Please provide information as noted in Note# 1391‐C Section 4.2‐4.8 and 1217 G Section 5.2.3.2.1

Answer:SeeOrders1391dsection4.2‐4.8and1217Gsection5.2.3.2.1asstatedonthedrawing.
Thedrawingstated1391c,butitshouldbe1391d.

Re‐ bar in Foundation ground wire

4. No size and no Point of Ground connection in the ground system 1‐0 or 4‐0.

Answer: Weld to counterpoise

5. Detailfor2"pipefromhandholetoL.H.A.spacernotclearindetailspageCOOSPAPILHAtrench
detailsrequestbetweenhighandlowvoltagemin..24"andinbetweenfirstrowandsecondrow6"min.

Answer: 6”

6. Please provide detail to penetrate and connecting wire # 6 ground to LHA

Answer: See Drawing SMX‐D‐PAPI30‐C003, all details

7. Please provide detail how terminate 1 "pipe coming up the concrete for LHA exterior grounding.

Answer: Cut off 1” pvc 1” above concrete. Run #6 through 1”pvc to ground the LHA chassis.

8. W#6forgroundingL.H.Ashallbesealedorstrandedgreensignsitiscomingfromunderground
andtobeconnectedto1‐0or4‐0

Answer: All grounding to be terminated underground at the counterpoise.

9. EMT leg detail 3 required 2" lock nut need to be galvanized or stainless steel or Standard.

Answer: Galvanized

10. Ground wire# 1 O Under the rod shall be in 1" pipe or no pipe.

Answer: Should be in PVC.

11. Groundre‐barinLHAFoundationtobeconnectedto10or40LOPLHAUnitground#6tobe
connectedto10or40LOP

Answer: Ground re‐bar 1/0 / 4/0 should be terminated with ground counterpoise.

12. PAPI LHA Trench details 12" or 24 "min. Separation between power primary power and control conduits.

Answer: 6”

Copper Industries

C004 ‐Ground to ground and air to ground radio control details.

B‐

13. 32 Strands of# 17 ( 2 PL) Lightning protection and labeled provided by?????

Answer: Contractor

14. 28R Welded to 4‐0 not clear.

Answer: Weld to 4/0

15. 2" GRS Conduit stand for ???????????

Answer: Galvanized Rigid Conduit

16. 2" PVC spare conduit not clear to which side to directed out of the foundation.

Answer: ‐ to the incoming power

C005 ‐Duct bank grounding

17. Not clear ‐The distance in between the ground round and between H.H,. Boxes.

Answer: It’s specified in the order 1391d or 019e.

Hand hole detail

18. As note # 5 request 3 ground round per H.H. Box ..

Answer: Refer to the latest order 1391d.

19. In the detail grounding appear in the duct Bank 3 sides of H.H. Box is it correct?

Answer: The requirement is stated in the drawing and if not clear, please refer to the order 1391d.

20. ThesizeofproposedaccessasphaltroadtothePAPIisnotclearlydefinedNeitherintheSpecnor
onthedrawing.

Answer: Refer to drawing C002 & C004

21. Verify (Refer to drawing C002), the type of conduits RSG or RSC?

Answer: RSG

22. Please verify if the conduit sizes in drawing C006 are 3" & 4"?

Answer: 4”

DTFASA-17-R-00145 Amend 1
Answers for DTFASA-17-R-00145