AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
FAA-003 01/22/2015
6. ISSUED BY 7. ADMINISTRATED BY (If other than Item 6) Federal Aviation Administration Acquisition Management Branch, AAQ-530 1601 Lind Ave SW Renton, WA 98057
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
9A. AMENDMENT OF SOLICITATION NO.
DTFANM-15-R-00014
9B. DATED (SEE ITEM 11)
1/05/2015
10A. MODIFICATION OF CONTRACT/ORDER NO.
*TO BE COMPLETED BY VENDOR IF NOT COMPLETE 10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation on as amended, by one of the following methods:
(a) By completing Item 8 and 15, and returning 1 copies of the amendment; (b) acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hours and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO.
AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
***PROPOSALS ARE DUE NO LATER THAN 12:00 PM LOCAL TIME ON JANUARY 29, 2015***
***PLEASE SEE QUESTIONS AND ANSWERS ON PAGE 2***
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Matthew Benbow
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign)
BY
(Signature of Contracting Officer)
OMB Control No. 2120-0595 (SF-30) FAA Template No. 11 (8/97)
1. What is the model # of the Hi-security gate operator is being required? See Specification – Division 2, Section 02832 (Gate Operator). HY-Security Model Slide Driver 15, part number 222
SS ST.
2. What type or model keypad is required? See Specification – Division 13, Section 13721 (Access Control). See also drawing –E029 (Block Wiring Diagram)
3. Is the Tymetal gate require steel or aluminum? Aluminum
4. If Tymetal gates are used they must have ground tracks ty-metal Gates do dot offer double ground wheels v groove only. As per drawing –C017, use TyMetal high security gate or equal. Delete the requirement of a double wheel carrier instead use a Heavy Duty Cantilever for both sliding gates. The associated hardware (Gate hanger, Bottom guide, Track and catch assembly) shall be from the gate manufacturer. See attached cutsheet (GS931-1 to 3) from TyMetal. This cutsheet supersedes Detail 1/C016 of Drawing FFZ-D-ATCT-C016.
5. On the prints there are existing parking lot marks that are not shown on the final print. What method is to be used to remove the existing parking lot marks that will not remain? Overlay with asphalt liquid to remove the stripping/markings.
6. Clarification:
a. Terminal, corner, gate and line posts shall be hot-dipped galvanized and powder-coated black.
b. The drawing specifies the Terminal, corner and gate posts to be schedule 60, however, if schedule 60 is not readily available in the market, FAA is willing to accept Schedule 80 as a substitute. Line posts shall remain as schedule 40 as specified.
c. Fence fabric shall be powder-coated black.
DTFANM-15-R-00014 PAGE 2 of 2