20 AMENDMENT 2.pdf

PDF 92 KB Posted

Attached to
Construction of a New Perimeter Fence at Falcon Field ATCT in Mesa, AZ
Solicitation number
DTFANM-15-R-00014
Issued by

About this file

20 AMENDMENT 2 (pdf)

View the file

Other files

File Type Posted
RFO.pdf PDF
C D Waste Tracking Log.xlsx XLSX spreadsheet
20 AMENDMENT 3.pdf PDF
20 AMENDMENT 4A.pdf PDF
20 AMENDMENT 2.pdf PDF
20 AMENDMENT 1.pdf PDF
DRAWINGS.pdf PDF
ATTACHMENT 2 - SF-1413.pdf PDF
ATTACHMENT 1 - CUSTOMER SATISFACTION SURVEY.pdf PDF
SPECIFICATIONS.pdf PDF
ATTACHMENT 3 - DAVIS BACON WAGE DETERMINATION.pdf PDF
20 AMENDMENT 4B.pdf PDF
SPECIFICATIONS.pdf PDF
ATTACHMENT 3 - DAVIS BACON WAGE DETERMINATION.pdf PDF
ATTACHMENT 1 - CUSTOMER SATISFACTION SURVEY.pdf PDF
20 AMENDMENT 1.pdf PDF
20 AMENDMENT 3.pdf PDF
DRAWINGS.pdf PDF
C D Waste Tracking Log.xlsx XLSX spreadsheet
RFO.pdf PDF
20 AMENDMENT 2.pdf PDF
ATTACHMENT 2 - SF-1413.pdf PDF
RFO.pdf PDF
ATTACHMENT 3 - DAVIS BACON WAGE DETERMINATION.pdf PDF
ATTACHMENT 2 - SF-1413.pdf PDF
SPECIFICATIONS.pdf PDF
C D Waste Tracking Log.xlsx XLSX spreadsheet
20 AMENDMENT 1.pdf PDF
ATTACHMENT 1 - CUSTOMER SATISFACTION SURVEY.pdf PDF
DRAWINGS.pdf PDF
ATTACHMENT 1 - CUSTOMER SATISFACTION SURVEY.pdf PDF
ATTACHMENT 3 - DAVIS BACON WAGE DETERMINATION.pdf PDF
ATTACHMENT 2 - SF-1413.pdf PDF
20 AMENDMENT 1.pdf PDF
C D Waste Tracking Log.xlsx XLSX spreadsheet
RFO.pdf PDF
SPECIFICATIONS.pdf PDF
DRAWINGS.pdf PDF
C D Waste Tracking Log.xlsx XLSX spreadsheet
SPECIFICATIONS.pdf PDF
ATTACHMENT 1 - CUSTOMER SATISFACTION SURVEY.pdf PDF
DRAWINGS.pdf PDF
ATTACHMENT 2 - SF-1413.pdf PDF
ATTACHMENT 3 - DAVIS BACON WAGE DETERMINATION.pdf PDF
RFO.pdf PDF
ATTACHMENT 2 - SF-1413.pdf PDF
RFO.pdf PDF
ATTACHMENT 1 - CUSTOMER SATISFACTION SURVEY.pdf PDF
DRAWINGS.pdf PDF
SPECIFICATIONS.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

FAA-002 01/20/2015

6. ISSUED BY 7. ADMINISTRATED BY (If other than Item 6) Federal Aviation Administration Acquisition Management Branch, AAQ-530 1601 Lind Ave SW Renton, WA 98057

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

9A. AMENDMENT OF SOLICITATION NO.

DTFANM-15-R-00014

9B. DATED (SEE ITEM 11)

1/05/2015

10A. MODIFICATION OF CONTRACT/ORDER NO.

*TO BE COMPLETED BY VENDOR IF NOT COMPLETE 10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation on as amended, by one of the following methods:

(a) By completing Item 8 and 15, and returning 1 copies of the amendment; (b) acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hours and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO.

AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

***PROPOSALS ARE DUE NO LATER THAN 12:00 PM LOCAL TIME ON JANUARY 29, 2015***

***PLEASE SEE QUESTIONS AND ANSWERS ON PAGE 2***

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Matthew Benbow

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign)

BY

(Signature of Contracting Officer)

OMB Control No. 2120-0595 (SF-30) FAA Template No. 11 (8/97)

1. On the plans it says that he needs to install a key pad, does he needs to run electricity to it? Yes, see “Intercom/Keypad Access Control Wiring Diagram” on drawing –E029.

2. On the plans it asks for a gate operator, he needs to know what type. See Specification – Division 2, Section 02832 (Gate Operator)

3. Who will tie into the city’s power for the street light? Will it be the city? Contractor will tie into the city’s power located at the street. Are they running through the city’s power? Yes, the new parking lot lighting power source will be from the city’s street light power source.

4. The plans call out for a mag 60.2.3. There are no mags of that size, but he found a mag 601 and if he needs to bore or trench across the street to tie into the street light. Bedding shall be as per

MAG 601.4.3.

5. Does the buyer want a mow strip (concrete strip around the fence)? Only at the grass areas.

6. He also needs the Davis Bacon wages. Please see FAA Contract Opportunities website

7. PVS coated RGS: is it ridged or coated from the street lights to the parking lot? Use Schedule 40 PVC manufactured with a factory 90 deg bend and a radius of not less than 18” as per the drawing and as per MAG Specs.

DTFANM-15-R-00014 PAGE 2 of 2

AMENDMENT 2
AMENDMENT 2 page 2

File details come from the government source that posted it. Updated .