About this file

DTFAAC-16-R-07136 (pdf)

View the file

Other files

File Type Posted
Attachment J.3 Wage Determination.pdf PDF
Attachment J.2 Garage Construction - Drawings.pdf PDF
16-07136 SF-30 0003.pdf PDF
Attachment J.8 ConsentLtr.pdf PDF
Attachment J.6 Past Performance Questionnaire.pdf PDF
Attachment J.1 QKA SD Garage Construction SOW.pdf PDF
Attachment J.10 Payment bond.pdf PDF
DTFAAC-16-R-07136.pdf PDF
16-07136 SF-30 0002.pdf PDF
Attachment J.7 Client Authorization Letter.pdf PDF
Attachment J.11 Pics of old garage.pdf PDF
16-07136 SF-30 0001.pdf PDF
Attachment J.4 Contractor's Release.pdf PDF
Attachment J.5 Experience Information Form.pdf PDF
Attachment J.2 Garage Construction - Drawings.pdf PDF
Attachment J.1 QKA SD Garage Construction SOW.pdf PDF
Attachment J.4 Contractor's Release.pdf PDF
Attachment J.3 Wage Determination.pdf PDF
16-07136 SF-30 0001.pdf PDF
DTFAAC-16-R-07136.pdf PDF
Attachment J.8 ConsentLtr.pdf PDF
16-07136 SF-30 0002.pdf PDF
Attachment J.6 Past Performance Questionnaire.pdf PDF
Attachment J.7 Client Authorization Letter.pdf PDF
Attachment J.5 Experience Information Form.pdf PDF
Attachment J.3 Wage Determination.pdf PDF
Attachment J.7 Client Authorization Letter.pdf PDF
16-07136 SF-30 0001.pdf PDF
Attachment J.2 Garage Construction - Drawings.pdf PDF
Attachment J.4 Contractor's Release.pdf PDF
Attachment J.5 Experience Information Form.pdf PDF
Attachment J.1 QKA SD Garage Construction SOW.pdf PDF
Attachment J.8 ConsentLtr.pdf PDF
DTFAAC-16-R-07136.pdf PDF
Attachment J.6 Past Performance Questionnaire.pdf PDF
Attachment J.4 Contractor's Release.pdf PDF
Attachment J.3 Wage Determination.pdf PDF
Attachment J.7 Client Authorization Letter.pdf PDF
Attachment J.5 Experience Information Form.pdf PDF
Attachment J.8 ConsentLtr.pdf PDF
Attachment J.2 Garage Construction - Drawings.pdf PDF
Attachment J.1 QKA SD Garage Construction SOW.pdf PDF
Attachment J.6 Past Performance Questionnaire.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB Control No. 2120-0595 (SF-1442) FAA Template No. 3 (8/97)

SOLICITATION, OFFER, AND

AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

7. ISSUED BY 8. ADDRESS OFFER TO

9. FOR INFORMATION

CALL:

A. NAME B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, Identifying no., date):

11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable.

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date): Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

TABLE OF CONTENTS

() SEC DESCRIPTION PAGE(S) SEC DESCRIPTION PAGE(S)

PART II - CONTRACT CLAUSES

A I CONTRACT CLAUSES

B PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

C J LIST OF ATTACHMENTS

D PART IV - REPRESENTATIONS AND INSTRUCTIONS

E K REPRESENTATIONS, CERTIFICATIONS AND OTHER

F STATEMENTS OF OFFERORS

G L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

H

PART I - THE SCHEDULE

SOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECS./WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS M EVALUATION FACTORS FOR AWARD

100% SET ASIDE FOR COMPETITION AMONG CERTIFIED SMALL BUSINESSES.

(a) Statement of Work, “The Specifications for the construction of a new garage located at the FAA facility on Mt. Kaala, Hawaii.”

(b) FAA Drawings “ Mt. Kaala Halfway House Equipment Garage” (10/21/2015), “Mt. Kaala Halfway House New Garage foundation Drawings” (10/23/2015), and “Mt. Kaala Halfway House New Hazardous Shelter Foundation Drawings” (10/23/2015).

THE ESTIMATED PRICE RANGE OF THIS PROCUREMENT IS: $50,000 to $100,000

1-2 8-9 10-12

13-26

28-36

37-46 47-50

DTFAAC-16-R-07136 NEGOTIATED (RFO)

AC-16-07136

Logistic Center Support Section (AAQ-721) 6500 South MacArthur Boulevard P.O. Box 25082 Oklahoma City, OK 73125-4929

FAA, Customer Service Desk (AAQ-700) Room 313, Multi-Purpose Building 6500 South MacArthur Boulevard (Zip Code 73169) P.O. Box 25082 Oklahoma City, OK 73125-4933

Cilony M. Alejandro 405-954-7814

15 120 X X

N/A

IN THE AMOUNT OF 20% OF THE OFFERED PRICE, WHEN PROPOSAL EXCEEDS $100,000.X

OMB Control No. 2120-0595 (SF-1442) FAA Template No. 3 (Reverse) (8/97)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Offerors providing less than the calendar days indicated here for

Government acceptance after the date offers are due will not be considered and offer will be rejected.)

AMOUNTS Materials $ Labor $ Total $

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each.)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN (Type or print) 20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. RESERVED.

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract.

The rights and obligations of the parties to this contract shall be governed by

(a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consist of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO

SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA

BY

31C. AWARD

DATE

Logistic Center Acquisition Section Contract Management Team (AAQ-721) 6500 South MacArthur Boulevard P.O. Box 25082 Oklahoma City, OK 73125-4929

FAA, Financial Operations Division (AMK-300) 6500 South MacArthur Boulevard P.O. Box 25710 Oklahoma City, OK 73125

PART I - SECTION B

SUPPLIES/SERVICES & PRICE/COST

The contractor shall furnish all labor, tools, materials, equipment, transportation, and supplies necessary to complete all work defined in the specifications construction of a new garage located at the FAA facility on Mt.

Kaala, Hawaii.

ITEM NO. DESCRIPTION

0001 CONSTRUCTION OF A NEW GARAGE LOCATED AT THE FAA FACILITY

ON MT. KAALA, HAWAII DESCRIPTION OF ITEM AMOUNT

PERIOD OF PERFORMANCE:

TO BE COMPLETED 120 DAYS AFTER NTP

FIRM FIXED PRICE TOTAL AMOUNT $__________

The remainder of this page is intentionally left blank

SCOPE OF WORK

C.1 STATEMENT OF WORK (SOW)

The contractor shall furnish all labor, tools, materials, equipment, and supplies, necessary to accomplish the construction project set forth, in accordance with the attached technical specifications, drawings, and all other terms, conditions, and provisions as set forth herein.

C.2 SPECIFICATIONS AND/OR DRAWINGS

The following specifications and/or drawings are applicable to this acquisition:

(a) Statement of Work, “The Specifications for the construction of a new garage located at the FAA facility on Mt.

Kaala, Hawaii.”

(b) FAA Drawings “ Mt. Kaala Halfway House Equipment Garage” (10/21/2015), “Mt. Kaala Halfway House New Garage foundation Drawings” (10/23/2015), and “Mt. Kaala Halfway House New Hazardous Shelter Foundation Drawings” (10/23/2015).

C.3 EMERGENCY SITUATIONS AND EXERCISES DURING CONTRACT PERFORMANCE (JUL 2015)

CLA.4548

(a) Emergency situations and exercises are temporary exceptions to the prohibition of contractor personnel not being subject to the direction and control of Government personnel when performing non-personal contract services in

FAA facilities.

(b) All contractor personnel at a FAA work site or facility during an actual emergency shall conform to the procedures posted or directed by FAA officials responsible for emergency response at that site or facility. Such officials include evacuation wardens/monitors, security personnel, Emergency Readiness Officers, management, etc.

(c) Contractor personnel shall participate in all emergency exercises, including evacuations, as part of performance under this contract. On rare occasions and based on advance arrangements that are then announced at the time of an exercise, contractor personnel will be excused from /evacuations.

(d) Contractor management/supervisors shall ensure that each contractor employee assigned work in FAA facilities possesses a general awareness of emergency and evacuation procedures at all locations where the employees might be during an emergency or exercise. Information on emergency procedures may be requested from the

Contracting Officer’s Technical Representative or a designated FAA contact point at the work site.

The remainder of this page is intentionally left blank

PART I - SECTION C

N/A

PART I - SECTION D

PACKAGING AND MARKING

PART I - SECTION E

INSPECTION AND ACCEPTANCE

E.1 INSPECTION

The Contracting Officer or his authorized representative may at all reasonable times inspect or otherwise evaluate the work being performed hereunder and the premises on which it is being performed. If any inspection or evaluation is made on the premises of the vendor or his subcontractor, the vendor shall provide and shall require his subcontractors to provide all reasonable facilities and assistance for the safety and convenience of the

Government representatives in the performance of their duties. All inspections and evaluations shall be performed in such a manner as will not unduly delay the work.

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JULY 2011)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting

Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

http://conwrite.faa.gov.

3.10.4-10 INSPECTION OF CONSTRUCTION (SEPTEMBER 2009)

3.10.4-16 RESPONSIBILITY FOR SUPPLIES (APRIL 1996)

The remainder of this page is intentionally left blank http://conwrite.faa.gov/

PART I - SECTION F

DELIVERIES OR PERFORMANCE

F.1 WORKING HOURS

Work shall be conducted between 7:00 a.m and 5p.m. Due to safety concerns, work may need to end prior to 5 p.m. to avoid driving down the access road after dark. It is a 30 minute drive from the highway up to the site. Any changes to this schedule must be approved by the FAA.

F.2 WORK LOCATION

The work will be performed on the FAA facility on Mt. Kaala, Hawaii.

F.3 CONTRACT PERIOD (January 1997) CLA.1604

The effective period of this contract is 120 days from the notice to proceed.

F.4 ACCELERATED DELIVERY (JAN 1997) CLA.1817

Any Schedule for delivery or performance may be expedited at the contractor's option, if without additional expense to the Government.

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JULY 2011)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting

Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

http://conwrite.faa.gov.

3.10.1-9 STOP-WORK ORDER (OCTOBER 1996)

3.10.1-11 GOVERNMENT DELAY OF WORK (APRIL 1996)

3.10.1-24 NOTICE OF DELAY (MARCH 2009)

The remainder of this page is intentionally left blank

PART I - SECTION G

CONTRACT ADMINISTRATION DATA

G.1 RELEASE FORM (JAN 1997) CLA.1227

The contractor will be required to execute Contractor's Release Form DOT F 4220.4 (2-71) prior to final payment under the contract. (Note: A copy of Form DOT F 4220.4 (2-71) is attached hereto for information purposes.)

G.2 AVAILABILITY AND USE OF UTILITY SERVICES (JAN 1997) CLA.1405

The contractor may use existing utilities without charge, if available; however, the contractor at his own expense and in a workmanlike manner satisfactory to the Contracting Officer, shall furnish, install, and maintain all necessary temporary connections and distribution lines, and shall remove same prior to final acceptance of the construction.

G.3 PAYMENT PROCEDURES (JUL 1997) CLA.2916

(a) The contractor shall submit original invoices, including applications for installment payments, directly to:

FAA, Mike Monroney Aeronautical Center

Financial Operations Division (AMK-311)

P.O. Box 25710

Oklahoma City, OK 73125-4913

(b) Payment for work performed or items furnished under this contract is subject to approval by the

Contracting Officer. The contractor shall submit 1 copy of all invoices, including applications for installment payments, to:

1) FAA, Mike Monroney Aeronautical Center

Logistic Center Acquisition Section Contract Management Team (AAQ-721)

6500 South MacArthur Blvd

P.O. Box 25082

Oklahoma City, OK 73125

2) FAA, Mike Monroney Aeronautical Center

ATTN: Timothy M. Jones

(AML-8050)

6500 South MacArthur Blvd

P.O. Box 25082

Oklahoma City, OK 73125

(c) Each invoice, including applications for installment payments, must reflect the contract number, delivery order number, and a description of the work, services, or items being invoiced.

3.10.1-23 CONTRACTING OFFICER'S REPRESENTATIVE-CONSTRUCTION CONTRACTS (APRIL

2012)

(a) The Contracting Officer may appoint other Government personnel to accomplish certain contract administration matters. While there shall be various titles and divisions of duties for these individuals, generically they are known as Contracting Officer's Representatives (CORs). The Contracting Officer will provide written notice of COR appointment(s), setting forth the authorities and limitations, to the Contractor within 5 calendar days prior to the notice to proceed. COR duties may include, but are not limited to:

(1) Perform as the authorized representative of the Contracting Officer for technical matters, including interpretation of specifications and drawings, and inspection and review of work performed.

(2) Perform as the authorized representative of the Contracting Officer for administrative matters, including reviewing payments, and updated delivery schedules.

(b) These representatives are authorized to act for the Contracting Officer in all specifically delegated matters pertaining to the contract, except:

(1) contract modifications that change the contract price or cost, technical requirements or time for performance, unless delegated field change order authority;

(2) suspension or termination of the Contractor's right to proceed, either for default or for convenience;

(3) final decisions on any matters subject to appeal, e.g., disputes under the "Contract Disputes" clause; and

(4) final acceptance under the contract.

PART I - SECTION H

SPECIAL CONTRACT REQUIREMENTS

H.1 PERMITS AND RESPONSIBILITIES

The Contractor shall secure and pay for all permits, licenses, special inspections, etc., required in the execution of the work, whether of a permanent or temporary nature.

H.2 ACCIDENT AND FIRE REPORTING

(a) In accordance with FAA Order 3900.19B, the Contractor shall report to the Contracting Officer any accident or fire occurring at the site of the work which causes:

(1) A fatality or as much as one lost workday on the part of any employee of the Contractor or subcontractor at any tier;

(2) Damage of $1,000 or more to Federal property, either real or personal;

(3) Damage of $1,000 or more to Contractor or subcontractor owned or leased motor vehicles or mobile equipment; or

(4) Damage for which a contract time extension may be requested.

(b) Accident and fire reports required by paragraph (a) above shall be accomplished by the following means:

(1) Accidents or fires resulting in a death, hospitalization of three or more persons, or destruction of Federal property (either real or personal), the total value of which is estimated at $100,000 or more, shall be reported immediately by telephone to the Contracting Officer or his/her authorized representative and shall be confirmed by telegram or facsimile transmission within 24 hours to the Contracting Officer. Such telegram or facsimile transmission shall state all known facts as to extent of injury and damage and as to cause of the accident or fire.

(2) Other accident and fire reports required by paragraph (a) above may be reported by the

Contractor using a state, private insurance carrier, or Contractor accident report form which provides for the statement of:

(i) The extent of injury; and

(ii) The damage and cause of the accident or fire.

Such report shall be mailed or otherwise delivered to the Contracting Officer within 48 hours of the occurrence of the accident or fire.

(c) The Contractor shall assure compliance by subcontractors at all tiers with the requirements of this clause.

H. 3 NOTIFICATION REQUIREMENTS WHEN FRIABLE ASBESTOS MATERIAL IS REMOVED/

DISTURBED CLA 1231

a) Prior to any planned and/or scheduled disturbance of friable asbestos material, mainly CAFCO ceilings, the contractor shall present a written plan to the Contracting Officer. The plan shall include, but not be limited to, location, type facility, size of area to be disturbed or removed, method of containment to be used, disposal procedures, clean-up procedures, number of employees involved, protective clothing/equipment to be used, the date and time removal/disturbance is planned and any other information requested by the Contracting Officer. The contractor shall not proceed with any removal or disturbance of friable asbestos material without written approval from the Contracting

Officer.

(b) If during the performance of the contract the contractor inadvertently disturbs friable asbestos material, mainly

CAFCO ceilings, the contractor shall immediately cease operations and notify the Contracting Officer. The contractor shall remain at the site of disturbance for the Contracting Officer's instructions.

H.4 AGREEMENT TO PARTICIPATE IN ALTERNATIVE DISPUTE RESOLUTION (JUN 2015) CLA.4540

(a) The Federal Aviation Administration encourages direct communications and negotiations between the contractor and the contracting officer in an attempt to resolve contract disputes. In those situations where the parties are not able to achieve resolution at the contracting officer level, the agency favors the use of alternative dispute resolution (ADR) techniques to resolve disputes.

(b) The parties hereby agree that, prior to referring a contract dispute to the Office of Disputes Resolution as described in contract clause 3.9.1-1 “Contract Disputes”, the parties will discuss whether they are willing to utilize

ADR techniques such as mediation or nonbinding evaluation of the dispute by a neutral party. Upon receipt of a contract dispute from the contractor, the contracting officer will explore with the contractor whether the use of ADR techniques would be appropriate to resolve the dispute. Both parties must agree that the use of such techniques is appropriate, and agree to fairly share the associated expenses. If the parties do not mutually agree to utilize ADR to resolve the dispute, the dispute will be processed in accordance with the procedures set forth in clause 3.9.1-1.

H.5 NOTICE OF CONTRACTOR TESTIMONY (SEPTEMBER 2006) CLA.4555

(a) The contractor shall notify the Contracting Officer promptly in writing of its intention, or the intention of its employees, subcontractors of any tier, or subcontractor employees, either voluntarily or under compulsion of competent authority, to provide sworn testimony on any matter related to or arising under the work required by and/or performed under, this contract. Such written notification at a minimum shall consist of the date and time of the testimony, identification of the court, board, or other body before which the testimony is made, the nature of the testimony to be given to the extent it is known at the time of this report, the nature of the contractor’s involvement in the proceeding and any other circumstances related to the work performed under or related to the contract and the proceeding in which the testimony will be taken.

(b) The contractor shall include the substance of this clause, including this paragraph (b), in all subcontracts executed under this contract and shall require all subcontractors to provide the required report to the contractor.

H.6 STRIKES OR PICKETING AFFECTING TIMELY COMPLETION OF THE CONTRACT WORK

(SEPTEMBER 2006) CLA.4557

Notwithstanding any other provision hereof, the Contractor is responsible for delays arising out of labor disputes, including but not limited to strikes, if such strikes are reasonably avoidable. A delay caused by a strike or by picketing which constitutes an unfair labor practice is not excusable unless the Contractor takes all reasonable and appropriate action to end such a strike or picketing, such as the filing of a charge with the National Labor Relations

Board, the use of other available Government procedures, and the use of private boards or organizations for the settlement of disputes.

H.7 TIME EXTENSION

Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the change work and that the remaining contract completion dates for all those portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule.

3.1.9-1 ELECTRONIC COMMERCE AND SIGNATURE (JULY 2013)

(a) The Electronic Signatures in Global and National Commerce Act (E-SIGN) establishes a legal equivalence between:

(1) Contracts written on paper and contracts in electronic form;

(2) Pen-and-ink signatures and electronic signatures; and

(3) Other legally-required written records and the same information in electronic form.

(b) With the submission of an offer, the offeror acknowledges and accepts the utilization of electronic commerce as part of the requirements of this solicitation and the resultant contract.

(c) Certain documents may need to be provided or maintained in original form, such as large scale drawings impractical to convert to electronic format or a document with a raised seal signifying authenticity. This clause does not change or affect any other requirements that a document must be in paper format to satisfy legal requirements such as for certain real estate transactions.

(d) The use of electronic signature technology is authorized under this solicitation and the resulting contract.

Contractors may use the following means of electronic signature technology (digital signatures).

PART II - SECTION I

CONTRACT CLAUSES

I.1 SAVE HARMLESS AND INDEMNITY AGREEMENT (JANUARY 1997)

CLA.3211

The contractor shall save and keep harmless and indemnify the Government against any and all liability, claims, and costs of whatsoever kind and nature of injury to or death of any person or persons and for loss or damage to any property (Government or otherwise) occurring in connection with or in any way incident to or arising out of the occupancy, use, service, operations, or performance of work in connection with this contract, resulting from the negligent acts, fault or omissions of the contractor, any subcontractor, or any employee, agent, or representative of the contractor or any subcontractor.

I.2 LIABILITY INSURANCE (JAN 1997) CLA.3212

(a) Pursuant to AMS 3.4.1-10, insurance--Work on a Government Installation, the insurance required of the contract during contract performance is:

(1) Workers' compensation and employer's liability as required by applicable Federal and Hawaii State workers' compensation and occupational disease statutes. Employer's liability coverage shall be not less than

$100,000.

(2) General liability coverage written on the comprehensive form of policy providing limits of liability for bodily injury of not less than $50,000 for each occurrence and property damage limits of liability of not less than

$25,000 for each accident.

(3) Automobile liability (applicable to vehicles used in connection with contract performance) written on the comprehensive form of policy providing coverage of at least $50,000 per person and $100,000 per occurrence for bodily injury and $100,000 per occurrence for property damage.

(b) The policy shall name "The United States of America, acting by and through the Federal Aviation

Administration" as an additional insured with respect to operations performed under this contract.

(c) The policy shall include the following provision: "It is a condition of this policy that the insurer shall furnish written notice to the Federal Aviation Administration (certificate holder) 30 days in advance of any reduction in or cancellation of this policy."

(d) Certificate holder address:

FAA-Mike Monroney Aeronautical Center

Logistic Center Acquisition Section Contract Management

Team (AAQ-721)

P. O. Box 25082

Oklahoma City, OK 73l25

(e) At any time during contract performance and upon request of the Contracting Officer, the contractor shall provide a certified true copy of the liability policy and manually countersigned endorsements of any changes thereto

3.2.2.3-41 PERFORMING WORK (JULY 2004)

The Contractor (you) must perform, using your own organization, work equivalent to at least 15 percent of the total amount of work under the contract on the site. The CO may modify this contract to reduce this percentage if you request a reduction and the CO determines that it would be to the Government's advantage to do so.

3.2.2.3-50 ALTERNATE I PROPERTY PROTECTION (JULY 2009)

(h) Managing and disposing of hazardous wastes and materials may expose the Contractor (you) and FAA (we) to short- and long-term liabilities. To reduce these possible liabilities you must be fully aware of the hazards and regulatory requirements associated with the hazardous materials involved in this project. You must use qualified personnel to handle and transport hazardous materials.

(i) Before commencing work, you must:

(1) Do an environmental assessment of the work the contract requires, identifying tasks which involve using, handling or transporting hazardous materials or wastes. The following work items are known to involve such substances:

Painting, adhering the roofing membrane, priming the roofing joints, sealant for roofing lap joints, soldering with solder flux.

(2) Submit an environmental plan identifying and dealing with each specific task involving the wastes. The plan must be specific enough to demonstrate a thorough understanding of the environmental risks and the appropriate method for dealing with them. The plan must also list the required permits and reference the regulations that govern the activities needed to deal with the materials or wastes.

(3) Meet with the CO's representatives during the preconstruction conference to discuss and to develop a mutual understanding on implementing the plan.

(4) The CO may require other tasks to be added to the plan. If the CO considers your planned methods for dealing with the risks insufficient, the CO may require you to revise the plan. Work involving hazardous materials or wastes must not start until we have approved your plan. Our review of your plan does not relieve you of liability for environmental law and regulatory compliance.

3.2.2.3-68 ALTERNATE I SAFETY AND HEALTH (JULY 2004)

(a) Before beginning work, the Contractor (you) must:

(1) Perform hazards analysis of the work specified in this contract. Consider both the site and adjacent conditions. Identify all significant hazards. Some of the hazards you might encounter are working at heights above

6 feet, heavy lifting, using power tools, wind, and rain.

(2) Submit a safety plan for dealing with each specific hazard identified, whether you or FAA identified it.

(3) Meet with the CO's representatives during the preconstruction conference to discuss and to develop a mutual understanding about the content and implementation of the plan.

(4) The CO or her or his representatives may require other hazards to be added to the plan. If the CO determines that your planned hazard avoidance measures are insufficient, the CO or a designated representative may require you to revise the plan. You may not begin work involving identified hazards unless you have submitted adequate plans to the CO and the CO has reviewed them. This approval does not relieve you of your liability for safe performance.

3.2.2.3-44 PHYSICAL DATA (JULY 2004)

Data and information the FAA (we, us) provides or refers to below is for the Contractor's (your) information. We are not responsible for your interpretation of or conclusions based on the data or information. Further, we do not warrant construction methodology which may be included in these documents.

(a) The descriptions of physical conditions on the drawings and in the specifications are the result of site investigations. There have not been any site investigations done. The Contractor would need to do that themselves if required for construction.

(b) Other relevant information it takes approximately 30 minutes to drive from the highway to the site of the new garage. The road is paved yet quite steep, therefore 4 wheel drive vehicles are required. There are multiple locked gates on the road so the contractor needs to be escorted at all times. Any extra vehicles going up or down the road need to be coordinated with the FAA.

3.2.2.3-71 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (JULY 2004)

The Contractor (you) must

(a) Begin work under this contract within 5 calendar days after the date you receive the notice to proceed,

(b) Perform the work diligently, and

(c) complete the entire work ready for use not later than 120 days. The time allowed for completion must include final cleanup of the premises.

3.2.2.3-71 ALTERNATE I STARTING, PERFORMING AND COMPLETING WORK (JULY 2004)

(d) The completion date assumes that the successful offeror will receive the notice to proceed by 15 days after contract award. The CO will extend the completion date by the number of calendar days after the above date that you receive the notice to proceed, except to the extent that the delay in issuing the notice to proceed results from your failure to execute the contract and give the required performance and payment bonds to FAA within the time specified.

3.3.1-33 SYSTEM FOR AWARD MANAGEMENT (AUGUST 2012)

(a) Definitions. As used in this clause

"Data Universal Numbering System (DUNS) number" means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

"Data Universal Numbering System +4 (DUNS+4) number" means the DUNS number assigned by D&B plus a

4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional

SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts for the same parent concern.

"Registered in the SAM database" means that the Contractor has entered all mandatory information, including the

DUNS number or the DUNS+4 number, into the SAM database.

"System for Award Management (SAM) Database" means the primary Government repository for Contractor information required for the conduct of business with the Government.

(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror shall enter, in Representations, Certifications and Other Statements of Offerors Section of the solicitation, the DUNS or DUNS +4 number that identifies the offeror's name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the SAM database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number

(i) If located within the United States, by calling Dun and Bradstreet at 1-866-705-5711 or via the Internet at http://fedgov.dnb.com/webform; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company Physical Street Address, City, State, and ZIP Code.

(iv) Company Mailing Address, City, State and ZIP Code (if different from physical street address).

(v) Company Telephone Number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

http://fedgov.dnb.com/webform

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) If the offeror does not become registered in the SAM database in the time prescribed by the Contracting

Officer, the Contracting Officer may proceed to award to the next otherwise successful registered offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) The Contractor is responsible for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the

SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(g)(1)(i) If a Contractor has legally changed its business name, "doing business as" name, or division name

(whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in AMS Procurement

Guidance, the Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to:

(A) change the name in the SAM database;

(B) comply with the requirements of AMS regarding novation and change-of-name agreements; and

(C) agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The

Contractor must provide the Contracting Officer with the notification, sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the "Suspension of

Payment" paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims. Assignees shall be separately registered in the SAM database. Information provided to the Contractor's SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the "Suspension of payment" paragraph of the EFT clause of this contract.

(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the internet at http://www.sam.gov.

3.6.2-14 EMPLOYMENT REPORTS ON VETERANS (JANUARY 2011)

(a) Unless the contractor is a State or local government agency, the contractor must report at least annually, as required by the Secretary of Labor, on:

(1) The total number of employees in the contractor's workforce, by job category and hiring location, who are disabled veterans, other protected veterans, Armed Forces service medal veterans, and recently separated veterans,

(2) The total number of new employees hired during the period covered by the report, and of the total, the number of disabled veterans, other protected veterans, Armed Forces service medal veterans, and recently separated veterans; and

(3) The maximum number and minimum number of employees of the Contractor or subcontractor at each hiring location during the period covered by the report.

http://www.sam.gov/

(b) The above items must be reported by completing the form titled 'Federal Contractor Veterans' Employment

Report VETS-100A.'

(c) Reports shall be submitted no later than September 30 of each year.

(d) The employment activity report required by paragraph (a)(2) of this clause must reflect total hires during the most recent 12-month period as of the ending date selected for the employment profile report required by paragraph (a)(1) of this clause. Contractors may select an ending date: (1) As of the end of any pay period during the period January through March 1st of the year the report is due, or (2) as of December 31, if the contractor has previous written approval from the Equal Employment Opportunity Commission to do so for purposes of submitting the Employer Information Report EEO-1 (Standard Form 100).

(e) The count of veterans reported according to paragraph (a) of this clause must be based on data known to the contractor when completing the VETS-100A. .The Contractor's knowledge of veterans status may be obtained in a variety of ways, including an invitation to applicants to self-identify (in accordance with 41 CFR 60-300.42), voluntary self-disclosure by employees, or actual knowledge of veteran status by the contractor. This paragraph does not relieve the employer of liability for a determination under 38 U.S.C. 4212.

(f) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order of

$100,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor.

3.6.2-24 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION

(OCTOBER 2010)

(a) Definitions.

(1) "Employer identification number," as used in this clause, means the last four digits of the Federal

Social Security number used on the employer's quarterly federal tax return, U.S. Treasury Department Form 941.

(2) "Minority," as used in this clause, means

(i) Black (all persons having origins in any of the black African racial groups not of Hispanic origin);

(ii) Hispanic (all persons of Mexican, Puerto Rican, Cuban, Central or South American, or other Spanish culture or origin, regardless of race);

(iii) Asian and Pacific Islander (all persons having origins in any of the original peoples of the Far East, Southeast Asia, the Indian Subcontinent, or the Pacific Islands); and

(iv) American Indian or Alaskan Native (all persons having origins in any of the original peoples of North America and maintaining identifiable tribal affiliations through membership and participation or community identification).

(b) If the Contractor, or a subcontractor at any tier, subcontracts a portion of the work involving any construction trade, each such subcontract in excess of $10,000 shall include this clause, including the goals for minority and female participation stated herein.

(c) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate work force in each trade on all construction work in the covered area, are as follows:

Goals for minority participation: 69.1%

Goals for female participation: 6.9%

Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Office of Federal Contract Compliance Programs

(OFCCP) area office within 10 working days following award of any construction subcontract in excess of

$10,000 at any tier for construction work under the contract resulting from this screening information request.

The notification shall list the:

(1) Name, address, and telephone number of the subcontractor,

(2) Employer identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) The Contractor shall implement the affirmative action procedures in subparagraphs (f)(1) through (7) of this clause. The goals stated in this contract are expressed as percentages of the total hours of employment and training of minority and female utilization that the Contractor should reasonably be able to achieve in each construction trade in which it has employees in the covered area. If the contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for the geographical area where that work is actually performed. The Contractor is expected to make substantially uniform progress toward its goals in each craft.

(f) The contractor shall take affirmative action steps at least as extensive as the following:

(1) Ensure a working environment free of harassment, intimidation, and coercion at all sites, and in all facilities where the Contractor's employees are assigned to work. The Contractor, if possible, will assign two or more women to each construction project. The Contractor shall ensure foremen, superintendents, and other on-site supervisory personnel are aware of and carry out the Contractor's obligation to maintain such a working environment, with specific attention to minority or female individuals working at these sites or facilities.

(2) Immediately notify the OFCCP area office when the union or unions, with which the Contractor has a collective bargaining agreement, has not referred back to the Contractor a minority or woman sent by the

Contractor, or when the Contractor has other information that the union referral process has impeded the

Contractor's efforts to meet its obligations.

(3) Develop on-the-job training opportunities and/or participate in training programs for the area that expressly include minorities and women, including upgrading programs and apprenticeship and trainee programs relevant to the Contractor's employment needs, especially those programs funded or approved by the Department of Labor. The Contractor shall provide notice of these programs to the sources compiled under subparagraph

(f)(2) above.

(4) Review, at least annually, the Contractor's equal employment policy and affirmative action obligations with all employees having responsibility for hiring, assignment, layoff, termination, or other employment decisions. Conduct reviews of this policy with all on-site supervision, personnel prior to initiation of construction work at a job site. A written record shall be made and maintained identifying the time and place of these meetings, persons attending, subject matter discussed, and disposition of the subject matter.

(5) Disseminate the Contractor's equal employment policy externally by including it in any advertising in the news media, specifically including minority and female news media. Provide written notification to, and discuss this policy with, other Contractors and subcontractors with which the Contractor does or anticipates doing business.

(6) Conduct, at least annually, an inventory and evaluation at least of all minority and female personnel for promotional opportunities. Encourage these employees to seek or to prepare for, through appropriate training, etc., opportunities for promotion.

(7) Maintain a record of solicitations for subcontracts for minority and female construction contractors and suppliers, including circulation of solicitations to minority and -female contractor associations and other business associations.

(g) The Contractor is encouraged to participate in voluntary associations that may assist in fulfilling one or more of the affirmative action obligations contained in subparagraphs (f)(1) through (7). The efforts of a contractor association, joint contractor-union, contractor-community, or similar group of which the contractor is a member and participant, may be useful in achieving one or more of its obligations under subparagraphs (f)(1) through (7).

(h) A single goal for minorities and a separate single goal for women shall be established. The Contractor is required to provide equal employment opportunity and to take affirmative action for all minority groups, both male and female, and all women, both minority and non-minority. Consequently, the Contractor may be in violation of

Executive Order 11246, as amended, if a particular group is employed in a substantially disparate manner.

(i) The contractor shall not use goals or affirmative action standards to discriminate against any person because of race, color, religion, sex, or national origin.

(j) The Contractor shall not enter into any subcontract with any person or firm debarred from Government contracts under Executive Order 11246, as amended.

(k) The Contractor shall carry out such sanctions and penalties for violation of this clause and of the

Nondiscrimination and Affirmative Action clause, including suspension, termination, and cancellation of existing subcontracts, as may be imposed or ordered under Executive Order 11246, as amended, and its implementing regulations, by the OFCCP. Any failure to carry out these sanctions and penalties as ordered shall be a violation of this clause and Executive Order 11246, as amended.

(l) Nothing contained herein shall be construed as a limitation upon the application of other laws that establish different standards of compliance.

3.6.2-41 EMPLOYMENT ELIGIBILITY VERIFICATION (SEPTEMBER 2009)

(a) Definitions:

"Employee assigned to the contract" means an employee who was hired after November 6, 1986, who is directly performing work, in the United States, under a contract that is required to include the Employment Eligibility

Verification clause. An employee is not considered to be directly performing work under a contract if the employee--

(1) Normally performs support work, such as indirect or overhead functions; and

(2) Does not perform any substantial duties applicable to the contract.

"Subcontract" means any contract entered into by a subcontractor to furnish supplies or services for performance of a prime contract or a subcontract. It includes but is not limited to purchase orders, and changes and modifications to purchase orders.

"Subcontractor" means any supplier, distributor, vendor, or firm that furnishes supplies or services to or for a prime Contractor or another subcontractor.

"United States", as defined in 8 U.S.C. 1101(a)(38), means the 50 States, the District of Columbia, Puerto Rico, Guam, and the U.S. Virgin Islands.

(b) Enrollment and verification requirements.

(1) If the Contractor is not enrolled as a Federal Contractor in Department of Homeland Security's Employment

Eligibility Verification system ("E-Verify") at time of contract award, the Contractor shall--

(i) Enroll. Enroll as a Federal Contractor in the E-Verify program within 30 calendar days of contract award;

(ii) Verify all new employees. Within 90 calendar days of enrollment in the E-Verify program, begin to use

E-Verify to initiate verification of employment eligibility of all new hires of the Contractor, who are working in the United States, whether or not assigned to the contract, within 3 business days after the date of hire (but see paragraph (b)(3) of this section); and

(iii) Verify employees assigned to the contract. For each employee assigned to the contract, initiate verification within 90 calendar days after date of enrollment or within 30 calendar days of the employee's assignment to the contract, whichever date is later

(but see paragraph (b)(4) of this section).

(2) If the Contractor is enrolled as a Federal Contractor in E-Verify at time of contract award, the Contractor shall use E-Verify to initiate verification of employment eligibility of--

(i) All new employees.

(A) Enrolled 90 calendar days or more.

The Contractor shall initiate verification of all new hires of the Contractor, who are working in the United States, whether or not assigned to the contract, within 3 business days after the date of hire (but see paragraph (b)(3) of this section); or

(B) Enrolled less than 90 calendar days. Within 90 calendar days after enrollment as a Federal Contractor in

E-verify, the Contractor shall initiate verification of all new hires of the Contractor, who are working in the United

States, whether or not assigned to the contract, within 3 business days after the date of hire (but see paragraph (b)(3) of this section); or

(ii) Employees assigned to the contract. For each employee assigned to the contract, the Contractor shall initiate verification within 90 calendar days after date of contract award or within 30 calendar days after assignment to the contract, whichever date is later (but see paragraph (b)(4) of this section).

(3) If the Contractor is an institution of higher education (as defined at 20 U.S.C. 1001(a)); a State or local government or the government of a Federally recognized Indian tribe; or a surety performing under a takeover agreement entered into with a Federal agency pursuant to a performance bond, the Contractor may choose to verify only employees assigned to the contract, whether existing employees or new hires. The Contractor shall follow the applicable verification requirements at (b)(1) or (b)(2), respectively, except that any requirement for verification of new employees applies only to new employees assigned to the contract.

(4) Option to verify employment eligibility of all…