DT Music Rooms - Issue for Construction - Specs.pdf
PDF 8 MB Posted
- Attached to
- AFB 2752 CON2545 DT Music Rooms Renovations
- Solicitation number
- IFB1 GJJA 2027000056 1
- Issued by
- El Paso County, Colorado
About this file
This is an Issue for Construction Specification document and Design/Bid/Build Agreement (Form SC-6.21) for the Pikes Peak State College Downtown Music Rooms Project (CON2545), issued by the State of Colorado Office of the State Architect, State Buildings Program. The project involves renovation work on downtown music rooms at Pikes Peak State College, with architectural services provided by Architectural Workshop, LLC. The contract is structured as a Design/Bid/Build agreement, with the Principal Representative being Jo Walker at Pikes Peak State College (5675 S. Academy Blvd., Colorado Springs, CO 90906). The contract documents specify performance of all work required for complete execution of the project in accordance with Contract Documents, including specifications for work such as skim coating existing walls and ceilings. The agreement includes standard completion timelines measured in calendar days from Notice to Proceed, with provisions for Substantial Completion and Final Acceptance phases. The contract is not effective until signed by the State Controller or authorized delegate and includes a four-year initial expiration date from the capital construction appropriation date, encompassing the one-year warranty period.
The contract sum and specific pricing are to be inserted by the State prior to execution and are subject to additions and deductions as provided in the General Conditions. Payment terms, liquidated damages, and other financial provisions are contingent upon conditions precedent regarding sufficient funding appropriation and availability. The agreement requires submission of multiple exhibits including contractor's bid, performance bond, labor and material payment bond, insurance certificates, and prevailing wage determinations. State prevailing wage requirements apply to the project, with apprenticeship utilization certifications required for projects of $1,000,000 or more. The Buy Clean Colorado Act may apply depending on Principal Representative election, requiring Environmental Product Declaration submissions for eligible materials. The contract incorporates the General Conditions of the Design/Bid/Build Agreement (Form SC-6.23) and specifies compliance with approved state building codes and State Development Requirements. Funds are budgeted and appropriated through the State Controller's Office, with specific fund and account numbers to be inserted, and the contract is subject to Colorado Fiscal Rules.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DT Music Rooms - Issue for Construction - Drawings.pdf | ||
| AFB 2762 DT Music Rooms.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pikes Peak State College
Downtown Music Rooms
Project # CON2545
STATE OF COLORADO
STATE BUILDINGS AND REAL ESTATE PROGRAMS
November 25, 2026
Issue for Construction Specification
Architect: Architectural Workshop, LLC.
2 Kalamath Street
Denver, CO 80223
Ph: 303.788.1717
/01,23(45,6(,056.0.,-*77,8,93:*;/.*;/-01(<61<64-)**16),/*=0.4*/
7*-0.4*/2>??;(45,6(,050=,@-*7*)0:*6()4/86@-*A?B?C
1,-D0/4-07,/84/,,)*E),-*):
.*::6(0-,5@(, FGC(0)5(*4/.:)H@6<4.,CG?
8*7:,/@-*7*)0:*A?I?>
.6(0-,5J6.KH,/84/,,)4/8
LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL33333333LLLLLLLLLLL
1,-D0/4-07,/84/,,)*E),-*):3333333333333333333333:0., MNOMPOQNQR
)*)+,-.+/*)01.0))-23-)+2-4
,24456/+)786)
9:;6/-762.0,4-<85=.,);:>
12*4)08+2*2-/42?>@>A
,56/+)7B5,C<)01.0))-.01
DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDEEEEEEEEDDDDDDDDDDD
)*)+,-.+/*)01.0))-23-)+2-4EEEEEEEEEEEEEEEEEEEEEE4/,)
FGHFIHJGJK
Project # CON 2545
TABLE OF CONTENTS 00 00 00 - 1
TABLE OF CONTENTS
Division 0 – Bid Documents Advertisement for Bids Specimen of Competitive Sealed Best Value Bidding (AFB-CSBV-App-A) Information for Bidders (SBP-6.12) Apprenticeship Contribution Rates and Prevailing Wage Determinations Specimen of Bid (SBP-6.13) Specimen of Bid Alternate Form (SBP-6.131) Specimen of Unit Pricing Form (SBP-6.133) Specimen of Contractors Agreement (SC6.21) Specimen of General Conditions of the Contract (SC-6.23)
The following links will guide you to the link to download the following documents.
https://osa.colorado.gov/state-buildings/project-management-policies-guidelines/contract-forms https://osa.colorado.gov/state-buildings/project-management-policies-guidelines/procedural-forms
Bid Bond (SBP-6.14) Notice of Award (SBP-6.15) Performance Bond (SC-6.22) Labor and Material Bond (SC-6.221) Notice to Proceed (SBP-6.26) Notice of Substantial Completion (SBP-07) Notice of Occupancy/Use (SBP-01) Notice of Acceptance (SBP-6.27) Notice of Contractor’s Settlement (SBP7.3)
Division 1 – General Requirements
Section 01 00 00 General Section 01 01 00 Summary of Work Section 01 02 00 Administration and Supervision Section 01 02 60 Unit Prices Section 01 03 00 Alternates Section 01 04 10 Project Coordination Section 01 04 20 Mechanical and Electrical Coordination Section 01 04 50 Cutting and Patching Section 01 06 01 Regulatory Requirements Section 01 07 50 Specification System Section 01 10 00 Special Project Procedures Section 01 12 10 Hazardous Material Procedures Section 01 20 00 Project Meetings Section 01 30 00 Submittals Section 01 40 00 Quality Control Section 01 60 00 Material and Equipment Section 01 63 00 Product Options and Substitutions Section 01 70 00 Contract Closeout Section 01 71 00 Cleaning Section 01 72 00 Project Record Documents Section 01 73 00 Operating and Maintenance Data
Division 2 – Site Work
Section 02 07 00 Selective Demolition
TABLE OF CONTENTS 00 00 00 - 2
Division 3 – Concrete
Section 03 30 00 Cast-In-Place Concrete
Division 4 – Masonry – N/A
Division 5 – Metals
Section 05 12 00 Structural Steel Section 05 40 00 Cold Formed Metal Framing
Division 6 – Wood and Plastics Section 06 10 00 Rough Carpentry Section 06 20 00 Finish Carpentry Section 06 40 00 Architectural Woodwork
Division 7 – Thermal and Moisture Protection
Section 07 21 00 Building Insulation Section 07 27 00 Firestopping Section 07 53 00 Single-Ply Membrane Roofing Section 07 60 00 Flashing and Sheet Metal Section 07 90 00 Joint Sealers
Division 8 – Doors and Windows
Section 08 10 00 Metal Doors and Frames Section 08 21 01 Wood Doors Section 08 30 50 Access Doors Section 08 71 00 Door Hardware Section 08 80 00 Glazing
Division 9 – Finishes
Section 09 26 00 Gypsum Board Systems Section 09 51 00 Acoustical Ceilings Section 09 65 00 Resilient Flooring Section 09 68 00 Carpet Section 09 77 13 Stretched Fabric Wall Systems Section 09 84 00 One-Dimensional Quadratic Residue Diffuser Section 09 84 01 Two-Dimensional Quadratic Residue Diffuser Section 09 84 02 Mono Wave Wall Redirector Section 09 84 03 Mono Wave Ceiling Redirector Section 09 84 04 Hybrid Sound Panels - Diffusive + Absorptive Section 09 84 05 Sound Diffusing Ceiling Panels Section 09 84 06 Fabric-covered Absorption Panel Section 09 90 00 Painting
Division 10 – Special Construction
Section 10 50 00 Lockers
Division 11 – 14– N/A
Division 21 – Fire Suppression
Section 21 00 10 Fire Suppression General Provisions Section 21 01 16 Demolition of Fire Protection Systems Section 21 05 00 Common Work Results for Fire Suppression Section 21 05 17 Sleeves and Sleeve Seals for Fire Suppression Section 21 05 18 Escutcheons for Fire Suppression
TABLE OF CONTENTS 00 00 00 - 3
Section 21 05 29 Hangers and Supports for Fire Suppression.
Section 21 05 53 Identification for Fire Suppression Piping and Equipment Section 21 13 13 Wet-Pipe Sprinkler System
Division 22 – Plumbing Section 22 00 10 Plumbing General Provisions Section 22 05 53 Identification for Plumbing Systems Section 22 16 13 Natural Gas Piping
Division 23 – Heating, Ventilating, And Air-Conditioning (HVAC) Section 23 00 10 HVAC (Heating, Ventilation, and Air Conditioning) General Provisions Section 23 01 16 Demolition of HVAC Systems Section 23 05 13 Common Motor Requirements for HVAC Equipment Section 23 05 14 Variable Frequency Drives Section 23 05 17 Sleeves And Sleeve Seals for HVAC Piping Section 23 05 21 Thermometers and Pressure Gauges Section 23 05 29 Hangers and Supports for HVAC Section 23 05 48 Vibration and Seismic Controls for HVAC Section 23 05 53 Identification for HVAC Section 23 05 91 HVAC System Startup Section 23 05 93 Testing, Adjusting, and Balancing for HVAC Section 23 07 12 HVAC Insulation Section 23 08 00 Commissioning of HVAC Systems Section 23 09 20.01 Control Systems Section 23 21 13 Hydronic Piping Section 23 21 16 Hydronic Piping Specialties Section 23 31 13 Metal Ducts Section 23 33 00 Air Duct Accessories Section 23 37 13 Diffusers, Registers, and Grilles Section 23 81 03 Packaged Rooftop Air Conditioning Units - Non-Custom Section 23 82 19 Air Fan Powered Box Terminal Unit
Division 26 – Electrical
Section 26 00 10 General Electrical Requirements Section 26 05 19 Electrical Conductors and Cables Section 26 05 26 Grounding and Bonding for Electrical Systems Section 26 05 29 Hangers and Supports for Electrical Systems Section 26 05 33 Conduit for Electrical Systems Section 26 05 34 Boxes for Electrical Systems Section 26 05 53 Identification for Electrical Systems Section 26 05 83 Wiring Connections Section 26 09 23 Lighting Control Devices Section 26 27 26 Wiring Devices Section 26 28 13 Fuses Section 26 28 16 Enclosed Switches Section 26 51 00 Interior Lighting
Division 27 – Communications
Section 27 05 33 Conduit for Communications Systems
Division 28 – Electronic Safety and Security
Section 28 46 00 Fire Detection and Alarm
END OF SECTION
AFB-CSBV pg. 1
REV 9/2026
ADVERTISEMENT FOR BIDS
Competitive Sealed Best Value
State of Colorado
Notice Number: AFB 2749
Project Number: CON 2545
Project Title: Downtown Music Rooms Renovation
NOTICES
1. For all projects with a total dollar value above $150,000 Notice of Final Settlement is required by C.R.S. §38-26-107(1). Final Settlement, if required, will be advertised in the same location as the original solicitation.
2. For State Public Works C.R.S. §8-17-101 - Colorado labor shall be employed to perform at least 80% of the work. Colorado labor means any person who is a resident of the state of Colorado at the time of the Public Works project.
3. All respondents accept the conditions of this AFB, including but not limited to, the following:
a. All submittals shall become the property of the State of Colorado and will not be returned.
b. Late submittals shall not be evaluated.
c. The State reserves the right to reject any or all proposals on the basis of being unresponsive to this AFB or for failure to disclose requested information.
d. The State shall not be liable for any costs incurred by respondents in the preparation of submittals and proposals nor in costs related to any element of the selection and contract negotiation process.
4. The respondent has reviewed Appendix F and by responding has agreed that the terms and conditions of the sample Contractor’s Design/Bid/Build (D/B/B) Agreement (SC-6.21) and General Terms and Conditions of the Contractor’s Design/Bid/Build Agreement (SC- 6.23) are expressly workable without reservation. Any exceptions to the contract must be communicated formally in writing before the bid closes.
AFB-CSBV pg. 2
5. Per C.R.S. §24-92-115 unless prohibited by applicable federal law, contract for any public project in the amount of one million dollars or more, that does not receive federal money, in the amount of one million dollars or more shall require the general contractor to which the contract is awarded to submit, at the time the mechanical, electrical, or plumbing subcontractor is put under contract, documentation that Identifies the contractors or subcontractors that will be used for all mechanical, sheet metal, fire suppression, sprinkler fitting, electrical, and plumbing work required on the project and certifies that all firms identified participate in apprenticeship programs registered with the United States department of labor’s employment and training administration or state apprenticeship councils recognized by the United States department of labor and have a proven record of graduating a minimum of 15% of its apprentices for at least three of the past five years.
6. Per C.R.S. §24-92-117, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the Buy Clean Colorado (BCCO) Act program requirements. The BCCO Act requires the Office of the State Architect to establish a maximum acceptable global warming potential (GWP) limit for each category of eligible materials, which include asphalt and asphalt mixtures, cement and concrete mixtures, glass, post-tension steel, reinforcing steel, structural steel, and wood structural elements. For any solicitation for a contract for the design of an eligible project, a State Agency or institution shall require the designer who is awarded the contract to include, in project specifications when final construction documents are released, a current Environmental Product Declaration (EPD) that meets the maximum acceptable GWP limits for each eligible material specified for the project. A contractor that is awarded a contract for an eligible project shall not install any eligible materials on the project until the contractor submits an EPD for each eligible material procured for the project.
7. Per C.R.S. §24-92-Part 2, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the State prevailing wage rate, of the regular, holiday, and overtime wages paid and the general prevailing payments on behalf of employees to lawful welfare, pension, vacation, apprentice training, and educational funds in the State, for each employee needed to execute the contract. Payments to the funds must constitute an ordinary business expense deduction for federal income tax purposes by contractors and subcontractors. Contractors are required to pay their employees at weekly intervals and shall comply with the enforcement provisions of C.R.S. §24-92-209. Contractors awarded a project of this size will be required to utilize the LCPTracker cloud-based labor compliance and certified payroll application.
8. Preference shall be given to Colorado resident bidders and for Colorado labor, as provided by law.
AFB-CSBV pg. 3
9. Per C.R.S. §24-105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid.
PROJECT OVERVIEW
Pikes Peak State College (PPSC) intends to renovate existing classroom spaces totaling approximately 3,200 square feet, located on the 2nd floor of the North Building at the Downtown Campus. The primary goal of this project is to convert these areas into an enlarged, state-of-the-art music performance and classroom, recording studio, control room, practice rooms, offices to support and enhance the college's music program.
Project Objectives
The project aims to transform the designated space to meet the specific functional and acoustic needs of music education and performance. Specific objectives include:
- Creating acoustically appropriate environments suitable for music rehearsal and potential performance, focusing on both sound isolation and interior room acoustics.
- Integrating necessary performance and educational technology infrastructure, including provisions for stage lighting, sound reinforcement, and recording capabilities.
- Providing flexible and functional spaces that meet the pedagogical requirements of the PPSC music program.
- Enhancing the overall student learning and performance experience.
- Completing the project within the anticipated budget and timeframe, while minimizing disruption to ongoing campus operations in adjacent areas.
Scope of Services
The scope of services will include full Construction Contracting Services for the project specified during the process of construction and warranty period to the State as per the Advertisement for Bid. Specific tasks to be performed by the Contractor include those generally performed by the construction community where the Contractor is the prime vendor to the State. Bidders shall reference the drawings, specifications, and supporting documents in the Appendices for an understanding of the entire scope of the project.
Per C.R.S. §38-26-106, if a contract amounts to $150,000 or more, the awarded contractor shall provide payment and performance bonds not less than 50% of the value of the contract. The costs associated with this bond are to be included in the contractor’s bid.
MINIMUM REQUIREMENTS
Notice is hereby given to all interested parties that all firms will be required to meet all minimum requirements to be considered for this project. Interested bidders should
AFB-CSBV pg. 4 be prepared to show evidence of the following to be considered as qualified, as a minimum:
1. Not previously terminated by the State for non-performance on a State Buildings contract or procurement.
2. The bidding contractor must have been in the same business, under the same name for the last five (5) years.
3. Demonstrated experience as a general contractor in projects of similar scope and complexity (demolition and construction in an occupied building) for at least two (2) projects each in excess of $ 2,000,000 (hard costs), utilizing Colorado Office of State Architect policies and procedures.
4. Demonstrated bonding capability up to $ 2,000,000 for an individual project coincidentally with current and anticipated workloads; provide letter from surety that affirms this capacity.
5. Respondents must provide safety record from their insurance company indicating Experience Modification Rating (EMR) below 1.0
6. Respondents must acknowledge all issued addenda in their submittal and proposal.
7. Attended and signed in at the Mandatory Pre-Bid Conference
Firms meeting the minimum requirements may obtain the bidding documents on the website accompanying this advertisement.
At http://colorado.gov/vss
MANDATORY PRE-BID CONFERENCE AND SITE TOUR
A mandatory Pre-Bid Meeting will be held at:
Building Address: Pikes Peak State College; Downtown Campus
100 W Pikes Peak Ave, Colorado Springs, CO 80903 Room: N214 (North Building; Second Floor) Date/Time Friday, Dec 4 @ 10:00 AM
SCHEDULE
The following is a tentative schedule of events for the Bid Submittal process and an outline of the schedule for the balance of the project. All dates are subject to change and changes in the schedule will be issued via addendum.
Advertisement for Bids Issued Wednesday, Nov 25 Mandatory Pre-Bid Conference and Site Tour Friday, Dec 4 10:00 AM Rm. N214 Request for Clarifications Due Friday, Dec 11 COB
Final Addendum Issued (anticipated) Wednesday, Dec 16 COB
Qualifications Due (date and Time) Friday, Dec 11 2:00 PM http://colorado.gov/vss
AFB-CSBV pg. 5
Bid Submittals Due (date and Time) Wednesday, Dec 23 10:00 AM
Public Bid Opening Wednesday, Dec 23 10:00 AM ______
Award Intent Notification (anticipated) Wednesday, Jan 6
Contracting Start Monday, Jan 11
Contract Approval (anticipated) Monday, Jan 18
Anticipated Construction Start February 1, 2027
Anticipated Construction Finish July 2027
The above schedule is tentative. Responding firms shall be notified of revisions in a timely manner by email or posted on ColoradoVSS website. Respondents may elect to verify times and dates by email, but no earlier than 36 hours before the scheduled date and time.
QUESTIONS, CLARIFICATIONS AND ADDENDA
Owner initiated changes to this AFB will be issued under numerically sequenced addenda.
Owner initiated changes to this AFB will be posted in the form of addenda on ColoradoVSS.
Questions and requests for clarifications regarding this project shall be submitted before the deadline listed in the above Schedule.
Communication regarding the project during the procurement, outside of this submission process or scheduled procurement milestones is not permitted.
POINT OF CONTACT/CLARIFICATION
Name: James Gellenbeck
Agency: Pikes Peak State College
Email Address: procurement.bids@pikespeak.edu
Phone: 719-502-2008
SUBMITTALS OF SEALED QUALIFICATIONS AND BIDS
1. This AFB document, it’s appendices, and any written addenda issued prior to the bid opening, and written clarifications shall serve as the only basis for Bid.
2. All submittals must comply with the following items, a through h. The State retains the right to waive any minor irregularity or requirement should it be judged to be in the best interest of the State.
a. Qualifications shall be formatted and tabbed in the exact form and numeric sequence of the Evaluation Form (1 through 6) in Appendix A1.
A cover letter (maximum two pages) addressed to the following: Pikes Peak State College Procurement Department – Attn: James Gellenbeck;
mailto:procurement.bids@pikespeak.edu
AFB-CSBV pg. 6 outlining the firm(s) qualifications is required at the front of the submittal. (Not counting the cover letter and required Acknowledgement and Attestation form, the entire submittal is to be no more than 10 8 ½’ x 11” sized pages in portrait format, at least 10 font. No loose-leaf notebooks or hard bound submittals.)
b. Qualifications shall be evaluated in accordance with criteria as indicated in PREQUALIFICATION SUBMITTAL CRITERIA and ranked on the corresponding Evaluation Form in Appendix A1.
c. Response to all items shall be complete.
d. All references shall be current and relevant.
e. Bids shall be submitted on the required bid form as indicated on the Information For Bidders document (SBP-6.12) in Appendix A.
f. Each solicitation by a state agency for construction services shall contain a clause requiring the bidder to disclose if they are a Service-Disabled- Veteran-Owned-Small-Business (SDVOSB). A SDVOSB per C.R.S. 24-103- 211, must be incorporated or organized in Colorado or maintains a place of business or has an office in Colorado and who is officially registered and verified as a SDVOSB by the Center for Veteran Enterprise within the U.S. Department of Veterans Affairs
g. An electronic copy of the qualifications are due Friday, December 11 and shall be received no later than 2:00 PM (MD/ST).
One (1) hard copies of the sealed bid submittal are due Wednesday, December 23 and shall be received no later than 10:00 AM (MD/ST), and shall be submitted/accepted as described in the Information for Bidders
(SBP-6.12)
h. Bid Forms and Appendices to be included with bid submittal:
Bid Form (SBP-6.13)
Bid Bond (SBP-6.14)
Bid Alternates (SBP-6.131)
Unit Pricing (SBP-6.133)
3. Late bid submittals will be rejected without consideration. The State of Colorado assumes no responsibility for costs related to the preparation of bid submittals.
METHOD OF SELECTION AND AWARD
The process to be used in the selection of the Construction Contracting Services is the Competitive Sealed Best Value Bidding method comprised of two steps. STEP I is the Submittal of Qualifications as described above. STEP II is the submittal and opening of the sealed bids at a public bid opening. PPSC will evaluate the qualifications prior to the public bid opening in Step II. After the public bid opening and acknowledgement
AFB-CSBV pg. 7 of the apparent low bidder, PPSC will consider both qualifications and bid prices and determine the final ranking of firms with qualifications given 40% of the value of the weighted criteria and the bid price given 60%. Selection and award of this project will be by written notice and will be based on a combination of qualifications and bid price that represents the most advantageous and best overall value to the State.
After selection and award all bids, qualifications and ranking documents will be made available to the public on the agency or institutions solicitation platform.
EVALUATION OF QUALIFICATIONS
A. EVALUATION FACTORS
1. TECHNICAL APPROACH TO THE PROJECT
• Provide a strategic project approach summary discussing how your firm will provide successful Construction Contracting Services for this project. Include specific examples (1-2 page excerpts) of actual products (estimates, progress reports, schedules, constructability reviews, value engineering studies, forms, etc.).
2. EXPERIENCE, PAST PERFORMANCE AND EXPERTISE
• Provide a description of successful prior construction contracts, including performance in the areas of cost, quality control, schedule, compliance with plans and specifications and adherence to applicable laws and regulations as performed by your firm and by your subcontractors.
3. PROJECT MANAGEMENT PLAN
• Provide a description of the composition and management structure of your firm including a graphic organizational chart.
• Describe the proposed project schedule, quality control program, financial resources, equipment to be used on this project and its current location, and any other information or resources that demonstrates your firm’s competency to perform this work.
4. STAFFING PLAN
• Provide a detailed staffing plan of key personnel to be assigned to this project from your firm to include a resume and references for the project superintendent and project manager.
5. SAFETY PLAN AND SAFETY RECORD
• Describe your firm’s safety program and provide your firms’ safety record over the last ten years.
6. JOB STANDARDS
• Describe how a high quality of workmanship were achieved and industry standards were met on past projects.
AFB-CSBV pg. 8
APPENDICES:
Appendix A: Information for Bidders (SBP-6.12)
Appendix A1: Evaluation of Qualifications Form (AFB-CSBV-App-A)
Appendix B: Bid Form (SBP-6.13)
Appendix B1: Bid Alternates (SBP-6.131)
Appendix B2: Unit Pricing (SBP-6.133) [if applicable]
Appendix B3: Bid Bond (SBP-6.14) [if applicable]
Appendix C: Sample: Direct Labor Burden Calculation (SBP-6.18)
Appendix D: Applicable Prevailing Wage and Apprenticeship and Fringe Rates
Appendix E: Sample: Apprenticeship Utilization Certifications (SBP-2.1)
(Appendix F: Sample: SC6.21 and SC6.23 Design/Bid/Build Contractor’s Agreement and General Conditions of the Contract)
AFB-CSBV-App-A
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
EXHIBIT A1: EVALUATION OF QUALIFICATIONS
FORM: COMPETITIVE SEALED BEST VALUE BIDDING
Name of Firm:_____________________________________________________________________ Name of Project: _CON2545 / Downtown Music Rooms Renovation_________________________ Evaluator No:_______________________________________ Date:______________________________________________
AFB REFERENCE MINIMUM REQUIREMENTS Y ____ N ____
If the minimum requirements (including letter from surety) have not been met, specify the reason(s):
INSTRUCTIONS:
1. Weights are to be assigned prior to evaluation and are to be consistent on all evaluation forms.
2. Use only whole numbers.
3. Rating: 0 = not provided, 1 = Unacceptable, 2 = Poor, 3 = Fair, 4 = Good, 5 = Excellent
4. Total score includes the sum total of all criteria.
5. A passing score (as a percentage of the total points available) is to be established by the state prior to evaluation.
1. TECHNICAL APPROACH TO PROJECT Weight X Rating = Score ◻ Provide a project summary discussing how your firm will provide Construction Contracting Services for this project. 5 x =
2. EXPERIENCE, PAST PERFORMANCE AND EXPERTISE
◻ Provide a description of successful prior construction contracts of similar scope and complexity as performed by your firm. 4 x =
3. STAFFING PLAN
◻ Identify and provide resumes for the firm’s key personnel that will be used on this project. 5 x
4. PROJECT MANAGEMENT APPROACH
◻ Describe the proposed project schedule, quality control program, and any other information or resources that demonstrate your firm’s competency to perform this work.
x
5. SAFETY PLAN AND SAFETY RECORD
◻ Describe your firm’s safety program and provide your firms’ safety record over the last ten years. 5 x =
6. JOB STANDARDS
◻ Demonstrate on past projects examples how a high quality of workmanship was achieved and industry standards of care were achieved. 4 x =
Total Score: _________
EXHIBIT A2: QUALIFICATIONS AND BID RANKING
MATRIX: COMPETITIVE SEALED BEST VALUE
BIDDING
INSTRUCTIONS/EXAMPLE:
1. QUALIFICATIONS 40% / BID 60%
2. Insert total score from each evaluator's SUBMITTAL review.
3. Add all evaluators’ total scores and divide by the number of evaluators to determine the average score for each firm’s qualifications.
4. The maximum score for qualifications on the evaluation form is equivalent to 40 points and is equivalent to the maximum points available for qualifications. Therefore, each firm’s score is determined as a percentage of the maximum points available. To score each average qualification score, use the example formula.
5. Assume the highest score is 600.
SCORING OF QUALIFICATIONS
FIRM B: 600 X 40 points = 40 points
FIRM C: 500 X 40 points = 33.33 points
FIRM A: 400 X40 points = 26.66 points
6. Determine score for each firm’s sealed Bid with the lowest fee being equivalent to a maximum score of 60 points. To score each Bid, use the example formula.
7. Assume the lowest Bid was $100,000.
SCORING OF BIDS
FIRM A: $100,000 X 60 points = 60 points $100,000
FIRM B: $100,000 X 60 points = 48 points $125,000
FIRM C: $100,000 X 60 points = 39.99 points $150,000
8. Add the average qualification score to the Bid score to determine cumulative qualifications and fee score.
9. Numerically rank all firms with the highest scoring firm being the most qualified and advantageous to the state.
FIRM
QUALIFICATIONS
AVE.
QUALS
SCORE
BID
& BID
RANK
EVAL
#1
EVA
L #2
EVA
L #3
EVA
L #4
EVA
L #5
EVA
L #6
SBP-6.12
Rev 7/2025
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
INFORMATION FOR BIDDERS
Institution or Agency:
Project No./Project Name:
1. BID FORM: Bidders are required to use the Bid form attached to the solicitation.
Each bidder is required to bid on all alternates and indicate the time from the date of the Notice to Proceed to Substantial Completion in calendar days. In addition, the bidder is required to indicate the period of time to finally complete the project from Substantial Completion to Final Acceptance, in calendar days.
Bids indicating times for Substantial Completion and Final Acceptance in excess of the number of days indicated in the Advertisement for Bids for completion of the entire Project may be found non-responsive and may be rejected. The bid shall not be modified or conditioned in any manner. Bids and applicable bid security shall be submitted according to the following instructions:
2. INCONSISTENCIES AND OMISSIONS: Bidders may request clarification of any seeming inconsistencies, or matters seeming to require explanation, in the bidding documents at least three (3) business days prior to the time set for the opening of Bids. Decisions of major importance on such matters will be issued in the form of addendum.
3. APPLICABLE LAWS AND REGULATIONS: All work under this Contract shall comply with the provisions of all state and local laws, approved state building codes, ordinances and regulations which might in any manner affect the work to be done or those to be employed in or about the work. Labor for work shall be governed by the provisions of Colorado law which are hereinafter set forth in Articles 27 and 52 of the General Conditions. This includes the requirements for apprenticeship and prevailing wage on Public Projects. The bidder should be aware that reporting of embodied carbon emissions of eligible materials shall be governed by the provisions of Colorado State Law. This includes the requirements for Environmental Product Declarations (EPDs) that meet the maximum acceptable Global Warming Potential (GWP) limits as established by the Office of the State Architect.
4. BID SECURITY: A bid security of not less than 5% of the bid price is required when the price is estimated to be $50,000 or more. The security shall be a bond by a surety company, the equivalent in cash, or otherwise supplied in a form
SBP-6.12
satisfactory for the State. Noncompliance requires the bid to be rejected as nonresponsive.
5. TAXES: The Bid submitted shall exclude all applicable federal excise or manufacturers’ taxes and all state sales and use taxes as hereinafter set forth in Article 9.3 of the GENERAL CONDITIONS.
6. OR EQUAL: The words “OR EQUAL” are applicable to all specifications and drawings relating to materials or equipment specified. Any material or equipment that will fully perform the duties specified, will be considered “equal”, provided the bid submits proof that such material or equipment is of equivalent substance and function and is approved, in writing. Requests for the approval of “or equal” shall be made in writing at least five (5) business days prior to bid opening. During the bidding period, all approvals shall be issued by the Architect/Engineer in the form of addenda at least two (2) business days prior to the bid opening date.
7. ADDENDA: Owner/architect initiated addenda shall not be issued later than two
(2) business days prior to bid opening date. All addenda shall become part of the Contract Documents and receipt must be acknowledged on the Bid form.
8. METHOD OF AWARD - LOWEST RESPONSIBLE BIDDER: If the bidding documents for this project require alternate prices, additive and/or deductible alternates shall be listed on the alternates bid form provided by the Principal Representative.
Bidders should note the Method of Award is applicable to this Bid as stated below.
A. DEDUCTIBLE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by, and the contract will be awarded on the base bid combined with deductible alternates, accepted in numerical order as listed in the Bid Alternates Form provided by the Principal Representative. The subtraction of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be subtracted from the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder.
B. ADDITIVE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by and the contract will be awarded on the base bid combined with additive alternates in numerical order in as listed in the Bid Alternates Form provided by the Principal Representative. The addition of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be added to the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder.
C. DEDUCTIBLE AND ADDITIVE ALTERNATES: Additive alternates will not be used if deductible alternates are used and deductible alternates will not be used if additive alternates are used.
9. NOTICE OF CONTRACTOR’S SETTLEMENT – Agencies/institutions must indicate in the initial Solicitation where settlement will be advertised in electronic media.
Rev. 07/2026
Colorado Apprenticeship 2026 Contribution Rates
Table of Contents
International Brotherhood of Boilermakers, Iron Ship Builders, Blacksmiths, Forgers and Helpers
International Union of Bricklayers and Allied Craft Workers (CO/WY)
Carpet, Linoleum and Resilient Tile Layers (IUPAT)
Glazier, Architectural Metal and Glass Workers, (IUPAT)
Painters and Drywall Finishers (IUPAT)
Operative Plasterers and Cement Masons International Association
International Brotherhood of Electrical Workers (IBEW)
International Union of Elevator Constructors
International Association of Heat and Frost Insulators and Allied Workers
International Association of Bridge, Structural, Ornamental, and Reinforcing Iron Workers
Laborers’ International Union of North America (LIUNA)
International Union of Operating Engineers
Pipefitters (United Association-UA)
Plumbers & Pipefitters
Western Colorado Plumbers and Pipefitters
Plumbers (UA)
United Union of Roofers, Water Proofers, and Allied Workers
Sheet Metal Workers International Association
Southwest Regional Council of Carpenters #255
Southwest Regional Council of Carpenters #555
Sprinkler fitters (UA)
International Association of Bridge, Structural, Ornamental, and Reinforcing Iron Workers
Teamsters (IBTTJC)
International Brotherhood of Boilermakers, Iron Ship Builders, Blacksmiths, Forgers and Helpers
• Local Union #101
• Geographic Region: Colorado
• Apprenticeship Rate: $1.50 per hour
International Union of Bricklayers and Allied Craft Workers (CO/WY)
• Local Union #07
• Geographic Region: Colorado unless otherwise noted
• Apprenticeship Rate Refractory Projects: $0.35 per hour
• Apprenticeship Rate Tile, Terrazzo, Marble Stone, Finishers: $0.35 per hour
• Apprenticeship Rate Masonry - Northern Counties: $0.30 per hour
• Apprenticeship Rate Masonry - Southern Counties: $0.42 per hour
Northern Counties
Covering Northern Colorado Counties of Adams, Arapahoe, Boulder, Broomfield, Clear
Creek, Denver, Douglas, Eagle Garfield, Gilpin, Grand, Jackson, Jefferson, Larimer, Logan, Moffat, Morgan, Phillips, Pitkin, Rio Blanco, Routt, Sedgewick, Summit, Washington, Weld and Yuma counties.
Southern Counties
Covering Southern Colorado Counties of Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Conejos, Costilla, Crowley, Custer, Delta, Dolores, El Paso, Elbert, Fremont, Gunnison, Hinsdale, Huerfano, Kiowa, Kit Carson, La Plata, Lake, Las Animas, Lincoln, Mesa, Mineral, Montezuma, Montrose, Otero, Ouray, Park, Prowers, Pueblo, Rio Grande, Saguache, San Juan, San Miguel and Teller counties
Carpet, Linoleum and Resilient Tile Layers (IUPAT)
• Local Union #419
• Geographic Region: Colorado
• Apprenticeship Rate: $0.29 per hour
Glazier, Architectural Metal and Glass Workers, (IUPAT)
• Local Union #930
• Geographic Region: Colorado
• Apprenticeship Rate: $0.80 per hour
Painters and Drywall Finishers (IUPAT)
• Local Union #79
• Geographic Region: Colorado
• Apprenticeship Rate: $0.30
Operative Plasterers and Cement Masons International Association
• Local Union #577
• Geographic Region: Colorado
• Apprenticeship Rate: $0.80
International Brotherhood of Electrical Workers (IBEW)
IBEW-Grand Junction Electrical Apprenticeship
• Local Union #111
IBEW #68
• Local Union #68
• Geographic Region: Adams; Arapahoe; Boulder; Broomfield; Clear Creak; Denver;
Douglas; Eagle; Gilpin; Grand; Jackson; Jefferson; Lake; Larimer; Logan; Morgan;
Phillips; Sedgwick; Summit; Washington; Weld and Yuma Counties
• Commercial Apprenticeship Rate: $0.63
• Residential Apprenticeship Rates: $0.17
IBEW #12
• Local Union #12
• Geographic Region: Adams; Arapahoe; Boulder; Broomfield; Clear Creak; Denver;
Douglas; Eagle; Gilpin; Grand; Jackson; Jefferson; Lake; Larimer; Logan; Morgan;
Phillips; Sedgwick; Summit; Washington; Weld and Yuma Counties
Geographic
Region Region Description
Apprenticeship
Rate (per hour)
Zone 1 Mesa, Delta, Montrose, Rio Blanco, Routt, Moffat, Garfield, Hinsdale Dolores, Gunnison, Montezuma, and La Plata Counties
$0.84
Zone 2 Pitkin, San Miguel, San Juan, Ouray Counties $0.84
Zone 3 Mesa, Delta, Montrose, Garfield, Rio Blanco and Counties
$0.84
• Commercial Apprenticeship Rate: $0.60
• Residential Apprenticeship Rate: $0.23
IBEW-Colorado Springs Joint Electrical Apprenticeship
• Local Union #113
• Geographic Region: El Paso County
• Apprenticeship Rate: $0.75 per hour
International Union of Elevator Constructors
• Local #25
• Geographic Region: Colorado
• Apprenticeship Rate: $0.85 per hour
International Association of Heat and Frost Insulators and Allied Workers
• Local Union #28
• Geographic Region: Colorado
• Apprenticeship Rate: $1.50 per hour
International Association of Bridge, Structural, Ornamental, and Reinforcing Iron Workers
• Local Union #24
• Geographic Region: Colorado
• Apprenticeship Rate Industrial: $1.84 per hour
• Apprenticeship Rate Commercial: $0.48 per hour
Laborers’ International Union of North America (LIUNA)
• Local Union #720
• Geographic Region: Colorado
• Apprenticeship Rate: $0.68
International Union of Operating Engineers
• Local Union #9
• Apprenticeship Rate: $1.40
Pipefitters (United Association-UA)
• Local Union #208
• Geographic Region: Denver & Northern Colorado
• Apprenticeship Rate Commercial: $0.93 per hour
• Apprenticeship Rate Industrial: $0.93 per hour
• Apprenticeship Rate Service: $1.00 per hour
Plumbers & Pipefitters
• Local #58
• Geographic Region: Southern Colorado
• Apprenticeship Rate: $1.80
Western Colorado Plumbers and Pipefitters
• Local Union #145
• Geographic Region: Western Colorado
• Apprenticeship Rate Commercial: $1.45 per hour
• Apprenticeship Rate Industrial: $0.60 per hour
• Apprenticeship Rate Service: $1.40 per hour
Region Description:
Western Colorado, commencing at the Colorado New Mexico state lines, including the following counties: Archuleta, Hinsdale, Gunnison, Pitkin, and that portion of the Eagle
County west of the line to and including the town of Edwards and northerly to the southwest corner of Routt County, Routt, Moffat, Rio Blanco, Garfield, Mesa, Delta, Montrose, Ouray, San Miguel, San Juan, Montezuma, La Plata and Dolores Counties.
Plumbers (UA)
• Local Union #3
• Geographic Region: Denver and Northern Colorado
• Apprenticeship Rate Commercial: $1.05 per hour
• Apprenticeship Rate Industrial: $1.05 per hour
• Apprenticeship Rate Pipe Tradesman: $1.05 per hour
• Apprenticeship Rate Utility: $1.05 per hour
United Union of Roofers, Water Proofers, and Allied Workers
• Local Union #58
• Geographic Region: Colorado
• Apprenticeship Rate: $0.15
Sheet Metal Workers International Association
• Local Union #9
• Geographic Region: Denver, Colorado Springs, Grand Junction JATC
Western States Regional Council of Carpenters
• Local Union #555
• Geographic Region: Colorado
• Apprenticeship Rate Heavy and Highway work: $0.59
Western States Regional Council of Carpenters
• Local Union #555
• Geographic Region: Colorado
• Apprenticeship Rate Statewide Building Construction: $0.59 per hour
Western States Regional Council of Carpenters
• Local Union #555
• Geographic Region: Colorado
• Apprenticeship Rate Independent Drywall, Ceiling & Interior Systems & Millwright:
$0.54 per hour
Sprinkler fitters (UA)
Year Apprenticeship Rate (per hour)
1st year $1.30
2nd year $1.54
3rd year $1.66
4th year $1.90
Journeyman $2.37
• Local Union #669
• Geographic Region: Colorado
• Apprenticeship Rate: $0.52
International Association of Bridge, Structural, Ornamental, and Reinforcing Iron Workers
• Local Union #847
• Geographic Region: Colorado
• Apprenticeship Rate: $1.25
Teamsters (IBTTJC)
• Local Union #455
• Apprenticeship Rate: $0.50
"General Decision Number: CO20260022 05/18/2026
State: Colorado
Construction Types: Building
Counties: Colorado Counties of El Paso
Modification Number Publication Date 0 01/02/2026 1 05/18/2026
ASBE0028-002 07/01/2025
Rates Fringes
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL
(DUCT, PIPE & MECHANICAL SYSTEM INSULATION).........$ 36.98 16.82
ELEC0113-005 06/01/2025
Rates Fringes
ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING)...........$ 40.70 18.47
ELEV0025-001 01/01/2025
Rates Fringes
ELEVATOR MECHANIC FOOTNOTE: A.VACATION:
6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR
ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR
HOURLY RATE FOR ALL HOURS WORKED. B. PAID
HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY;
THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING
DAY; AND CHRISTMAS DAY..............................$ 56.57 38.44
ENGI0009-017 05/01/2024
Rates Fringes
POWER EQUIPMENT OPERATOR: CRANE (91 TO 140 TONS)....$ 37.34 15.20
POWER EQUIPMENT OPERATOR: CRANE (51 TO 90 TONS).....$ 36.09 15.20
POWER EQUIPMENT OPERATOR: CRANE (50 TONS AND UNDER).$ 35.78 15.20
POWER EQUIPMENT OPERATOR: CRANE (141 TONS AND OVER).$ 39.80 15.20
IRON0024-009 11/01/2024
Rates Fringes
IRONWORKER: ORNAMENTAL..............................$ 39.21 12.50
IRON0024-011 11/01/2024
Rates Fringes
IRONWORKER, STRUCTURAL..............................$ 39.21 12.50
6/26/26, 7:11 AM SAM.gov https://sam.gov/wage-determination/CO20260022/1 1/5
PAIN0079-009 08/01/2024
Rates Fringes
PAINTER (SPRAY).....................................$ 27.41 11.56
PLAS0577-002 05/01/2025
Rates Fringes
CEMENT MASON/CONCRETE FINISHER......................$ 34.73 15.15
PLUM0058-003 07/01/2025
Rates Fringes
PLUMBER (EXCLUDES HVAC DUCT, PIPE AND UNIT
INSTALLATION).......................................$ 47.60 18.10
PLUM0058-004 07/01/2025
Rates Fringes
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION
(EXCLUDES HVAC DUCT AND UNIT INSTALLATION)..........$ 47.60 18.10
SFCO0669-002 04/01/2025
Rates Fringes
SPRINKLER FITTER (FIRE SPRINKLERS)..................$ 48.60 27.57
SHEE0009-009 07/01/2025
Rates Fringes
SHEET METAL WORKER INCLUDES HVAC DUCT INSTALLATION
(EXCLUDES HVAC PIPE AND UNIT INSTALLATION)..........$ 43.05 22.65
SUCO2013-008 07/31/2015
Rates Fringes
TRUCK DRIVER: DUMP TRUCK...........................$ 17.34 0.00
SHEET METAL WORKER (HVAC UNIT INSTALLATION ONLY)....$ 24.00 2.18
ROOFER..............................................$ 16.71 0.00
PAINTER (BRUSH AND ROLLER)..........................$ 17.20 0.00
OPERATOR: GRADER/BLADE.............................$ 21.50 0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER............$ 18.58 2.42
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE...............$ 20.26 8.62
LABORER: PIPELAYER.................................$ 16.96 3.68
LABORER: MASON TENDER - CEMENT/CONCRETE............$ 16.00 0.00
LABORER: MASON TENDER - BRICK......................$ 15.99 0.00
LABORER: COMMON OR GENERAL.........................$ 13.40 1.40
CARPENTER...........................................$ 22.63 6.98
BRICKLAYER..........................................$ 21.96 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other https://sam.gov/wage-determination/CO20260022/1 2/5 health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than �SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 https://sam.gov/wage-determination/CO20260022/1 3/5 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The �SU� identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
�SU� wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The �SA� identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the �SA� identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
https://sam.gov/wage-determination/CO20260022/1 4/5
Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .