DS 270000000007 SCHEDULE B - PRICING MATRIX Plugging Wellmaster - Newaygo_Mecosta_.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Wellmaster Newaygo & Mecosta OW Plug Project 22 wells
Solicitation number
DS 761 270000000007 2
Issued by
Oceana County, Michigan

About this file

This is a Schedule B Pricing Matrix for the Wellmaster Orphan Well Plugging Project in Newaygo and Mecosta Counties, Michigan, administered by EGLE (Michigan Department of Environment, Great Lakes, and Energy). The project encompasses the plugging of two wells and requires bidders to provide comprehensive unit pricing for all materials, equipment, labor, and services necessary to complete the work. The pricing matrix contains 64 line items covering contractor personnel (site supervisors, laborers), specialized drilling equipment (pole rigs, derrick rigs, BOPs, tubing, drill bits, casing), cementing services and materials, environmental compliance equipment (H2S safety equipment, frac tanks), heavy equipment (dozers, excavators, dump trucks, water trucks), and site preparation and restoration activities. Bidders must submit quantity estimates and unit prices for all rated items, including those not anticipated for use, to allow for scope modifications, change orders, or transition to time-and-materials billing. Bidders must also provide a detailed project timeline assuming 10-hour workdays.

Pricing is structured as unit rates for individual services and materials, with two lump-sum items for site access/preparation and site restoration/recontour. The matrix includes an overhead percentage line item applicable to subcontracted services, rentals, and materials only, which cannot be applied to hourly or daily rates already listed on the Schedule B. All specialized equipment, supplies, and materials require prior approval from the EGLE Project Manager before mobilization or charging. Key restrictions include limitations on invoicing multiple site supervisors per day without authorization, prohibitions on double-billing (such as charging both rig crew and laborer rates simultaneously), and requirements that rated items used to complete lump-sum work activities be incorporated into the lump-sum price rather than invoiced separately. The contract allows bidders to add additional line items as needed and permits invoicing of unlisted materials at cost plus the overhead percentage.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE B - PRICING MATRIX
Wellmaster - Newaygo & Mecosta Orphan Well Plugging Project (Newaygo and Mecosta Counties) - 2 Wells
Project Resource ItemItem DescriptionUnitPriceTotal for ProjectVendor Item?
Quantityper(Y/N)
Unit
1Contractor Site Supervisorday$0.00
2Contractor Site Supervisor mileagemile$0.00
3Per diem (meals & lodging)day$0.00
4Laborer (this rate is to be utilized but is not limited to Roustabout, Heavy Equipment Operator, Tool Hand, General Laborer type work. See note at bottom of Schedule B for more information.)hour$0.00
5Pick-up Truck mileage (all descriptions)mile$0.00
6Pole Rig-3 man crewhour$0.00
7Single Derrick Rig-3 man crewhour$0.00
8Double Derrick Rig-3 man crewhour$0.00
9Pit Liner Material (20 mil PVC)roll$0.00
10Rig Anchors (install/remove, includes all labor and materials)site$0.00
11Cellar (install./remove, includes all labor and materials)job$0.00
12Mobile Arc Welder (inc. ½” steel plate for capping)hour$0.00
13BOP Rental (hydraulic) - Includes all parts such as but not limited to accumulator, annular (hydril), pipe rams, blind rams, etc
13 A4 1/2”day$0.00
13 B5 1/2"day$0.00
13 C7”day$0.00
13 D7 5/8”day$0.00
13 E8 5/8”day$0.00
13 F9 5/8”day$0.00
13 G10 3/4"day$0.00
13 H11 3/4”day$0.00
14Tubing/Workstring (rental) - rental fees to include any necessary post use pipe inspections
14 A1.9" tubingfoot$0.00
14 B2 3/8" tubingfoot$0.00
14 C2 7/8" tubingfoot$0.00
14 DDrill Collarsfoot$0.00
15Drill Bits (rental)
15 A3.5" - 7"bit$0.00
15 B7 1/8" - 11"bit$0.00
15 C11 1/8" - 16"bit$0.00
16Well Casing
16 A5 1/2" 15.5#/ftfoot$0.00
16 B8 5/8" 24#/ftfoot$0.00
16 C10 3/4" 32#/ftfoot$0.00
16 D11 3/4" 42#/ftfoot$0.00
16 E16" 75#/ftfoot$0.00
17Power Swivel Unithour$0.00
18Power Swivel Unit Operator (can also run mud pump)hour$0.00
19Rental 100 bbl. Half Tankday$0.00
20Rental - Mud Mixing System - includes mixing system and pit(s)day$0.00
21Mud Engineerhour$0.00
22Mixed Mud Drilling Fluidbbl$0.00
23Baritesx$0.00
24Shale Shakerday$0.00
25Rental Frac Tank (water and brine storage)day$0.00
26Casing Cutters (wireline)
26 A(jet cutter) 4 1/2”job$0.00
26 B(jet cutter) 5 1/2"job$0.00
26 C(jet cutter) 7"job$0.00
26 D(jet cutter) 8 5/8"job$0.00
26 ECollar busterjob$0.00
27Casing Cutters (mechanical/hydraulic)
27 A4 ½”job$0.00
27 B5 ½”job$0.00
27 C7"job$0.00
27 D8 5/8"job$0.00
28Casing Spear
28 A3.5" - 8.625"job$0.00
28 B9" - 14"job$0.00
29Mechanical/Electrical Plugs/Fishing Tools
29 A4.5” Cast Iron Bridge Plugea.$0.00
29 B4.5” Cement Retainerea.$0.00
29 C5.5" Cast Iron Bridge Plugea.$0.00
29 D5.5” Cement Retainerea.$0.00
29 E7” Cast Iron Bridge Plugea.$0.00
29 F7” Cement Retainerea.$0.00
29 G8 5/8” Cast Iron Bridge Plugea.$0.00
29 H8 5/8” Cement Retainerea.$0.00
29 I9 5/8” Cast Iron Bridge Plugea.$0.00
29 J9 5/8” Cement Retainerea.$0.00
29 K10” Cast Iron Bridge Plugea.$0.00
29 L10” Cement Retainerea.$0.00
30Wireline Services (inc. operator, and hands/riggers)
30 AElectric logging (Gamma Log, CCL, Freepoint)job$0.00
30 ACement Bond Logjob$0.00
30 CPerforatingjob$0.00
30 DSetting Mechanical Plugsjob$0.00
31Fresh Water Chargebbl.$0.00
32Duplex/Triplex Mud Pumpday$0.00
33Cementing Services
33 ACementerhour$0.00
33 BPump Truck Operatorhour$0.00
33 CBulk Truck Operatorhour$0.00
33 DCement Pump Truck OThour$0.00
33 ECement Pump Truck Mileagemile$0.00
34Cement
34 AStandard Cement (Type 1L)sx$0.00
34 BClass H Cementsx$0.00
34 C50/50 Poz. Cementsx$0.00
34 DGas Block Additivesx$0.00
35Cement Handling Chargesx$0.00
36Cement Transportation Chargeton/mile$0.00
37Calcium Chloridesx$0.00
38Cellophane Flake (LCM)sx$0.00
39Bentonitesx$0.00
40Flarejob$0.00
41H2S Scavenger Fluidbbl$0.00
42H2S Safety Companyday$0.00
43Enclosed (sealed) frac tank for H2Sday$0.00
44Waste Disposal Services
44 APump, Transport, and Disposal of All Generated or Collected Liquids. Per bbl price should include all labor and equipmentbbl$0.00
44 BExcavate, Transport, and Disposal of Contaminated Soil to Landfill. Per ton price should include all labor, equipmentton$0.00
45Dozerhour$0.00
45 ADozer - Standby Ratehour$0.00
46Backhoehour$0.00
46 ABackhoe - Standby Ratehour$0.00
47Excavatorhour$0.00
47 AExcavator - Standby Ratehour$0.00
48Skid Steerhour$0.00
48 ASkid Steer - Standby Ratehour$0.00
49Tele Handlerhour$0.00
49 ATele Handler - Standby Ratehour$0.00
5010,000 Square Feet of Composite Matsday$0.00
51Tractor & Low Boy/Float Transportationhour$0.00
52Site Access/Site Prep/Brush Hogging/Tree Clearing/Woodchipper (for location access) Includes all labor and equipment necessary to complete tasks related to accessing sites, clearing, and making them ready for equipment to plug the well.Lump Sum$0.00
53Site Restoration – Recontour and Seed Location – . Removal of gravel at well pad areas. Includes all labor and equipment necessary to complete tasks.Lump Sum$0.00
54Dump truck w/Operator (10cy dump)hour$0.00
55Dump truck w/Operator (20 cy lead dump)hour$0.00
56Dump truck w/Operator (30 cy dump or train)hour$0.00
5770 bbl. Water Truck w/ Vac. Pumphour$0.00
58120-150 bbl Water Tanker w/ Vac. Pumphour$0.00
59Water Truck Operatorhour$0.00
60Vacuum Truck/Cuscohour$0.00
61Vacuum Truck Operatorhour$0.00
62Hot Oilerhour$0.00
63Infrastructure/Equipment – Dismantle, Remove, Scrap/Salvage (includes any related surface infrastructure, such as but not limited to tanks, flares, heater/treaters, separators, tubulars, well pumps, pumping units, production equipment, compressors, piping, concrete pads, buildings, fencing, gates, electrical infrastructure (power poles and panels, etc.). Concrete Pads, Buildings, Fencing, and Gates. Also, if found to be present, include costs to purge, cut, and cap (steel cap), flow line at the Daniels 1-1B. Includes all labor and equipment necessary to complete tasks.Lump Sum$0.00
64Overhead % for subcontracted services, rentals, & materials%
Grand Total ($)$0.00
NOTES:
1. You must submit a project timeline as outlined in DS document. Please assume 10-hour days.
2. Provide Quantity and Price/Unit for all items listed in the Bid Table, even if the item is not likely to be used for the project. We call this 'Rated Items' and have requested the unit pricing in the event
the Scope of Work changes, a change order is necessary, or we move to a time and materials billing.
3. Bidder cannot mobilize, use, or charge for items in the pricing matrix without prior approval from EGLE Project Manager.
4. If a ‘rated item’ is used to complete a ‘lump sum’ item work activity included in the original scope of work, it cannot be invoiced separately.
For example, if you utilize an ‘excavator’ to complete concrete pad removal (‘Other Infrastructure Removal’ bid item), you cannot charge
for the excavator or operators hours as it should have been included as part of the lump sum price for ‘Other Infrastructure Removal’
5. Only 1 Contractor Site Supervisor can be invoiced per day of onsite work, unless authorized and/or approved by EGLE Project Manager.
6. Rental and/or purchase of any specialized equipment, supplies, services, or materials must have prior approval from EGLE Project Manager.
7. Overhead % cannot be added to the hourly or daily rates of items already included on Schedule B when invoicing.
8. If a material, such as 'casing' is needed to properly plug the well and is not listed on this pricing matrix, it will be invoiced at cost plus the 'Overhead %'
9. Laborer includes but is not limited to: Roustabout, Heavy Equipment Operator, Tool Hand, and other similar positions. The Laborer rate will also be used by the rig crew when they are completing work activities not assoicated
with the rig, including but not limited to: laying mats, moving equipment, loading/offloading equipment and supplies or other similar general labor duties. Rig crew cannot be invoiced at the Laborer and 'Rig Crew'
line items at the same time, as that would be double-billing.
10. You may add additional lines to this pricing matrix at the BOTTOM if needed.

File details come from the government source that posted it. Updated .