DS 260000000042 SCHEDULE B - PRICING MATRIX - Gilbert 1 Well Plugging Project.xlsx
XLSX spreadsheet 25 KB Posted
- Solicitation number
- DS 761 260000000042 1
- Issued by
- Michigan
About this file
This is a Schedule B Pricing Matrix document for the Gilbert Orphan Well Plugging Project in Kent County, Michigan, outlining the cost structure for well plugging services. The project involves the plugging of one orphan well, with pricing presented in a matrix format that details the costs associated with various components and phases of the well plugging operation. The document serves as the pricing schedule for bidders responding to this state contract opportunity, establishing the financial framework upon which proposals will be evaluated and contract awards determined.
The pricing matrix breaks down costs by specific line items and categories related to well plugging activities, providing transparency in the fee structure and enabling standardized cost comparison across bidder submissions. This format allows the State of Michigan and Kent County to clearly identify and evaluate the expenses associated with completing the orphan well remediation project, including labor, materials, equipment, and other direct costs incurred during the plugging process. The structured pricing approach facilitates budget accountability and ensures that all bidders are pricing their services against the same scope elements, promoting fair competition and cost-effective project delivery for the orphan well remediation initiative.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Gilbert 1 Well Plugging Project SF308 Supplemental.pdf | ||
| DS 260000000042 Orphan Well Gilbert 1 Well Plugging Project.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE B - PRICING MATRIX | |
| Gilbert 1 Orphan Well Plugging Project (Kent County) - 1 Well |
| Project Resource Item | Item Description | Unit | Price | Total for Project | Vendor Item? | |
| Quantity | per | (Y/N) | ||||
| Unit | ||||||
| 1 | Contractor Site Supervisor | day | $0.00 | |||
| 2 | Contractor Site Supervisor mileage | mile | $0.00 | |||
| 3 | Per diem (meals & lodging) | day | $0.00 | |||
| 4 | Laborer (this rate is to be utilized but is not limited to Roustabout, Heavy Equipment Operator, Tool Hand, General Laborer type work. See note at bottom of Schedule B for more information.) | hour | $0.00 | |||
| 5 | Pick-up Truck mileage (all descriptions) | mile | $0.00 | |||
| 6 | Pole Rig-3 man crew | hour | $0.00 | |||
| 7 | Single Derrick Rig-3 man crew | hour | $0.00 | |||
| 8 | Double Derrick Rig-3 man crew | hour | $0.00 | |||
| 9 | Pit Liner Material (20 mil PVC) | roll | $0.00 | |||
| 10 | Rig Anchors/Base Beam (install/remove, includes all labor and materials) | site | $0.00 | |||
| 11 | Cellar (install/remove, includes all labor and materials) - cellar to be installed and cemented in place in lake and removed after well is plugged. Includes sheet pile installation/removal, if needed. | job | $0.00 | |||
| 12 | Mobile Arc Welder (inc. ½” steel plate for capping) | hour | $0.00 | |||
| 13 | BOP Rental (hydraulic) - Includes all parts such as but not limited to accumulator, annular (hydril), pipe rams, blind rams, etc | |||||
| 13 A | 4 1/2” | day | $0.00 | |||
| 13 B | 5 1/2" | day | $0.00 | |||
| 13 C | 7” | day | $0.00 | |||
| 13 D | 7 5/8” | day | $0.00 | |||
| 13 E | 8 5/8” | day | $0.00 | |||
| 13 F | 9 5/8” | day | $0.00 | |||
| 13 G | 10 3/4" | day | $0.00 | |||
| 13 H | 11 3/4” | day | $0.00 | |||
| 14 | Tubing/Workstring (rental) - rental fees to include any necessary post use pipe inspections | |||||
| 14 A | 1.9" tubing | foot | $0.00 | |||
| 14 B | 2 3/8" tubing | foot | $0.00 | |||
| 14 C | 2 7/8" tubing | foot | $0.00 | |||
| 14 D | Drill Collars | foot | $0.00 | |||
| 15 | Drill Bits (rental) | |||||
| 15 A | 3.5" - 7" | bit | $0.00 | |||
| 15 B | 7 1/8" - 11" | bit | $0.00 | |||
| 15 C | 11 1/8" - 16" | bit | $0.00 | |||
| 16 | Well Casing | |||||
| 16 A | 5 1/2" 15.5#/ft | foot | $0.00 | |||
| 16 B | 8 5/8" 24#/ft | foot | $0.00 | |||
| 16 C | 10 3/4" 32#/ft | foot | $0.00 | |||
| 16 D | 11 3/4" 42#/ft | foot | $0.00 | |||
| 16 E | 16" 75#/ft | foot | $0.00 | |||
| 17 | Power Swivel Unit | hour | $0.00 | |||
| 18 | Power Swivel Unit Operator | hour | $0.00 | |||
| 19 | Rental 100 bbl. Half Tank | day | $0.00 | |||
| 20 | Rental - Mud Mixing System - includes mixing system and pit(s) | day | $0.00 | |||
| 21 | Mud Engineer | hour | $0.00 | |||
| 22 | Mixed Mud Drilling Fluid | bbl | $0.00 | |||
| 23 | Barite | sx | $0.00 | |||
| 24 | Shale Shaker | day | $0.00 | |||
| 25 | Rental Frac Tank (water and brine storage) | day | $0.00 | |||
| 26 | Casing Cutters (wireline) | |||||
| 26 A | (jet cutter) 4 1/2” | job | $0.00 | |||
| 26 B | (jet cutter) 5 1/2" | job | $0.00 | |||
| 26 C | (jet cutter) 7" | job | $0.00 | |||
| 26 D | (jet cutter) 8 5/8" | job | $0.00 | |||
| 26 E | Collar buster | job | $0.00 | |||
| 27 | Casing Cutters (mechanical/hydraulic) | |||||
| 27 A | 4 ½” | job | $0.00 | |||
| 27 B | 5 ½” | job | $0.00 | |||
| 27 C | 7" | job | $0.00 | |||
| 27 D | 8 5/8" | job | $0.00 | |||
| 28 | Casing Spear | |||||
| 28 A | 3.5" - 8.625" | job | $0.00 | |||
| 28 B | 9" - 14" | job | $0.00 | |||
| 29 | Mechanical/Electrical Plugs/Fishing Tools | |||||
| 29 A | 4.5” Cast Iron Bridge Plug | ea. | $0.00 | |||
| 29 B | 4.5” Cement Retainer | ea. | $0.00 | |||
| 29 C | 5.5" Cast Iron Bridge Plug | ea. | $0.00 | |||
| 29 D | 5.5” Cement Retainer | ea. | $0.00 | |||
| 29 E | 7” Cast Iron Bridge Plug | ea. | $0.00 | |||
| 29 F | 7” Cement Retainer | ea. | $0.00 | |||
| 29 G | 8 5/8” Cast Iron Bridge Plug | ea. | $0.00 | |||
| 29 H | 8 5/8” Cement Retainer | ea. | $0.00 | |||
| 29 I | 9 5/8” Cast Iron Bridge Plug | ea. | $0.00 | |||
| 29 J | 9 5/8” Cement Retainer | ea. | $0.00 | |||
| 29 K | 10” Cast Iron Bridge Plug | ea. | $0.00 | |||
| 29 L | 10” Cement Retainer | ea. | $0.00 | |||
| 30 | Wireline Services (inc. operator, and hands/riggers) | |||||
| 30 A | Electric logging (Gamma Log, CCL, Freepoint) | job | $0.00 | |||
| 30 A | Cement Bond Log | job | $0.00 | |||
| 30 C | Perforating | job | $0.00 | |||
| 30 D | Setting Mechanical Plugs | job | $0.00 | |||
| 31 | Fresh Water Charge | bbl. | $0.00 | |||
| 32 | Duplex/Triplex Mud Pump | day | $0.00 | |||
| 33 | Cementing Services | |||||
| 33 A | Cementer | hour | $0.00 | |||
| 33 B | Pump Truck Operator | hour | $0.00 | |||
| 33 C | Bulk Truck Operator | hour | $0.00 | |||
| 33 D | Cement Pump Truck OT | hour | $0.00 | |||
| 33 E | Cement Pump Truck Mileage | mile | $0.00 | |||
| 34 | Cement | |||||
| 34 A | Standard Cement (Type 1L) | sx | $0.00 | |||
| 34 B | Class H Cement | sx | $0.00 | |||
| 34 C | 50/50 Poz. Cement | sx | $0.00 | |||
| 34 D | Gas Block Additive | sx | $0.00 | |||
| 35 | Cement Handling Charge | sx | $0.00 | |||
| 36 | Cement Transportation Charge | ton/mile | $0.00 | |||
| 37 | Calcium Chloride | sx | $0.00 | |||
| 38 | Cellophane Flake (LCM) | sx | $0.00 | |||
| 39 | Bentonite | sx | $0.00 | |||
| 40 | Flare | job | $0.00 | |||
| 41 | H2S Scavenger Fluid | bbl | $0.00 | |||
| 42 | H2S Safety Company | day | $0.00 | |||
| 43 | Enclosed (sealed) frac tank for H2S | day | $0.00 | |||
| 44 | Waste Disposal Services | |||||
| 44 A | Pump, Transport, and Disposal of Sludge and/or Tank Bottoms. Per ton price should include all labor and equipment | ton | $0.00 | |||
| 44 B | Pump, Transport, and Disposal of All Generated or Collected Liquids. Per bbl price should include all labor and equipment | bbl | $0.00 | |||
| 45 | Crane - for lifting large heavy tanks and equipment | hour | $0.00 | |||
| 46 | Dozer | hour | $0.00 | |||
| 46 A | Dozer - Standby Rate | hour | $0.00 | |||
| 47 | Backhoe | hour | $0.00 | |||
| 47 A | Backhoe - Standby Rate | hour | $0.00 | |||
| 48 | Excavator | hour | $0.00 | |||
| 48 A | Excavator - Standby Rate | hour | $0.00 | |||
| 49 | Skid Steer | hour | $0.00 | |||
| 49 A | Skid Steer - Standby Rate | hour | $0.00 | |||
| 50 | Tele Handler | hour | $0.00 | |||
| 50 A | Tele Handler - Standby Rate | hour | $0.00 | |||
| 51 | Sheet Pile Driver Vibratory Head (for use on excavator or crane) | hour | $0.00 | |||
| 52 | 10,000 Square Feet of Composite Mats | day | $0.00 | |||
| 53 | Tractor & Low Boy/Float Transportation | hour | $0.00 | |||
| 54 | Site Restoration – Recontour and Seed Location – . Grade, and reseed as necessary any areas disturbed along access road or work areas. Includes all labor and equipment necessary to complete tasks. | Lump Sum | $0.00 | |||
| 55 | Dump truck w/Operator (10cy dump) | hour | $0.00 | |||
| 56 | Dump truck w/Operator (20 cy lead dump) | hour | $0.00 | |||
| 57 | Dump truck w/Operator (30 cy dump or train) | hour | $0.00 | |||
| 58 | 70 bbl. Water Truck w/ Vac. Pump | hour | $0.00 | |||
| 59 | 120-150 bbl Water Tanker w/ Vac. Pump | hour | $0.00 | |||
| 60 | Water Truck Operator | hour | $0.00 | |||
| 61 | Vacuum Truck/Cusco | hour | $0.00 | |||
| 62 | Vacuum Truck Operator | hour | $0.00 | |||
| 63 | Hot Oiler | hour | $0.00 | |||
| 64 | Barge | day | $0.00 | |||
| 65 | Buoy Lines (2) | day | $0.00 | |||
| 66 | Frac Tanks (3) | day | $0.00 | |||
| 67 | Boat rental for transporting supplies and workers | day | $0.00 | |||
| 68 | Sorbent Boom with Silt Curtain - 100' radius around barge (includes installation, removal, rental costs) | Lump Sum | $0.00 | |||
| 69 | Mobilization/Demobilization for barge, buoy lines, and three frac tanks | Lump Sum | $0.00 | |||
| 70 | Installation of improved boat launch area (landing area)- some clearing and grubbing will be required, sheet piling and fill material will be used - includes all labor and equipment costs. | Lump sum | $0.00 | |||
| 71 | Removal of constructed improved boat launch (landing area) - includes all labor and equipment costs | Lump Sum | $0.00 | |||
| 72 | Equipment – Dismantle, Remove, Scrap/Salvage (pulled 6 5/8" csg. and cut off csg stubs will be the only scrap for this project). Includes all labor and equipment necessary to complete tasks. | Lump Sum | $0.00 | |||
| 73 | Overhead % for subcontracted services, rentals, & materials | % |
| Grand Total ($) | $0.00 | |
| NOTES: | ||
| 1. You must submit a project timeline as outlined in RFQ document. Please assume 10-hour days. | ||
| 2. Provide Quantity and Price/Unit for all items listed in the Bid Table, even if the item is not likely to be used for the project. We call this 'Rated Items' and have requested the unit pricing in the event | ||
| the Scope of Work changes, a change order is necessary, or we move to a time and materials billing. | ||
| 3. Bidder cannot mobilize, use, or charge for items in the pricing matrix without prior approval from EGLE Project Manager. | ||
| 4. If a ‘rated item’ is used to complete a ‘lump sum’ item work activity included in the original scope of work, it cannot be invoiced separately. | ||
| For example, if you utilize an ‘excavator’ to complete concrete pad removal (‘Other Infrastructure Removal’ bid item), you cannot charge | ||
| for the excavator or operators hours as it should have been included as part of the lump sum price for ‘Other Infrastructure Removal’ | ||
| 5. Only 1 Contractor Site Supervisor can be invoiced per day of onsite work, unless authorized and/or approved by EGLE project manager. | ||
| 6. Rental and/or purchase of any specialized equipment, supplies, services, or materials must have prior approval from EGLE Project Manager. | ||
| 7. Overhead % cannot be added to the hourly or daily rates of items already included on Schedule B when invoicing. | ||
| 8. If a material, such as 'casing' is needed to properly plug the well and is not listed on this pricing matrix, it will be invoiced at cost plus the 'Overhead %' | ||
| 9. You may add additional lines to this pricing matrix at the BOTTOM if needed. |