DS 260000000035 SCHEDULE B - PRICING MATRIX - New Haven Sec 31 - 33.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Orphan Well New Haven Sec 31-33 - 9 Wells - Gratiot County
Solicitation number
DS 761 260000000035 1
Issued by
Michigan

About this file

This is a Schedule B Pricing Matrix for the Orphan Well New Haven Sec 31-33 project in Gratiot County, Michigan, administered by the state of Michigan's environmental agency. The project encompasses the plugging and remediation of nine orphan wells located in the New Haven Section 31-33 area. The pricing matrix establishes unit rates and quantities for all materials, equipment, labor, and services required to complete the well plugging operations, site restoration, and infrastructure removal activities. Bidders are required to provide pricing for all 68 line items listed in the matrix, designated as "rated items," regardless of whether the specific item is anticipated to be used on the project, with the understanding that rated items may become necessary if the scope of work changes or amendments are issued. The document mandates submission of a detailed project timeline assuming 10-hour workdays and requires bidders to assume all costs associated with site mobilization, equipment operation, waste disposal, environmental compliance, and site restoration within their pricing.

The pricing matrix establishes unit-based billing for labor, equipment rental, materials, and specialized services, with all costs expected to be reflected in the line-item pricing rather than inflated through overhead allocation to already-rated items. Bidders are prohibited from mobilizing, using, or charging for items without prior approval from the EGLE Project Manager, and any specialized equipment, supplies, services, or materials not explicitly listed on the matrix must receive project manager authorization before use. The contract contains provisions preventing double-billing, such as prohibiting separate invoicing of rig crews and laborers for the same work activities or charging for rated items used to complete lump-sum scope items. Overhead percentages may only be applied to unlisted materials invoiced at cost and cannot be added to hourly, daily, or unit rates already established in Schedule B. All pricing is due at $0.00 pending formal bid submission, with the grand total placeholder indicating that final project cost will be determined by the bidder's unit pricing multiplied by actual quantities consumed during well plugging operations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE B - PRICING MATRIX
New Haven Sect. 31 - 33 Orphan Well Plugging Project (Gratiot County) - 9 Wells
Project Resource ItemItem DescriptionUnitPriceTotal for ProjectVendor Item?
Quantityper(Y/N)
Unit
1Contractor Site Supervisorday$0.00
2Contractor Site Supervisor mileagemile$0.00
3Per diem (meals & lodging)day$0.00
4Laborer (this rate is to be utilized but is not limited to Roustabout, Heavy Equipment Operator, Tool Hand, General Laborer type work. See note at bottom of Schedule B for more information.)hour$0.00
5Pick-up Truck mileage (all descriptions)mile$0.00
6Pole Rig-3 man crewhour$0.00
7Single Derrick Rig-3 man crewhour$0.00
8Double Derrick Rig-3 man crewhour$0.00
9Pit Liner Material (20 mil PVC)roll$0.00
10Rig Anchors (install/remove, includes all labor and materials)site$0.00
11Cellar (install./remove, includes all labor and materials)job$0.00
12Mobile Arc Welder (inc. ½” steel plate for capping)hour$0.00
13BOP Rental (hydraulic) - Includes all parts such as but not limited to accumulator, annular (hydril), pipe rams, blind rams, etc
13 A4 1/2”day$0.00
13 B5 1/2"day$0.00
13 C7”day$0.00
13 D7 5/8”day$0.00
13 E8 5/8”day$0.00
13 F9 5/8”day$0.00
13 G10 3/4"day$0.00
13 H11 3/4”day$0.00
14Tubing/Workstring (rental) - rental fees to include any necessary post use pipe inspections
14 A1.9" tubingfoot$0.00
14 B2 3/8" tubingfoot$0.00
14 C2 7/8" tubingfoot$0.00
14 DDrill Collarsfoot$0.00
15Drill Bits (rental)
15 A3.5" - 7"bit$0.00
15 B7 1/8" - 11"bit$0.00
15 C11 1/8" - 16"bit$0.00
16Well Casing
16 A5 1/2" 15.5#/ftfoot$0.00
16 B8 5/8" 24#/ftfoot$0.00
16 C10 3/4" 32#/ftfoot$0.00
16 D11 3/4" 42#/ftfoot$0.00
16 E16" 75#/ftfoot$0.00
17Power Swivel Unithour$0.00
18Power Swivel Unit Operatorhour$0.00
19Rental 100 bbl. Half Tankday$0.00
20Rental - Mud Mixing System - includes mixing system and pit(s)day$0.00
21Mud Engineerhour$0.00
22Mixed Mud Drilling Fluidbbl$0.00
23Baritesx$0.00
24Shale Shakerday$0.00
25Rental Frac Tank (water and brine storage)day$0.00
26Casing Cutters (wireline)
26 A(jet cutter) 4 1/2”job$0.00
26 B(jet cutter) 5 1/2"job$0.00
26 C(jet cutter) 7"job$0.00
26 D(jet cutter) 8 5/8"job$0.00
26 ECollar busterjob$0.00
27Casing Cutters (mechanical/hydraulic)
27 A4 ½”job$0.00
27 B5 ½”job$0.00
27 C7"job$0.00
27 D8 5/8"job$0.00
28Casing Spear
28 A3.5" - 8.625"job$0.00
28 B9" - 14"job$0.00
29Mechanical/Electrical Plugs/Fishing Tools
29 A4.5” Cast Iron Bridge Plugea.$0.00
29 B4.5” Cement Retainerea.$0.00
29 C5.5" Cast Iron Bridge Plugea.$0.00
29 D5.5” Cement Retainerea.$0.00
29 E7” Cast Iron Bridge Plugea.$0.00
29 F7” Cement Retainerea.$0.00
29 G8 5/8” Cast Iron Bridge Plugea.$0.00
29 H8 5/8” Cement Retainerea.$0.00
29 I9 5/8” Cast Iron Bridge Plugea.$0.00
29 J9 5/8” Cement Retainerea.$0.00
29 K10” Cast Iron Bridge Plugea.$0.00
29 L10” Cement Retainerea.$0.00
30Wireline Services (inc. operator, and hands/riggers)
30 AElectric logging (Gamma Log, CCL, Freepoint)job$0.00
30 ACement Bond Logjob$0.00
30 CPerforatingjob$0.00
30 DSetting Mechanical Plugsjob$0.00
31Fresh Water Chargebbl.$0.00
32Duplex/Triplex Mud Pumpday$0.00
33Cementing Services
33 ACementerhour$0.00
33 BPump Truck Operatorhour$0.00
33 CBulk Truck Operatorhour$0.00
33 DCement Pump Truck OThour$0.00
33 ECement Pump Truck Mileagemile$0.00
34Cement
34 AStandard Cement (Type 1L)sx$0.00
34 BClass H Cementsx$0.00
34 C50/50 Poz. Cementsx$0.00
34 DGas Block Additivesx$0.00
35Cement Handling Chargesx$0.00
36Cement Transportation Chargeton/mile$0.00
37Calcium Chloridesx$0.00
38Cellophane Flake (LCM)sx$0.00
39Bentonitesx$0.00
40Flarejob$0.00
41H2S Scavenger Fluidbbl$0.00
42H2S Safety Companyday$0.00
43Enclosed (sealed) frac tank for H2Sday$0.00
44Waste Disposal Services
44 AWaste Characterization – Fluids and Sludges from Tanks, Flowlines, Vessels, Drums, Secondary Containments, etc. Includes all labor, equipment, and laboratory feesLump sum$0.00
44 BPump, Transport, and Disposal of Sludge and/or Tank Bottoms. Per ton price should include all labor and equipmentton$0.00
44 CPump, Transport, and Disposal of All Generated or Collected Liquids. Per bbl price should include all labor and equipmentbbl$0.00
44 DExcavate, Transport, and Disposal of Contaminated Soil to Landfill. Per ton price should include all labor, equipmentton$0.00
45Pole Truck (tandem axle) - for moving stock tanks, etc.hour$0.00
46Crane - for lifting large heavy tanks and equipmenthour$0.00
47Dozerhour$0.00
47 ADozer - Standby Ratehour$0.00
48Backhoehour$0.00
48 ABackhoe - Standby Ratehour$0.00
49Excavatorhour$0.00
49 AExcavator - Standby Ratehour$0.00
50Skid Steerhour$0.00
50 ASkid Steer - Standby Ratehour$0.00
51Tele Handlerhour$0.00
51 ATele Handler - Standby Ratehour$0.00
5210,000 Square Feet of Composite Matsday$0.00
53Tractor & Low Boy/Float Transportationhour$0.00
54Site Access/Site Prep/Brush Hogging/Tree Clearing/Woodchipper (for location access) Includes all labor and equipment necessary to complete tasks related to accessing sites, clearing, and making them ready for equipment to plug the well.Lump Sum$0.00
55Site Restoration – Recontour and Seed Location – . Removal of gravel at well pad areas. Includes all labor and equipment necessary to complete tasks.Lump Sum$0.00
56Dump truck w/Operator (10cy dump)hour$0.00
57Dump truck w/Operator (20 cy lead dump)hour$0.00
58Dump truck w/Operator (30 cy dump or train)hour$0.00
5970 bbl. Water Truck w/ Vac. Pumphour$0.00
60120-150 bbl Water Tanker w/ Vac. Pumphour$0.00
61Water Truck Operatorhour$0.00
62Vacuum Truck/Cuscohour$0.00
63Vacuum Truck Operatorhour$0.00
64Hot Oilerhour$0.00
65Equipment – Dismantle, Remove, Scrap/Salvage (includes any related surface infrastructure, tanks, flares, heater/treaters, separators, tubulars, well pumps, pumping units, production equipment, compressors, piping, etc.). Includes all labor and equipment necessary to complete tasks.Lump Sum$0.00
66Other Infrastructure Removal – Concrete Pads, Buildings, Fencing, Gates, Electrical Infrastructure (power poles, electrical panels, etc.) Includes all labor and equipment necessary to complete tasks.Lump Sum$0.00
67Flow-Lines – Empty, Purge/Pull, Scrap/Salvage, Cut and Cap Flowlines (use of welder to be billed in line item 15, but not billed in both line item 15 and 69). Includes all labor and equipment necessary to complete tasks.Lump Sum$0.00
68Overhead % for subcontracted services, rentals, & materials%

Grand Total ($) $0.00

NOTES:
1. You must submit a project timeline as outlined in DS document. Please assume 10-hour days.
2. Provide Quantity and Price/Unit for all items listed in the Bid Table, even if the item is not likely to be used for the project. We call this 'Rated Items' and have requested the unit pricing in the event
the Scope of Work changes, a change order (aka - Amendment) is necessary, or we move to a time and materials billing.
3. Bidder cannot mobilize, use, or charge for items in the pricing matrix without prior approval from EGLE Project Manager.
4. If a ‘rated item’ is used to complete a ‘lump sum’ item work activity included in the original scope of work, it cannot be invoiced separately.
For example, if you utilize an ‘excavator’ to complete concrete pad removal (‘Other Infrastructure Removal’ bid item), you cannot charge
for the excavator or operators hours as it should have been included as part of the lump sum price for ‘Other Infrastructure Removal’
5. Only 1 Contractor Site Supervisor can be invoiced per day of onsite work.
6. Rental and/or purchase of any specialized equipment, supplies, services, or materials must have prior approval from EGLE Project Manager.
7. Overhead % cannot be added to the hourly or daily rates of items already included on Schedule B when invoicing.
8. If a material, such as 'casing' is needed to properly plug the well and is not listed on this pricing matrix, it will be invoiced at cost plus the 'Overhead %'
9. Laborer includes but is not limited to: Roustabout, Heavy Equipment Operator, Tool Hand, and other similar positions. The Laborer rate will also be used by the rig crew when they are completing work activities not assoicated
with the rig, including but not limited to: laying mats, moving equipment, loading/offloading equipment and supplies or other similar general labor duties. Rig crew cannot be invoiced at the Laborer and 'Rig Crew'
line items at the same time, as that would be double-billing.