DS 260000000032 SCHEDULE B - PRICING MATRIX New Haven Sec 3.xlsx
XLSX spreadsheet 25 KB Posted
- Solicitation number
- DS 761 260000000032 2
- Issued by
- Michigan
About this file
This is a Schedule B Pricing Matrix submitted as part of a bid for the Orphan Well New Haven Section 3 project in Gratiot County, Michigan, involving the plugging and abandonment of three orphan wells managed by the Michigan Department of Environment, Great Lakes, and Energy (EGLE). The project encompasses comprehensive well plugging services including site supervision, labor, equipment rental, materials, and site restoration. Bidders must provide unit pricing for all 68 line items listed in the matrix, regardless of anticipated use, to establish rated pricing for potential change orders or scope modifications. Pricing categories include contractor supervision and per diem, laborer hours, rig services (pole, single derrick, and double derrick configurations), well casing and tubing rental, drilling equipment, cementing services, mud engineering and fluids, wireline services, waste disposal, heavy equipment operations, site preparation, restoration, and infrastructure removal. All work is calculated on a 10-hour day basis, and bidders must submit a detailed project timeline with their bid response.
Pricing terms require bidders to establish unit costs for all line items, with a specified overhead percentage applied only to subcontracted services, rentals, and materials—not to hourly or daily rates already listed on the matrix. Additional equipment, supplies, or specialized services not included on the pricing matrix may be invoiced at cost plus the overhead percentage with prior written approval from the EGLE Project Manager. Key restrictions include limitations on invoicing multiple cost categories for the same work activity (prohibiting double-billing when rated items are used to complete lump sum activities), a requirement that only one contractor site supervisor may be invoiced per day of onsite work, and restrictions on equipment mobilization without prior approval. Materials and specialized equipment must receive Project Manager approval before use or invoicing, and the laborer rate serves as the standard for both general labor and rig crew non-rig-related work activities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-bid Meeting Notes New Haven Projects 2026.docx | DOCX document | |
| 40474 3 Final - Gratiot Montcalm County - Welder - well plugging.pdf | ||
| 40474 2 Final - Gratiot County - well plugging.pdf | ||
| Q & A DS 26-0032 New Haven Sec 3.docx | DOCX document | |
| DS 260000000032 New Haven Energy Sec 3.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE B - PRICING MATRIX | |
| New Haven Sect. 3 Orphan Well Plugging Project (Gratiot County) - 3 Wells |
| Project Resource Item | Item Description | Unit | Price | Total for Project | Vendor Item? | |
| Quantity | per | (Y/N) | ||||
| Unit | ||||||
| 1 | Contractor Site Supervisor | day | $0.00 | |||
| 2 | Contractor Site Supervisor mileage | mile | $0.00 | |||
| 3 | Per diem (meals & lodging) | day | $0.00 | |||
| 4 | Laborer (this rate is to be utilized but is not limited to Roustabout, Heavy Equipment Operator, Tool Hand, General Laborer type work. See note at bottom of Schedule B for more information.) | hour | $0.00 | |||
| 5 | Pick-up Truck mileage (all descriptions) | mile | $0.00 | |||
| 6 | Pole Rig-3 man crew | hour | $0.00 | |||
| 7 | Single Derrick Rig-3 man crew | hour | $0.00 | |||
| 8 | Double Derrick Rig-3 man crew | hour | $0.00 | |||
| 9 | Pit Liner Material (20 mil PVC) | roll | $0.00 | |||
| 10 | Rig Anchors (install/remove, includes all labor and materials) | site | $0.00 | |||
| 11 | Cellar (install./remove, includes all labor and materials) | job | $0.00 | |||
| 12 | Mobile Arc Welder (inc. ½” steel plate for capping) | hour | $0.00 | |||
| 13 | BOP Rental (hydraulic) - Includes all parts such as but not limited to accumulator, annular (hydril), pipe rams, blind rams, etc | |||||
| 13 A | 4 1/2” | day | $0.00 | |||
| 13 B | 5 1/2" | day | $0.00 | |||
| 13 C | 7” | day | $0.00 | |||
| 13 D | 7 5/8” | day | $0.00 | |||
| 13 E | 8 5/8” | day | $0.00 | |||
| 13 F | 9 5/8” | day | $0.00 | |||
| 13 G | 10 3/4" | day | $0.00 | |||
| 13 H | 11 3/4” | day | $0.00 | |||
| 14 | Tubing/Workstring (rental) - rental fees to include any necessary post use pipe inspections | |||||
| 14 A | 1.9" tubing | foot | $0.00 | |||
| 14 B | 2 3/8" tubing | foot | $0.00 | |||
| 14 C | 2 7/8" tubing | foot | $0.00 | |||
| 14 D | Drill Collars | foot | $0.00 | |||
| 15 | Drill Bits (rental) | |||||
| 15 A | 3.5" - 7" | bit | $0.00 | |||
| 15 B | 7 1/8" - 11" | bit | $0.00 | |||
| 15 C | 11 1/8" - 16" | bit | $0.00 | |||
| 16 | Well Casing | |||||
| 16 A | 5 1/2" 15.5#/ft | foot | $0.00 | |||
| 16 B | 8 5/8" 24#/ft | foot | $0.00 | |||
| 16 C | 10 3/4" 32#/ft | foot | $0.00 | |||
| 16 D | 11 3/4" 42#/ft | foot | $0.00 | |||
| 16 E | 16" 75#/ft | foot | $0.00 | |||
| 17 | Power Swivel Unit | hour | $0.00 | |||
| 18 | Power Swivel Unit Operator | hour | $0.00 | |||
| 19 | Rental 100 bbl. Half Tank | day | $0.00 | |||
| 20 | Rental - Mud Mixing System - includes mixing system and pit(s) | day | $0.00 | |||
| 21 | Mud Engineer | hour | $0.00 | |||
| 22 | Mixed Mud Drilling Fluid | bbl | $0.00 | |||
| 23 | Barite | sx | $0.00 | |||
| 24 | Shale Shaker | day | $0.00 | |||
| 25 | Rental Frac Tank (water and brine storage) | day | $0.00 | |||
| 26 | Casing Cutters (wireline) | |||||
| 26 A | (jet cutter) 4 1/2” | job | $0.00 | |||
| 26 B | (jet cutter) 5 1/2" | job | $0.00 | |||
| 26 C | (jet cutter) 7" | job | $0.00 | |||
| 26 D | (jet cutter) 8 5/8" | job | $0.00 | |||
| 26 E | Collar buster | job | $0.00 | |||
| 27 | Casing Cutters (mechanical/hydraulic) | |||||
| 27 A | 4 ½” | job | $0.00 | |||
| 27 B | 5 ½” | job | $0.00 | |||
| 27 C | 7" | job | $0.00 | |||
| 27 D | 8 5/8" | job | $0.00 | |||
| 28 | Casing Spear | |||||
| 28 A | 3.5" - 8.625" | job | $0.00 | |||
| 28 B | 9" - 14" | job | $0.00 | |||
| 29 | Mechanical/Electrical Plugs/Fishing Tools | |||||
| 29 A | 4.5” Cast Iron Bridge Plug | ea. | $0.00 | |||
| 29 B | 4.5” Cement Retainer | ea. | $0.00 | |||
| 29 C | 5.5" Cast Iron Bridge Plug | ea. | $0.00 | |||
| 29 D | 5.5” Cement Retainer | ea. | $0.00 | |||
| 29 E | 7” Cast Iron Bridge Plug | ea. | $0.00 | |||
| 29 F | 7” Cement Retainer | ea. | $0.00 | |||
| 29 G | 8 5/8” Cast Iron Bridge Plug | ea. | $0.00 | |||
| 29 H | 8 5/8” Cement Retainer | ea. | $0.00 | |||
| 29 I | 9 5/8” Cast Iron Bridge Plug | ea. | $0.00 | |||
| 29 J | 9 5/8” Cement Retainer | ea. | $0.00 | |||
| 29 K | 10” Cast Iron Bridge Plug | ea. | $0.00 | |||
| 29 L | 10” Cement Retainer | ea. | $0.00 | |||
| 30 | Wireline Services (inc. operator, and hands/riggers) | |||||
| 30 A | Electric logging (Gamma Log, CCL, Freepoint) | job | $0.00 | |||
| 30 A | Cement Bond Log | job | $0.00 | |||
| 30 C | Perforating | job | $0.00 | |||
| 30 D | Setting Mechanical Plugs | job | $0.00 | |||
| 31 | Fresh Water Charge | bbl. | $0.00 | |||
| 32 | Duplex/Triplex Mud Pump | day | $0.00 | |||
| 33 | Cementing Services | |||||
| 33 A | Cementer | hour | $0.00 | |||
| 33 B | Pump Truck Operator | hour | $0.00 | |||
| 33 C | Bulk Truck Operator | hour | $0.00 | |||
| 33 D | Cement Pump Truck OT | hour | $0.00 | |||
| 33 E | Cement Pump Truck Mileage | mile | $0.00 | |||
| 34 | Cement | |||||
| 34 A | Standard Cement (Type 1L) | sx | $0.00 | |||
| 34 B | Class H Cement | sx | $0.00 | |||
| 34 C | 50/50 Poz. Cement | sx | $0.00 | |||
| 34 D | Gas Block Additive | sx | $0.00 | |||
| 35 | Cement Handling Charge | sx | $0.00 | |||
| 36 | Cement Transportation Charge | ton/mile | $0.00 | |||
| 37 | Calcium Chloride | sx | $0.00 | |||
| 38 | Cellophane Flake (LCM) | sx | $0.00 | |||
| 39 | Bentonite | sx | $0.00 | |||
| 40 | Flare | job | $0.00 | |||
| 41 | H2S Scavenger Fluid | bbl | $0.00 | |||
| 42 | H2S Safety Company | day | $0.00 | |||
| 43 | Enclosed (sealed) frac tank for H2S | day | $0.00 | |||
| 44 | Waste Disposal Services | |||||
| 44 A | Waste Characterization – Fluids and Sludges from Tanks, Flowlines, Vessels, Drums, Secondary Containments, etc. Includes all labor, equipment, and laboratory fees | Lump sum | $0.00 | |||
| 44 B | Pump, Transport, and Disposal of Sludge and/or Tank Bottoms. Per ton price should include all labor and equipment | ton | $0.00 | |||
| 44 C | Pump, Transport, and Disposal of All Generated or Collected Liquids. Per bbl price should include all labor and equipment | bbl | $0.00 | |||
| 44 D | Excavate, Transport, and Disposal of Contaminated Soil to Landfill. Per ton price should include all labor, equipment | ton | $0.00 | |||
| 45 | Pole Truck (tandem axle) - for moving stock tanks, etc. | hour | $0.00 | |||
| 46 | Crane - for lifting large heavy tanks and equipment | hour | $0.00 | |||
| 47 | Dozer | hour | $0.00 | |||
| 47 A | Dozer - Standby Rate | hour | $0.00 | |||
| 48 | Backhoe | hour | $0.00 | |||
| 48 A | Backhoe - Standby Rate | hour | $0.00 | |||
| 49 | Excavator | hour | $0.00 | |||
| 49 A | Excavator - Standby Rate | hour | $0.00 | |||
| 50 | Skid Steer | hour | $0.00 | |||
| 50 A | Skid Steer - Standby Rate | hour | $0.00 | |||
| 51 | Tele Handler | hour | $0.00 | |||
| 51 A | Tele Handler - Standby Rate | hour | $0.00 | |||
| 52 | 10,000 Square Feet of Composite Mats | day | $0.00 | |||
| 53 | Tractor & Low Boy/Float Transportation | hour | $0.00 | |||
| 54 | Site Access/Site Prep/Brush Hogging/Tree Clearing/Woodchipper (for location access) Includes all labor and equipment necessary to complete tasks related to accessing sites, clearing, and making them ready for equipment to plug the well. | Lump Sum | $0.00 | |||
| 55 | Site Restoration – Recontour and Seed Location – . Removal of gravel at well pad areas. Includes all labor and equipment necessary to complete tasks. | Lump Sum | $0.00 | |||
| 56 | Dump truck w/Operator (10cy dump) | hour | $0.00 | |||
| 57 | Dump truck w/Operator (20 cy lead dump) | hour | $0.00 | |||
| 58 | Dump truck w/Operator (30 cy dump or train) | hour | $0.00 | |||
| 59 | 70 bbl. Water Truck w/ Vac. Pump | hour | $0.00 | |||
| 60 | 120-150 bbl Water Tanker w/ Vac. Pump | hour | $0.00 | |||
| 61 | Water Truck Operator | hour | $0.00 | |||
| 62 | Vacuum Truck/Cusco | hour | $0.00 | |||
| 63 | Vacuum Truck Operator | hour | $0.00 | |||
| 64 | Hot Oiler | hour | $0.00 | |||
| 65 | Equipment – Dismantle, Remove, Scrap/Salvage (includes any related surface infrastructure, tanks, flares, heater/treaters, separators, tubulars, well pumps, pumping units, production equipment, compressors, piping, etc.). Includes all labor and equipment necessary to complete tasks. | Lump Sum | $0.00 | |||
| 66 | Other Infrastructure Removal – Concrete Pads, Buildings, Fencing, Gates, Electrical Infrastructure (power poles, electrical panels, etc.) Includes all labor and equipment necessary to complete tasks. | Lump Sum | $0.00 | |||
| 67 | Flow-Lines – Empty, Purge/Pull, Scrap/Salvage, Cut and Cap Flowlines (use of welder to be billed in line item 15, but not billed in both line item 15 and 69). Includes all labor and equipment necessary to complete tasks. | Lump Sum | $0.00 | |||
| 68 | Overhead % for subcontracted services, rentals, & materials | % |
Grand Total ($) $0.00
| NOTES: |
| 1. You must submit a project timeline as outlined in DS document. Please assume 10-hour days. |
| 2. Provide Quantity and Price/Unit for all items listed in the Bid Table, even if the item is not likely to be used for the project. We call this 'Rated Items' and have requested the unit pricing in the event |
| the Scope of Work changes, a change order (aka - Amendment) is necessary, or we move to a time and materials billing. |
| 3. Bidder cannot mobilize, use, or charge for items in the pricing matrix without prior approval from EGLE Project Manager. |
| 4. If a ‘rated item’ is used to complete a ‘lump sum’ item work activity included in the original scope of work, it cannot be invoiced separately. |
| For example, if you utilize an ‘excavator’ to complete concrete pad removal (‘Other Infrastructure Removal’ bid item), you cannot charge |
| for the excavator or operators hours as it should have been included as part of the lump sum price for ‘Other Infrastructure Removal’ |
| 5. Only 1 Contractor Site Supervisor can be invoiced per day of onsite work. |
| 6. Rental and/or purchase of any specialized equipment, supplies, services, or materials must have prior approval from EGLE Project Manager. |
| 7. Overhead % cannot be added to the hourly or daily rates of items already included on Schedule B when invoicing. |
| 8. If a material, such as 'casing' is needed to properly plug the well and is not listed on this pricing matrix, it will be invoiced at cost plus the 'Overhead %' |
| 9. Laborer includes but is not limited to: Roustabout, Heavy Equipment Operator, Tool Hand, and other similar positions. The Laborer rate will also be used by the rig crew when they are completing work activities not assoicated |
| with the rig, including but not limited to: laying mats, moving equipment, loading/offloading equipment and supplies or other similar general labor duties. Rig crew cannot be invoiced at the Laborer and 'Rig Crew' |
| line items at the same time, as that would be double-billing. |
File details come from the government source that posted it. Updated .