Dry Pipe Drawings.pdf
PDF 18 MB Posted
- Attached to
- Z1DA--Replace Dry Pipe Sprinkler System Federal contract opportunity
- Solicitation number
- 36C24623B0057
About this file
This document provides details on a federal contract opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The solicitation number is 36C24623B0057 for the replacement of the dry pipe sprinkler system at Z1DA. The related file is a set of dry pipe drawings in PDF format that is 18MB in size. The opportunity type is a solicitation to replace an existing dry pipe sprinkler system. No further information is provided on requirements, response dates, or other salient terms.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S04 Site Visit 8-8-2023.pdf | ||
| S05 RFI Solicitation questions for Replace Dry Pipe Sprinkler System.pdf | ||
| 36C24623B0057 0002.docx | DOCX document | |
| 36C24623B0057 0001.docx | DOCX document | |
| Dry Pipe Specifications.pdf | ||
| VAMC Fire Sprinkler System ACM Survey.pdf | ||
| 36C24623B0057.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE PROTECTION SHEET LIST
Sheet Number DRAWING NAME
F001 FIRE PROTECTION GENERAL NOTES AND DETAILS
F002 FIRE PROTECTION GENERAL CONSTRUCTION DETAILS
F003 CAMPUS WATER DISTRIBUTION SITE PLAN
01-FD101 FIRE PROTECTION PLANS - DEMOLITION
01-F101 FIRE PROTECTION PLANS - NEW WORK
01-F201 DRY PIPE RISER SECTIONS
02-FD101 FIRE PROTECTION PLANS - DEMOLITION
02-FD102 FIRE PROTECTION PLANS - DEMOLITION
02-F101 FIRE PROTECTION PLANS - NEW WORK
02-F102 FIRE PROTECTION PLANS - NEW WORK
02-F201 DRY PIPE RISER SECTIONS
04-FD101 FIRE PROTECTION PLAN - DEMOLITION
04-FD102 FIRE PROTECTION PLAN - DEMOLITION
04-FD103 FIRE PROTECTION PLANS AND SECTIONS - DEMOLITION
04-F101 FIRE PROTECTION PLAN - NEW WORK
04-F102 FIRE PROTECTION PLAN - NEW WORK
04-F103 FIRE PROTECTION PLANS AND SECTIONS - NEW WORK
05-FD101 FIRE PROTECTION PLANS - DEMOLITION
05-F101 FIRE PROTECTION PLANS - NEW WORK
05-F201 DRY PIPE RISER SECTIONS
07-FD101 FIRE PROTECTION PLAN - DEMOLITION
07-FD102 FIRE PROTECTION PLANS - DEMOLITION
07-F101 FIRE PROTECTION PLAN - NEW WORK
07-F102 FIRE PROTECTION PLANS - NEW WORK
07-F201 DRY PIPE RISER SECTIONS
08-FD101 FIRE PROTECTION PLAN - DEMOLITION
08-FD102 FIRE PROTECTION PLANS - DEMOLITION
08-F101 FIRE PROTECTION PLAN - NEW WORK
08-F102 FIRE PROTECTION PLANS - NEW WORK
08-F201 DRY PIPE RISER SECTIONS
09-FD101 FIRE PROTECTION PLAN - DEMOLITION
09-FD102 FIRE PROTECTION PLANS - DEMOLITION
09-F101 FIRE PROTECTION PLAN - NEW WORK
09-F102 FIRE PROTECTION PLANS - NEW WORK
09-F201 DRY PIPE RISER SECTIONS
10-FD101 FIRE PROTECTION PLANS - DEMOLITION
10-FD102 FIRE PROTECTION PLAN - DEMOLITION
10-F101 FIRE PROTECTION PLANS - NEW WORK
10-F102 FIRE PROTECTION PLAN - NEW WORK
10-F201 DRY PIPE RISER SECTIONS
11-FD101 FIRE PROTECTION PLAN - DEMOLITION
11-FD102 FIRE PROTECTION PLANS - DEMOLITION
11-F101 FIRE PROTECTION PLAN - NEW WORK
11-F102 FIRE PROTECTION PLANS - NEW WORK
11-F201 DRY PIPE RISER SECTIONS
12-FD101 FIRE PROTECTION PLAN - DEMOLITION
12-FD102 FIRE PROTECTION PLAN - DEMOLITION
12-F101 FIRE PROTECTION PLANS - NEW WORK
12-F102 FIRE PROTECTION PLAN - NEW WORK
12-F201 DRY PIPE RISER SECTIONS
74-FD101 FIRE PROTECTION PLAN - DEMOLITION
74-FD102 FIRE PROTECTION PLANS - DEMOLITION
74-F101 FIRE PROTECTION PLAN - NEW WORK
74-F102 FIRE PROTECTION PLANS - NEW WORK
74-F201 DRY PIPE RISER SECTIONS
75-FD101 FIRE PROTECTION PLANS - DEMOLITION
75-FD102 FIRE PROTECTION PLAN - DEMOLITION
75-F101 FIRE PROTECTION PLANS - NEW WORK
75-F102 FIRE PROTECTION PLAN - NEW WORK
75-F201 DRY PIPE RISER SECTIONS
76-FD101 FIRE PROTECTION PLANS - DEMOLITION
76-FD102 FIRE PROTECTION PLAN - DEMOLITION
76-F101 FIRE PROTECTION PLANS - NEW WORK
76-F102 FIRE PROTECTION PLAN - NEW WORK
76-F201 DRY PIPE RISER SECTIONS
77-FD101 FIRE PROTECTION PLAN - DEMOLITION
77-FD102 FIRE PROTECTION PLANS - DEMOLITION
77-F101 FIRE PROTECTION PLAN - NEW WORK
77-F102 FIRE PROTECTION PLANS - NEW WORK
77-F201 DRY PIPE RISER SECTIONS
A
B
C
D
E
F
21 4 5 6 7 8 9
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
U.S. Department of Veterans Affairs
LIST OF DRAWINGS
PROJECT CONTACT DIRECTORY
LOCATION MAP
CONTRACT SPECIALIST CONTRACTING OFFICER REPRESENTATIVE (COR) ARCHITECT / MEP/FP & STRUCTURAL ENGINEERS acela architects + engineers, pc 2633 Moravian Avenue Allentown, PA 18103
Joseph L. Herman, AIA, NCARB, LEED AP Cell: (610) 417-7850 jherman@acela-ae.com
APPROVALS
Approved by Medical Center Director Approved by Director of Facility Management Service
Approved by Project COR Approved by Medical Director
Approved by Infection Control Approved by Safety Officer
Approved by Project CO
Approved by
PROJECT INFORMATION
N O
T F
O R
C O
N S
T R
U C
T
IO
N
A
B
C
D
E
F
321 4 5 6 7 8 9
4/
/2
:2 3:
A
M C
:\U se rs \b pe re ira \D oc um en ts
\2 1-
U S
D V
A -1
S al em
V A
B
LD
G
_b pe re ira
5N M
M N
.rv t
GI101
COVER SHEET
04/29/2022 DTB ACELA
SALEM VA MEDICAL CENTER
658-21-101REPLACE DRY SYSTEMS (FIRE
SPRINKLER)
REPLACE DRY SYSTEMS (FIRE
SPRINKLER)
SALEM VA MEDICAL CENTER
CONSTRUCTION DOCUMENTS
SUBMISSION
1970 ROANOKE BLVD, SALEM, VA 24153
Revisions: Date:
GENERAL INFORMATION SHEET LIST
Sheet Number DRAWING NAME
GI101 COVER SHEET
ELECTRICAL SHEET LIST
Sheet Number DRAWING NAME
E001 ELECTRICAL SYMBOLS, ABBREVIATIONS, GENERAL NOTES, AND
GENERAL CONSTRUCTION DETAILS
01-E101 ELECTRICAL PLANS - NEW WORK
02-E101 ELECTRICAL PLANS - NEW WORK
04-E101 ELECTRICAL PLANS - NEW WORK
05-E101 ELECTRICAL PLANS - NEW WORK
07-E101 ELECTRICAL PLANS - NEW WORK
08-E101 ELECTRICAL PLANS - NEW WORK
09-E101 ELECTRICAL PLANS - NEW WORK
10-E101 ELECTRICAL PLANS - NEW WORK
11-E101 ELECTRICAL PLANS - NEW WORK
12-E101 ELECTRICAL PLANS - NEW WORK
74-E101 ELECTRICAL PLANS - NEW WORK
75-E101 ELECTRICAL PLANS - NEW WORK
76-E101 ELECTRICAL PLANS - NEW WORK
77-E101 ELECTRICAL PLANS - NEW WORK
CHRISTOPHER
WILLIAM GEARY
Lic. No. 0402063136
C O M M
O N
W E A L T H O F VI R G I N I A
P R O F E S S I O N A L E N G I N
E E R
FIRE PROTECTION DESIGN NOTES
1. THESE FIRE PROTECTION DESIGN NOTES ARE APPLICABLE TO ALL BUILDINGS IN THE
PROJECT SCOPE OF WORK.
2. SYSTEM TYPE; DRY-PIPE, NITROGEN CHARGED. SYSTEM SERVING ATTIC SPACES
LOCATED OUTSIDE OF THE BUILDING THERMAL ENVELOPE.
3. SPRINKLER SHALL BE: ORDINARY HAZARD GROUP I. PROVIDE 0.15 GPM/SQ.FT. OVER MOST
REMOTE 1950 SQ.FT (1500 SQ.FT + 30% FOR DRY PIPE) WITH MAXIMUM 130 SQ.FT. PER
SPRINKLER HEAD COVERAGE.
4. AN ADDITIONAL WATER ALLOWANCE OF 250 GPM FOR INSIDE AND OUTSIDE HOSE
STREAMS SHALL BE ADDED TO THE SPRINKLER SYSTEM HYDRAULIC REQUIREMENTS.
5. THE CALCULATED DEMAND INCLUDING HOSE STREAM REQUIREMENTS SHALLNOT
EXCEED 90 PERCENT OF THE AVAILABLE WATER SUPPLY.
6. SYSTEM SHALL BE HYDRAULICALLY CALCULATED BY THE INSTALLING FIRE PROTECTION
CONTRACTOR. CALCULATIONS SHALL UTILIZE THE AREA DENSITY METHOD DEFINED IN
CHAPTER 19 OF NFPA 13. CALCULATIONS AND SHOP DRAWINGS SHALL BE PREPARED BY
A NICET III / IV CERTIFIED TECHNICIAN.
7. HYDRAULIC CALCULATIONS SHALL BE BASED ON CURRENT FLOW TEST DATA. THE
CONTRACTOR SHALL PERFORM WATER SUPPLY FLOW TESTING TO OBTAIN THE DATA
NECESSARY TO PERFORM REQUIRED HYDRAULIC CALCULATIONS. FLOW TESTING SHALL
BE COORDINATED WITH THE VA COR.
8. PIPE SIZES, DISTRIBUTION PIPE LAYOUT, AND SPRINKLER HEAD LOCATIONS INDICATED
ARE FOR REFERENCE TO SHOW DESIGN INTENT; FINAL PIPE SIZES, DISTRIBUTION PIPE
LAYOUT, AND SPRINKLER HEAD LOCATIONS SHALL BE DETERMINED BY THE INSTALLING
CONTRACTOR IN ACCORDANCE WITH NFPA 13 AND THE HYDRAULIC CALCULATIONS.
9. CONTRACTOR SHALL CALCULATE FINAL SYSTEM VOLUME BASED ON PIPE LAYOUT AND
SIZING DETERMINED THROUGH HYDRAULIC CALCULATIONS. WHEN VOLUME EXCEEDS 750
GALLON THE CONTRACTOR SHALL PROVIDE CALCULATIONS (USING CALCULATION
PROGRAM LISTED BY A NATIONALLY RECOGNIZED TESTING LABORATORY) CONFIRMING A
MAXIMUM WATER DELIVERY TIME OF 50 SECONDS WITH TWO MOST REMOTE HEADS
INITIALLY OPEN (WATER DELIVERY TIME SHALL INCLUDE A QUICK OPENING DEVICE ON
THE DRY PIPE VALVE). WHERE VOLUME IS MORE THAN 500 GALLONS AND EQUAL TO 750
GALLONS OR LESS; NO CALCULATION IS REQUIRED IF A QUICK OPENING DEVICE IS
PROVIDED ON THE DRY PIPE VALVE. WHERE VOLUME IS EQUAL TO 500 GALLONS OR LESS;
NO CALCULATION IS REQUIRED AND NO QUICK OPENING DEVISE IS REQUIRED ON THE
DRY PIPE VALVE.
10. BASED ON VOLUME CALCULATIONS, CONTRACTOR SHALL VERIFY THE CAPACITY OF THE
PROPOSED NITROGEN GENERATOR SERVING EACH DRY PIPE RISER IS CAPABLE OF
DELIVERING ADEQUATE VOLUME TO FILL THE SYSTEM AND RESTORE NORMAL SYSTEM
NITROGEN PRESSURE IN 30 MINUTES OR LESS. NORMAL OPERATING PRESSURE SHALL BE
DETERMINED IN ACCORDANCE WITH THE WRITTEN INSTRUCTIONS PROVIDED WITH THE
DRY PIPE VALVE FURNISHED.
11. ALL INSPECTOR TEST DRAINS SHALL BE DIRECTED TO OUTSIDE OF THE BUILDING.
GENERAL NOTES
1. THE PROJECT SCOPE OF WORK CONSISTS OF REPLACING THE DRY PIPE SPRINKLER SYSTEMS IN 14 BUILDINGS ACROSS THE SALEM VA MEDICAL CENTER ( BUILDINGS 1, 2, 4, 5, 7, 8, 9, 10, 11, 12, 74, 75, 76, AND 77). THESE FIRE PROTECTION GENERAL NOTES ARE APPLICABLE TO ALL BUILDINGS IN THE PROJECT SCOPE
OF WORK.
2. THE EXISTING DRY PIPE SYSTEM(S) IN EACH BUILDING ARE COMPRESSED AIR CHARGED AND SERVE THE ATTIC SPACES LOCATED OUTSIDE OF THE BUILDING THERMAL ENVELOPE. THE NEW SYSTEM(S) IN EACH BUILDING SHALL BE NITROGEN CHARGED AND SHALL SERVE THE SAME SPACES AS THE EXISTING SYSTEM.
3. THE INTENT IS TO CONSTRUCT THE NEW SYSTEM(S) IN EACH BUILDING PARALLEL TO THE EXISTING SYSTEM TO THE GREATEST EXTENT POSSIBLE TO KEEP THE EXISTING SYSTEM(S) IN SERVICE AND MINIMIZE SPRINKLER SYSTEM DOWNTIME. FURTHERMORE; THE INTENT IS TO SHUT DOWN SYSTEM(S), WHEN REQUIRED, BY CLOSING THE EXISTING SUPERVISED OS&Y GATE ISOLATION VALVE AT THE INLET TO THE EXISTING DRY PIPE SYSTEM VALVE TO AVOID INTERRUPTION TO WET PIPE SYSTEMS WITHIN THE BUILDING.
CONTRACTOR SHALL COORDINATE AND SCHEDULE SPRINKLER SYSTEM DOWNTIME WITH THE VA COR.
4. CONTRACTOR SHALL PROVIDE ALL INTERIM LIFE SAFETY MEASURES (ILSM) REQUIRED BY THE COR TO SUPPORT CONSTRUCTION ACTIVITY. THE CONTRACTOR SHALL PROVIDE A PLAN TO THE COR FOR ISLM IN EACH BUILDING 14 DAYS PRIOR TO SCHEDULED START OF CONSTRUCTION IN THE BUILDING. NO CONSTRUCTION WORK SHALL COMMENCE WITHOUT APPROVAL OF ISLM PLAN AND INSTALLED MEASURES BY THE VA COR. ISLM PLAN, AT A MINIMUM, SHALL BE A DOWNTIME SAFETY WATCH FOR ALL AREAS SERVED
BY THE DRY PIPE SYSTEM.
5. CONTRACTOR SHALL PROVIDE ALL TEMPORARY ENVIRONMENTAL CONTROLS REQUIRED BY THE COR. TO SUPPORT CONSTRUCTION ACITIVITIES. TEMPORARY ENVIRONMENTAL CONTROLS SHALL INCLUDE BUT NOT NECESSARILY BE LIMITED TO: ICRA BARRIERS INCLUDING ANTI-ROOM, SPACE AIR PRESSURIZATION CONTROLS, AND TEMPORARY EGRESS SIGNAGE. PLACE TEMPORARY ENVIRONMENTAL CONTROLS PRIOR TO COMMENCING IN ANY CONSTRUCTION WORK. TEMPORARY ENVIRONMENTAL CONTROLS SHALL BE PROVIDED IN ACCORDANCE WITH THE SPECIFICATIONS AND COORDINATED AND APPROVED BY THE VA
COR.
6. CONTRACTOR SHALL BECOME FAMILAR WITH ALL VA COVID-19 PROTOCOLS IN EFFECT AT THE TIME OF CONSTRUCTION AND SHALL COMPLY WITH ALL REQUIREMENTS. ALL EMPLOYEES OF THE CONTRACTOR
NOT COMPLYING WITH REQUIREMENTS WILL BE REMOVED FROM THE SITE.
7. FIRE PROTECTION SPRINKLER INSTALLATION SHALL MEET THE REQUIREMENTS OF THE FOLLOWING:
A. NFPA 13 AND 14, 2019 EDITION.
B. DVA FIRE PROTECTION MANUAL; EIGHTH EDITION, REVISED JUNE 2021.
8. SPRINKLER HEADS SHALL BE FM APPROVED QUICK RESPONSE IN ALL AREAS, EXCEPT WHERE SPECIFICALLY PROHIBITED, IN COMPLIANCE WITH VA GUIDELINES AND NFPA REQUIREMENTS. ALL SPRINKLER HEADS SHALL BE ORDINARY TEMPERATURE RATED UNLESS INDICATED OTHERWISE ON PLANS.
9. SPRINKLER PIPE SIZES, PIPE ROUTING, AND SPRINKLER HEAD LOCATIONS SHALL CONFORM TO NFPA REQUIREMENTS. ALL SPRINKLER HEADS SHALL BE UPRIGHT HEADS. ALL SYSTEM PIPING SHALL BE PITCHED AND HAVE DRAIN VALVES AT LOW POINTSTO ALLOW FOR DRAINAGE OF ENTIRE SYSTEM AFTER TESTING.
10. PIPE HANGERS INCLUDING SEISMIC PROTECTION TO BE INSTALLED AS REQUIRED BY NFPA FOR SUPPORTING SPRINKLER PIPING. NO OTHER PIPING AND/OR DEVICES ARE TO BE ATTACHED TO THE
SPRINKLER PIPE OR SPRINKLER PIPE HANGERS.
11. SPRINKLER PIPING SHALL NOT BE LOCATED IN ANY ELECTRICAL, TELECOMMUNICATION OR DATA ROOMS/CLOSETS UNLESS THOSE PIPES SERVE ONLY THAT SPACE OR UNLESS SPECIFICALLY NOTED
OTHERWISE.
12. ALL SPRINKLER PIPE TO MAINTAIN A 6'-0" MIN. VERTICAL CLEARANCE FROM TOP OF ELECTRICAL CONTROL
PANELS & SWITCHGEAR/TRANSFORMERS.
13. DURING INSTALLATION OF NEW SPRINKLER SYSTEM NO HOT WORK (WELDING, BRAZING, TORCH CUTTING, SOLDERING, ETC.) SHALL BE ALLOWED WITHIN ANY BUILDING ACROSS THE SALEM VA MEDICAL CENTER UNLESS THE CONTRACTOR HAS OBTAINED A HOT WORK PERMIT. REQUEST FOR HOT WORK PERMIT SHALL BE SUBMITTED TO THE VA COR A MINIMUM OF 10 WORKING DAYS PRIOR TO PERFORMANCE OF THE
PROPOSED HOT WORK.
14. EACH DRY PIPE SPRINKLER RISER (DRY PIPE SYSTEM) SHALL BE EQUIPPED WITH A NEW DRY PIPE SPRINKLER VALVE ASSEMBLY. DRY PIPE SPRINKLER VALVE ASSEMBLY SHALL WATER SYSTEM PRESSURE GAUGE, NITROGEN SYSTEM PRESSURES GAUGE, NITROGEN SYSTEM PRESSURE MAINTENANCE DEVICE, NITROGEN SYSTEM SUPERVISORY SWITCH, WATER ALARM PRESSURE SWITCH, ALARM TEST VALVE, AND SYSTEM DRAIN. ALL ALARM DEVICES SHALL BE CONNECTED TO THE EXISTING ADDRESSABLE BUILDING
FIRE ALARM SYSTEM.
15. INSTALL PIPING SO THAT ANY NEW VALVES ARE ACCESSIBLE AND STEMS EXTEND VERTICALLY UP. ALL
ISOLATION VALVES SHALL BE EQUIPPED WITH SUPERVISORY TAMPER SWITCHES.
16. ALL WATER FLOW SWITCHES MUST BE ISOLATED BY MEANS OF A FITTING OR UNION ON BOTH SIDES TO
FACILITATE REMOVAL AND SERVICE OF THE FLOW SWITCH.
17. THE FIRE PROTECTION CONTRACTOR SHALL PROVIDE THE QUANTITY OF SPRINKLER HEADS AS REQUIRED TO MAINTAIN THE MINIMUM COVERAGE REQUIRED BY NFPA 13 IN ALL AREAS IN THE PROJECT SCOPE.
18. SPRINKLER SYSTEM COMPONENTS ARE INDICATED ON THE DRAWING FOR REVIEW AND INFORMATIONAL PURPOSES ONLY. THE CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL COMPONENTS FOR A COMPLETE
FIRE SUPPRESSION INSTALLATION AS PER THE INTENT OF THE PROJECT SCOPE OF WORK AND
SPECIFICATIONS. ALL SPRINKLER SYSTEM COMPONENT INSTALLATIONS SHALL CONFORM TO NFPA AND VA
REQUIREMENTS.
19. SPRINKLER PIPE SIZES AND LOCATIONS ARE INDICATED ON DRAWING FOR BID PURPOSES ONLY.
SPRINKLER PIPE SIZES AND LOCATIONS SHALL CONFORM TO NFPA REQUIREMENTS AND SHALL BE BASED
ON HYDRAULIC CALCULATIONS.
20. COORDINATE THE EXACT LOCATION OF ALL SPRINKLER HEADS, PIPING, EQUIPMENT, AND DEVICES WITH EXISTING BUILDING STRUCTURES AND COMPONENTS OF OTHER SYSTEMS INCLUDING PIPING, DUCTWORK, LIGHTING, ETC. THE CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF THESE COMPONENTS IN THE
FIELD AND DOCUMENT ON THEIR SUBMITTALS.
21. PROVIDE COMPLETE AND FUNCTIONAL FIRE PROTECTION SYSTEMS FOR THE PROJECT. THE SYSTEMS SHALL CONFORM TO THE SPECIFICATIONS AND AS SHOWN ON DRAWINGS. ITEMS OR WORK NOT SHOWN OR SPECIFIED, BUT REQUIRED FOR COMPLETE SYSTEMS, SHALL BE PROVIDED AND SHALL CONFORM TO ACCEPTED TRADE PRACTICES. THE DRAWINGS AND SPECIFICATIONS ARE PRESENTED TO DEFINE SPECIFIC
SYSTEM REQUIREMENTS AND SERVE TO EXPAND ON THE PRIMARY CONTRACT REQUIREMENTS OF
PROVIDING COMPLETE SYSTEMS. THE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL
ARRANGEMENT AND ROUTING OF THE SYSTEMS INCLUDED IN THE SCOPE OF WORK.
22. THESE DRAWINGS WERE PREPARED FROM INFORMATION TAKEN FROM THE ORIGINAL BUILDING DRAWINGS AND FIELD SURVEY INFORMATION COMPILED BY THE ENGINEERING DESIGN TEAM FOR THE PURPOSE OF ENGINEERING DESIGN CONCEPT. EXISTING CONDITIONS ARE SHOWN AS ACCURATELY AS POSSIBLE.
HOWEVER, THERE IS THE POSSIBILITY THAT CONDITIONS SHOWN ARE NOT EXACTLY AS EXISTING.
CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, LOCATIONS, SIZES AND CONDITIONS AT THE
SITE AND DOCUMENT ALL INFORMATION ON SUBMITTALS.
23. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING REQUIRED FOR DEMOLITION OF EXISTING SYSTEM AND/OR INSTALLATION OF NEW SYSTEMS. ALL CUTTING AND PATCHING WORK SHALL BE COORDIINATED WITH THE VA PROJECT COR. ALL PATCHING WORK SHALL BE PERFORMED TO MATCH EXISTING ADJACENT SURFACES AND SHALL BE PERFORMED TO THE SATISFACTION OF THE VA PROJECT
COR.
24. THE CONTRACTOR WILL BE RESPONSIBLE FOR ENSURING THAT ALL RULES AND REGULATIONS ARE BEING OBSERVED. THE CONTRACTOR SHALL INSTALL SIGNAGE, BARRIERS, AND OTHER MEANS TO PROVIDE WARNING AND PERSONNEL SAFETY. PLACEMENT OF THESE ITEMS WILL BE COORDINATED WITH THE COR
AND WILL PROMPTLY BE REMOVED WHEN WORK IN A PARTICULAR AREA HAS BEEN COMPLETED.
25. CONTRACTOR SHALL MAKE ALL NECESSARY SUBMISSIONS AND OBTAIN ALL NECESSARY PERMITS AND
APPROVALS PRIOR TO STARTING FABRICATION AND CONSTRUCTION.
HAZARDOUS MATERIAL NOTES
1. ASBESTOS CONTAINING MATERIALS (ACM) WILL BE ENCOUNTERED THROUGHOUT THE
PROJECT SCOPE OF WORK BUILDINGS. ITEMS KNOW TO CONTAIN ASBESTOS THAT
REQUIRE REMOVAL OR ABATEMENT ARE IDENTIFIED IN THE ON THE PLANS AND IN THE
“PRE-RENOVATION ASBESTOS SURVEY AND LEAD BASED PAINT SCREENING” ATTACHED
TO THE PROJECT SPECIFICATIONS. CARE SHALL BE TAKEN NOT TO DISTURB OTHER ACM
OR SUSPECTED ACM ENCOUNTERED IN THE EXECUTION OF THIS PROJECT.
2. FINISHED SURFACES COATED WITH PAINTS CONTAINING DETECTABLE CONCENTRATIONS
OF LEAD WERE IDENTIFIED THROUGHOUT THE PROJECT SCOPE OF WORK BUILDINGS.
ITEMS KNOW TO CONTAIN DETECTABLE CONCENTRATIONS OF LEAD ARE IDENTIFIED IN
THE “PRE-RENOVATION ASBESTOS SURVEY AND LEAD BASED PAINT SCREENING”
ATTACHED TO THE PROJECT SPECIFICATIONS. SHOULD ANY SURFACES COATED WITH
PAINTS CONTAINING DETECTABLE CONCENTRATIONS OF LEAD NEED TO BE DISTURBED
DURING THE EXECUTION OF THE PROJECT; CONTRACTOR SHALL PROVIDE
ENVIRONMENTAL AND PERSONNEL MONITORING TO ASSURE EXPOSURES DO NOT
EXCEED THE PERMISSIBLE EXPOSURE LIMIT DEFINED BY OSHA CONSTRUCTION RULE 29
CFR 1926.62.
FIRE PROTECTION LEGEND
EXISTING SMOKE BARRIER TO REMAIN
SEMI RECESSED PENDANT SPRINKLER
EXISTING PLANS: EXISTING TO BE REMOVED
NEW WORK PLANS: NEW TO BE INSTALLED
SIDE WALL SPRINKLER HEAD
EXISTING PLANS: EXISTING TO BE REMOVED
NEW WORK PLANS: NEW TO BE INSTALLED
SEMI RECESSED PENDANT SPRINKLER
EXISTING TO REMAIN
SIDE WALL SPRINKLER HEAD
EXISTING TO REMAIN
UPRIGHT SPRINKLER HEAD
EXISTING PLANS: EXISTING TO BE REMOVED
NEW WORK PLANS: NEW TO BE INSTALLED
UPRIGHT SPRINKLER HEAD
EXISTING TO REMAIN
AREA NOT IN SCOPE
EXTENT OF REMOVAL OF EXISTING
POINT OF CONNECTION OF
NEW TO EXISTING
DEMARCATION POINT FOR
WORK REQUIRING SHUTDOWN
EXISTING PIPING TO REMAIN
EXISTING PIPING TO BE REMOVED
NEW PIPING
DRY PIPE ASSEMBLY
VALVE
PIPE SLOPED UP (ARROWHEAD
INDICATES DIRECTION)
m m
1" M
A X
SIDE VIEW TRAPEZE HANGER FOR UP TO 453KG [1000 LB.] UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER
SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER
SEE SPECIFICATIONS
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
mm
[IN]
mm
[FT]
mm
[FT]
THRU 20
[THRU 3/4]
[7]
[5]
[1]
[7]
[6]
[1-1/4]
[7]
[7]
[1-1/2]
[9]
[8]
[2]
[10]
[8]
[2-1/2]
[11]
[9]
[3]
[12]
[10]
[4]
[14]
[12]
[5]
[16]
[13]
[6]
[17]
[14]
[8]
[19]
[16]
[10]
[22]
[12]
[23]
[14]
[25]
[16]
[27]
[18]
[28]
[20]
[30]
[24]
[32]
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(200mm [8"] MIN.)
BAND
43mm [1-5/8"] 12 GAUGE CHANNEL OR 50x50x6.4mm
[2"X2"X1/4"] ANGLE
15mm [1/2"] DIA.
HANGER RODS WITH
900mm [36"] MAX.
SPACING ON EACH
CHANNEL
SADDLE
INSULATION SHIELD
AT HANGER
HANGER ROD
SEE PIPE
HANGER
DETAIL
SPRINKLER HEAD DEFLECTOR SHALL BE WITHIN 12"
OF BOTTOM OF FRAMING MEMBER OR ROOF DECK
METAL DECKING
OR CEILING
BRANCH LINE
NOTE:
1. APPLICABLE TO PENETRATIONS OF ALL FIRE
RATED MEMBRANES, IN ACCORDANCE WITH
NFPA 101. REFER TO SPECIFICATIONS
SECTION 07 84 00, FIRE STOPPING SYSTEMS.
FLOOR
FIRESTOP MATERIAL
PIPE SLEEVE WHERE
SPECIFIED
FLOOR OR DECK PENETRATION
PARTITION OR CHASE PENETRATION
MASONRY PARTITION
PARTITION SUPPORT
FIRESTOP
MATERIAL
DRYWALL PARTITION
PIPE
FROM WATER
SUPPLY
TO SYSTEM
WATER FLOW
PRESSURE
ALARM
SWITCH
CHECK
VALVE
SUPPLY WATER
PRESSURE GAUGE
ALARM TEST
VALVE (N.G)
LOW BODY DRAIN (NORMALLY CLOSED)
(DISC. TO DRIP OFF MAIN DRAIN)
EXISTING MANUAL VALVE
NITROGEN
PRESSURE
ALARM SWITCH
NITROGEN
PRESSURE
GAUGE
REGULATOR
FROM NITROGEN
SUPPLY
NITROGEN
MAINTENANCE
DEVICES
SWITCH CHECK
VALVE
MAIN SYSTEM DRAIN
(NORMALLY CLOSED)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
21 4 5 6 7 8 9
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
N O
T F
O R
C O
N S
T R
U C
T
IO
N
321 4 5 6 7 8 9
A
B
C
D
E
C U s e rs \b p e re ir a
\D o c u m e n ts \2
-U
S D
V A
-1 S a le m V
A B
L D
G b p e re ir a
N
M M
N .r v t
/2
/2
:4 :5
P
M
F001
FIRE PROTECTION GENERAL NOTES AND DETAILS
04/29/2022 DTB ACELA
SALEM VA MEDICAL CENTER
658-21-101REPLACE DRY SYSTEMS (FIRE
SPRINKLER)
CONSTRUCTION DOCUMENTS
SUBMISSION
N.T.S.
PIPE HANGER DETAIL
N.T.S.
UPRIGHT SPRINKLER HEAD DETAIL
N.T.S.
PIPE PENETRATION OF SMOKE/FIRE BARRIERS
N.T.S.
DRY PIPE VALVE ASSEMBLY DETAIL
Revisions: Date:
CHRISTOPHER
WILLIAM GEARY
Lic. No. 0402063136
C O M M
O N
W E A L T H O F VI R G I N I A
P R O F E S S I O N A L E N G I N
BOLTED TO
1/8" PLATE
STEEL
BACKING
6"x6" BASE PLATE
BOLTED TO FLOOR
(TYPICAL OF 4)
GALVANIZED
STEEL CHANNEL
FRAME
NITROGEN GENERATOR
CABINET
BASED O
N U
NIT D
EPTH
TO MATCH W
IDTH OF NITROGEN GENERATOR
T O
M A
T C
H H
E
IG
H T
O F
N
IT
R O
G E
N G
E N
E R
A T
O R
NOTE:
1. 1. REFER TO BUILDING PLANS FOR REQUIRED
LOCATIONS.
2. LOCATIONS INDICATED ON PLANS ARE BASED ON
BASIS OF DESIGN GENERATORS. CONTRACTOR IS
RESPONSIBLE FOR LOCATION ADEQUACY IF
ALTERNATE GENERATOR IS PROVIDED.
REMOVE EXISTING CHASE TO ALLOW FOR
REMOVAL OF DRY PIPE SPRINKLER RISER
FOR DEMOLITION. NEW DRY PIPE SPRINKLER
RISER SHALL BE INSTALLED BEFORE
DEMOLITION OF EXISTING DRY PIPE
SPRINKLER RISER SHALL COMMENCE
METAL STUD (TYP.)
CHASE DEMOLITION CHASE NEW WORK
EXISTING DRY PIPE SPRINKLER
RISER IN CHASE WALL TO BE
REMOVED
5/8" GYP. BOARD FINISH TO MATCH
EXISTING WALLS AS REQUIRED
5/8" GYP. BOARD FINISH TO MATCH
EXISTING WALLS AS REQUIRED
METAL STUD (TYP.)
NEW DRY PIPE SPRINKLER
RISER IN CHASE WALL
(SEE PLANS FOR SIZE)
EXISTING WALL
NEW DRY PIPE SPRINKLER
RISER IN NEW CHASE
(SEE PLANS FOR SIZE)
5/8" GYP. BOARD FINISH TO MATCH
EXISTING WALLS AS REQUIRED
METAL STUD (TYP.)
EXISTING DRY PIPE SPRINKLER
RISER IN CHASE WALL TO BE
REMOVED
EXISTING DRY PIPE SPRINKLER
RISER IN CHASE WALL TO BE
REMOVED
REMOVE PORTION OF CHASE TO ALLOW
FOR REMOVAL OF DRY PIPE SPRINKLER
RISER FOR DEMOLITION. NEW DRY PIPE
SPRINKLER RISER SHALL BE INSTALLED
BEFORE DEMOLITION OF EXISTING DRY PIPE
SPRINKLER RISER SHALL COMMENCE
WIDTH AS REQ'D. TO ACCOMMODATE FOR INSTALLATION AND REMOVAL
WIDTH AS REQ'D. TO ACCOMMODATE FOR INSTALLATION AND REMOVAL
REMOVE PORTION OF CHASE TO ALLOW
FOR REMOVAL OF DRY PIPE SPRINKLER
RISER FOR DEMOLITION. NEW DRY PIPE
SPRINKLER RISER SHALL BE INSTALLED
BEFORE DEMOLITION OF EXISTING DRY PIPE
SPRINKLER RISER SHALL COMMENCE
NEW DRY PIPE SPRINKLER
RISER IN CHASE WALL
(SEE PLANS FOR SIZE)
TYPE 'A'
CHASE DEMOLITION CHASE NEW WORK
TYPE 'B'
CHASE DEMOLITION CHASE NEW WORK
TYPE 'C'
PATCH EXISTING CONCRETE
FLOOR TO MATCH EXISTING
PATCH EXISTING CONCRETE
FLOOR TO MATCH EXISTING
PATCH EXISTING CONCRETE
FLOOR TO MATCH EXISTING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
21 4 5 6 7 8 9
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
N O
T F
O R
C O
N S
T R
U C
T
IO
N
321 4 5 6 7 8 9
A
B
C
D
E
C U s e rs \b p e re ir a
\D o c u m e n ts \2
-U
S D
V A
-1 S a le m V
A B
L D
G b p e re ir a
N
M M
N .r v t
/2
/2
:4 :5
P
M
F002
FIRE PROTECTION GENERAL CONSTRUCTION DETAILS
04/29/2022 DTB ACELA
SALEM VA MEDICAL CENTER
658-21-101REPLACE DRY SYSTEMS (FIRE
SPRINKLER)
CONSTRUCTION DOCUMENTS
SUBMISSION
Revisions: Date:
1/8" = 1'-0"1
TYPICAL NITROGEN GENERATOR FRAME DETAIL
N.T.S.
CHASE ENCLOSURE DETAILS
CHRISTOPHER
WILLIAM GEARY
Lic. No. 0402063136
C O M M
O N
W E A L T H O F VI R G I N I A
P R O F E S S I O N A L E N G I N
F.H. 25
F.H. 26
F.H. 27
F.H. 28
F.H. 20
F.H. 17
F.H. 18
F.H. 15
F.H. 5
F.H. 7
F.H. 4
F.H. 2
F.H. 1
F.H. 30
F.H. 6
F.H. 19
F.H. 22
F.H. 23
F.H. 24
F.H. 14
F.H. 9
F.H. 11
F.H. 10
F.H. 8
F.H. 13
F.H. 12
F.H. 21
F.H. 29
B2 B1
B77
B76
B75
B7
B8
B9
B10
B11
B12
B5
B74
F.H. 16
B4
B143
B2A
B15
B72 B13
B14
B16
B148
B145
B159
B157
B160
B138
B152
B139
B132
B126
B168
B149
B131
B130
B18
B19
B25
B27
B28
B23
B29
B17
B26
6"
8"
8"
6"
8"
4"
6"
8" 10"
3/4"
3/4"
4"
8"
8"
8"
8"
8"
8"
8"
8"
6"
4"
8"
6" 4"
8"
1"
10"
8"
8"
6"
6"
4"
6"
8"
8"
4"
4"
4"
4"
6"
6"
6"
4"
3"
8"
8"
8"
8"
8" 2"
6"
1 1/2"
1 1/2"
1"
1"
1"
10"
8"
10"
2"
1 1/2" 3/4"
8"
6"
6"
6"
6"
6"3"
8"
8"
8"
8"
8"
4"
1 1/2"
6"
4"
8"
6"
4"
8"
4"
8"
8"
8"
10"
10"
8"
8"
6" 6"
4"
6" 6"
4"
4"
8"
8"
6"
6"
8" 4"
4"
4"
4"
6"
6"
10"
2"
2"
600,00 GAL. WATER TANK
100,000 GAL. WATER TANK
PRESSURE
REDUCING VALVE
WATER
WATER
WATER
W
ATER
W
ATE
R
W A
T E
R
W A
T E
R
W A
T E
R
WATER W
A
T E
R
WATER
W A
T E
R
WATER
WATER
WATER
W A
T E
R
WATER
WATER
W A
T E
R
W
ATER
W A
TE
R
W A
T E
R
WATER
WATER
W A
T E
R
W A
T E
R
W A
T E
R
WATER
W A
T E
R
W
ATER
W A
T E
R
WATER
WATER
W
ATER
W A T E R
W A T E R
WATER
W
ATER
W A
T E
R
W
ATER
W A
T E
R
W A
T E
R
WATER
WATER
WATER
WATER
W
ATER
W
ATER
WATER
WATER
WATER
W A
T E
R
WATER
WATER
WATER
W A
T E
R
W A
T E
R
WATER
WATER
WATER
W A
T E
R
W A
T E
R
W A
T E
R
2"
W A
T E
R
WATER
W A
T E
R
WATER
W
ATER
WATER
W A
T E
R
W A
T E
R
W A
T E
R
W A
T E
R
W A
T E
R
W A
T E
R
W A
T E
R
W A
TE
R
W A
T E
R
W A
T E
R
W A
T E
R
WATER
WATER
WATER
W A
T E
R
W A
T E
R
WATER
W A
T E
R
W A
T E
R
W A
T E
R
W A
T E
R
WATER
W A
T E
R
WATER
WATER
W
ATER
WATER
WATER
W A
T E
R
WATER
WATER
S S
W R
S S
W R
S S
W R
S S
W R
WATER
W A
T E
R
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
21 4 5 6 7 8 9
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
N O
T F
O R
C O
N S
T R
U C
T
IO
N
321 4 5 6 7 8 9
A
B
C
D
E
DTB ACELA
C U s e rs \b p e re ir a
\D o c u m e n ts \2
-U
S D
V A
-1 S a le m V
A B
L D
G b p e re ir a
N
M M
N .r v t
/2
/2
:1
:2
A
M
F003
CAMPUS WATER DISTRIBUTION SITE PLAN
04/29/2022
SALEM VA MEDICAL CENTER
658-21-101REPLACE DRY SYSTEMS (FIRE
SPRINKLER)
CONSTRUCTION DOCUMENTS
SUBMISSION
Revisions: Date:
1 : 18001
SITE PLAN
1" = 150'-0"
NOTE: HATCHING INDICATES BUILDINGS WITHIN SCOPE OF PROJECT.
CHRISTOPHER
WILLIAM GEARY
Lic. No. 0402063136
C O M M
O N
W E A L T H O F VI R G I N I A
P R O F E S S I O N A L E N G I N
4" DRY PIPE SPRINKLER
MAIN DOWN TO BASEMENT
TO BE REMOVED
3"Ø
"Ø
"Ø
/2 "Ø
1 1/2"Ø
1 1/2"Ø
1 1/2"Ø
/2 "Ø
"Ø
"Ø
"Ø
/2 "Ø
/2 "Ø
/2 "Ø
/2 "Ø
2"Ø
"Ø1
"Ø
"Ø
1"Ø
"Ø
1 1/2"Ø
1 1/2"Ø
1 1/2"Ø
/2 "Ø
"Ø
DRAIN DRAIN
UPRIGHT SPRINKLER HEAD INSTALLED
PERPENDICULAR TO ROOF LINE (TYP.)
UPRIGHT SPRINKLER HEAD AT
RIDGE OF DORMER (TYP.)
UPRIGHT SPRINKLER HEAD INSTALLED
AT ROOF RIDGE (TYP.)
01-F201
REMOVE DRY PIPE SPRINKLER RISER TO
ISOLATION VALVE AT INLET OF DRY PIPE VALVE
ASSEMBLY
MECH ROOM
3H
OFFICE
2B
REMOVE FLOOR MOUNTED
AIR COMPRESSOR
01-F201
EXIST. 4" DRY PIPE
SPRINKLER RISER UP
FROM BELOW
TYPE 'A' CHASE
01-F201
EXIST. 4" DRY PIPE SPRINKLER
RISER FROM BELOW
EXIST. 4" DRY PIPE SPRINKLER
RISER UP TO ATTIC
MECH
203 D
OFFICE
203 C
CORR.
TYPE 'A' CHASE
VOUCHER OFFICE
203 E
01-F201
1. FOR REFERENCE THE FINISHED FIRST FLOOR ELEVATION IN BUILDING 1 SHALL BE
CONSIDERED 0'-0". THE BASEMENT FINISH FLOOR ELEVATION IS -12'-0", SECOND FLOOR
ELEVATION IS 12'-0", AND THE ATTIC FLOOR ELEVATION IS 24'-10".
2. BUILDING IS FULLY SPRINKLERED. THE BASEMENT, FIRST, AND SECOND FLOORS ARE
SERVED BY AN EXISTING WET PIPE SYSTEM THAT WILL REMAIN. THE ATTIC AREA IS SERVED
BY THE DRY PIPE SPRINKLER SYSTEM BEING REPLACED BY THIS PROJECT.
3. THE BUILDINGS WET PIPE SYSTEM SHALL REMAIN IN SERVICE DURING THE ENTIRE PROJECT.
4. BUILDING 1 SHALL REMAIN OPERATIONAL THROUGHOUT THE PROJECT CONSTRUCTION.
WORK IN NORMALLY OCCUPIED SPACES SHALL BE PERFORMED DURING NON-OPERATIONAL
HOURS. WORK IN NORMALLY UNOCCUPIED SPACES, SUCH AS ATTICS AND MECHANICAL
ROOMS, CAN BE PREFORMED DURING OPERATIONAL HOURS. WORK SCHEDULE SHALL BE
COORDINATED WITH THE VA COR. FOR BIDDING PURPOSES OPERATIONAL HOURS SHALL BE
ASSUMED TO BE MONDAY THROUGH FRIDAY, EXCEPT FEDERAL HOLIDAYS, BETWEEN THE
HOURS OF 7:00 AM TO 6:00 PM.
5. THE ENTIRE ATTIC SPACE IN THIS BUILDING HAS A WALKABLE FLOOR.
6. THE EXISTING DRY PIPE SPRINKLER SYSTEM CONTAINS APPROXIMATELY 205 GALLONS WITH
66 HEADS.
7. BUILDING GENERAL NOTES ARE APPLICABLE FOR ALL DRAWINGS IN BUILDING 1.
BUILDING GENERAL NOTES
1. ENTIRE EXISTING DRY PIPE SPRINKLER SYSTEM IS TO BE REMOVED BACK TO THE ISOLATION
VALVE AT THE INLET TO THE EXISTING DRY PIPE VALVE ASSEMBLY. REMOVAL SHALL
INCLUDE ALL PIPING, PIPE FITTINGS, VALVES, SPRINKLER HEADS, PIPE HANGERS, AND ALL
SYSTEM ACCESSORIES.
2. REMOVE AND DIPOSE OF EXISTING AIR COMPRESSOR SERVING DRY PIPE SYSTEM.
DEMOLITION SHALL INCLUDE ASSOCIATED PIPING AND ACCESSORIES BETWEEN AIR
COMPRESSOR AND DRY PIPE SYSTEM VALVE.
3. EXISTING DRY PIPE SYSTEM SHALL REMAIN IN PLACE AND OPERATIONAL UNTIL NEW SYSTEM
IS INSTALLED AND OPERATIONAL. DEMOLITION WORK SHALL BEGIN ONLY UPON APPROVAL
OF THE NEW SYSTEM BY THE VA PROJECT COR.
4. ALL BUILDING CUTTING AND PATCHING REQUIRED TO FACILITATE DEMOLITION WORK IS THE
RESPONSIBILITY OF THE CONTRACTOR. PATCH WORK SHALL BE PERFORMED TO RESTORE
CUT AREAS TO MATCH EXISTING ADJACENT SURFACES, INCLUDING FINISH. ALL PATCHING
WORK SHALL BE APPROVED BY THE VA COR. REFER TO F002 DETAIL 2 FOR ADDITIONAL
INFORMATION.
5. BUILDING DEMOLITION NOTES ARE APPLICABLE TO ALL DEMOLITION DRAWINGS FOR
BUILDING 1.
BUILDING DEMOLITION NOTES
AREA OF WORK
AREA OF WORK
AREA OF WORK
1. THE PIPE THREAD JOINT SEALING COMPOUND UTILIZED THROUGHOUT THE EXISTING DRY PIPE SPRINKLER SYSTEM IN BUILDING 1 CONTAINS TRACE (<1% CHRYOSTILE) ASBESTOS. CONTRACTOR
SHALL ENGAGE A LICENSED/ACCREDITED ASBESTOS ABATEMENT CONTRACTOR TO REMOVE AND
PROPERLY DISPOSE OF ALL THREADED PIPE FITTINGS THROUGHOUT THE EXISTING DRY PIPE
SPRINKLER SYSTEM. REMOVAL SHALL BE THROUGH THE CUTTING OF PIPE SECTIONS ADJACENT TO EACH JOINT, LEAVING THE THREADED FITTING AND PIPE SEALANT INTACT. THE REMAINDER OF THE PIPE COMPRISING THE DRY PIPE MAY BE REMOVED THROUGH NORMAL DEMOLITION PROCESSES AND
RECYCLED.
ASBESTOS CONTAINING MATERIAL (ACM) REMOVAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
21 4 5 6 7 8 9
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
N O
T F
O R
C O
N S
T R
U C
T
IO
N
321 4 5 6 7 8 9
A
B
C
D
E
DTB ACELA
C U s e rs \b p e re ir a
\D o c u m e n ts \2
-U
S D
V A
-1 S a le m V
A B
L D
G b p e re ir a
N
M M
N .r v t
/2
/2
:0
:5
A
M
01-FD101
FIRE PROTECTION PLANS - DEMOLITION
04/29/2022
SALEM VA MEDICAL CENTER
658-21-101REPLACE DRY SYSTEMS (FIRE
SPRINKLER)
CONSTRUCTION DOCUMENTS
SUBMISSION
Revisions: Date:
1/8" = 1'-0"1
PARTIAL ATTIC FIRE PROTECTION
DEMOLITION PLAN
1/8" = 1'-0"2
PARTIAL BASEMENT FIRE
PROTECTION PLAN - DEMOLITION
1/8" = 1'-0"3
PARTIAL FIRST FLOOR FIRE
PROTECTION PLAN - DEMOLITION
1/8" = 1'-0"4
PARTIAL SECOND FLOOR FIRE
PROTECTION PLAN - DEMOLITION
KEY PLAN
KEY PLAN
KEY PLAN
KEY PLAN
N
CHRISTOPHER
WILLIAM GEARY
Lic. No. 0402063136
C O M M
O N
W E A L T H O F VI R G I N I A
P R O F E S S I O N A L E N G I N
INSTALL NEW DRY PIPE VALVE
ASSEMBLY ADJACENT AND EXTEND
4" DRY PIPE SPRINKLER MAIN TO
NEW SYSTEM
SECTION OF NEW DRY PIPE
SYSTEM TO BE INSTALLED
DURING SYSTEM SHUTDOWN MECH ROOM
3H
OFFICE
2B
01-F201
NEW 4" DRY PIPE
SPRINKLER RISER UP
FROM BELOW
NEW 4" DRY PIPE
SPRINKLER RISER ABOVE
CEILING UP TO ATTIC
CORR.
TYPE 'A' CHASE
OFFICE
203 C
VOUCHER OFFICE
203 E
01-F201
1. NEW DRY PIPE SPRINKLER SYSTEM SHALL BE INSTALLED ADJACENT TO
EXISTING SYSTEM WHILE MAINTAINING EXISTING SYSTEM. INSTALL NEW
SYSTEM TO POINT INDICATED IN PREPARATION OF CHANGE OVER. INSTALLED
PORTION OF NEW SYSTEM SHALL BE TESTED AND MADE READY TO PLACE IN
SERVICE.
2. DRY PIPE SYSTEM SHALL BE TAKEN OFFLINE TO MAKE FINAL PIPING
CONNECTION TO EXISTING VALVE AT INLET TO DRY PIPE VALVE. NEW DRY
PIPE VALVE ASSEMBLY SHALL BE INSTALLED DURING SHUTDOWN. FINAL
PIPING CONNECTIONS TO NITROGEN SUPPLY AND WIRING TO FIRE ALARM
SYSTEM SHALL ALSO BE MADE DURING SHUTDOWN.
3. DURING SYSTEM SHUTDOWN CONTRACTOR SHALL PROVIDE A FIRE WATCH
FOR THE ENTIRE AREA SERVED BY THE DRY PIPE SYSTEM.
4. NEW DRY PIPE NITROGEN GENERATOR SHALL BE POTTER INTELLIGEN SERIES,
MODEL INS-250 OR APPROVED EQUAL.PROVIDE UNISTRUT MOUNTING SYSTEM
FOR NEW NITROGEN GENERATOR CABINET. REFER TO DETAIL ON DRAWING
F002 DETAIL 1 FOR ADDITIONAL INFORMATION.
5. WHEN FINAL CONNECTIONS ARE COMPLETE NEW SYSTEM SHALL BE FINAL
TESTED AND PLACED IN SERVICE. DEMOLITION OF EXISTING SYSTEM SHALL
COMMENCE. UPON APPROVAL OF NEW SYSTEM BY VA COR.
6. BUILDING NEW WORK NOTES ARE APPLICABLE TO ALL NEW WORK DRAWINGS
FOR BUILDING 1.
BUILDING NEW WORK NOTES
NEW 4" DRY PIPE
SPRINKLER RISER UP
FROM BELOW
TYPE 'A' CHASE
01-F201
NEW 4" DRY SPRINKLER MAIN
DOWN TO BASEMENT
"Ø
"Ø
/2 "Ø
1 1/2"Ø
1 1/2"Ø
/2 "Ø
"Ø
"Ø
"Ø
/2 "Ø
/2 "Ø
/2 "Ø
/2 "Ø
2"Ø
"Ø1
"Ø
"Ø
1"Ø
"Ø
1 1/2"Ø
1 1/2"Ø
1 1/2"Ø
/2 "Ø
"Ø
1 1/2"Ø
DRAINDRAIN
INSPECTOR TEST
DRAIN
ELEV = A ELEV = A
ELEV = A
ELEV = A
ELEV = B
ELEV = C
ELEV = C
ELEV = D
ELEV = A ELEV = A
ELEV = C
ELEV = B
ELEV = C
ELEV = A
ELEV = E
ELEV = F ELEV = F
UPRIGHT SPRINKLER HEAD INSTALLED
PERPENDICULAR TO ROOF LINE (TYP.)
UPRIGHT SPRINKLER HEAD AT
RIDGE OF DORMER (TYP.)
UPRIGHT SPRINKLER HEAD INSTALLED
AT ROOF RIDGE (TYP.)
01-F201
AREA OF WORK
AREA OF WORK
AREA OF WORK
A = 3'-6"± ℄ ABOVE ATTIC FLOOR
B = 10'-7"± ℄ ABOVE ATTIC FLOOR
C = 4'-4" ± ℄ ABOVE ATTIC FLOOR
D = 10'- 11"± ℄ ABOVE ATTIC FLOOR
E = 0'-1" ± ℄ ABOVE ATTIC FLOOR
F = 2'-8"± ℄ ABOVE ATTIC FLOOR
ATTIC PIPING
ELEVATION LEGEND:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
21 4 5 6 7 8 9
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
N O
T F
O R
C O
N S
T R
U C
T
IO
N
321 4 5 6 7 8 9
A
B
C
D
E
DTB ACELA
C U s e rs \b p e re ir a
\D o c u m e n ts \2
-U
S D
V A
-1 S a le m V
A B
L D
G b p e re ir a
N
M M
N .r v t
/2
/2
:1
:1
A
M
01-F101
FIRE PROTECTION PLANS - NEW WORK
04/29/2022
SALEM VA MEDICAL CENTER
658-21-101REPLACE DRY SYSTEMS (FIRE
SPRINKLER)
CONSTRUCTION DOCUMENTS
SUBMISSION
Revisions: Date:
N
1/8" = 1'-0"2
PARTIAL BASEMENT FIRE
PROTECTION PLAN - NEW WORK
1/8" = 1'-0"4
PARTIAL SECOND FLOOR FIRE
PROTECTION PLAN - NEW WORK
1/8" = 1'-0"3
PARTIAL FIRST FLOOR FIRE
PROTECTION PLAN - NEW WORK
1/8" = 1'-0"1
ATTIC FIRE PROTECTION PLAN -
NEW WORK KEY PLAN
KEY PLAN
KEY PLAN
KEY PLAN
CHRISTOPHER
WILLIAM GEARY
Lic. No. 0402063136
C O M M
O N
W E A L T H O F VI R G I N I A
P R O F E S S I O N A L E N G I N
BASEMENT
-12' - 0"
SECOND FLOOR
12' - 0"
ATTIC
24' - 10"
FIRST FLOOR
0' - 0"
SEE 1/ 01-FD101 FOR
CONTINUATION
REMOVE DRY PIPE SPRINKLER RISER TO
ISOLATION VALVE AT INLET OF DRY PIPE VALVE
ASSEMBLY
BASEMENT
-12' - 0"
SECOND FLOOR
12' - 0"
ATTIC
24' - 10"
FIRST FLOOR
0' - 0"
SEE 2/ 01-F101 FOR
CONTINUATION
INSTALL NEW DRY PIPE VALVE
ASSEMBLY ADJACENT AND EXTEND
4" DRY PIPE SPRINKLER MAIN TO
NEW SYSTEM
SECTION OF NEW DRY PIPE
SYSTEM TO BE INSTALLED
DURING SYSTEM SHUTDOWN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
21 4 5 6 7 8 9
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
N O
T F
O R
C O
N S
T R
U C
T
IO
N
321 4 5 6 7 8 9
A
B
C
D
E
DTB ACELA
C U s e rs \b p e re ir a
\D o c u m e n ts \2
-U
S D
V A
-1 S a le m V
A B
L D
G b p e re ir a
N
M M
N .r v t
/2
/2
:1
:1
A
M
01-F201
DRY PIPE RISER SECTIONS
04/29/2022
SALEM VA MEDICAL CENTER
658-21-101REPLACE DRY SYSTEMS (FIRE
SPRINKLER)
CONSTRUCTION DOCUMENTS
SUBMISSION
Revisions: Date:
1/4" = 1'-0"
SECTION1
01-FD101 1/4" = 1'-0"
SECTION2
01-F101
CHRISTOPHER
WILLIAM GEARY
Lic. No. 0402063136
C O M M
O N
W E A L T H O F VI R G I N I A
P R O F E S S I O N A L E N G I N
MATCHLINE
5"Ø
"Ø
G
H
CORR.
XX
MECH ROOM
XX
EXISTING 5" DRY
PIPE SPRINKLER
RISER UP
REMOVE DRY PIPE SPRINKLER
RISER TO ISOLATION VALVE AT
INLET OF DRY PIPE ASSEMBLY
REMOVE FLOOR MOUNTED
AIR COMPRESSOR
1-2
02-F201
1 2 3
EXIST. 5" RISER UP FROM BELOW
"Ø
"Ø
"Ø
"Ø
2"Ø 2"Ø
2"Ø
"Ø
2"Ø
"Ø
2"Ø
"Ø
2"Ø
2"Ø
2"Ø
"Ø
"Ø
/2 "Ø
"Ø
"Ø
"Ø
2"Ø
2"Ø
2"Ø 2"Ø
2"Ø
"Ø
"Ø2 "Ø
2"Ø
2"Ø
2"Ø
2"Ø
2"Ø
2"Ø
"Ø
"Ø
2"Ø
"Ø
"Ø
"Ø
"Ø
/2 "Ø
/2 "Ø
1"Ø
1"Ø
"Ø
5"Ø2 1/2"Ø
/2 "Ø
/2 "Ø
2"Ø
2"Ø
2"Ø 2"Ø2"Ø
"Ø
"Ø
"Ø
2"Ø "Ø
"Ø
"Ø
2"Ø 2"Ø
"Ø
MATCHLINE
02-FD102
UPRIGHT SPRINKLER HEAD INSTALLED
PERPENDICULAR TO ROOF LINE (TYP.)
UPRIGHT SPRINKLER HEAD INSTALLED
AT ROOF RIDGE (TYP.)
UPRIGHT SPRINKLER HEAD INSTALLED
PERPENDICULAR TO ROOF LINE (TYP.)
4 5 6
G
H
I
J
K
L
1-1
02-F201
1. FOR REFERENCE THE FINISHED FIRST FLOOR ELEVATION IN BUILDING 2 SHALL BE
CONSIDERED 0'-0". THE BASEMENT FINISH FLOOR ELEVATION IS -12'-0", SECOND FINISHED FLOOR ELEVATION IS 13'-9", THIRD FINISHED FLOOR ELEVATION IS 26'-1", AND THE ATTIC
FINISHED FLOOR ELEVATION IS 39'-5".
2. BUILDING IS FULLY SPRINKLERED. THE BASEMENT, FIRST, SECOND, AND THIRD FLOORS ARE
SERVED BY AN EXISTING WET PIPE SYSTEM THAT WILL REMAIN. THE ATTIC AREA IS SERVED
BY THE DRY PIPE SPRINKLER SYSTEM BEING REPLACED BY THIS PROJECT.
3. THE BUILDINGS WET PIPE SPRINKLER SYSTEM SHALL REMAIN IN SERVICE FOR THE ENTIRE
PROJECT.
4. BUILDING 2 SHALL REMAIN OPERATIONAL THROUGHOUT THE PROJECT CONSTRUCTION. THE
SECOND & THIRD FLOORS ARE OCCUPIED AROUND THE CLOCK, WORK IN THESE AREAS
SHALL BE SCHEDULED THROUGH THE VA COR. WORK IN ALL OTHER NORMALLY OCCUPIED
AREAS SHALL BE PERFORMED DURING NON-OPERATIONAL HOURS. WORK IN NORMALLY
UNOCCUPIED SPACES, SUCH AS ATTICS AND MECHANICAL ROOM, CAN BE PERFORMED
DURING OPERATIONAL HOURS; HOWEVER SPACES MUST HAVE RESTRICTED ACCESS AND
SECURITY TO ASSURE PATIENT SAFETY. WORK SCHEDULE SHALL BE COORDINATED WITH
THE VA COR; FOR BIDDING PURPOSES OPERATIONAL HOURS SHALL BE ASSUMED TO BE
MONDAY THROUGH FRIDAY, EXCEPT FEDERAL HOLIDAYS, BETWEEN 7:00 AM AND 6:00 PM.
5. THE ENTIRE ATTIC SPACE IN THIS BUILDING HAS A WALKABLE FLOOR.
6. THE EXISTING DRY PIPE SPRINKLER SYSTEM CONTAINS APPROXIMATELY 860 GALLONS WITH
311 HEADS.
7. BUILDING GENERAL NOTES ARE APPLICABLE FOR ALL DRAWINGS FOR BUILDING 2.
BUILDING GENERAL NOTES
1. ENTIRE EXISTING DRY PIPE SPRINKLER SYSTEM IS TO BE REMOVED BACK TO THE ISOLATION
VALVE AT THE INLET TO THE EXISTING DRY PIPE VALVE ASSEMBLY. REMOVAL SHALL
INCLUDE ALL PIPING, PIPE FITTINGS, VALVES, SPRINKLER HEADS, PIPE HANGERS, AND ALL
SYSTEM ACCESSORIES.
2. REMOVE AND DISPOSE OF EXISTING AIR COMPRESSOR. SERVICE EXISTING DRY PIPE
SYSTEM. DEMOLITION SHALL INCLUDE REMOVAL OF COMPRESSED AIR PIPING NAD
ACCESSORIES.
3. ALL BUILDING CUTTING AND PATCHING REQUIRED TO FACILITATE DEMOLITION WORK IS THE
RESPONSIBILITY OF THE CONTRACTOR. PATCH WORK SHALL BE PERFORMED TO RESTORE
CUT AREAS TO MATCH EXISTING ADJACENT SURFACES, INCLUDING FINISH. ALL PATCHING
WORK SHALL BE APPROVED BY THE VA COR. REFER TO DRAWING F002 DETAIL 2 FOR
ADDITIONAL INFORMATION.
4. EXISTING DRY PIPE SYSTEM SHALL REMAIN IN PLACE AND OPERATIONAL UNTIL NEW SYSTEM
IS INSTALLED AND OPERATIONAL. DEMOLITION WORK SHALL BEGIN ONLY UPON APPROVAL
OF THE NEW SYSTEM BY THE VA PROJECT COR.
5. BUILDING DEMOLITION NOTES ARE APPLICABLE TO ALL DEMOLITION DRAWINGS FOR
BUILDING 2.
BUILDING DEMOLITION NOTES
G
EXISTING 5" DRY
PIPE SPRINKLER
RISER UP
1-1
02-F201
TYPE 'A' CHASE
NURSE MANAGER
CORRIDOR
C2-12
2-BED
STORAGE
NOURISH.
3 4
G
EXISTING 5"
DRY PIPE
SPRINKLER
RISER UP
OFFICE
OFFICE
OFFICE
CORR.
C1-9
TYPE 'A' CHASE
1. PIPE THREAD JOINT SEALING COMPOUND CONTAINING ASBESTOS WAS NOT VISUALLY IDENTIFIED AS BEING UTILIZED IN THE EXISTING DRY PIPE SPRINKLER SYSTEM IN BUILDING 2. HOWEVER, SINCE THE EXISTING DRY PIPE SYSTEM IN THE BUILDING WAS CONSTRUCTED AROUND THE SAME TIME AS SYSTEMS IN OTHER SURROUNDING BUILDINGS IT IS ASSUMED THAT PIPE THREAD JOINT
SEALING COMPOUND UTILIZED THROUGHOUT THE EXISTING DRY PIPE SPRINKLER SYSTEM
CONTAINS TRACE (<1% CHRYOSTILE) ASBESTOS. CONTRACTOR SHALL ENGAGE A
LICENSED/ACCREDITED ASBESTOS ABATEMENT CONTRACTOR TO REMOVE AND PROPERLY
DISPOSE OF ALL THREADED PIPE FITTINGS THROUGHOUT THE EXISTING DRY PIPE SPRINKLER
SYSTEM. REMOVAL SHALL BE THROUGH THE CUTTING OF PIPE SECTIONS ADJACENT TO EACH
JOINT, LEAVING THE THREADED FITTING AND PIPE SEALANT INTACT. THE REMAINDER OF THE PIPE
COMPRISING THE DRY PIPE MAY BE REMOVED THROUGH NORMAL DEMOLITION PROCESSES AND
RECYCLED.
ASBESTOS CONTAINING MATERIAL (ACM) REMOVAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
21 4 5 6 7 8 9
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
N O
T F
O R
C O
N S
T R
U C
T
IO
N
321 4 5 6 7 8 9
A
B
C
D
E
DTB ACELA
C U s e rs \k s c h n e c k \D o c u m e n ts
\2 -U
S D
V A
-1 S a le m V
A B
L D
G
C
G e a ry
A c e la
E n g
.c o m .r v t
/2
/2
:4
:3
A
M
02-FD101
FIRE PROTECTION PLANS - DEMOLITION
04/29/2022
SALEM VA MEDICAL CENTER
658-21-101REPLACE DRY SYSTEMS (FIRE
SPRINKLER)
CONSTRUCTION DOCUMENTS
SUBMISSION
N
Revisions: Date:
KEY PLAN1/8" = 1'-0"2
PARTIAL BASEMENT FIRE
PROTECTION PLAN - DEMOLITION
1/8" = 1'-0"1
PARTIAL ATTIC FIRE PROTECTION
PLAN - DEMOLITION
1/8" = 1'-0"4
PARTIAL SECOND FLOOR FIRE
PROTECTION PLAN - DEMOLITION
1/8" = 1'-0"3
PARTIAL FIRST FLOOR FIRE
PROTECTION PLAN - DEMOLITION
KEY PLAN
KEY PLAN
KEY PLAN
AREA OF WORK
AREA OF WORK
AREA OF WORK
CHRISTOPHER
WILLIAM GEARY
Lic. No. 0402063136
C O M M
O N
W E A L T H O F VI R G I N I A
P R O F E S S I O N A L E N G I N
A
1 2 3
B
C
"Ø 2
"Ø 2 "Ø
"Ø2 "Ø2
"Ø
"Ø2
"Ø
"Ø
/2 "Ø
"Ø
/2 "Ø
/2 "Ø
/2 "Ø
"Ø
"Ø
/2 "Ø 2 "Ø
2"Ø2 1/2"Ø
"Ø
/2 "Ø 2 "Ø
2"Ø
"Ø
/2 "Ø
2 1/2"Ø 2"Ø
2"Ø2"Ø
"Ø
2"Ø
2"Ø
2"Ø
"Ø
2"Ø
2"Ø
2"Ø
2"Ø
2"Ø
/2 "Ø
2"Ø
2 1/2"Ø
2"Ø
2"Ø
2"Ø
2"Ø
2 1/2"Ø2 1/2"Ø
/2 "Ø
2 1/2"Ø
2"Ø
2"Ø
2 1/2"Ø
2 1/2"Ø "Ø
"Ø
2"Ø
1"Ø
2"Ø
MATCHLINE
02-FD101
UPRIGHT SPRINKLER HEAD INSTALLED
PERPENDICULAR TO ROOF LINE (TYP.)
UPRIGHT SPRINKLER HEAD AT
RIDGE OF DORMER (TYP.)
UPRIGHT SPRINKLER HEAD INSTALLED
AT ROOF RIDGE (TYP.)
4 5 6
D
E
F
G
EXISTING 5" DRY PIPE
SPRINKLER RISER UP
TO ATTIC
1-1
02-F201
TYPE 'A' CHASE
NURSE MANAGER
2-BED
CORRIDOR
C3-12
STORAGE
NOURISH.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
21 4 5 6 7 8 9
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
N O
T F
O R
C O
N S
T R
U C
T
IO
N
321 4 5 6 7 8 9
A
B
C
D
E
DTB ACELA
C U s e rs \b p e re ir a
\D o c u m e n ts \2
-U
S D
V A
-1 S a le m V
A B
L D
G b p e re ir a
N
M M
N .r v t
/2
/2
:2
:2
A
M
02-FD102
FIRE PROTECTION PLANS - DEMOLITION
04/29/2022
SALEM VA MEDICAL CENTER
658-21-101REPLACE DRY SYSTEMS (FIRE
SPRINKLER)
CONSTRUCTION DOCUMENTS
SUBMISSION
Revisions: Date:
KEY PLAN N
1/8" = 1'-0"1
PARTIAL ATTIC FIRE PROTECTION
PLAN - DEMOLITION
1/8" = 1'-0"2
PARTIAL THIRD FLOOR FIRE
PROTECTION PLAN - DEMOLITION
DRAIN
DRAIN
KEY PLAN
AREA OF WORK
CHRISTOPHER
WILLIAM GEARY
Lic. No. 0402063136
C O M M
O N
W E A L T H O F VI R G I N I A
P R O F E S S I O N A L E N G I N
1 2 3
2"Ø 2"Ø
"Ø
2"Ø
"Ø 2 "Ø
"Ø
"Ø
"Ø
2"Ø 2"Ø
2"Ø2"Ø
2"Ø 2"Ø
2"Ø
2"Ø
2"Ø
"Ø
2"Ø
"Ø
2"Ø
2"Ø1"Ø
2"Ø
2"Ø
2"Ø
"Ø
"Ø
2"Ø
2"Ø
2"Ø
"Ø
"Ø
"Ø
"Ø
"Ø
5"Ø2 1/2"Ø
"Ø
"Ø
/2 "Ø
"Ø
/2 "Ø
/2 "Ø
"Ø
2"Ø
2"Ø
2"Ø
2"Ø
"Ø
2"Ø
"Ø
2"Ø 2"Ø
"Ø
2"Ø2"Ø
2"Ø
2"Ø
"Ø
MATCHLINE
02-F102
5 6
G
H
I
J
K
L
NEW 4" DRY PIPE SPRINKLER
RISER FROM BELOW
2-1
02-F201
ELEV = A
ELEV = A
ELEV = A
ELEV = B ELEV = B
ELEV = C ELEV = C
ELEV = D
ELEV = E
ELEV = F
ELEV = F
ELEV = G
ELEV = F
ELEV = G
ELEV = H
ELEV = F
ELEV = J
ELEV = K
ELEV = J
ELEV = L
ELEV = F
ELEV = C
ELEV = C
ELEV = D
ELEV = M
ELEV = N
ELEV = P
ELEV = Q
ELEV = R
ELEV = S
ELEV = N
ELEV = R
ELEV = F
ELEV = F
ELEV = G
ELEV = F
ELEV = G
ELEV = H
UPRIGHT SPRINKLER HEAD INSTALLED
PERPENDICULAR TO ROOF LINE (TYP.)
UPRIGHT SPRINKLER HEAD AT
RIDGE OF DORMER (TYP.)
UPRIGHT SPRINKLER HEAD INSTALLED
AT ROOF RIDGE (TYP.)
G
5" DRY PIPE SRINKLER
RISER UP TO ATTIC
2 TYPE 'A' CHASE
2-1
02-F201
2-BED
NURSE MANAGER
CORRIDOR
C2-12
1. NEW DRY PIPE SPRINKLER SYSTEM SHALL BE INSTALLED ADJACENT TO
EXISTING SYSTEM WHILE MAINTAINING EXISTING SYSTEM. INSTALL NEW
SYSTEM TO POINT INDICATED IN PREPARATION OF CHANGE OVER. INSTALLED
PORTION OF NEW SYSTEM SHALL BE TESTED AND MADE READY TO PLACE IN
SERVICE.
2. EXISTING DRY PIPE SYSTEM SHALL BE TAKEN OFFLINE TO MAKE FINAL PIPING
CONNECTION TO EXISTING VALVE AT INLET TO DRY PIPE VALVE. NEW DRY
PIPE VALVE ASSEMBLY SHALL BE INSTALLED DURING SHUTDOWN. FINAL
PIPING CONNECTIONS TO NITROGEN SUPPLY AND WIRING TO FIRE ALARM
SYSTEM SHALL ALSO BE MADE DURING SHUTDOWN.
3. DURING SYSTEM SHUTDOWN CONTRACTOR SHALL PROVIDE A FIRE WATCH
FOR THE ENTIRE AREA SERVED BY THE DRY PIPE SYSTEM.
4. NEW DRY PIPE NITROGEN GENERATOR SHALL BE POTTER INTELLIGEN SERIES
MODEL INS-1000 OR APPROVED EQUAL. PROVIDE UNISTRUT MOUNTING
SYSTEM FOR NEW NITROGEN GENERATOR PANEL. REFER TO DETAIL 1 ON
DRAWING F002 FOR ADDITIONAL INFORMATION.
5. WHEN FINAL CONNECTIONS ARE COMPLETE NEW SYSTEM SHALL BE FINAL
TESTED AND PLACED IN SERVICE. DEMOLITION OF EXISTING SYSTEM SHALL
COMMENCE UPON APPROVAL OF NEW SYSTEM BY VA COR.
6. BUILDING NEW WORK NOTES ARE APPLICABLE TO ALL NEW WORK DRAWINGS
FOR BUILDING 2.
BUILDING NEW WORK NOTES
G
5" DRY PIPE
SPRINKLER RISER
UP AND DN.
OFFICE
CORR.
C1-9
TYPE 'A' CHASE
2-1
02-F201
3 4
G
H
CORR.
XX
MECH ROOM
XX
NEW 5" DRY
PIPE
SPRINKLER
RISER UP
"Ø
5"Ø
INSTALL NEW DRY PIPE
VALVE ASSEMBLIES AND
EXTEND 5" DRY PIPE
SPRINKLER MAIN TO NEW
SYSTEM.NEW NITROGEN
GENERATOR CABINET
SECTION OF NEW DRY PIPE
SYSTEM TO BE INSTALLED
DURING SYSTEM SHUTDOWN
MECH ROOM
XX
2-1
02-F201
2-2
02-F201
MECH ROOM
XX
A = 0'-7"± ℄ ABOVE ATTIC FLOOR
B = 1'-10"± ℄ ABOVE ATTIC FLOOR
C = 5'-9"± ℄ ABOVE ATTIC FLOOR
D = 8'-5"± ℄ ABOVE ATTIC FLOOR
E = 3'-0"± ℄ ABOVE ATTIC FLOOR
F = 3'-11"± ℄ ABOVE ATTIC FLOOR
G = 7'-6"± ℄ ABOVE ATTIC FLOOR
H = 12'-0"± ℄ ABOVE ATTIC FLOOR
J = 5'-0"± ℄ ABOVE ATTIC FLOOR
K = 13'-8"± ℄ ABOVE ATTIC FLOOR
L = 9'-2"± ℄ ABOVE ATTIC FLOOR
M = 7'-0"± ℄ ABOVE ATTIC FLOOR
N = 3'-9"± ℄ ABOVE ATTIC FLOOR
P = 9'-6"± ℄ ABOVE ATTIC FLOOR
Q = 16'-2"± ℄ ABOVE ATTIC FLOOR
R = 11'-7"± ℄ ABOVE ATTIC FLOOR
S = 10'-0"± ℄ ABOVE ATTIC FLOOR
T = 8'-0"± ℄ ABOVE ATTIC FLOOR
U - 4'-5"± ℄ ABOVE ATTIC FLOOR
ATTIC PIPING
ELEVATION LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
21 4 5 6 7 8 9
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
N O
T F
O R
C O
N S
T R
U C
T
IO
N
321 4 5 6 7 8 9
A
B
C
D
E
DTB ACELA
C U s e rs \b p e re ir a
\D o c u m e n ts \2
-U
S D
V A
-1 S a le m V
A B
L D
G b p e re ir a
N
M M
N .r v t
/2
/2
:2
:1
A
M
02-F101
FIRE PROTECTION PLANS - NEW WORK
04/29/2022
SALEM VA MEDICAL CENTER
658-21-101REPLACE DRY SYSTEMS (FIRE
SPRINKLER)
CONSTRUCTION DOCUMENTS
SUBMISSION
N
Revisions: Date:
KEY PLAN
1/8" = 1'-0"1
PARTIAL ATTIC FIRE PROTECTION
PLAN - NEW WORK
1/8" = 1'-0"4
PARTIAL SECOND FLOOR FIRE
PROTECTION PLAN - NEW WORK
1/8" = 1'-0"3
PARTIAL FIRST FLOOR FIRE
PROTECTION PLAN - NEW WORK
1/8" = 1'-0"2
PARTIAL BASEMENT FIRE
PROTECTION PLAN - NEW WORK
KEY PLAN
AREA OF WORK
KEY PLAN
KEY PLAN
AREA OF WORK
AREA OF WORK
CHRISTOPHER
WILLIAM GEARY
Lic. No. 0402063136
C O M M
O N
W E A L T H O F VI R G I N I A
P R O F E S S I O N A L E N G I N
A
1 2 3
B
C
MATCHLINE
02-F101
UPRIGHT SPRINKLER HEAD INSTALLED
PERPENDICULAR TO ROOF LINE (TYP.)
UPRIGHT SPRINKLER HEAD AT
RIDGE OF DORMER (TYP.)
UPRIGHT SPRINKLER HEAD INSTALLED
AT ROOF RIDGE (TYP.)
5 6
D
E
F
2"Ø
2"Ø
2"Ø
"Ø
/2 "Ø
/2 "Ø
2 1/2"Ø
/2 "Ø
/2 "Ø
2"Ø
"Ø
2 1/2"Ø 2"Ø
"Ø
"Ø
/2 "Ø
/2 "Ø
"Ø
/2 "Ø
2 1/2"Ø
2 1/2"Ø
2"Ø
"Ø
2"Ø
2 1/2"Ø
/2 "Ø
2 1/2"Ø
2"Ø
"Ø
1"Ø 1"Ø
"Ø
"Ø
2 1/2"Ø
"Ø
"Ø
"Ø
2 1/2"Ø
2"Ø
2 1/2"Ø
/2 "Ø
2"Ø 2"Ø
2"Ø
"Ø
2"Ø2"Ø
2"Ø 2"Ø
"Ø
2"Ø
2"Ø
"Ø
2"Ø
"Ø
"Ø
/2 "Ø
2 1/2"Ø 2"Ø
2"Ø2"Ø
"Ø
2"Ø2"Ø
DRAIN
ELEV = K
ELEV = A
ELEV = A
ELEV = J
ELEV = B ELEV = G
ELEV = B
ELEV = R
ELEV = T
ELEV = B
ELEV = T
ELEV = BELEV = B
ELEV = A
ELEV = R
ELEV = R
ELEV = G
ELEV = J
ELEV = F
ELEV = M
ELEV = Q
ELEV = F
ELEV = S
ELEV = F
ELEV = R
ELEV = R
ELEV = M ELEV = D
ELEV = C
ELEV = L
ELEV = T
ELEV = U
ELEV = J
ELEV = F
ELEV = L
ELEV = C
G
5" DRY PIPE
SRINKLER RISER
UP TO ATTIC
TYPE 'A' CHASE
2-1
02-F201
2-BED
2-BED
NURSE MANAGER
A = 0'-7"± ℄ ABOVE ATTIC FLOOR
B = 1'-10"± ℄ ABOVE ATTIC FLOOR
C = 5'-9"± ℄ ABOVE ATTIC FLOOR
D = 8'-5"± ℄ ABOVE ATTIC FLOOR
E = 3'-0"± ℄ ABOVE ATTIC FLOOR
F = 3'-11"± ℄ ABOVE ATTIC FLOOR
G = 7'-6"± ℄ ABOVE ATTIC FLOOR
H = 12'-0"± ℄ ABOVE ATTIC FLOOR
J = 5'-0"± ℄ ABOVE ATTIC FLOOR
K = 13'-8"± ℄ ABOVE ATTIC FLOOR
L = 9'-2"± ℄ ABOVE ATTIC FLOOR
M = 7'-0"± ℄ ABOVE ATTIC FLOOR
N = 3'-9"± ℄ ABOVE ATTIC FLOOR
P = 9'-6"± ℄ ABOVE ATTIC FLOOR
Q = 16'-2"± ℄ ABOVE ATTIC FLOOR
R = 11'-7"± ℄ ABOVE ATTIC FLOOR
S = 10'-0"± ℄ ABOVE ATTIC FLOOR
T = 8'-0"± ℄ ABOVE ATTIC FLOOR
U - 4'-5"± ℄ ABOVE ATTIC FLOOR
ATTIC PIPING
ELEVATION LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
21 4 5 6 7 8 9
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
N O
T F
O R
C O
N S
T R
U C
T
IO
N
321 4 5 6 7 8 9
A
B
C
D
E
DTB ACELA
C U s e rs \b p e re ir a
\D o c u m e n ts \2
-U
S D
V A
-1 S a le m V
A B
L D
G b p e re ir a
N
M M
N .r v t
/2
/2
:2
:1
A
M
02-F102
FIRE PROTECTION PLANS - NEW WORK
04/29/2022
SALEM VA MEDICAL CENTER
658-21-101REPLACE DRY SYSTEMS (FIRE
SPRINKLER)
CONSTRUCTION DOCUMENTS
SUBMISSION
Revisions: Date:
N
KEY PLAN
1/8" = 1'-0"1
PARTIAL ATTIC FIRE PROTECTION
PLAN - NEW WORK
1/8" = 1'-0"2
PARTIAL THIRD FLOOR FIRE
PROTECTION PLAN - NEW WORK
REFER TO DRAWING 02-F101 FOR LOCATION
KEY PLAN
AREA OF WORK
CHRISTOPHER
WILLIAM GEARY
Lic. No. 0402063136
C O M M
O N
W E A L T H O F VI R G I N I A
P R O F E S S I O N A L E N G I N
FIRST FLOOR
0' - 0"
BASEMENT
-12' - 0"
ATTIC
39' - 5"
SEE 1/02-FD102 FOR
CONTINUATION.
FIRST FLOOR
0' - 0"
BASEMENT
-12' - 0"
ATTIC
39' - 5"
SEE 01/02-F101 FOR
CONTINUATION
FIRST FLOOR
0' - 0"
BASEMENT
-12' - 0"
REMOVE DRY PIPE SPRINKLER
RISER TO ISOLATION VALVE AT
INLET OF DRY PIPE VALVE
ASSEMBLY
5"Ø
FIRST FLOOR
0' - 0"
BASEMENT
-12' - 0"
NEW 5" DRY PIPE
SPRINKLER MAIN UP TO
ATTIC
EXIST. INCOMING
SPRINKLER MAIN
INSTALL NEW DRY PIPE
VALVE ASSEMBLIES AND
EXTEND 5" DRY PIPE
SPRINKLER MAIN TO NEW
SYSTEM.
SECTION OF NEW DRY PIPE
SYSTEM TO BE INSTALLED
DURING SYSTEM SHUTDOWN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
21 4 5 6 7 8 9
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
N O
T F
O R
C O
N S
T R
U C
T
IO
N
321 4 5 6 7 8 9
A
B
C
D
E
DTB ACELA
C U s e rs \b p e re ir a
\D o c u m e n ts \2
-U
S D
V A
-1 S a le m V
A B
L D
G b p e re ir a
N
M M
N .r v t
/2
/2
:2
:1
A
M
02-F201
DRY PIPE RISER SECTIONS
04/29/2022
SALEM VA MEDICAL CENTER
658-21-101REPLACE DRY SYSTEMS (FIRE
SPRINKLER)
CONSTRUCTION DOCUMENTS
SUBMISSION
Revisions: Date:
3/16" = 1'-0"
SECTION1-1
02-FD101 3/16" = 1'-0"
SECTION2-1
02-F101
1/8" = 1'-0"
SECTION1-2
02-FD101
1/8" = 1'-0"
SECTION2-2
02-F101
CHRISTOPHER
WILLIAM GEARY
Lic. No. 0402063136
C O M M
O N
W E A L T H O F VI R G I N I A
P R O F E S S I O N A L E N G I N
F A
C P
F A
C P
1 2 3 4 5 6 7 8
C
D
E
F
"Ø
4"Ø
"Ø
EXIST. 4" DRY PIPE
SPRINKLER RISER UP TO
MAIN BLDG. ATTIC
EXIST. 5" DRY PIPE
SPRINKLER RISER
UP TO MAIN BLDG.
ATTIC OVER FIRST
FLOOR
REMOVE DRY PIPE
RISER TO ISOLATION
VALVE AT INLET OF DRY
PIPE VALVE ASSEMBLY
EXIST. 3" AND 4"
WET PIPE
SPRINKLER MAINS
TO REMAIN
"Ø
"Ø
EXIST. 6" INCOMING
SPRINKLER MAIN TO
REMAIN
1-1
04-FD101
REMOVE FLOOR
MOUNTED AIR
COMPRESSOR
"Ø
5"Ø
"Ø
1-1
04-FD103
4"Ø
EXIST. CHECK
VALVES TO REMAIN
5"Ø
1-2
04-FD103
CANTEEN STORAGE
CANTEEN RETAIL
CANTEEN OFFICE
11C
OFFICE
11D
CANTEEN STORAGE
11B
CANTEEN STORAGE
MECH. RM.
25G
DRESSING RM.
25F
MECH
19A
CANTEEN RETAIL
STAIRS
1. ENTIRE EXISTING DRY PIPE SPRINKLER SYSTEM IS TO BE REMOVED BACK TO THE ISOLATION
VALVE AT THE INLET TO THE EXISTING DRY PIPE VALVE ASSEMBLY. REMOVAL SHALL
INCLUDE ALL PIPING, PIPE FITTINGS, VALVES, SPRINKLER HEADS, PIPE HANGERS, AND ALL
SYSTEM ACCESSORIES.
2. REMOVE AND DIPOSE OF EXISTING AIR COMPRESSOR SERVING DRY PIPE SYSTEM.
DEMOLITION SHALL INCLUDE ASSOCIATED PIPING AND ACCESSORIES BETWEEN AIR
COMPRESSOR AND DRY PIPE SYSTEM VALVE.
3. EXISTING DRY PIPE SYSTEM SHALL REMAIN IN PLACE AND OPERATIONAL UNTIL NEW SYSTEM
IS INSTALLED AND OPERATIONAL. DEMOLITION WORK SHALL BEGIN ONLY UPON APPROVAL
OF THE NEW SYSTEM BY THE VA PROJECT COR.
4. ALL BUILDING CUTTING AND PATCHING REQUIRED TO FACILITATE DEMOLITION WORK IS THE
RESPONSIBILITY OF THE CONTRACTOR. PATCH WORK SHALL BE PERFORMED TO RESTORE
CUT AREAS TO MATCH EXISTING ADJACENT SURFACES, INCLUDING FINISH. ALL PATCHING
WORK SHALL BE APPROVED BY THE VA COR. REFER TO F002 DETAIL 2 FOR ADDITIONAL
INFORMATION.
5. BUILDING DEMOLITION NOTES ARE APPLICABLE TO ALL DEMOLITION DRAWINGS FOR
BUILDING 4.
BUILDING DEMOLITION NOTES
1. FOR REFERENCE THE FINISHED FIRST FLOOR ELEVATION IN BUILDING 4 SHALL BE
CONSIDERED 0'-0". THE BASEMENT FINISH FLOOR ELEVATION IS 0'-0", THE FINISH MAIN
SECOND FLOOR ELEVATION IS…