Drum Screens SOW Revised 10_16_26 PAN_102126_.pdf
PDF 732 KB Posted
- Solicitation number
- PE-66062-NONST-2027-000000514
- Issued by
- Fulton County, Atlanta City, Georgia
About this file
This Scope of Work document outlines specifications for drum screen equipment parts and ancillary repair services issued by the City of Atlanta, Department of Watershed Management, in support of an Invitation for Bids process. The solicitation seeks qualified suppliers to provide parts, equipment, and services for the maintenance, replacement, and repair of drum screen and related equipment used in the City's water and wastewater facilities, specifically including Ovivo, Brackett Green, and other Heritage Brand equipment or equivalents. The specification is organized into five classification groups: RM Clayton Liquid Separators/Drum Screens (Group I), Various Drum Screens (Group II), Bar Screen Braking Systems (Group III), Miscellaneous Parts (Group IV), and Miscellaneous Services (Group V). Bidders must demonstrate compliance with all specification requirements and provide written statements of "Compliance" or "Exception" for each group. The contract includes a one-year warranty period from the delivery date, and bidders are required to supply 90 percent of required parts within seven business days and access to the remaining 10 percent within 72 hours, with failure to meet this requirement potentially resulting in contract termination.
Bidders must provide original manufacturer parts or manufacturer-approved equivalents and submit original manufacturer warranty documentation at shipment. The specification requires vendors to provide parts, service, and operating manuals; offer four hours of instruction on proper and safe equipment use at the bidder's expense; and submit annual itemized reports of purchases to the Chief Procurement Officer within 15 days after each contract anniversary date. Bidders must also meet or beat store, municipal, state, and federal pricing for bid items and provide like or similar goods or substitutes at the same quoted prices with no cost increases to the City. The specification permits bidders to submit optional multi-year purchase proposals covering three years of service and parts, subject to City approval and compliance with Atlanta's Code of Ordinance prohibiting obligating the City for future budget years. No specific contract term, award date, bid due date, or pre-bid conference date is identified in this scope of work document.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
Rev. 08.22.25
Material Type: Drum Screen Equipment Parts and Ancillary Repair Item Number:
Revision Date: 7/14/2026
CITY OF ATLANTA SPECIFICATION FOR
DRUM SCREEN EQUIPMENT PARTS AND ANCILLARY REPAIR
SCOPE AND CLASSIFICATION - PART I
1. Scope - This specification describes minimum requirements for the supply of parts, equipment, and ancillary associated services to maintain, replace, and repair equipment, parts, and ancillary parts/systems associated with the operation and maintenance of the Ovivo, e.g. Brackett Green® and other Heritage Brand equipment (or equivalent), for the City of Atlanta.
Classification - The material(s) must be classified as follows:
Group I - RM Clayton Liquid Separators/Drum Screen Group II - Various Drum Screens
Group III - Bar Screen Braking System Group IV - Miscellaneous Parts
Group V - Miscellaneous
SPECIFICATION REQUIREMENTS
1. Definitions
1.1. “Parts” means the components of a unit to be provided by a Preferred Bidder to the City of Atlanta.
1.2. “Pricing Line” means the separate pricing that the Bidder submits for each line-item bid.
1.3. “Service” means the furnishing of labor, time, or effort to repair or rebuild an entire unit or part(s) of a unit.
2. Standards And Specifications – Material(s), goods, Parts or Service(s) being solicited under this IFB must comply with the Federal Occupational Safety and Health Acts, Federal Aviation Administration Standards, and Georgia Occupational Safety and Health Act requirements, where applicable and in effect at time of delivery.
3. Equipment. The equipment to be furnished must be currently on production and must be manufacturer's standard model complete with all standard equipment. Bidder must be able to supply 90% of Parts required to maintain this equipment within 7 business days and have access to the remaining 10% of Parts within 72 hours. Failure to meet this requirement may result in termination of the contract. To the extent applicable, and except as otherwise expressly provided in this IFB, all energy consuming equipment purchased will be energy efficient, defined as meeting either Energy Star specification of criteria that puts products in the upper 25% of energy efficiency, as well as meeting quality, performance, and durability requirements.
4. Parts and Service Warranty. This Invitation for Bid (IFB) must cover Parts and Service warranty for one (1) year after delivery date. While under warranty, Bidder must replace any damaged or inferior item in a prompt and timely manner. Bidder must submit price information for Parts and Service indicating schedule or rate of discount, which must apply to the City of Atlanta.
5. Original Manufacturer Part Crossover Numbers. Bidder must supply original manufacturer part crossover numbers for parts that are not manufactured by the equipment manufacturer after the award of bid, but prior to the delivery of equipment.
6. Safe Use of Equipment. Bidder (where applicable) must provide a minimum of four (4) hours instruction on the proper and safe use of the equipment at the Bidder’s expense.
7. Manuals. Upon request by the City, Bidder must provide parts, service, and operating manuals for each unit of equipment provided and submit electronically, one (1) set of descriptive literature.
8. Without expressed or implied obligation on the part of the City of Atlanta to perform, the Bidder may submit on a separate sheet an option to the City for a multi-year purchase concept covering three (3) years’ service and parts for equipment covered by its bid. Include the terms of the multi-year purchase option including terms, price, and expiration date.
8.1. The Code of Ordinance of the City of Atlanta specifically prohibits obligating the City for future budget years.
8.2. In the event options are exercised to purchase units in subsequent years, the provisions as related to parts and services will apply as indicated above.
9. Reservation of Rights. The City of Atlanta reserves the right to increase or decrease quantities shown without penalty.
10. Report of Purchases. Bidder must provide an itemized report of the annual spend (“Report of Purchases”) to the Chief Procurement Officer. The Report of Purchases must be submitted annually within fifteen (15) days after the anniversary date of the Agreement. Failure to submit a Report of Purchases may result in forfeiture of future contracts with the City of Atlanta.
11. Brand Name or Trade Name Instructions. If items in this IFB have been identified, described, or referenced by a brand name or trade name description, such identification is intended to be descriptive, but not restrictive and is to indicate the quality and characteristics of products that may be offered. Products may be considered for award if such products are clearly identified in the bids and are determined by the City of Atlanta to meet its needs in all respects.
11.1. All bidders, including bidders whose products may be referenced, must clearly indicate manufacturer/trade name and identifying number in space provided within Pricing Line of this IFB.
11.2. Bidder must not furnish obsolete and/or near-expired products. If the Bidder proposes to furnish another product, such products must be clearly identified in the bid. The evaluation of bids and the determination as to equality of products offered must be the responsibility of the City and will be based on information furnished by the bidder.
Accordingly, to ensure that sufficient information is available the bidder may be required to submit literature and/or samples prior to award. These must be supplied within seven (7) days, if required.
11.3. The purchase of any item by the City, as a result of this Invitation for Bid, is not a judgment of one product against another. Consideration of application, need, and price will constitute purchase determination.
12. Like or Similar Goods. Bidder is only permitted to provide like or similar goods or services to those identified in its bid, if the goods or services identified in the bid are discontinued or out of stock. Vendor must provide like or similar goods or services at the same price(s) quoted in its bid. The City will not absorb any cost increases for like or similar goods or services.
12.1. Bidder must provide like, or similar goods or services not listed in the bid price (s) at or below standard industry rates.
12.2. Bidder must meet or beat store, municipal, state and federal pricing for items bid on.
12.3. Bidder must provide like and similar goods or a direct substitute not listed on pricing lines at _______% discount from catalog prices.
13. Quality Assurance
13.1. Test and Inspection. It is the Bidder's responsibility to perform all tests and inspections required by this specification unless otherwise stated in the purchase order, data sheet, and/or contract. The Bidder may use in the process his/her own facility or any recognized independent laboratory acceptable to the City of Atlanta. The City of Atlanta reserves the right to perform any of the tests and inspection requirements where such tests and inspections are needed to further determine compliance with the specification. If such testing is needed, Bidder must pay for all testing costs.
13.2. Certification. Material covered by this specification must be manufacturer original parts or approved by the manufacturer for use in the specified systems. Certification to this standard must be provided with the Parts and/or Service. It is Bidder's responsibility to ensure that that all parts and/or services meet industry standards. Full acceptance of the materials must be subject upon findings of suitability as determined under Subsection 13.1.
13.3. Sampling. It is the Bidder’s responsibility to submit a random sample testing in accordance with this specification. Material furnished must be identical to the sample submitted for performance test and must comply with the requirements set forth herein. If the material does not comply with the requirements of this specification, or is not identical to the original sample submitted, the Bidder must be required to replace all such materials at its own expense. This includes all handling charges and transportation, with the material that does so comply.
13.4. Quality and Quantity Control - A system of test and inspection must be used to ensure receipt of the quality and quantity of items supplied. Goods will be promptly unpacked and inspected; any discrepancies from purchase order or supplier invoice will be reported immediately to the Chief Procurement Officer of the Department of Procurement.
14. Preparation for Delivery
14.1. Packing - Packing must be accomplished in accordance with acceptable commercial practices for domestic shipments, unless otherwise stated in the Agreement and/or purchase order. The Bidder must make shipments using the minimum number of containers consistent with the requirements of safe transit, available mode of transportation and routing. It is the Bidder’s responsibility to determine that packing is adequate to assure that all materials must arrive at destination in an undamaged condition ready for intended use.
14.2. Marking - All packages must be identified with the City of Atlanta purchase order number and the User Department. Sealed packing lists must be affixed to all cartons showing its content.
14.3. Shipping - The Bidder must follow shipping instructions as stated in the purchase order or Agreement.
15. Warranty. It is the Bidder's responsibility to submit, at time of shipment, the original manufacturer's warranty of the goods/material(s) supplied.
16. Guarantee. The material must be guaranteed to be free from defects of construction, conception, and workmanship for a period of at least 12 months or manufacturer’s warranty whichever is greatest from date of acceptance. Any part or portion found not in accordance with this specification will be rejected and returned to Bidder at Bidder's expense for immediate replacement.
SCOPE AND CLASSIFICATION - PART II
REQUIREMENTS
Vendor must state “Compliance” or “Exception” for the requirements listed below for each group.
Check marks, dittos, or any other markings may not be accepted, and your bid could be rejected.
1. General Requirements
1.1 Successful bidder must provide parts, service, and operating manuals for each unit provided.
1.2 The vendor must obtain approval from the User Agency prior to using any subcontractor.
2. Specific Requirements
2.1 Group I – RM Clayton Liquid Separators/Drum Screen – Vendor must use drum screen/Liquid separators that filters suspend or remove solids, oils, grease, or other contaminants using physical separation methods.
2.2 Group II - Various Drum Screens – Vendor must provide various drum screens used in water and wastewater facilities.
2.3 Group III - Bar Screen Braking System – Vendor must be able to provide safety and control mechanisms that slow or stops the movement of a mechanically cleaned bar screen during normal operation, maintenance, or emergencies. This includes, but is not limited to disc brake, drum brake, motor holding brake, hydraulic brake, mechanical locking device.
2.4 Group IV - Miscellaneous Parts – Vendor must be able to supply spare miscellaneous parts that support operation, maintenance, safety, and installation of water and wastewater facilities. This will minimize downtime through readily available replacement parts.
2.5 Group V- Miscellaneous
Vendor must provide straight time quotation rate per day/per hour for technician(s), helper(s) and apprentice.
ACKNOWLEDGEMENT
Bidder, by and through its authorized representative, acknowledges that it has read and understands this Invitation for Bid (“IFB”) and has submitted all required documents and information in response to this IFB. Bidder further acknowledges and agrees that if it is awarded a contract, pursuant to this IFB, Bidder will be bound by terms and conditions of the Contract Documents which are, collectively, this IFB, Bidder’s submitted bid documents, any resulting purchase order(s) and the City’s terms and conditions as provided under an applicable purchase order(s), and the Agreement.
[Bidder]:
Legal Name of Firm
Address
City State Zip Code
Authorized Representative/Print
Signature/Title/Date
Area Code/Telephone Number /Email
COA Supplier ID Number
File details come from the government source that posted it. Updated .