DRM 2018-46 8 Conduit Installation - NECC - Addendum 1.pdf

PDF 678 KB Posted

Attached to
DRM 2018-46 #8 Conduit Installation @ NECC
Solicitation number
BD-23-1025-DOCFS-9821-78375
Issued by
Middlesex County, Massachusetts

About this file

This document is an addendum to a solicitation issued by the Division of Resource Management (DRM) for DRM 2018-46 #8 Conduit Installation at the Northeast Correctional Center (NECC) in Massachusetts. The addendum provides updated information regarding the availability of the plans and specifications, which will be available by appointment only starting August 18, 2022, at 12:00 p.m. Bid intent forms are required to be submitted by August 26, 2022, by 12:00 p.m. to Darlene Keane at Darlene.Keane@doc.state.ma.us.

The pricing terms, set-asides, incumbent, current environment, funding requirements and sources, and other salient information are not provided in this addendum. The addendum focuses solely on the updated details regarding the availability of the plans and specifications and the bid intent form submission requirements.

View the file

Other files

File Type Posted
Plan Holders List~21.docx DOCX document
Prevailing Wage Payroll Report Form~47.pdf PDF
Bid_Intent_Form~2.doc DOC document
Bid Results~47.doc DOC document
Bid Package~10.doc DOC document
Site Visit Attendees~5.pdf PDF
SDP Plan Form 3~5.xlsx XLSX spreadsheet
Bidder Checklist~39.doc DOC document
Prevailing Wages~19.pdf PDF
Where to get plans and specs~22.docx DOCX document
Prevailing Wage Statement of Compliance~47.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .