This is a Draft Request for Proposal (RFP) for the Enduring-High Energy Laser (E-HEL) Production effort issued by the United States Army Portfolio Acquisition Executive (PAE) Fires. The Government seeks to produce and rapidly field up to 24 E-HEL systems through a negotiated acquisition conducted as a best-value tradeoff. The solicitation requests proposals across five line items: Engineering Services (Cost Plus Fixed Fee), E-HEL Production units at various quantities (2, 5, 5, or 6 units depending on option selection—Firm Fixed Price), Spares (Firm Fixed Price), Risk Reduction Special Studies/Services (Cost Plus Fixed Fee, optional), Repair and Replace System Engineering (Cost Plus Fixed Fee, optional), and Contractor Logistics Support (Cost Plus Fixed Fee, optional). The Contract Data Requirements List (CDRL) and Performance Work Statement are marked Controlled Unclassified Information (CUI) and must be requested from the Government points of contact.
Proposals must be submitted electronically via DoD SAFE in five volumes with strict page limitations: Demonstrated Data (10 pages maximum), Technical Design (15 pages maximum), Production Capabilities (15 pages maximum), Cost/Price (no page limit), and Solicitation/Offer/Award Documents with Certifications/Representations (no page limit). All proposals must demonstrate hard-kill capability against Group 1-2 UAS One-Way Attack systems and Group 3 UAS, achieve at least 1 kW/cm² peak irradiance at 4 km slant range, provide 60 seconds continuous lasing at full power, and integrate onto an Army JLTV vehicle. The evaluation prioritizes demonstrated range-proven data, technical design feasibility, and production capabilities, with cost evaluated separately for reasonableness and realism. The Government intends to award one contract but may award none depending on proposal quality and price. This Draft RFP closes for comments on January 26, 2026, at 10:00 AM Eastern Time, with the actual solicitation to be released on SAM.gov at a future date. The Product Service Code is 1095, and no small business set-aside is noted.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFTSECTION
15A. NAME AND
ADDRESS
OF OFFEROR
SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.
RATING PAGE OF PAGES
2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER
CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME B. TELEPHONE (NO COLLECT CALLS)
AREA CODE NUMBER EXTENSION
C. EMAIL ADDRESS
11. TABLE OF CONTENTS
(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION
A B C D E F G H
I
J
K
L
M EVALUATION FACTORS FOR AWARD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
LIST OF ATTACHMENTS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
CONTRACT CLAUSESSOLICITATION/CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
PACKAGING AND MARKING
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
CONTRACT ADMINISTRATION DATA
SPECIAL CONTRACT REQUIREMENTS
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause Number 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)
DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
15B. TELEPHONE NUMBER
AREA CODE NUMBER EXTENSION
15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE
UNITED STATES CODE AT:
10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)
24. ADMINISTERED BY (If other than Item 7)
26. NAME OF CONTRACTING OFFICER (Type or print)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
25. PAYMENT WILL BE MADE BY
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
CODE
ITEM
STANDARD FORM 33 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.214 (c)
SEALED BID (IFB) INVITATION FOR BID
NEGOTIATED (RFP) REQUEST FOR
PROPOSAL
(Hour) (Date)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
Created On:
21 Jan 2026, 14:53 PM Central Standard Time
Section A - Solicitation/Contract Form
RFP for Enduring High Energy Laser (E-HEL) Production RequirementInstrument Name:
Product Service Code : 1095
THIS IS NOT A REQUEST FOR PROPOSAL. NO PROPOSALS ARE TO BE SUBMITTED IN
RESPONSE TO THIS NOTICE.
This notice is issued by the United States Portfolio Acquisition Executive (PAE) Fires to post a Draft RFP to solicit responses from interested parties. This document is for information and planning purposes and to allow industry the opportunity to verify reasonableness and feasibility of the requirement, as well as promote competition.
This Draft RFP is for the PAE Fires Enduring-High Energy Laser (E-HEL) Requirement. The principal purpose of this requirement is to produce and rapidly field up to twenty-four (24) E- HEL system for the United States Portfolio Acquisition Executive (PAE) Fires.
This presolicitation synopsis is not to be construed as a commitment by the Government, nor will the Government pay for the information submitted in response. The Government may not respond to question/concerns submitted. The Government will use the information to finalize the RFP, as necessary.
All comments or questions shall be submitted electronically via email to Ms. Sydney Horn, sydney.m.horn.civ@army.mil, AND Ms. Kendra Taylor, kendra.n.taylor2.civ@army.
mil, no later than 10:00 AM Eastern Time on Monday, 26 JAN 2026. When responding, reference DRFP-W50RAJ26RA001.
If a solicitation is released, then it and any additional documents will be available on SAM.gov.
It is the offeror's responsibility to monitor this website for the release of the solicitation and amendments (if any). Potential offerors will be responsible for downloading their own copy of the solicitation and amendments (if any).
*** END OF NARRATIVE 1 ***
W50RAJ26RA001
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price
Amount
0001 Engineering Services Pricing Arrangement: Cost Plus Fixed Fee
Job
0002 E-HEL Production Commercial and Government Entity (CAGE) Code: TBD Pricing Arrangement: Firm Fixed Price
2 Each
0003 Spares Pricing Arrangement: Firm Fixed Price
Each
Option Line Item
Risk Reduction Special Studies /Services Pricing Arrangement: Cost Plus Fixed Fee
Job
Option Line Item
Repair and Replace System Engineering Pricing Arrangement: Cost Plus Fixed Fee
Job
Option Line Item
Contractor Logistics Support Pricing Arrangement: Cost Plus Fixed Fee
Job
Option Line Item
E-HEL Production Commercial and Government Entity (CAGE) Code: TBD Pricing Arrangement: Firm Fixed Price
2 Each
1003 Spares Pricing Arrangement: Firm Fixed Price
Each
Option E-HEL Production 5 Each
Line Item
Commercial and Government Entity (CAGE) Code: TBD Pricing Arrangement: Firm Fixed Price
2003 Spares Pricing Arrangement: Firm Fixed Price
Each
Option Line Item
E-HEL Production Commercial and Government Entity (CAGE) Code: TBD Pricing Arrangement: Firm Fixed Price
5 Each
3003 Spares Pricing Arrangement: Firm Fixed Price
Each
Option Line Item
E-HEL Production Commercial and Government Entity (CAGE) Code: TBD Pricing Arrangement: Firm Fixed Price
6 Each
4003 Spares Pricing Arrangement: Firm Fixed Price
Each
Section C - Description/Specifications/Statement of Work
Reference Section J for the E-HEL PWS and CDRL Attachments.
*** END OF NARRATIVE 1 ***
Product Service Code : 1095
Option Line Item 1002 Product Service Code : 1095
Option Line Item 2002 Product Service Code : 1095
Option Line Item 3002 Product Service Code : 1095
Option Line Item 4002 Product Service Code : 1095
Section D - Packaging and Marking
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.246-3 Inspection of Supplies-Cost- Reimbursement.
2001-05
52.246-5 Inspection of Services-Cost- Reimbursement.
1984-04
Overall Contract Inspection/Acceptance Locations
Section F - Deliveries or Performance
0002 2 EachQuantity
Address and POC
Special Handling/Notes FoB Details
Party to Pay Transportation Cost: Contractor
Point Type: Destination
0003 Quantity
Address and POC
Special Handling/Notes FoB Details
Party to Pay Transportation Cost: Contractor
Point Type: Destination
Option Line Item
2 EachQuantity
Address and POC
Special Handling/Notes FoB Details
Party to Pay Transportation Cost: Contractor
Point Type: Destination
1003 Quantity
Address and POC
Special Handling/Notes FoB Details
Party to Pay Transportation Cost: Contractor
Point Type: Destination
Option Line Item
5 EachQuantity
Address and POC
Special Handling/Notes FoB Details
Party to Pay Transportation Cost: Contractor
Point Type: Destination
2003 Quantity
Address and POC
Special Handling/Notes FoB Details
Party to Pay Transportation Cost: Contractor
Point Type: Destination
Option Line Item
5 EachQuantity
Address and POC
Special Handling/Notes FoB Details
Party to Pay Transportation Cost: Contractor
Point Type: Destination
3003 Quantity
Address and POC
Special Handling/Notes FoB Details
Party to Pay Transportation Cost: Contractor
Point Type: Destination
Option Line Item
6 EachQuantity
Address and POC
Special Handling/Notes FoB Details
Party to Pay Transportation Cost: Contractor
Point Type: Destination
4003 Quantity
Address and POC
Special Handling/Notes
FoB Details
Party to Pay Transportation Cost: Contractor
Point Type: Destination
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.211-17 Delivery of Excess Quantities.
1989-09
52.242-15 Stop-Work Order. 1989-08
52.242-15 Stop-Work Order.
(Alternate I)
1989-08 Alternate I 1984-04
52.242-17 Government Delay of Work.
1984-04
52.247-34 F.o.b. Destination. 1991-01
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.201-7000 Contracting Officer's Representative. 1991-12
252.204-7006 Billing Instructions-Cost Vouchers 2023-05
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.
2018-12
DFARS Clauses Incorporated by Full Text
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.232-7006 Wide Area WorkFlow Payment Instructions.
2023-01
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause-
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall-
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web- Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC W58DEK Issue By DoDAAC W50RAJ Admin DoDAAC W50RAJ Inspect By DoDAAC W58DEK Ship To Code W58DEK Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) W58DEK Service Acceptor (DoDAAC) W58DEK Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____ (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
COR, Ms. Barbara Cantrell
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
Section I - Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.203-3 Gratuities. 1984-04
52.203-5 Covenant Against Contingent Fees. 2014-05
52.203-6 Restrictions on Subcontractor Sales to the Government.
2020-06
52.203-7 Anti-Kickback Procedures. 2020-06
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity.
2014-05
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity.
2014-05
52.203-12 Limitation on Payments to Influence Certain Federal Transactions.
2020-06
52.203-13 Contractor Code of Business Ethics and Conduct.
2021-11
52.203-16 Preventing Personal Conflicts of Interest. 2020-06
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.
2017-01
52.204-2 Security Requirements. 2021-03
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards.
2020-06
52.204-13 System for Award Management Maintenance.
2018-10
52.204-18 Commercial and Government Entity Code 2020-08
Maintenance.
52.204-19 Incorporation by Reference of Representations and Certifications.
2014-12
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities.
2023-12
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
2021-11
52.204-27 Prohibition on a ByteDance Covered Application.
2023-06
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded
2025-01
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations.
2015-11
52.210-1 Market Research. 2021-11
52.211-5 Material Requirements. 2000-08
52.211-15 Defense Priority and Allocation Requirements.
2008-04
52.215-2 Audit and Records-Negotiation. 2020-06
52.215-10 Price Reduction for Defective Certified Cost or Pricing Data.
2011-08
52.215-11 Price Reduction for Defective Certified Cost or Pricing Data -- Modifications
(DEVIATION 2022-O0001)
2020-06 Deviation 2022- O0001
2021-10
52.215-12 Subcontractor Certified Cost or Pricing Data (DEVIATION 2022-O0001)
2020-06 Deviation 2022-
2021-10
O0001
52.215-13 Subcontractor Certified Cost or Pricing Data -- Modifications (Deviation 2022- O0001)
2020-06 Deviation 2022- O0001
2021-10
52.216-8 Fixed Fee. 2011-06
52.219-9 Small Business Subcontracting Plan.
(Alternate II)
2025-01 Alternate
II
2016-11
52.219-9 Small Business Subcontracting Plan. 2025-01
52.219-16 Liquidated Damages-Subcontracting Plan. 2021-09
52.222-3 Convict Labor. 2003-06
52.222-35 Equal Opportunity for Veterans. 2020-06
52.222-36 Equal Opportunity for Workers with Disabilities.
2020-06
52.222-37 Employment Reports on Veterans. 2020-06
52.222-40 Notification of Employee Rights Under the National Labor Relations Act.
2010-12
52.222-50 Combating Trafficking in Persons. 2025-10
52.223-5 Pollution Prevention and Right-to-Know Information.
2024-05
52.223-10 Waste Reduction Program. (DEVIATION 2025-O0004)
2024-05 Deviation 2025- O0004
2025-03
52.225-13 Restrictions on Certain Foreign Purchases.
2021-02
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.
2024-05
52.228-7 Insurance-Liability to Third Persons. 1996-03
52.232-1 Payments. 1984-04
52.232-8 Discounts for Prompt Payment. 2002-02
52.232-11 Extras. 1984-04
52.232-22 Limitation of Funds. 1984-04
52.232-25 Prompt Payment. 2017-01
52.232-33 Payment by Electronic Funds Transfer- System for Award Management.
2018-10
52.232-39 Unenforceability of Unauthorized Obligations.
2013-06
52.232-40 Providing Accelerated Payments to Small Business Subcontractors.
2023-03
52.233-1 Disputes. 2014-05
52.233-1 Disputes. (Alternate I) 2014-05 Alternate I
1991-12
52.233-3 Protest after Award. 1996-08
52.233-3 Protest after Award. (Alternate I) 1996-08 Alternate I
1985-06
52.233-4 Applicable Law for Breach of Contract Claim.
2004-10
52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities.
2024-11
52.242-1 Notice of Intent to Disallow Costs. 1984-04
52.242-5 Payments to Small Business Subcontractors.
2017-01
52.243-1 Changes-Fixed-Price. 1987-08
52.243-2 Changes-Cost-Reimbursement. 1987-08
52.244-6 Subcontracts for Commercial Products and Commercial Services.
2025-10
52.245-1 Government Property. 2021-09
52.245-9 Use and Charges. 2012-04
52.247-5 Familiarization with Conditions. 1984-04
52.247-12 Supervision, Labor, or Materials. 1984-04
52.247-15 Contractor Responsibility for Loading and Unloading.
1984-04
52.247-16 Contractor Responsibility for Returning Undelivered Freight.
1984-04
52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form).
1984-04
52.249-6 Termination (Cost-Reimbursement). 2004-05
52.249-14 Excusable Delays. 1984-04
52.253-1 Computer Generated Forms. 1991-01
DFARS Clauses Incorporated by Reference
Date
Alternate Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials.
2011-09
252.203-7002 Requirement to Inform Employees of Whistleblower Rights.
2022-12
252.204-7003 Control of Government Personnel 1992-04
Work Product.
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. (DEVIATION 2024-O0013
REVISION 1)
2024-05 Deviation 2024- O0013
2024-05
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
2023-01
252.204-7020 NIST SP 800-171 DoD Assessment Requirements.
2023-11
252.215-7015 Program Should-Cost Review. 2019-11
252.223-7008 Prohibition of Hexavalent Chromium. 2023-01
252.225-7048 Export-Controlled Items. 2013-06
252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime.
2023-01
252.232-7010 Levies on Contract Payments. 2006-12
252.233-7001 Choice of Law (Overseas). 1997-06
252.242-7006 Accounting System Administration. 2025-01
252.243-7001 Pricing of Contract Modifications. 1991-12
252.244-7000 Subcontracts for Commercial Products or Commercial Services.
2023-11
252.244-7001 Contractor Purchasing System Administration.
2025-01
252.245-7003 Contractor Property Management System Administration
2025-01
252.245-7005 Management and Reporting of Government Property.
2024-01
252.246-7007 Contractor Counterfeit Electronic Part Detection and Avoidance System.
2023-01
252.246-7008 Sources of Electronic Parts. 2023-01
252.247-7023 Transportation of Supplies by Sea. 2024-10
FAR Clauses Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
52.209-3 First Article Approval-Contractor Testing.
1989-09
First Article Approval-Contractor Testing (Sept 1989)
[Contracting Officer shall insert details]
(a) The Contractor shall test ____ unit(s) of Lot/Item ____ as specified in this contract. At least ____ calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
(b) The Contractor shall submit the first article test report within ____ calendar days from the date of this contract to ____ [insert address of the Government activity to receive the report] marked "First Article Test Report: Contract No. ____, Lot/Item No. ____" Within ____ calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) of this subsection. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) of this subsection, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
52.209-4 First Article Approval-Government Testing.
1989-09
First Article Approval-Government Testing (Sep 1989)
[Contracting Officer shall insert details]
(a) The Contractor shall deliver____ unit(s) of Lot/Item ____ within ____ calendar days from the date of this contract to the Government at ____ [insert name and address of the testing facility] for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.
(b) Within ____ calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, the Contractor-
(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and
(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.
(f) If the Government does not act within the time specified in paragraph (b) or (c) of this clause, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.
(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.
52.211-16 Variation in Quantity. 1984-04
Variation in Quantity (Apr 1984)
(a) A variation in the quantity of any item called for by this contract will not be accepted unless the variation has been caused by conditions of loading, shipping, or packing, or allowances in manufacturing processes, and then only to the extent, if any, specified in paragraph (b) of this clause.
(b) The permissible variation shall be limited to:
____ Percent increase [Contracting Officer insert percentage]
____ Percent decrease [Contracting Officer insert percentage]
This increase or decrease shall apply to ____.*
* Contracting Officer shall insert in the blank the designation(s) to which the percentages apply, such as-
(1) The total contract quantity;
(2) Item1 only;
(3) Each quantity specified in the delivery schedule;
(4) The total item quantity for each destination; or
(5) The total quantity of each item without regard to destination.
52.216-7 Allowable Cost and Payment. 2018-08
Allowable Cost and Payment (Aug 2018)
(a) Invoicing.
(1) The Government will make payments to the Contractor when requested as work progresses, but (except for small business concerns) not more often than once every 2 weeks, in amounts determined to be allowable by the Contracting Officer in accordance with Federal Acquisition Regulation (FAR) subpart 31.2 in effect on the date of this contract and the terms of this contract. The Contractor may submit to an authorized representative of the Contracting Officer, in such form and reasonable detail as the representative may require, an invoice or voucher supported by a statement of the claimed allowable cost for performing this contract.
(2) Contract financing payments are not subject to the interest penalty provisions of the Prompt Payment Act. Interim payments made prior to the final payment under the contract are contract financing payments, except interim payments if this contract contains Alternate I to the clause at 52.232-25.
(3) The designated payment office will make interim payments for contract financing on the ____[Contracting Officer insert day as prescribed by agency head; if not prescribed, insert "30th"] day after the designated billing office receives a proper payment request. In the event that the Government requires an audit or other review of a specific payment request to ensure compliance with the terms and conditions of the contract, the designated payment office is not compelled to make payment by the specified due date.
(b) Reimbursing costs.
(1) For the purpose of reimbursing allowable costs (except as provided in paragraph (b)(2) of this clause, with respect to pension, deferred profit sharing, and employee stock ownership plan contributions), the term "costs" includes only-
(i) Those recorded costs that, at the time of the request for reimbursement, the Contractor has paid by cash, check, or other form of actual payment for items or services purchased directly for the contract;
(ii) When the Contractor is not delinquent in paying costs of contract performance in the ordinary course of business, costs incurred, but not necessarily paid, for-
(A) Supplies and services purchased directly for the contract and associated financing payments to subcontractors, provided payments determined due will be made-
(1) In accordance with the terms and conditions of a subcontract or invoice; and
(2) Ordinarily within 30 days of the submission of the Contractor's payment request to the Government;
(B) Materials issued from the Contractor's inventory and placed in the production process for use on the contract;
(C) Direct labor;
(D) Direct travel;
(E) Other direct in-house costs; and
(F) Properly allocable and allowable indirect costs, as shown in the records maintained by the Contractor for purposes of obtaining reimbursement under Government contracts; and
(iii) The amount of financing payments that have been paid by cash, check, or other forms of payment to subcontractors.
(2) Accrued costs of Contractor contributions under employee pension plans shall be excluded until actually paid unless-
(i) The Contractor's practice is to make contributions to the retirement fund quarterly or more frequently; and
(ii) The contribution does not remain unpaid 30 days after the end of the applicable quarter or shorter payment period (any contribution remaining unpaid shall be excluded from the Contractor's indirect costs for payment purposes).
(3) Notwithstanding the audit and adjustment of invoices or vouchers under paragraph (g) of this clause, allowable indirect costs under this contract shall be obtained by applying indirect cost rates established in accordance with paragraph (d) of this clause.
(4) Any statements in specifications or other documents incorporated in this contract by reference designating performance of services or furnishing of materials at the Contractor's expense or at no cost to the Government shall be disregarded for purposes of cost-reimbursement under this clause.
(c) Small business concerns. A small business concern may receive more frequent payments than every 2 weeks.
(d) Final indirect cost rates.
(1) Final annual indirect cost rates and the appropriate bases shall be established in accordance with subpart 42.7 of the Federal Acquisition Regulation (FAR) in effect for the period covered by the indirect cost rate proposal.
(2)
(i) The Contractor shall submit an adequate final indirect cost rate proposal to the Contracting Officer (or cognizant Federal agency official) and auditor within the 6-month period following the expiration of each of its fiscal years. Reasonable extensions, for exceptional circumstances only, may be requested in writing by the Contractor and granted in writing by the Contracting Officer. The Contractor shall support its proposal with adequate supporting data.
(ii) The proposed rates shall be based on the Contractor's actual cost experience for that period. The appropriate Government representative and the Contractor shall establish the final indirect cost rates as promptly as practical after receipt of the Contractor's proposal.
(iii) An adequate indirect cost rate proposal shall include the following data unless otherwise specified by the cognizant Federal agency official:
(A) Summary of all claimed indirect expense rates, including pool, base, and calculated indirect rate.
(B) General and Administrative expenses (final indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts).
(C) Overhead expenses (final indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts) for each final indirect cost pool.
(D) Occupancy expenses (intermediate indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts) and expense reallocation to final indirect cost pools.
(E) Claimed allocation bases, by element of cost, used to distribute indirect costs.
(F) Facilities capital cost of money factors computation.
(G) Reconciliation of books of account (i.e., General Ledger) and claimed direct costs by major cost element.
(H) Schedule of direct costs by contract and subcontract and indirect expense applied at claimed rates, as well as a subsidiary schedule of Government participation percentages in each of the allocation base amounts.
(I) Schedule of cumulative direct and indirect costs claimed and billed by contract and subcontract.
(J) Subcontract information. Listing of subcontracts awarded to companies for which the contractor is the prime or upper-tier contractor (include prime and subcontract numbers;
subcontract value and award type; amount claimed during the fiscal year; and the subcontractor name, address, and point of contact information).
(K) Summary of each time-and-materials and labor-hour contract information, including labor categories, labor rates, hours, and amounts; direct materials; other direct costs; and, indirect expense applied at claimed rates.
(L) Reconciliation of total payroll per IRS form 941 to total labor costs distribution.
(M) Listing of decisions/agreements/approvals and description of accounting/organizational changes.
(N) Certificate of final indirect costs (see 52.242-4, Certification of Final Indirect Costs).
(O) Contract closing information for contracts physically completed in this fiscal year (include contract number, period of performance, contract ceiling amounts, contract fee computations, level of effort, and indicate if the contract is ready to close).
(iv) The following supplemental information is not required to determine if a proposal is adequate, but may be required during the audit process:
(A) Comparative analysis of indirect expense pools detailed by account to prior fiscal year and budgetary data.
(B) General organizational information and limitation on allowability of compensation for certain contractor personnel. See 31.205-6(p). Additional salary reference information is available at https://www.whitehouse.gov/wp-content/uploads/2017/11 /ContractorCompensationCapContractsAwardedBeforeJune24.pdf and https://www.
whitehouse.gov/wp-content/uploads/2017/11 /ContractorCompensationCapContractsAwardedafterJune24.pdf.
(C) Identification of prime contracts under which the contractor performs as a subcontractor.
(D) Description of accounting system (excludes contractors required to submit a CAS Disclosure Statement or contractors where the description of the accounting system has not changed from the previous year's submission).
(E) Procedures for identifying and excluding unallowable costs from the costs claimed and billed (excludes contractors where the procedures have not changed from the previous year's submission).
(F) Certified financial statements and other financial data (e.g., trial balance, compilation, review, etc.).
(G) Management letter from outside CPAs concerning any internal control weaknesses.
(H) Actions that have been and/or will be implemented to correct the weaknesses described in the management letter from subparagraph (G) of this section.
(I) List of all internal audit reports issued since the last disclosure of internal audit reports to the Government.
(J) Annual internal audit plan of scheduled audits to be performed in the fiscal year when the final indirect cost rate submission is made.
(K) Federal and State income tax returns.
(L) Securities and Exchange Commission 10-K annual report.
(M) Minutes from board of directors meetings.
(N) Listing of delay claims and termination claims submitted which contain costs relating to the subject fiscal year.
(O) Contract briefings, which generally include a synopsis of all pertinent contract provisions, such as: contract type, contract amount, product or service(s) to be provided, contract performance period, rate ceilings, advance approval requirements, pre-contract cost allowability limitations, and billing limitations.
(v) The Contractor shall update the billings on all contracts to reflect the final settled rates and update the schedule of cumulative direct and indirect costs claimed and billed, as required in paragraph (d)(2)(iii)(I) of this section, within 60 days after settlement of final indirect cost rates.
(3) The Contractor and the appropriate Government representative shall execute a written understanding setting forth the final indirect cost rates. The understanding shall specify (i) the agreed-upon final annual indirect cost rates, (ii) the bases to which the rates apply, (iii) the periods for which the rates apply, (iv) any specific indirect cost items treated as direct costs in the settlement, and (v) the affected contract and/or subcontract, identifying any with advance agreements or special terms and the applicable rates. The understanding shall not change any monetary ceiling, contract obligation, or specific cost allowance or disallowance provided for in this contract. The understanding is incorporated into this contract upon execution.
(4) Failure by the parties to agree on a final annual indirect cost rate shall be a dispute within the meaning of the Disputes clause.
(5) Within 120 days (or longer period if approved in writing by the Contracting Officer) after settlement of the final annual indirect cost rates for all years of a physically complete contract, the Contractor shall submit a completion invoice or voucher to reflect the settled amounts and rates. The completion invoice or voucher shall include settled subcontract amounts and rates. The prime contractor is responsible for settling subcontractor amounts and rates included in the completion invoice or voucher and providing status of subcontractor audits to the contracting officer upon request.
(6)
(i) If the Contractor fails to submit a completion invoice or voucher within the time specified in paragraph (d)(5) of this clause, the Contracting Officer may-
(A) Determine the amounts due to the Contractor under the contract; and
(B) Record this determination in a unilateral modification to the contract.
(ii) This determination constitutes the final decision of the Contracting Officer in accordance with the Disputes clause.
(e) Billing rates. Until final annual indirect cost rates are established for any period, the Government shall reimburse the Contractor at billing rates established by the Contracting Officer or by an authorized representative (the cognizant auditor), subject to adjustment when the final rates are established. These billing rates-
(1) Shall be the anticipated final rates; and
(2) May be prospectively or retroactively revised by mutual agreement, at either party's request, to prevent substantial overpayment or underpayment.
(f) Quick-closeout procedures. Quick-closeout procedures are applicable when the conditions in FAR 42.708(a) are satisfied.
(g) Audit. At any time or times before final payment, the Contracting Officer may have the Contractor's invoices or vouchers and statements of cost audited. Any payment may be-
(1) Reduced by amounts found by the Contracting Officer not to constitute allowable costs; or
(2) Adjusted for prior overpayments or underpayments.
(h) Final payment.
(1) Upon approval of a completion invoice or voucher submitted by the Contractor in accordance with paragraph (d)(5) of this clause, and upon the Contractor's compliance with all terms of this contract, the Government shall promptly pay any balance of allowable costs and that part of the fee (if any) not previously paid.
(2) The Contractor shall pay to the Government any refunds, rebates, credits, or other amounts (including interest, if any) accruing to or received by the Contractor or any assignee under this contract, to the extent that those amounts are properly allocable to costs for which the Contractor has been reimbursed by the Government. Reasonable expenses incurred by the Contractor for securing refunds, rebates, credits, or other amounts shall be allowable costs if approved by the Contracting Officer. Before final payment under this contract, the Contractor and each assignee whose assignment is in effect at the time of final payment shall execute and deliver-
(i) An assignment to the Government, in form and substance satisfactory to the Contracting Officer, of refunds, rebates, credits, or other amounts (including interest, if any) properly allocable to costs for which the Contractor has been reimbursed by the Government under this contract; and
(ii) A release discharging the Government, its officers, agents, and employees from all liabilities, obligations, and claims arising out of or under this contract, except-
(A) Specified claims stated in exact amounts, or in estimated amounts when the exact amounts are not known;
(B) Claims (including reasonable incidental expenses) based upon liabilities of the Contractor to third parties arising out of the performance of this contract; provided, that the claims are not known to the Contractor on the date of the execution of the release, and that the Contractor gives notice of the claims in writing to the Contracting Officer within 6 years following the release date or notice of final payment date, whichever is earlier; and
(C) Claims for reimbursement of costs, including reasonable incidental expenses, incurred by the Contractor under the patent clauses of this contract, excluding, however, any expenses arising from the Contractor's indemnification of the Government against patent liability.
52.217-6 Option for Increased Quantity. 1989-03
Option for Increased Quantity (Mar 1989)
The Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the option by written notice to the Contractor within ____[insert in the clause the period of time in which the Contracting Officer has to exercise the option]. Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree.
52.217-7 Option for Increased Quantity- Separately Priced Line Item.
1989-03
Option for Increased Quantity-Separately Priced Line Item (Mar 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within ____ [insert in the clause the period of time in which the Contracting Officer has to exercise the option]. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
52.217-8 Option to Extend Services. 1999-11
Option to Extend Services (Nov 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30[insert the period of time within which the Contracting Officer may exercise the option].
52.217-9 Option to Extend the Term of the Contract.
2000-03
Option to Extend the Term of the Contract (Mar 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days[insert the period of time within which the Contracting Officer may exercise the option]; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days days[60days unless a different number of days is inserted] before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 66 months(months) (years).
52.219-28 Postaward Small Business Program Rerepresentation.
2025-01
Postaward Small Business Program Rerepresentation (Jan 2025)
Long-term contract means a contract of more than five years in duration, including options.
However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern-
(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (d) of this clause.
(2) Affiliates, as used in this definition, means business concerns, one of whom directly or indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.
(b) If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph
(h) of this clause, upon occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .