DRDs Attachments.pdf

PDF 409 KB Posted

Attached to
Integrated Graphics, Operations, and Analysis Lab (IGOAL) IV
Solicitation number
80JSC021Q0002
Issued by

View the file

Other files

File Type Posted
SF1449.pdf PDF
Contractor Questions.pdf PDF
80JSC021Q0002 Solicitation SAF.doc.pdf PDF
SF1449.pdf PDF
SF1449.pdf PDF
80JSC021Q0002 Solicitation.pdf PDF
Statement of Work _ IGOAL IV.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

80JSC021Q0002 Integrated Graphics, Operations, and Analysis Lab (IGOAL) IV D-01

Section D- List of Documents, Exhibits, and Other Attachments

Section D – List of Attachments Attachment D-01 Data Requirements List Attachment D-02 Data Requirements Documents Attachment D-03 Standard Labor Categories Attachment D-04 List of Installation-Accountable Government Property Attachment D-05 IT Security Management Plan Attachment D-06 Safety and Health Plan Attachment D-07 Government Property Management Information Attachment D-08 Contract Phase-In Plan Attachment D-09 Technical Acceptability Attachment D-10 Additional Proposed Standard Labor Categories

Attachment D-01 – Data Requirements List (DRL)

The following pages set out the documentation requirements of this contract, starting with a DRL, which is an index to the Data Requirements Descriptions (DRD). Each DRD prescribes the required data product content, schedule, type, and other particulars for specific data submission requirements.

Subject to the Clause 52.227-14, Rights in Data - General, this document sets forth the data requirements in each DRD and shall govern that data required for this contract. The contractor shall furnish data defined by the DRDs listed on the DRL by category of data. Such data shall be prepared, maintained, and delivered to NASA in accordance with the requirements set forth within this document. In cases where data requirements are covered by a Federal Acquisition Regulation (FAR) or NASA FAR Supplement (NFS) regulation or clause, the regulation will take precedence over this document, per FAR 52.215.33. NASA-Owned/Contractor-Held records shall be managed by the Contractor in accordance with Title 36 of the code of Federal Regulations, Chapter XII B, Records Management, and NMI 1440.6, NASA Records Management Program. The records shall be organized in accordance with the instructions in NHB 1442.1, NASA Uniform Files index, as applicable. The contractor shall disposition records and non-records in accordance with NHB 1441.1, NASA Retention Schedules, which has been approved by NASA and the National Archives and Records Administration (NARA). All questions on records management issues shall be directed through the Contracting Officer to the JSC Records Management Officer.

Documents included as applicable documents in the data requirements form a part of this document to the extent specified herein. References to documents other than applicable documents in the data requirements of this document may sometimes be utilized. These do not constitute a contractual obligation on the contractor. They are to be used only as a possible example or to provide related information to assist the contractor in developing a response to that particular data requirement.

Description This document identifies and defines the requirements and data types for information and data required under this contract.

The DRDs, along with the DRL, define, by an individual Data Requirement, the information and data required for each deliverable document.

The data types are used to identify the approval and control required for each DRD. The DRL is an index of all the DRDs by category and includes additional requirements for each DRD and the data types, as described below.

Documentation submitted pursuant to this clause may incorporate references to other current approved documentation, provided the references are adequate and include such identification elements as title, document number, and approval date (where applicable). However, if the pertinent information is of relatively minor size, the contractor shall incorporate the information itself, in lieu of using a reference. The contractor shall assure that any referenced information is readily available to appropriate users of the submitted document.

Number of Copies And Distribution Requirements The contractor shall submit data product required in each DRD in compliance with the standard distribution list shown in Block 8 of the DRLs. Additional distribution shall be made as directed, in writing, by the Contracting Officer. The number of copies required will not exceed the limits set forth in Clause 1852.208-81, Restrictions on Printing and Duplicating, without prior Contracting Officer approval. Electronic Data Transmittal Forms will be used to confirm delivery of electronically resident DRD deliverables.

Electronic Format All the data requirements shall be delivered in the format as depicted in each DRD and compatible with JSC software loads.

Further Explanation of DRL Contract Start is defined as April 1, 2021.

Block 3 – Frequency of submittal/Maintenance:

Code Description Code Description Code Description AD As Directed DA Daily RD As Released AN Annually DD Deferred Delivery RT One Time and Revisions as Required AR As Required MO Monthly SA Semi Annually BE Biannually OT One Time TY Three Per Year BM Bimonthly PV Per Vehicle UR Upon Request BW Biweekly QU Quarterly WK Weekly

Block 4 – As of Date- If reports are of a recurring nature, an as of date will be included in this block (cutoff date and due date: e.g., 15/1 indicated input cutoff date of 15th and due date of 1st).

Block 5 – 1st Submittal Date Block 6 – Copies –

a. Type Code Description E Electronic HC Hard Copy HS Hard Copy with Original Signature

b. Number – Number of copies required for each type of copy furnished.

Block 7 – Data Type For the purpose of this clause, the following information/documentation types are applicable:

(1) Type1 - Written approval -- Data and changes thereto requiring written approval by the NASA Office of Primary Responsibility (OPR) before formal release or implementation

(2) Type2 - Mandatory submittal -- Data provided to NASA for coordination, information, review, and/or management control

(3) Type3 - Submitted upon request -- Data prepared and retained under a specific contract to be made available to NASA upon request Type 1 submissions shall be marked “TYPE 1 PRELIMINARY pending NASA approval or Type I APPROVED BY NASA, as appropriate." Additional special designations and deviations may be required on specific submissions in accordance with configuration management requirements.

Type 2 submissions shall be marked “TYPE 2 PRELIMINARY - RELEASE TARGET DATE, xx/xx/xx" or "TYPE 2 FINAL - NASA COMMENTS INCLUDED" or “TYPE 2 FINAL DOCUMENT," where NASA comments were not received.

NOTE: Documents submitted under this clause, even though directly (Type 1) or implicitly (Type 2) approved by NASA, shall not take precedence over the specifications as set out in Section C, Statement of Work.

The contractor shall normally deliver a complete revised Type 1 or Type 2 data requirement with NASA comments incorporated within 45 days of receipt of comments.

Type 3 submissions shall be marked "TYPE 3 DOCUMENT - FOR INFORMATION, SURVEILLANCE, REVIEW OR MANAGEMENT CONTROL".

Block 8 – Distribution Block 9 – Remarks: Additional requirements, clarification or amplification of requirements from other blocks.

a. Title of Contract, Project, SOW, etc.

Integrated Graphics, Operations, and Analysis Lab (IGOAL) IV

b. Contract/RFP No.

80JSC021Q0002

c. DRL Date/Mod Date (mm/dd/yyyy) 04/1/2021

1. Line item no.

2. DRD Title

Progress Reports

3. Frequency

MO

4. As-of-date

See block 9

5. 1st subm.

date

5/1/2021

6. Copies

a. Type E

b. Number

7. Data type: (1) Written Approval (2) Mandatory Submittal (3) Submitted upon request

8. Distribution

1) Contracting Officer

2) Contracting Officer’s Representative

9. Remarks

4. Reports shall be delivered by the 10th of every month and shall cover the previous calendar month.

1. Line item no.

2. DRD Title

IT Security Management Plan

3. Frequency

RT

4. As-of-date n/a

5. 1st subm.

date

See Block 9

6. Copies

a. Type E

b. Number

7. Data type: (1) Written Approval (2) Mandatory Submittal (3) Submitted upon request

8. Distribution

1) Contracting Officer

2) Contracting Officer’s Representative

9. Remarks Block 3: Updates upon request of the Contracting Officer Block 5: Plan due within 30 days of contract start. Reports due per the DRD.

1. Line item no.

2. DRD Title

Safety and Health Plan

3. Frequency

RT

4. As-of-date n/a

5. 1st subm.

date

Due with Proposal

6. Copies

a. Type E

b. Number

7. Data type: (1) Written Approval (2) Mandatory Submittal (3) Submitted upon request

8. Distribution

1) Initial with Proposal

2) Contracting Officer

3) Contracting Officer’s Representative

4) NS/Safety and Test Operations Division

5) JSC Occupational Health Officer

6) JSC Emergency Preparedness Office

9. Remarks Block 3: Contractor shall review the plan annually and update as needed or as directed by the contracting officer.

a. Title of Contract, Project, SOW, etc.

Integrated Graphics, Operations, and Analysis Lab (IGOAL) IV

b. Contract/RFP No.

80JSC021Q0002

c. DRL Date/Mod Date (mm/dd/yyyy) 04/1/2021

1. Line item no.

2. DRD Title

Contract Phase-In Plan

3. Frequency

RT

4. As-of-date

See block 9

5. 1st subm.

date

Due with proposal

6. Copies

a. Type E

b. Number

7. Data type: (1) Written Approval (2) Mandatory Submittal (3) Submitted upon request

8. Distribution 1.) Initial with proposal

9. Remarks

1. Line item no. 2. DRD Title 3. Frequency 4. As-of-date 5. 1st subm.

date 6. Copies

a. Type b. Number

7. Data type: (1) Written Approval (2) Mandatory Submittal (3) Submitted upon request

8. Distribution

3)

9. Remarks

1. Line item no. 2. DRD Title 3. Frequency 4. As-of-date 5. 1st subm.

date 6. Copies

a. Type b. Number

7. Data type: (1) Written Approval (2) Mandatory Submittal (3) Submitted upon request

8. Distribution 9. Remarks

80JSC021Q0002 Integrated Graphics, Operations, and Analysis Lab (IGOAL) IV D-02

Attachment D-02 – Data Requirements Descriptions (DRD)

Table of Contents

DRD 01: Progress Reports DRD 02: IT Management Plan

DRD 03: Safety and Health Plan DRD 04: Contract Phase-In Plan

80JSC021Q00

Integrated Graphics, Operations, and Analysis Lab (IGOAL) III DRD-01

JSC DATA REQUIREMENTS DESCRIPTION (DRD)

(Based on JSC STD-123)

4. Use (Define need for, intended use of, and/or anticipated results of data) To provide a written status of completed activities for the specified time period.

5. DRD Category: (check one) X Technical Administrative SR&QA

6. References (Optional) 7. Interrelationships (e.g., with other DRDs) (Optional)

8. Preparation Information (Include complete instructions for document preparation)

Contractor shall submit monthly task order progress reports. As a minimum, the reports shall contain the following information:

(1) Contract number, task order number, and date of the order.

(2) Task ceiling price.

(3) Cost and hours incurred to date for each issued task.

(4) Costs and hours estimated to complete each issued task.

(5) Significant issues/problems associated with a task.

(6) Cost summary of the status of all tasks issued under the contract.

The reports shall also provide a general technical overview of accomplished tasks completed during the specified time period. They shall include sections for each major piece of software, a section for animations, and another for miscellaneous activities.

RFP/Contract No.

80JSC

021Q0002

3. DRL

Line

2. Current Version Date

04/1/2021

1. DRD Title

Progress Reports

Integrated Graphics, Operations, and Analysis Lab (IGOAL) III DRD-02

1. IT Security Management Plan (Government Furnished Services)

2. Date of current version

3. DRL RFP/Contract No.

IT Security Management Plan (for Contracts using I3P services only)

04/1/2021 02 80JSC021Q0002

4. Use (Define need for, intended use of, and/or anticipated results of data) 5. DRD Category: (check one) Defines IT plans and reports that document the contractor's compliance with Federal and NASA IT regulations and requirements.

Technical

Administrative X

SR&QA

6. References (Optional) 7. Interrelationships (e.g., with other DRDs) (Optional)

NPR 2810.1A, NPD 2810.1A, NFS

8. Preparation Information (Include complete instructions for document preparation)

The contractor shall prepare the data delivery as follows:

SCOPE:

The contractor shall submit an IT security management program plan for its unclassified technology information resources. This program plan shall describe the processes and procedures that will be followed to ensure appropriate security of IT resources that are developed, processed, or used under this contract. The Contractor’s IT security management program plan shall be compliant with the IT security requirements in accordance with Federal and NASA policies as referenced in OMB Circular A-130 (Management of Federal Information Resources), and NPR 2810.1A (Security of Information Technology). See the CIO-Procurement Website for any supporting documentation.

CONTENT:

The following provides guidance for contracts that contain no IT work and where IT equipment and support is provided by NASA or another NASA contract.

IT Security Management Plan (ITSMP) – Normally an ITSMP is required to be delivered at the beginning of a contract. For “non-IT” contracts it is not required. In its place the following requirements are established.

• All employees under the contract shall take the NASA IT Security Annual Awareness Training accessible in SATERN. Completion of the training shall be accomplished annually not later than the due date established by NASA each year. NASA may request periodic statuses on the number of employees who have completed the yearly training.

• Any employee who knows or suspects a cyber-security incident has occurred shall notify NASA immediately. Notification may be to the NASA organization computer security official (OCSO can be found at http://ird.jsc.nasa.gov/ITSecurity/Lists/OCSO/ocsolist.aspx), or the JSC IT Security Duty Phone, 281-844-0248, or to the NASA Security Operations Center, 877- NASA-SEC. This should be reviewed independently with employees yearly outside of the SATERN training.

• The contractor shall identify a point of contact that NASA may reach in its attempt to address http://ird.jsc.nasa.gov/ITSecurity/Lists/OCSO/ocsolist.aspx)

80JSC021Q0002 Integrated Graphics, Operations, and Analysis Lab (IGOAL) IV DRD-03

Safety and Health Plan

2. Current Version Date

08/13 (replaces 01/11 version)

3. DRL

Line Item No.

RFP/Contract No.

(Procurement completes)

80JSC021Q0002

4. Use:

Establishes Safety and Health Plan for Contractors providing support to JSC organizations

The Office of Primary Responsibility for this DRD is the JSC Safety and Test Operations Division. Any modifications to this DRD require approval from the Chief, Safety and Test Operations Division.

5. DRD Category: (check one) Technical Administrative X SR&QA

6. References (Optional) OSHA CSP 03-01-003, Voluntary Protection Program (VPP): Policies and Procedures Manual JPR 1700.1 JSC Safety and Health Requirements JPR 1040.4, JSC Emergency Preparedness Plan NPR 8621, NASA Procedural Requirements for Mishap and Close Call Reporting, Investigating, and Recordkeeping JPR 2310.1, JSC Organizational Learning Program

7. Interrelationships (e.g., with other DRDs)

Frequency of Submission. Initial submission with the proposal. Upon NASA approval, the Contractor’s Safety and Health Plan become a Contractual Requirement.

Distribution: Send copies to each of the following:

Contracting Officer (1 electronic copy) Contracting Officer’s Representative (1 electronic copy) NS/Safety and Test Operations Division (1 electronic copy) JSC Occupational Health Office (1 electronic copy) JSC Emergency Preparedness Office (1 electronic copy) Revisions to the Plan: Review the plan annually or as directed by the CO. Update the plan to meet the latest OSHA, JSC, and VPP requirements. Provide a copy of the updated plan with the changes highlighted to the distribution list above at the start of each Contract year. If no changes are required after the annual review, notify the individuals in the distribution list in writing to that affect.

Other Deliverables: The plan must include instructions for submitting the deliverables in Table 1 below to the Government and represent contractual commitments by the Contractor to provide this information. Include copies to the Contracting Officer and Contracting Officer’s Representative.

Deliverable Frequency DRD

Comments

Identity of key safety and health personnel:

• Company

Physician/Occupational Injury/illness case manager

• Designated Safety Official

• Safety Representative

• Building Fire Wardens

(Roster)

Within 15 days of contract start and updated with changes

1.5 Include in plan or

attachment to plan

Safety and Health Self Evaluation Report

Yearly by Sept 30 1.8 Send to Safety and Test Operations Division

Roster of Terminated Employees Yearly, 30 days after the end of the contract year

1.9.1 Send to the

Occupational Health Branch

Material Safety Data Sheets (MSDS)/Safety Data Sheets

(SDS)

When you introduce a new hazardous material

1.9.2 Send to the

Occupational Health Branch See JPR 1700.1, Chapters 9.1 & 9.2

Hazardous Materials Inventory Yearly or when quantities or locations change significantly.

Some products require quarterly updates

1.9.3 Send to the

Occupational Health Branch See JPR 1700.1, Chapter 9.2

Inspection results entered in Building Inspection Tracking System (BITS)

10 working days after completing inspection

2.4

On-site close calls forwarded to JSC close call tracking system

Within 3 working days of receipt

2.6 Send to Safety and Test

Operations Division Required only for contractor close call systems

Mishap reporting Immediate and follow-up as required in JPR 1700.1

2.7.1 See Chapter 2.6 of JPR

1700.1

Deliverable Frequency DRD

Comments

Lessons Learned Report Enter data into the JSC LLDB or NASA LLIS:

• Within 30 days of a triggering event;

• Within 30 days of a program milestone, mishap investigation, or hazard or other engineering analysis / evaluation is completed; or

• 30 days before end of contract evaluation period or 45 days before end of contract, whichever is applicable.

2.7.1.7 Database entry with 1

electronic copy to the Contracting Officer’s Representative

JSC Form 288, “Accident/Incident Statistics”

Monthly by the 10th of the month

2.7.2.

a

Send to JSC-Safety- Report-Submittals <JSC-Safety-Report- Submittals@mail.nasa.

gov>

OSHA logs Yearly by Feb 15 and within 30 days of contract end

2.7.2.b Send to Safety and Test Operations Division

OSHA 300 & 300A

with names removed.

Equivalent forms from contractor database are acceptable.

Hazards recorded in JSC Hazard Abatement Tracking System

(HATS)

Within 5 working days of discovery

3.1, 3.12

Applies to hazards not corrected within 30 days

Interim and Final Abatement Plans

Within 5 working days of discovery

3.12.3 Updates for hazards

entered into HATS

Table 1, Safety and Health Deliverables

Format:

1. Cover page - to include as a minimum, blocks for the signatures of Contractor's project manager and designated safety official; NASA COR; JSC Safety and Test Operations Division: JSC Occupational Health Branch: and the NASA Contracting Officer. Other signatures may be required at the discretion of the Government. Once approved by NASA, signatures will be collected and the plan placed on the contract.

2. Table of Contents. See content below.

3. Body of plan - as required. Contractor’s format is acceptable but should be aligned with the elements of the content below.

4. The contractor is part of a larger program – the NASA safety program – which has other contracted employees, civil servants, and other third parties that must be protected from any hazard in the workplace wherever they arise. This includes the following:

a. Hazards associated with work done on contractual tasks.

b. Hazards that arise from non-contractual operations in the vicinity of contractor’s workers.

c. Hazards that arise from contractual operations which may affect the safety and health of individuals and assets outside this contract.

5. The plan will clearly identify those resources to be provided by the Contractor and proposed resources to be provided by the Government.

The contractor will make this review and supporting rationale available to the Government as part of this plan. It can be documented as a checklist or outline, inserted directly in the body of the plan, or in any format developed by the Contractor that clearly conveys the results of this review including the basis for any underlying assumptions. For further information, see the LIST OF INSTALLATION PROVIDED FACILITIES AND SERVICES provided in this RFP.

6. The plan must cover the prime contractor and all subcontractors.

Details: Address the following items in your plan:

MANAGEMENT LEADERSHIP AND EMPLOYEE PARTICIPATION

Management and employees work together as a team to provide a safe and healthful workplace. Management and employee synergies often must work together across contractual lines.

1.1 Policy: Provide the Contractor’s safety and health compliance policy statement with the plan. Compare the Contractor’s policy statement with those of NASA and OSHA and discuss any differences.

1.2 Goals and Objectives. Describe your approach to the following:

1.2.1 Specific annual safety and health goals and objectives to be met. Include innovative employee input systems and management approaches that produce a measurable rate of improvement in employee participation. These goals and objectives may or may not be quantifiable. Explain how you will evaluate your accomplishment of these goals and objectives.

1.2.2 Methods to be used, if any, to improve on the Days Away Case Rate (DACR), the Total Recordable Injury Rate (TRIR), and the total Days Away plus Restricted Duty plus Job Transfer (DART).

1.3 Management Leadership. Describe how management will demonstrate its commitment to safety and health compliance through visible management activities and fulfill its line management responsibilities for safety and health. Describe specific processes and techniques for implementation in all Contract and subcontract activities and products. Include a statement from the project manager or designated safety official indicating that the plan will be implemented as approved and that the project manager will take personal responsibility for its implementation.

1.4 Employee Involvement. Describe procedures to promote, implement, and sustain employee (non-supervisory) involvement in safety and health compliance program development, implementation and decision-making from all areas of the contract.

1.5 Assignment of Responsibility. Describe line and staff responsibilities for safety and health program implementation. Identify any other personnel or organizations that provide safety services or exercises any form of control or assurance in these areas. As a minimum, the plan will identify the following:

1.5.1 Safety Representative - identify by title, the individual who will be responsive to Center-wide safety, health and fire protection concerns and goals, and who will participate in various joint meetings, forums, and other activities related to the JSC Safety and Health program.

1.5.2 Company Physician/Occupational Injury/illness case manager - identify a point of contact who is responsible for the transfer or receipt of company medical data and who will be the primary contact for the company in the event any employee suffers a work related injury or illness by name, address, and telephone number to the JSC Clinic, mail code SD32. This will facilitate communication of medical data to Contractor management. Promptly notify the JSC Clinic of any changes that occur in the point of contact.

1.5.3 Building Fire Wardens - provide a roster of fire wardens at the start of each Contract year (their names, telephone numbers and pagers, and mail codes). Contractor fire wardens facilitate the JSC fire safety program, including coordination of related issues with NASA facility managers and emergency planning and response officials and their representatives. Fire wardens will be trained per JPR 1700.1.

Update the Roster by letter to the JSC Safety and Test Operations Division, mail code NS2, with copies to the Contracting Officer and the COR. Provide the initial letter to the Government not later than 15 days after contract start.

1.5.4 Designated Safety and Health Official - identify by title the official(s) responsible for implementation of this plan and all formal contacts with regulatory agencies and with NASA.

1.6 Provision of Authority. Describe your approach to maintain consistency of this plan throughout the life of the contract with applicable NASA and JSC requirements and contractual direction as well as applicable Federal, State, and Local regulations.

1.7 Accountability. Describe procedures for ensuring that management and employees will be held accountable for implementing their tasks in a safe, healthful, and environmentally compliant manner.

1.8 Safety and Health Program Self Evaluation. Describe your approach to safety and health program evaluation. The program evaluation consists of providing a written self-evaluation report once per year that assesses your safety and health program effectiveness during the report period. The self-evaluation shall:

a. Follow the VPP program evaluation report format found in OSHA CSP 03-01-003, Voluntary Protection Program (VPP): Policies and Procedures Manual, Appendix C, “Format for Annual Submissions”, as mandated by the cognizant OSHA regional office.

b. Assess the elements of the approved safety and health plan as a minimum.

c. Include safety and health concerns and resolutions relating to JSC operations which may have been identified during the report period.

d. Include unresolved safety and health concerns relating to JSC operations which the Contractor feels merit attention of JSC safety and health management.

e. Include action plans with schedule for periodic progress reports to the Government on a frequency agreed to by the Government and the Contractor for each problem area.

f. Establish goals and objectives of the Contractor safety and health program for the next report period.

Note: Contractors who have submitted a written self-evaluation as a VPP site may submit their original report to NASA in lieu of writing a new self-evaluation provided that all action plans and status are updated.

Note: This self-evaluation is not the same as the Contractor performance self-evaluation but may be used for that purpose if specifically required by the contract.

1.9 Miscellaneous Deliverables. The Contractor will acknowledge the following as standing requests of the Government and to be handled as described below.

1.9.1 Roster of Terminated Employees. Identify personnel terminated by the contractor. At the contractor’s discretion, the report may include personnel changes during the previous year or cumulated for all years. Information required:

a. Date of report, Contractor identity, and Contract number.

b. For each person listed, provide name, social security number, and date of termination.

c. Name, address, and telephone number of Contractor representative to be contacted for questions or other information.

1.9.2 Material Safety Data Sheets (MSDS)/Safety Data Sheets (SDS). Prepare or deliver MSDSs/SDSs for hazardous materials brought onto Government property or included in products delivered to the Government as required in chapters 9.1 and 9.2 of JPR 1700.1.

1.9.3 Hazardous Materials Inventory. Compile an inventory report of all hazardous materials it has located on Government property quarterly as required by chapter 9.2 of JPR 1700.1, and which is within the scope of 29 CFR 1910.1200, “Hazard Communication”; and Federal Standard 313 (or FED-STD-313), “Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities”, as revised.

1.10 Government Access to Safety and Health Program Documentation. Include a statement that you will make all safety and health documentation (including relevant personnel records and medical records) available without impediment for inspection or audit to Government safety and health professionals and their representatives. Electronic access by the Government to this data is acceptable as long as Privacy Act and information security requirements are met. For the purpose of this plan, safety and health documentation includes but is not limited to: logs, records, minutes, procedures, checklists, statistics, reports, analyses, notes, or other written or electronic document which contains in whole or in part any subject matter pertinent to safety, health, or emergency preparedness.

1.11 Review and Modification of Safety Requirements. Recognize in the plan that you may be requested to participate in reviewing and modifying safety requirements that are to be implemented by the Government. This review activity will be implemented at the direction of the COR per established contractual procedures.

1.12 Procurement. Identify procedures used to assure that procurements are reviewed for safety and health compliance considerations and that subcontracts contain appropriate safety criteria and instructions. Include authority and responsibility to assure that NASA safety requirements and tasks are clearly stated (flowed down) in subcontracts.

1.13 Certified Professional Resources. Discuss your access to certified professional resources for safety and health protection and discuss their roles in your safety and health program.

WORKSITE ANALYSIS

Worksite analysis identifies hazards and other safety and health threats to employees and valuable assets. As a minimum, analysis will include primarily the following: developing job hazard analyses for its employees; provisions to protect is employees from hazards in their work areas; inspections of the workplace; investigations of mishaps and close calls; and the submission of safety and health data to the Government.

2.1 ANALYSIS OF Worksite Hazards. . Describe how you will rank, process, and mitigate hazards identified by any of the techniques identified per JPR 1700.1 and ensure that all hazards on NASA property, which are immediately dangerous to life or health, are reported immediately to the Safety and Test Operations Division. For administrative contracts, this is covered by a Job Hazard Analysis for office workers. JSC recommends that the Contractor use the office job hazard analysis at https://jsc-sma-missp.jsc.nasa.gov/sites/safety/SH%20%20Hazards/OfficeJHA.pdf to establish its office safety program. The template may be amended as need; Review the Office JHA periodically with contract personnel and update it as needed. Document and track the reviews so that each contract employee’s review is fully demonstrated.

2.1.1 Hazards from nearby operations not in the Contractor’s control. Describe how you will assess nearby hazardous operations for potential threats to its employees and establish controls for their mitigation.

2.2 Industrial Hygiene. Describe your industrial hygiene program and how it will be coordinated with the JSC authorities responsible for industrial hygiene at JSC-administered installations. If you use corporate resources to determine workplace exposures, provide copies of all monitoring data to JSC Occupational Health Branch within 15 days of receipt of results.

2.3 Hazard Identification. Describe the procedures and techniques to compile an inventory of hazards associated with the work to be performed on this Contract to include operations and work environments in the vicinity or in close proximity to Contract operations. Report the results to the Government in a manner suitable for inclusion in facilities baseline documentation as a permanent record of the facility. Specific techniques to be considered include:

a. Comprehensive Survey - A “wall to wall” engineering assessment of the Contractor’s worksite, which includes the Government furnished facilities to be used by the contractor and the immediate vicinity in which contractual work or tasks will be performed. This assessment encompasses facilities, equipment, materials, and processes.

b. Change (Pre-use) Analysis - Typically addresses modifications in facilities, equipment, processes, and materials (including waste); and related procedures for operations and maintenance

c. Hazard Analysis - May address facilities, systems/subsystems, operations, processes, materials (including waste), and specific tasks or jobs. See Chapter 2.3 of JPR 1700.1, "JSC Safety and Health Requirements," for analysis contents (found at https://jschandbook.jsc.nasa.gov/docs/revL/JPR1700-1ch2-3L.pdf.)

2.3.1 Describe the flow of the findings of the comprehensive survey of hazards into hazard analyses and job hazard analyses and subsequently into controls such as design, operations, processes, procedures, performance standards, and training.

2.4 Inspections. Describe how you will inspect all work areas every three months, in conjunction with civil service inspections.

2.4.1 Describe administrative requirements and procedures regularly scheduled inspections of your assigned areas for hazards including coordination of findings with area supervisors, facility managers, and JSC safety and health representatives as needed. Include how you will record completion of inspections in the JSC Building Inspection Tracking System (BITS). Inspections will identify:

a. Hazards and non-conformances

b. Risk assessment to include the severity and probability of an injury, illness, property damage, or environmental damage.

c. Corrective measures or controls implemented to immediately safe the area and to eliminate or control the hazard and schedules for completion.

d. Notification to persons who may be affected by hazards that pose an imminent or significant risk to safety and health of employees, operations, or facilities.

2.4.2 Describe methods to document inspection findings and corrective actions per Chapter 3.5 of JPR 1700.1.

2.5 Protective Equipment - Describe procedures for obtaining, inspecting, and maintaining all appropriate protective equipment, as required, or reference written procedures pertaining to this subject. Include methods for keeping records.

2.6 Employee Reports of Hazards - Identify methods to encourage employee participation in JSC’s Close Call Reporting System to report observed hazardous conditions and events without fear of reprisal. You may implement an internal close call reporting system provided features of JSC’s closed call reporting system are adopted and on-site close call information is included in the JSC closed call tracking system and in a manner that does not unnecessarily inhibit employee participation in JSC’s Close Call Reporting System.

2.7 Accident and Record Analysis

2.7.1 Mishap Reporting and Investigation. Describe your approach to mishap notification and response, reporting, investigating, and correcting negative findings that are discovered in its investigations. See NPR 8621.1 and JPR 1700.1. Include the following key items from https://jsc-sma-missp.jsc.nasa.gov/sites/safety/SH%20%20Hazards/OfficeJHA.pdf https://jsc-sma-missp.jsc.nasa.gov/sites/safety/SH%20%20Hazards/OfficeJHA.pdf https://jschandbook.jsc.nasa.gov/docs/revL/JPR1700-1ch2-3L.pdf

NPR 8621.1 and JPR 1700.1 in the plan:

2.7.1.1 Mishap Notification and Response –Describe how you will ensure prompt notification of mishaps and how it will respond to such notifications. This includes notifying the Safety and Test Operations Division, the Contracting Officer, and the COR immediately under the following circumstances:

a. Fatality, hospitalization, or total or partial permanent disability to one or more persons.

b. Property damage equal to or greater than $500,000.

c. Mishaps involving NASA personnel or NASA property regardless of severity.

d. Any mission failure.

NOTE: The expectation is that employees will notify their managers as soon as possible after a mishap to allow a preliminary investigation to secure the scene, identify witnesses, and to safeguard evidence, personnel or property.

2.7.1.2 Initial Reporting – Describe how you will provide an initial report within 24 hours of the mishap containing basic information that identifies personnel injured, the property damaged or lost, and the name and contact information of the appointing official and investigator.

Use JSC Form (JF) 1627. This report will be required for:

a. All mishaps and “close calls” involving property damage or first aid (as defined by NPR 8621.1) which occur onsite at a JSC-administered establishment. This includes Government owned and contractor operated facilities.

b. All type A and B mishaps at contractor and third party facilities when the mishap is a direct result of work performed on the contract.

c. All type C property damage mishaps at contractor and third party facilities when the mishap is a direct result of work performed on the contract.

2.7.1.3 Preliminary Investigation. Recognize in the plan that the Government may choose to immediately initiate a preliminary investigation including taking custody of the mishap scene and the collection of witness statements as a prelude to a Government investigation. Factual evidence will be made available for the contractor’s investigation at a time to be determined by the Government Investigating authority.

2.7.1.4 Interim Reporting. Describe how you will submit interim reports that bring attention to specific issues such as product safety or performance defects; procedural issues; or other items of an urgent nature requiring an immediate and timely intervention by other parties.

You may use your own format for interim reports.

2.7.1.5 Mishap Investigation. Describe how you will investigate all mishaps incurred while performing contract work as required in JPR

1700.1 and NPR 8621.1. Your final report shall identify which parts of the report are proprietary for business reasons or otherwise controlled for reasons of security. The Government reserves the right to initiate release of the report as specified in NPR 8621.1.

2.7.1.6 Corrective Actions. Describe how you will provide a corrective action plan that is traceable to findings, root causes, contributing factors, and recommendations and specific assignee with estimated completion dates. Include how you will notify the Government of completion dates and changes in the schedule. Indicate actions assignable to the Government or other parties.

2.7.1.7 Lessons Learned. Describe your program for lessons learned suitable for inclusion in the JSC Lessons Learned Database per JPR 2310.1, JSC Organizational Learning Program, and consistent with the areas defined in the statement of work or the work breakdown structure. Lessons learned are intended to prevent recurrence of undesirable events and to allow NASA and its team members to capitalize to the greatest extent practical on unique successes requiring documented insight for retrieval on demand. The program shall include:

a) Program structure and management responsibility for lessons learned and program advocacy throughout the contracted effort.

b) Approach to selecting, reviewing, and validating lessons learned using contract and government assets. Lessons learned usually involve uncommon insight arising from any event or observation that will benefit from sharing with a larger community of interested parties.

c) Approach used to balance trade secret and security imperatives vice government rights in data and the need to capture lessons for publication in Government information systems and processes.

d) The dissemination of lessons learned throughout appropriate NASA programs including the retrieval and dissemination of lessons published in the JSC Lessons Learned Database and the NASA Lessons Learned Information System. Sharing lessons with other Government agencies is also expected.

e) Information on the successful use of retrieved lessons including how they were used, by whom, for what purposed, and implementation detail delivered to the Government as additional recommendations for previously published lessons.

f) Goals for your lessons learned program including schedules, scope, breadth, quality, and quantity of lessons the government can expect as delivered lessons. Appropriate metrics for identification, publication, and dissemination are highly desirable.

g) The approach to the selection of media to be used for of supporting data inclusion with each lesson learned (such as photographs, analyses, diagrams, schematics, drawings, and streamed video.)

h) Submission of Lessons Learned reports with the following content:

1. Subject - one line subject of the lesson.

2. Lesson Learned - usually one sentence that describes insight gained

3. Description of Event - narrative that describes what happened.

4. Recommendations - may be an action plan, suggestion, etc., that was adopted at event source.

5. Supporting documentation – submit as needed to augment understanding of lesson (photographs with or without pointers and text labels), illustrations, drawings, etc.)

6. Contact name and e-mail address (for follow up by Government before publication of lesson).

2.7.2 Trend Analysis – Describe your approach to performing trend analysis of data (occupational injuries and illnesses; facilities, systems, and equipment performance; maintenance findings; etc.). Discuss methods to identify and abate common causes indicated by trend analysis. In support of site-wide trend analysis to be performed by the Government, discuss method of providing the following data:

a. Accident/Incident Summary Report - Accident/Incident Summary Reports as specified on JSC Form 288, “Statistical Information - Contractor Safety and Health Program” as revised. Negative reports that include exposure hours are also required.

b. Log of Occupational Injuries/Illnesses - For each establishment on and off NASA property that performs work on this Contract, deliver, to the Government, a copy of its annual summary of occupational injuries and illnesses (OSHA 300 and OSHA 300A) as described in Title 29, Code of Federal Regulations, Subpart 1904.5 If you are exempt by regulation from maintaining and publishing such logs, data equivalent to the OSHA log is acceptable.

HAZARD PREVENTION AND CONTROL

Once hazards are identified, they must be eliminated or controlled to lessen the risk to personnel, facilities, and the work environment. This section builds on worksite analysis described in section 2.0 above.

3.1 Describe your approach to eliminating or controlling Identified hazards. In the multiple employer environment of the Center, certain hazards and corrective actions must be collected in a Center wide information system Hazard Abatement Tracking System (HATS) for risk management purposes.

3.2 Appropriate Controls. Discuss approach to consideration and selection of controls as described in chapters 3.2 and 3.5 of JPR 1700.1.

3.3 Hazardous Operations and Processes. Describe methods for notification of personnel when hazardous operations and processes are to be performed in their facilities or when hazardous conditions are found to exist during the course of this Contract. Use JPR 1700.1 as a guide for defining, classifying, and prioritizing hazardous operations. Determine if any hazardous process meet the criteria of 29 CFR

1910.119. If so, follow the requirements of 29 CFR 1910.119. Otherwise, use it as a guide for hazardous processes. Develop and maintain a list of hazardous operations and processes to be performed during the life of this Contract. Provide the list of hazardous operations and processes to the Government as part of the plan for review and approval.

3.3.1 Describe how you will develop a schedule to write procedures with particular emphasis on identifying the job safety steps required, before hazardous operations or processes begin. Recognize that NASA will have access on request to any Contractor data necessary to verify implementation.

3.3.2 Describe how you will identify the operations or processes that may have safety or health implications outside Contract operations.

The Safety and Test Operations Division or Occupational Health Branch will provide additional instructions for further NASA management review and approval.

3.4 Written Procedures. Describe methods to assure that written procedures, which include appropriate hazard controls, are developed for all hazardous operations, including testing, maintenance, repairs, and handling of hazardous materials and hazardous waste. Include how you will ensure that procedures aree readily available to personnel as required to correctly perform their duties.

3.5 Hazardous Operations Permits. Identify facilities, operations or tasks where hazardous operations permits will be required as specified in JPR 1700.1 such as confined space entry, hot work, etc and how you will adhere to established NASA JSC procedures.

3.6 Operations Involving Potential Asbestos Exposures. Describe method to assure compliance with JSC Asbestos Control Program as established in JPR 1700.1, as revised.

3.7 Operations Involving Exposures to Toxic or Unhealthful Materials. Describe how you will ensure that these operations are evaluated by the JSC Occupational Health Branch and are properly controlled as advised. Include notification of JSC Occupational Health Branch before starting any new or modified operation potentially hazardous to health.

3.8 Baseline Documentation. Discuss your responsibilities for maintaining facilities baseline documentation per Chapter 10.4 of JPR 1700.1.

3.9 Preventive Maintenance. Discuss your approach to preventive maintenance. Describe scope, frequency, and supporting rationale for your preventive maintenance program including facilities or equipment to be emphasized or de-emphasized.

3.10 Medical (Occupational Healthcare) Program. Discuss implementation of JSC’s “Clinic First” policy when on site per JPR 1700.1, Chapter 3.6. Include return to work policies and the use of Government provided medical and emergency facilities for the initial treatment of occupational injuries & illnesses. Discuss your approach to Cardiopulmonary Resuscitation (CPR), Automatic External Defibrillator (AED), first aid, and, return to work policies and the use of Government provided medical and emergency facilities for the initial treatment of occupational injuries and illnesses.

3.10.1 Discuss your medical surveillance program to evaluate personnel and workplace conditions to identify specific health issues and prevent degradation of personnel health as a result of occupational exposures. The program must comply with JPR 1700.1, Chapter 3.6.

3.11. Hazard Correction and Tracking. Discuss your system for correcting and tracking safety, health, and environmental hazards with particular emphasis on integration with JSC’s Hazard Abatement Process (found on line athttps://jsc-sma-missp.jsc.nasa.gov/sites/safety/SH%20%20Haz%20Process/Home.aspx). (The scope is restricted to establishments at JSC, Sonny Carter Training Facility, and Ellington Field.) This includes the following:

3.11.1 Personnel Awareness of Hazards. Discuss your approach to communicate unsafe conditions and approved countermeasures to your employees, the Government, and other Contractors whose personnel may be exposed to these unsafe conditions.

3.11.2. Interim and Final Abatement Plans. Describe how you will approach interim and final abatement of hazards. Describe how you will provide data to the JSC HATS for all hazards within Contractor-occupied facilities that are not finally abated (all interim and final abatement actions completed) within 30 days of discovery. Include the use of JSC Form 1240, “JSC Notice of Safety or Health and Action Plan”, or equivalent.

3.12 Disciplinary System. Describe your system for ensuring safety and health discipline in your personnel (including subcontractors).

Describe your approach to modifying personnel behaviors when personnel are exhibiting unsafe and unhealthful behavior.

3.13 Emergency Preparedness. Discuss your approach to emergency preparedness and contingency planning which addresses fire, explosion, inclement weather29 CFR 1910.120 (HAZWOPER); and local, regional, and national incidents at JSC as described in JPR 1040.4, JSC Emergency Preparedness Plan. Address how you will protect employees and facilities, and how you will notify JSC emergency forces. Include your pre-planning strategies and how they will be implemented through procedures, training, drills, etc. Identify your methods and schedules to verify emergency readiness. Describe how your employees will be able to locate and be knowledgeable in appropriate emergency action plans. Discuss methods to verify emergency readiness and communicate with employees after an evacuation.

Note: As a minimum, evaluate credible potential emergencies your employees will face, which will include emergencies such as fire evacuations, weather emergencies, workplace violence. Also consider potential of emergencies from nearby operations or emergencies in other areas that your employees routinely visit.

SAFETY AND HEALTH TRAINING

Employees (including management and supervisors) must be trained on the responsibilities to protect themselves and the facilities and operations in which they work. The results of worksite analyses and hazard prevention and control feed the resulting training programs.

Timely feedback from trainees is critical to ongoing improvement of training material and course content.

4.1 Describe your training program including identification of responsibility for training employees to assure understanding of safe work practices, hazard recognition, and appropriate responses for protective or emergency countermeasures, including training to meet Federal, State, and Local regulatory requirements.

4.2 Describe your approach to identifying training needs including traceability to exercises such as job safety analyses, performance evaluation profiles, hazard analyses, mishap investigations, trend analyses, etc. Discuss your approach to written exams (a NASA requirement) and other methods to establish trainee proficiency. Include your approach to ensure that training is retained and practiced.

4.3 Describe your approach to training personnel in the proper use and care of personal protective equipment (PPE).

4.4 Discuss tailoring of training toward specific audiences (management, supervisors, and employees) and topics (safety orientation for new hires, specific training for certain tasks or operations).