Drawings-Volume 3.pdf

PDF 26 MB Posted

Attached to
EWEB ITB 25-025-PW Construction Load Bank Station
Solicitation number
S-P00140-00012836
Issued by
Lake County, Oregon

About this file

The provided file appears to be "Drawings-Volume 3.pdf" related to EWEB (Eugene Water & Electric Board) ITB 25-025-PW Construction Load Bank Station project. However, there seems to be a discrepancy between the file name and the project description, as the description discusses fish passage facilities at Trail Bridge dam and reservoir on the McKenzie River, while the file name references a Load Bank Station construction project. Without access to the actual contents of the PDF document, I cannot provide specific details about the drawings or technical specifications contained within.

The project as described in the contract opportunity requires engineering, design, and related services for both upstream and downstream fish passage facilities at Trail Bridge dam and reservoir, located approximately 70 miles east of Eugene, Oregon. Bidders must meet minimum qualifications for both the primary contractor and specialty sub-contractors as specified in the bid packages.

View the file

Other files

File Type Posted
Notice of Intent to Award-all bidders~7.pdf PDF
25-025-PW Carmen Load Bank Construction ITB.pdf PDF
Addendum 1~22.pdf PDF
Drawings-Volume 2.pdf PDF
Drawings-Volume 1.pdf PDF
25-025-PW Carmen Load Bank Construction ITB~1.pdf PDF
Procurement Information~60.docx DOCX document
Bid Tab~18.pdf PDF
Load_Bank_Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .