Drawings_TMS_Boilers.pdf
PDF 2 MB Posted
- Solicitation number
- RFP - LIS - 240000000598
- Issued by
- Lenawee County, Michigan
About this file
This document is a Drawings and Specifications package related to a boiler replacement project for the Tecumseh Public Schools Middle School located in Tecumseh, Michigan. The project involves the replacement of two existing boilers serving the heating hot water system with two new 2750 MBH boilers, including replacement of associated boiler circulation pumps, lead/lag pumps, and miscellaneous equipment. Additionally, the project includes the replacement of one domestic water heater and associated circulation pumps and piping. Contractors are required to submit shop drawings for review and approval prior to purchasing equipment. The project also requires obtaining necessary permits and completing project closeout documentation.
The pricing and bidding terms are not provided in this document. However, the solicitation for this project is a Request for Proposals (RFP) issued by Tecumseh Public Schools, which is located in Lenawee County, Michigan. Contractors will need to review the full RFP document to understand any set-asides, funding requirements, and other salient bidding information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_-_Middle-School_-_Boiler_Replacement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES
1. ALL WORK MUST COMPLY WITH THE REQUIREMENTS OF LOCAL CODES AND
ORDINANCES. WHERE INSPECTIONS ARE REQUIRED BY AUTHORITIES HAVING
JURISDICTION, WORK WILL NOT BE CONSIDERED COMPLETE UNTIL TESTED, INSPECTED,
AND ACCEPTED.
2. DRAWINGS ARE BASED ON AVAILABLE DOCUMENTS, SITE INSPECTION AND DESIGN
EXPERIENCE. DRAWINGS MAY NOT REFLECT A COMPLETE AS BUILT CONDITION.
CONTRACTOR TO FIELD VERIFY.
3. DRAWINGS DIAGRAMMATICALLY INDICATE THE GENERAL WORK SCOPE BUT DO NOT
PROVIDE EXACT SCALE OR LOCATIONS. PROPER INSTALLATION OF ALL SYSTEMS, AFTER
COORDINATION WITH OTHER TRADES, IS THE CONTRACTORS RESPONSIBILITY.
4. CONTRACTOR SHALL USE BID WALK-THROUGH AND FIELD OBSERVATIONS TO ENHANCE
PROJECT UNDERSTANDING BEFORE BIDDING ON PROJECT.
5. ALL CONTRACTORS TO REVIEW DRAWINGS AND SPECIFICATIONS TO UNDERSTAND THE
SCOPE OF WORK FOR THEIR DISCIPLINE.
6. NO DEMOLITION SHALL TAKE PLACE WITHOUT APPROVAL FROM THE OWNER'S
REPRESENTATIVE.
7. ALL UTILITY SHUTDOWNS ARE TO BE SCHEDULED WITH OWNER'S REPRESENTATIVE
MINIMUM 24 HOURS IN ADVANCE.
8. TEMPORARY REMOVAL OF ANY AND ALL EXISTING MISCELLANEOUS ITEMS (I.E. CONDUIT,
PIPING, LIGHTING, ETC.) FOR THE PURPOSE OF PERFORMING THIS WORK SHALL BE
REINSTALLED BACK TO PRE-CONSTRUCTION LEVEL AS PART OF THIS PROJECT. NO
ADDITIONAL FEES WILL BE AWARDED.
9. CONTRACTOR TO TEMPORARILY SUPPORT ALL DUCTWORK, PIPING, CONDUIT, ETC.
DURING THE DEMOLITION AND CONSTRUCTION PHASES.
10. CONTRACTOR TO PROTECT ALL PIPING, PIPE INSULATION, CONDUITS, FIRE SPRINKLERS, AND OTHER MISCELLANEOUS ITEMS DURING THE DEMOLITION PHASE. ANY DAMAGE
RESULTING FROM THE CONTRACTOR'S OPERATIONS MUST BE REPAIRED OR REPLACED
WITH EQUAL AND TO THE OWNER'S SATISFACTION AND AT NO ADDITIONAL COST.
11. EQUIPMENT INDICATED ON THE CONSTRUCTION DOCUMENTS, TOGETHER WITH ITS BASE
AND/OR SUPPORT, DUCTWORK, ROOF OPENINGS, ELECTRICAL SERVICE, REFRIGERANT
PIPING, AND HEATING HOT WATER ARE BASED ON THE MAKE AND MODEL INDICATED IN
THE EQUIPMENT SCHEDULE. SHOULD AN EQUIVALENT ALTERNATE MAKE OF EQUIPMENT
BE SELECTED, EVEN IF APPROVED BY THE OWNER AS EQUAL, COORDINATE AND MAKE
THE MODIFICATIONS IN THE WORK WITH NO CHANGE IN THE CONTRACT AMOUNT.
12. UNLESS OTHERWISE SHOWN ON CONSTRUCTION DOCUMENTS OR SPECIFIED HEREIN,
PRODUCTS USED IN THE WORK SHALL BE INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS AND RECOMMENDATIONS. ANY
CHANGES OR MODIFICATIONS PROPOSED WHICH ARE BELIEVED TO IMPROVE THE
INSTALLATION SHALL BE APPROVED BY THE OWNER AND/OR ITS REPRESENTATIVE.
13. MAINTAIN SECURITY, LIFE SAFETY, FIRE AND SMOKE CONSTRUCTION INTEGRITY, FIRE
ESCAPES AND EGRESS PATHS AT ALL TIMES.
14. REFER TO CONTRACT DOCUMENTS AND PROJECT SPECIFICATIONS FOR ADDITIONAL
SCOPE AND INFORMATION.
15. SAFETY STANDARDS DICTATE THAT LIFTING OF EQUIPMENT ON THE ROOF OR IN THE
SPACE MUST BE DONE WHEN THERE ARE NO PERSONNEL PRESENT IN THE SPACE.
16. CONTRACTOR WILL BE RESPONSIBLE FOR REPAIRING ANY AND ALL DAMAGE CAUSED BY
CRANE AND/OR EQUIPMENT USED DURING LIFTING PROCESS AND/OR CAUSED DURING
CONSTRUCTION PROCESS.
17. CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING A COMPLETE AND WORKING
SYSTEM.
18. CONTRACTOR IS RESPONSIBLE FOR FINAL CLEANING OF PROJECT AREA(S).
19. PROVIDE ALL REQUIRED ACCESSORIES, INCLUDING MISCELLANEOUS SUPPORT STEEL,
REQUIRED FOR PROPER INSTALLATION.
20. CONTRACTOR SHALL PROVIDE SUBMITTALS ON ALL EQUIPMENT FOR APPROVAL BEFORE
PURCHASING.
21. PROTECT BUILDING FROM DUST MIGRATION USING APPROPRIATE SEALED BARRIERS TO
SEPARATE AND SEGREGATE CONSTRUCTION AREAS FROM ACTIVE TENANT AREAS
INCLUDING SHARED CEILING PLENUMS AND MECHANICAL SYSTEMS.
22. ALL PIPING TO BE SUPPORTED IN ACCORDANCE WITH ANSI/MSS SP-58 (2015 MICHIGAN
MECHANICAL CODE, SECTION 305).
PROJECT DESCRIPTION
THIS PROJECT INVOLVES THE REPLACEMENT OF TWO EXISTING BOILERS SERVING THE HEATING
HOT WATER (HHW) SYSTEM WITH TWO NEW 2750 MBH BOILERS. THE ASSOCIATED BOILER
CIRCUATION PUMPS AND LEAD/LAG PUMPS SERVING THE HHW WATER SYSTEM SHALL BE
REPLACED AND MISCELLANEOUS ASSOCIATED EQUIPMENT IN KIND. REPLACEMENT OF ONE
DOMESTIC WATER HEATER AND ASSOCIATED CIRCULATION PUMPS AND PIPING.
SCOPE OF WORK
THE FOLLOWING OUTLINES THE SCOPE OF WORK FOR EACH DISCIPLINE:
ARCHITECTURAL:
1. PATCH/REPAIR HOUSEKEEPING PADS FOR EQUIPMENT.
2. PATCH/REPAIR AND FLASH OF DEMO/NEW PENETRATIONS AFFECTED BY NEW
INSTALLATIONS.
MECHANICAL:
1. BOILER SYSTEMS:
A. REPLACEMENT OF EXISTING HHW BOILERS WITH NEW.
B. REPLACEMENT BREECHING FROM BOILERS.
C. REPLACEMENT OF HHW PUMPS AND ASSOCIATED PIPING.
D. REPLACEMENT OF AIR SEPERATOR AND SHOT FEEDER.
E. NEW COMBUSTION AIR OPENINGS.
F. REMOVAL OF ABANDONED EQUIPMENT.
F. ADD MODULATING OPPOSED BLADE DAMPER TO OUTISDE AIR LOUVER.
2. DOMESTIC WATER HEATER:
A. REMOVE ABANDONED WATER HEATER.
B. REPLACEMENT OF EXISTING WATER HEATER WITH NEW.
C. REPLACEMENT OF ASSOCIATED EXISTING HOT WATER CIRCULATION PUMPS AND
ASSOCIATED VALVES, SENSORS, AND PIPING.
F. REMOVAL OF ABANDONED EQUIPMENT.
3. PIPING SYSTEMS:
A. HEATING HOT WATER PIPING
B. DOMESTIC HOT WATER
C. DOMESTIC COLD WATER
D. NATURAL GAS
F. REMOVAL OF ABANDONED EQUIPMENT.
ELECTRICAL:
1. REMOVAL OF AND CONNECTION TO PUMPS AND BOILERS. ADDITION OF LOUVER DAMPER
ACTUATOR POWER.
2. PROVISION OF CONDIUT AND WIRE FOR EPO SYSTEM.
3. REMOVAL OF MISCELLEANEOUS ABANDONED EQUIPMENT IN THE BOILER ROOM.
4. PROVISION OF LOCAL DISCONNECTING MEANS FOR REPLACED EQUIPMENT.
TESTING AND BALANCING:
1. PERFORM A PRE-BALANCE/POST-BALANCE OF SYSTEMS SERVING THE AREA OF
CONSTRUCTION PRIOR TO THE START OF WORK.
2. PERFORM A POST-BALANCE OF SYSTEMS SERVING THE AREA OF CONSTRUCTION.
PROJECT CLOSE OUT DOCUMENTS
CONTRACTOR SHALL PROVIDE A COPY OF THE FOLLOWING CLOSE OUT DOCUMENTS:
• APPROVED ELECTRICAL, MECHANICAL AND FIRE ALARM CERTIFICATES
• AS-BUILTS/FOR RECORD DRAWINGS NOTING DEVIATIONS FROM CONSTRUCTION
DOCUMENTS
• ALL O&M MANUALS (ELECTRONIC AND PAPER COPY)
• UPDATED, TYPED PANELBOARD DIRECTORY IN ALL AFFECTED ELECTRICAL PANELS
• DOCUMENTATION OF FACTORY START UP AND OWNER TRAINING FOR ALL MEP
EQUIPMENT
• WARRANTIES/WARRANTY CONTACT LIST WITHIN O&M MANUAL.
SHUTDOWNS
• CONTRACTORS ARE ALSO ADVISED THAT OWNER WILL REMAIN OPERATIONAL DURING
CONSTRUCTION HOURS.
• COORDINATE AND SCHEDULE ANY SHUTDOWNS AND HEAVY NOISE GENERATING
ACTIVITIES WITH OWNER PERSONNEL AT LEAST 24 HOURS PRIOR TO IMPLEMENTING TO
ALLOW TIME FOR COORDINATION.
• LIFE SAFETY SYSTEM SHUTDOWNS (AND STARTUPS) SHALL BE COORDINATED WITH
OWNER PERSONNEL, AND LOCAL FIRE AUTHORITIES AND CENTRAL STATION MONITORING
SERVICES (IF APPLICABLE).
• LIFE SAFETY SYSTEMS SHALL BE IN OPERATION DURING OCCUPIED AND UNOCCUPIED
(I.E. NIGHT, WEEKEND, AND HOLIDAY) TIMES. PROVIDE FIRE WATCH DURING ALL TIMES
THAT THE FIRE SUPPRESSION SYSTEM AND/OR FIRE ALARM CONTROL PANEL (FACP) IS
DEACTIVATED.
SHOP DRAWING FOR REVIEW
CONTRACTOR SHALL SUBMIT THE FOLLOWING SHOP DRAWINGS FOR REVIEW AND
APPROVAL FROM ENGINEER PRIOR TO PURCHASING:
• 22 11 23 DOMESTIC WATER PUMPS
• 22 30 00 PLUMBING EQUIPMENT
• 23 05 00 OWNER TRAINING AGENDA
• 23 05 13 MOTORS
• 23 05 93 TESTING, ADJUSTING, AND BALANCING
• 23 07 19 HVAC PIPE INSULATION
• 23 09 13 INSTRUMENTATINO
• 23 21 23 HVAC PUMPS
• 23 51 00 PREFABRICATED STACKS
• 23 52 16 CONDENSING BOILERS
• 26 27 26 WIRING DEVICES
• 26 28 16 DISCONNECT SWITCHES AND CIRCUIT BREAKERS
• 26 29 13 MOTOR CONTROLLERS
HAZARDOUS MATERIALS NOTE
THIS PROJECT AREA MAY CONTAIN HAZARDOUS MATERIALS. IF THE CONTRACTOR SHOULD
ENCOUNTER ANY ITEMS SUSPECTED TO CONTAIN ASBESTOS, LEAD, OR MERCURY, CONTACT
THE PROJECT CONSTRUCTION MANAGER IMMEDIATELY FOR DIRECTION. DO NOT DISTURB
THE MATERIAL IN ITS LOCATION. PROJECT CONSTRUCTION MANAGER SHALL COORDINATE
REMOVAL OF ANY ITEMS SUSPECTED OF CONTAINING HAZARDOUS MATERIALS. REMOVAL
OF HAZARDOUS MATERIALS SHALL BE IN ACCORDANCE WITH EPA REQUIREMENTS AS WELL
AS REQUIREMENTS OF ANY OTHER AGENCIES WITH JURISDICTION OVER SUCH WORK.
PROJECT DIRECTORY
OWNER: 760 BROWN STREET
TECUMSEH, MI
PROJECT MANAGER: DALE NEITHAMMER
201 S. ANN ARBOR STREET
SALINE, MI, 48176
EMAIL: DALE.W.NEITHAMMER@IMEGCORP.COM
ENGINEER: IMEG
33533 W. TWELVE MILE
SUITE 200
FARMINGTION HILLS, MI 48331
P: 248.344.2800 F: 248.344.1650
SCOTT RAY
(248)255-4397
EMAIL: SCOTT.A.RAY@IMEGCORP.COM
NATHAN LOWRY
(513)782-4943
EMAIL: NATHANIEL.S.LOWRY@IMEGCORP.COM
ALTERNATE
CONTRACTOR SHALL PROVIDE ALTERNATE COST FOR CLEAVER BROOKS BOILER MODEL
CFC-E3000 AND ASSOCICATE COMPONENTS TO MAKE A FULLY OPERATIONAL SYSTEM.
IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,
TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING
AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND
SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT
WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
IMEG CORP. ©2023 IMEG CORP.
REF. SCALE IN INCHES
0 1 2 3
33533 W. TWELVE MILE
SUITE 200
FARMINGTON HILLS, MI 48331
P: 248.344.2800 F: 248.344.1650
The FUTURE. Built Smarter www.imegcorp.com
KEY PLAN
AGENCY APPROVAL
REVISIONS
PROFESSIONAL SEAL
CONSULTANT
No. Date Revision / Issue
DISCLAIMER
SHEET INFORMATION
Date
Project #
Drawn
Checked
Approved
SHEET TITLE
SCALE
SHEET NUMBER
Issue
PROJECT #23003104.00
AS INDICATED
/2
/2
:1 :2
P
M
760 BROWN STREET
TECUMSEH, MI 49286
Tecumseh MS Boiler Replacement
T001
TITLE SHEET
JC
JC
SK/JS/SR
23003104.00
T e c u m s e h
M S
B o il e r
R e p la c e m e n t .0
TECUMSEH MS BOILER
REPLACEMENT
TECUMSEH, MI
PERMITS
MECHANICAL SHEET INDEX
M000 HVAC COVERSHEET - PP, V
M201 BASEMENT PLAN - PIPING
M202 BASEMENT PLAN - HVAC
M210 LEVEL 01 PLAN - MECHANICAL
M400 MECHANICAL DETAILS
M500 MECHANICAL DIAGRAMS
M501 CONTROLS DIAGRAMS
M600 MECHANICAL SCHEDULES
M800 MECHANICAL SPECIFICATIONS
M801 MECHANICAL SPECIFICATIONS
M802 MECHANICAL SPECIFICATIONS
M803 MECHANICAL SPECIFICATIONS
GRAND TOTAL: 12
ELECTRICAL SHEET INDEX
E000 ELECTRICAL COVERSHEET
E200 BASEMENT PLAN - POWER AND SYSTEMS
GRAND TOTAL: 2
GENERAL SHEET INDEX
T001 TITLE SHEET
G001 GENERAL PHOTO DEMOLITION
GRAND TOTAL: 2
1 08-03-23 OWNER REVIEW
2 08-16-23 ISSUED FOR BIDS
3 10-03-23 PERMITS
NO SCALE
AERIAL VIEW
N
O R HT
SITE LOCATION
NO SCALE
PROJECT LOCATION
N
O R HT
PERMITS
10-03-23
Scott.A.Ray Text Box 10-03-23
IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,
TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING
AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND
SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT
WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
IMEG CORP. ©2023 IMEG CORP.
REF. SCALE IN INCHES
0 1 2 3
33533 W. TWELVE MILE
SUITE 200
FARMINGTON HILLS, MI 48331
P: 248.344.2800 F: 248.344.1650
The FUTURE. Built Smarter www.imegcorp.com
KEY PLAN
AGENCY APPROVAL
REVISIONS
PROFESSIONAL SEAL
CONSULTANT
No. Date Revision / Issue
DISCLAIMER
SHEET INFORMATION
Date
Project #
Drawn
Checked
Approved
SHEET TITLE
SCALE
SHEET NUMBER
Issue
PROJECT #23003104.00
AS INDICATED
/2
/2
:1 :0
P
M
760 BROWN STREET
TECUMSEH, MI 49286
Tecumseh MS Boiler Replacement
G001
GENERAL PHOTO DEMOLITION
JC
JC
SK/JS/SR
23003104.00
T e c u m s e h
M S
B o il e r
R e p la c e m e n t .0
1 08-03-23 OWNER REVIEW
2 08-16-23 ISSUED FOR BIDS
3 10-03-23 PERMITS
1 PHOTO 1
NO SCALE 2 PHOTO 2
NO SCALE 3 PHOTO 3
NO SCALE
4 PHOTO 4
NO SCALE 5 PHOTO 5
NO SCALE 6 PHOTO 6
NO SCALE
7 PHOTO 7
NO SCALE 8 PHOTO 8
NO SCALE 9 PHOTO 9
NO SCALE
GENERAL NOTES:
1. ALL ABANDONED EQUIPMENT SHALL BE
DEMOLISHED. ASSOCIATED PIPING, DUCTWORK,
AND ELECTRICAL CONNECTIONS SHALL BE
REMOVED BACK TO SOURCE.
2. IMAGES OF EXISTING/ABANDONED EQUIPMENT ARE
SHOWN TO ASSIST CONTRACTOR. NOT ALL
EQUIPMENT TO BE REMOVED SHOWN.
3. CONTRACTOR SHALL VERIFY WITH OWNER
ABANDONED EQUIPMENT FOR REMOVAL PRIOR TO
COMMENCEMENT OF WORK.
4. CONTRACTOR SHALL FILL, PATCH, AND PAINT
AREAS OF DAMAGE CAUSED BY REMOVAL OF
EQUIPMENT.
KEYNOTES:
1. DEMOLISH ABANDONED EQUIPMENT AND
ASSOCIATED PIPING, DUCTWORK, AND ELECTRICAL
CONNECTIONS BACK TO SOURCE.
2. DEMOLISH AND REPLACE. REFER TO PLANS FOR
ADDITIONAL INFORMATION.
3. RECEPTACLE SUPPLYING SUMP PUMP IS EXISTING
TO REMAIN.
4. REMOVE ABANDONED CONDUITS. CUT FLUSH WITH
FLOOR AND CAP.
5. VERIFY DISCONNECT AND STARTER ARE
ABANDONED PRIOR TO REMOVAL.
PERMITS
C
1. ALIGN TEMPERATURE SENSORS WITH LIGHT SWITCHES AND WHEN IN CLOSE PROXIMITY TO
EACH OTHER.
2. PROVIDE ACCESS DOORS AT ALL DUCT MOUNTED EQUIPMENT.
3. CONTRACTOR MAY REUSE PORTIONS OF EXISTING DUCT PROVIDED SIZES AND PRESSURE
CLASSES ARE CORRECT, DUCT IS THOROUGHLY CLEANED AND FREE OF DEFECTS, AND ALL
TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS ARE SEALED
AS SPECIFIED FOR NEW DUCTWORK.
VENTILATION GENERAL NOTES:
1. THE SIZE OF BRANCH PIPING TO TERMINAL HEATING DEVICES AND COILS SHALL BE 3/4"
UNLESS NOTED OTHERWISE.
2. PIPE DRAIN LINES FROM EQUIPMENT TO NEAREST FLOOR DRAIN.
PIPING GENERAL NOTES:
MECHANICAL GENERAL NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO,VENTILATION, PIPING AND TEMPERATURE CONTROL.
1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
ACCESS.
5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
EXPENSE TO OTHERS.
6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
DESIGN.
7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY
AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING
MOUNTED DEVICES, OTHER THAN SPRINKLERS.
8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
FINISH.
9. SEAL ALL WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING, AND
DUCTS PENETRATE.
10. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,
PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE
TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS
WITHIN ROOMS.
11. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED
OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL
RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.
12. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
PIPING, DUCTWORK, ETC.
13. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.
14. MAINTAIN A MINIMUM WORKING CLEARANCE OF 3’-6” IN FRONT OF ALL ELECTRICAL
EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDING BUT NOT
LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONTROL CENTERS,
TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS.
15. MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THE WIDTH / DEPTH
OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6’-0” ABOVE THE
EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEMS FOREIGN TO
THE ELECTRICAL DISTRIBUTION SYSTEM ARE NOT ALLOWED IN THE DEDICATED
ELECTRICAL SPACE INCLUDING: DUCTWORK, PIPING, ETC.
16. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL
EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.
17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER
NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE
CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.
MECHANICAL RENOVATION NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO,VENTILATION, PIPING AND TEMPERATURE CONTROL.
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD
SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND
REPORT ANY CONFLICTS BEFORE PROCEEDING.
2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS
BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.
3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE
FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD
CONDITIONS.
4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF THEIR WORK AND
SHALL NOTIFY THE ARCHITECT/ENGINEER PRIOR TO BIDDING IF OTHER UTILITIES ARE
REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO THEIR AREA OF WORK.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF
ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.
CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING] [EACH
CONTRACTOR SHALL CUT AND PATCH ROOFS, WALLS, AND FLOORS ASSOCIATED WITH
THEIR WORK.
6. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH
NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL
EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT
DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL
SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.
7. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING
CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT
REMAIN ACTIVE.
8. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY
REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW
SYSTEMS ARE INSTALLED.
9. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR
TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND
CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY
DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.
10. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT
THAT HAS BEEN REMOVED.
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
VIEW NAME
1/8" = 1'-0"
M101
SIMSIM
INDICATES SIMILAR DETAIL REFERENCED
IN MULTIPLE LOCATIONS
LEVEL NAME
10'-0" HEIGHT ABOVE
PROJECT 0'-0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
N
O R HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
LINE TYPE AND TAG KEY:
NEW WORK BY THIS CONTRACTOR (WIDE LINE)
NEW
EXISTING TO BE REMOVED (SHORT DASHED PATTERN)
NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)
EXISTING
EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)
EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
HALFTONING DOES NOT MODIFY SCOPE.
'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING
TAG-1 UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL
INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST
INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL
T101
BUILDING CODE: 2015 MICHIGAN BUILDING CODE
2015 MICHIGAN REHABILITATION CODE
PLUMBING CODE: 2018 MICHIGAN PLUMBING CODE
MECHANICAL CODE: 2015 MICHIGAN MECHANICAL CODE
ELECTRICAL CODE: 2017 NATIONAL ELECTRICAL CODE (NEC)
LIFE SAFETY CODE: NFPA 101 2012 EDITION
ENERGY CONSERVATION CODE: IECC 2015
2015 MICHIGAN ENERGY CODE
LOCAL BUILDING CODE: CURRENT EDITION
APPLICABLE CODES
CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS
INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING:
TEMPERATURE CONTROLS CONTRACTORT.C.C.
SECURITY CONTRACTORS.C.
FIRE PROTECTION CONTRACTORF.P.C.
HEATING CONTRACTORH.C.
PLUMBING CONTRACTORP.C.
GENERAL CONTRACTORG.C.
MECHANICAL CONTRACTORM.C.
VENTILATION CONTRACTORV.C.
ELECTRICAL CONTRACTORE.C.
CONTRACTOR ABBREVIATION KEY
ABBR: DESCRIPTION:
TECHNOLOGY CONTRACTORT.C.
CONSTRUCTION MANAGERC.M.
HVAC ABBREVIATION KEY
ABBR: DESCRIPTION:
AD ACCESS DOOR
ABOVE FINISHED FLOORAFF
NOT IN CONTRACTNIC
EA EXHAUST/RELIEF AIR
OA OUTSIDE AIR
RA RETURN AIR
SA SUPPLY AIR
UC-1 DOOR UNDERCUT BY OTHERS (1" TYPICAL)
TYPICALTYP
UON UNLESS OTHERWISE NOTED
NORMALLY CLOSEDN.C.
NORMALLY OPENN.O.
PRESSURE SWITCHPS
MIXING VALVEMV
CO CLEANOUT
SCCR SHORT CIRCUIT CURRENT RATING
AAV AUTOMATIC AIR VENT
CARBON MONOXIDE SENSOR
TEMPERATURE SENSOR WITH WELL
T
THERMOMETER WITH WELL (DIAL TYPE)T
THERMOMETER WITH WELL (FILLED TYPE)
DIRECTION OF AIR FLOW
MANUAL VOLUME DAMPER
DUCT CAP
DUCT DOWN
DUCT UP
SUPPLY/OUTSIDE AIR DUCT SECTION
RETURN AIR DUCT SECTION
EXHAUST/RELIEF AIR DUCT SECTION
OPPOSED BLADE DAMPER (REFER TO SCHEDULE)
PARALLEL BLADE DAMPER (REFER TO SCHEDULE)
PRESSURE SENSOR/MONITORP
THERMOSTAT/SENSORT
MECHANICAL SYMBOL LIST
SYMBOL: DESCRIPTION:
NOT ALL SYMBOLS MAY APPLY.
CONTROL VALVE (TWO-WAY)
PITCH PIPE IN DIRECTION
DIELECTRIC CONNECTION
UNION/FLANGE
BALANCING VALVE (NUMBER INDICATES GPM)
PIPE CAP
PIPE DOWN
PIPE UP OR UP/DOWN
DIRECTION OF FLOW IN PIPE
SHUTOFF VALVE NORMALLY OPEN
SHUTOFF VALVE NORMALLY CLOSED
THROTTLING VALVE
AUTOMATIC BALANCING VALVE
MIXING VALVE
CONTROL VALVE (THREE-WAY)
SOLENOID VALVE
CHECK VALVE
SAFETY/RELIEF VALVE
PRESSURE REDUCING VALVE (LIQUID/GAS)
TRIPLE DUTY VALVE (ANGLE TYPE)
TRIPLE DUTY VALVE (IN-LINE TYPE)
VACUUM BREAKER
"WYE" - STRAINER
"WYE" - STRAINER W/SHUTOFF VALVE AND HOSE CONNECTION WITH CAP
BASKET STRAINER
FLEXIBLE CONNECTION
PRESSURE/TEMPERATURE TEST PLUG
REDUCER - REFERENCE SPECIFICATION
FOR CONCENTRIC/ECCENTRIC AND FOT/FOB
SUCTION DIFFUSER WITH SUPPORT FOOT
AUTOMATIC AIR VENT
MANUAL AIR VENT
DRAIN VALVE WITH HOSE CONNECTION AND CAP
ALIGNMENT GUIDE
PIPE ANCHOR
BOILER BLOW DOWNBD
BOILER FEED WATERBF
COMPRESSED AIRCA
NATURAL GASG
HEATING WATER RETURNHWR
HEATING WATER SUPPLYHWS
SAFETY RELIEF VENTSV
DRAINDPP
GAS REGULATOR VENTGV
METERM
PUMP
STATIC SWITCH
PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P
PRESSURE SENSOR (FURNISHED WITH BALL VALVE)P
FLOW METER
FM
FLOW SWITCH
F
FS FLOW SENSOR
MECHANICAL SYMBOL LIST
SYMBOL: DESCRIPTION:
NOT ALL SYMBOLS MAY APPLY.
SP
BACKFLOW PREVENTER
PLUMBING ABBREVIATION KEY
FLOOR DRAINFD
HOSE BIBBHB
MIXING VALVEMV
NEUTRALIZATION TANKNT
TRENCH DRAINTD
WATER HEATERWH
VENT THROUGH ROOFVTR
ABOVE FINISHED FLOORAFF
BFP BACKFLOW PREVENTER
NOT IN CONTRACTNIC
ABBR: DESCRIPTION:
TYPICALTYP
UNLESS OTHERWISE NOTEDUON
EXISTINGE
FLOW METERFM
WATER METERWM
SHORT CIRCUIT CURRENT RATINGSCCR
1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.
CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR
FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.
2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO
THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS
RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN
THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES
PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER LISTED IS THE
BASIS OF DESIGN.
3. CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL
APPLICABLE STATE, LOCAL AND GOVERNING AUTHORITIES.
4. ALL FIXTURES SHALL CONFORM TO FEDERAL ACT S.3874
5. VERIFY UNDERGROUND PIPE SIZES, INVERT ELEVATIONS, AND LOCATIONS PRIOR TO
BEGINNING ANY WORK.
6. REFER TO THE PLUMBING ROUGH-IN SCHEDULE FOR THE SIZES OF BRANCH PIPES TO
PLUMBING FIXTURES.
7. FOR CLARITY, NOT ALL VALVES HAVE BEEN SHOWN. PROVIDE SHUTOFF VALVES IN
DOMESTIC WATER PIPING SERVING EACH ROOM WITH FIXTURES. ANGLE STOPS SHALL NOT
BE CONSIDERED SHUTOFF VALVES.
8. EXISTING CONDITIONS ON DEMOLITION PLANS ARE PROVIDED TO INDICATE THE GENERAL
SCOPE OF ITEMS TO BE REMOVED. REFER TO SPECIFICATION SECTION 22 05 05 FOR
ADDITIONAL DEMOLITION INFORMATION.
9. P.C. SHALL CUT AND PATCH EXISTING AS REQUIRED FOR NEW OR DEMOLITION WORK
UNLESS NOTED OTHERWISE. REFER TO SPECIFICATION SECTION 22 05 05 FOR ADDITIONAL
INFORMATION.
PLUMBING GENERAL NOTES:
IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,
TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING
AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND
SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT
WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
IMEG CORP. ©2023 IMEG CORP.
REF. SCALE IN INCHES
0 1 2 3
33533 W. TWELVE MILE
SUITE 200
FARMINGTON HILLS, MI 48331
P: 248.344.2800 F: 248.344.1650
The FUTURE. Built Smarter www.imegcorp.com
KEY PLAN
AGENCY APPROVAL
REVISIONS
PROFESSIONAL SEAL
CONSULTANT
No. Date Revision / Issue
DISCLAIMER
SHEET INFORMATION
Date
Project #
Drawn
Checked
Approved
SHEET TITLE
SCALE
SHEET NUMBER
Issue
PROJECT #23003104.00
AS INDICATED
/2
/2
:1 :0
P
M
760 BROWN STREET
TECUMSEH, MI 49286
Tecumseh MS Boiler Replacement
M000
HVAC COVERSHEET - PP, V
JC
JC
SK/JS/SR
23003104.00
T e c u m s e h
M S
B o il e r
R e p la c e m e n t .0
1 08-03-23 OWNER REVIEW
2 08-16-23 ISSUED FOR BIDS
3 10-03-23 PERMITS
T
UH-E
4"HWS 4"HWS
4"HWS
"G
/4 "H
W S
/4 "H
W R
6"G
6"G UP
/2
"C W
2"CW
H W
C
CW
HW
HWC
C W
C W
BLR-1
4"HWS
4"HWR
4"HWR H
W
C
P-1
WH-1
ET-1
ET-1
ET-2 BLR-2
4"HWR
BCP-2
BCP-1
EXISTING
SUMP
P-2
4"HWR
CP-1
CP-2
SF
AS-1
2 1/2"G
2 1/2"G
9 9
2 2
4"HWR
AAV
4"HWS
H W
L-E
CW
BLR-E BLR-E
WH-E
WH-E
UH-E
AS-E
4"HWS 4"HWS
4"HWS
"G
"H
W R
"H
W S
"H
W S
"H
W R
4"HWS
P-E
P-E
/4 "H
W S
/4 "H
W R
6"G
6"G UP
/2
"C W
2"CW
1 1/2"CW
3/4"CW
3/4"HWS
3/4"HWS
BCP-E BCP-E
H W
C H
W C
C W
CW
HW
HWC
C W
CW
C W
CW
ET-1
ET-2
SF-E
4"HWR 4"HWR
4"HWR
D4
D3 D1 D2
D1
D2
4"HWR
4"HWS
D2
D7
D7
D6
D6
EXISTING
SUMP
D6
PHOTOS 1-3 ON
SHEET G001
PHOTO 6
SHEET G001
EXISTING BOILER
EMERGENCY SHUT
DOWN
EXISTING BOILER
EMERGENCY SHUT
DOWN
PHOTO 7
SHEET G001
D6
PHOTO 6
SHEET G001
D5 D5
PHOTO 5
SHEET G001
L-E
IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,
TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING
AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND
SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT
WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
IMEG CORP. ©2023 IMEG CORP.
REF. SCALE IN INCHES
0 1 2 3
33533 W. TWELVE MILE
SUITE 200
FARMINGTON HILLS, MI 48331
P: 248.344.2800 F: 248.344.1650
The FUTURE. Built Smarter www.imegcorp.com
KEY PLAN
AGENCY APPROVAL
REVISIONS
PROFESSIONAL SEAL
CONSULTANT
No. Date Revision / Issue
DISCLAIMER
SHEET INFORMATION
Date
Project #
Drawn
Checked
Approved
SHEET TITLE
SCALE
SHEET NUMBER
Issue
PROJECT #23003104.00
AS INDICATED
/2
/2
:1 :1
P
M
760 BROWN STREET
TECUMSEH, MI 49286
Tecumseh MS Boiler Replacement
M201
BASEMENT PLAN - PIPING
JC
JC
SK/JS/SR
23003104.00
T e c u m s e h
M S
B o il e r
R e p la c e m e n t .0
N O R
HT
1/4" = 1'-0"
BASEMENT PLAN - PIPING
N O R
HT
1/4" = 1'-0"
BASEMENT DEMOLITION PLAN - PIPING
GENERAL NOTES:
1. CONTRACTOR SHALL MAINTAIN/RECONNECT
HWS/R PIPING CONNECTIONS TO EXISTING
UNIT HEATERS SERVED FROM HWS/R SYSTEM.
2. CONTRACTOR SHALL MAINTAIN AND
RECONNECT NATURAL GAS VENTING OFF OF
FIXTURES NOT BEING DEMOLISHED.
DEMOLITION KEYNOTES:
1. DEMOLISH EXISTING BOILER AND ASSOCIATED
EQUIPMENT FROM HEATING HOT WATER
SYSTEM. REFER TO PLANS FOR ADDITIONAL
INFORMATION.
2. DEMOLISH EXISTING PUMP ASSOCIATED
PIPING AND ELECTRICAL BACK TO SOURCE.
3. DEMOLISH EXISTING AIR SEPARATOR.
4. DEMOLISH EXISTING POT FEEDER.
5. DEMOLISH EXISTING BOILER GAS TRAIN, AND
ISOLATE GAS LINE AS SHOWN.
6. DEMOLISH ABANDONED EQUIPMENT REFER TO
PHOTO SHEET FOR ADDITIONAL INFORMATION.
7. DEMOLISH EXISTING WATER HEATERS,
ASSOCIATED PIPING AND FLUE VENTS.
D#
KEYNOTES:
1. CONTRACTOR SHALL PATCH/REPAIR EXISTING
HOUSEKEEPING PAD. CONTRACTOR TO FORM
THE HOUSEKEEPING PAD TO MATCH EXISTING
PAD HEIGHT.
2. PROVIDE AND INSTALL NEW BOILER AND
ASSOCIATED PIPING. REFER TO PIPING
DIAGRAM ON SHEET M500 FOR ADDITIONAL
INSTALLATION INFORMATION. CONTRACTOR
SHALL FOLLOW ALL MANUFACTURER
INSTALLATION INSTRUCTIONS.
3. PROVIDE AND INSTALL NEW PUMP. REFER TO
PIPING DIAGRAM ON SHEET M500.
4. PROVIDE AND INSTALL NEW AIR SEPARATOR
AS-1.
5. PROVIDE AND INSTALL NEW GENERAL WATER
SYSTEMS POT FEEDER MODEL NUMBER
DB-2-1THD-CS-A. REFER TO PIPING DIAGRAM
ON SHEET M500.
6. 4" HWR FROM BOILER CIRCULATION PUMP
(BCP). REFER TO PIPING DIAGRAM ON SHEET
M500 AND IN-LINE PUMP DETAIL ON SHEET
M400 FOR ADDITIONAL INFORMATION.
7. PROVIDE BOILER EMERGENCY SHUT DOWN
SWITCHES FOR BLR-1 & 2 AT MECHANICAL
ROOM EXIT PER CSD-1 REQUIREMENTS. REFER
TO CONTROL DIAGRAM ON SHEET M501.
8. CONTRACTOR SHALL PROVIDE COMBINATION
TRAP/TREATMENT NEUTRALIZATION TANK FOR
BOILER CONDENSATE. ROUTE 1" DRAIN TO
TRENCH DRAIN. CONTRACTOR SHALL FOLLOW
ALL MANUFACTURER INSTALLATION
INSTRUCTIONS.
9. 2 1/2" NATURAL GAS TO BOILER. REDUCE TO 2"
CONNECTION AT BOILER. REFER TO TYPICAL
GAS TRAIN DETAIL FOR ADDITIONAL
INFORMATION. NATURAL GAS REGULATOR
REQUIRED FOR EACH BOILER. REFER TO GAS
TRAIN FOR NEW BOILER DETAIL ON SHEET
M400.
10. CONTRACTOR SHALL MATCH EXISTING PIPE
SIZE.
11. CONTRACTOR SHALL PROVIDE COMBINATION
TRAP/TREATMENT NEUTRALIZATION TANK FOR
BOILER CONDENSATE. ROUTE 1/2" DRAIN TO
EXISTING FLOOR DRAIN. CONTRACTOR SHALL
FOLLOW ALL MANUFACTURER INSTALLATION
INSTRUCTIONS.
EXISTING
TRENCH DRAIN
1 08-03-23 OWNER REVIEW
2 08-16-23 ISSUED FOR BIDS
3 10-03-23 PERMITS
UH-E
ø
BLR-1BLR-2
10ø 1
EXISTING
SUMP
ø ø
SKYLIGHT ABOVE
EXISTING 50" W X 42" H LOUVER
5M
MOD-1
BLR-E BLR-E
WH-E
WH-E
UH-E
ø ø
6ø
22ø14ø ø
⌀22" EA UP
D1
D1D1
D2
D2
D2
EXISTING
SUMP
EXISTING 50" W X 42" H LOUVER
D2
⌀8" EA UP
IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,
TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING
AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND
SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT
WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
IMEG CORP. ©2023 IMEG CORP.
REF. SCALE IN INCHES
0 1 2 3
33533 W. TWELVE MILE
SUITE 200
FARMINGTON HILLS, MI 48331
P: 248.344.2800 F: 248.344.1650
The FUTURE. Built Smarter www.imegcorp.com
KEY PLAN
AGENCY APPROVAL
REVISIONS
PROFESSIONAL SEAL
CONSULTANT
No. Date Revision / Issue
DISCLAIMER
SHEET INFORMATION
Date
Project #
Drawn
Checked
Approved
SHEET TITLE
SCALE
SHEET NUMBER
Issue
PROJECT #23003104.00
AS INDICATED
/2
/2
:1 :1
P
M
760 BROWN STREET
TECUMSEH, MI 49286
Tecumseh MS Boiler Replacement
M202
BASEMENT PLAN - HVAC
JC
JC
SK/JS/SR
23003104.00
T e c u m s e h
M S
B o il e r
R e p la c e m e n t .0
N O R
HT
1/4" = 1'-0"
BASEMENT PLAN - HVAC
N O R
HT
1/4" = 1'-0"
BASEMENT DEMOLITION PLAN - HVAC
GENERAL NOTES:
1. CONTRACTOR SHALL MAINTAIN/RECONNECT
HWS/R PIPING CONNECTIONS TO EXISTING
UNIT HEATERS SERVED FROM HWS/R SYSTEM.
2. CONTRACTOR SHALL MAINTAIN AND
RECONNECT NATURAL GAS VENTING OFF OF
FIXTURES NOT BEING DEMOLISHED.
3. CONTRACTOR SHALL PROVIDE
MISCELLANEOUS SUPPORT STEEL AS
REQUIRED FOR COMBUSTION AIR / FLUE
PENETRATIONS.
DEMOLITION KEYNOTES:
1. DEMOLISH EXISTING BOILER FLUE,
ACCESSORIES, AND ASSOCIATED DUCTWORK.
2. DEMOLISH EXISTING WATER HEATER FLUE.
D#
KEYNOTES:
1. CONTRACTOR TO PROVIDE AND INSTALL NEW
10" Ø BOILER FLUE UP THROUGH EXISTING
BOILER CHIMNEY. REFER
TO MECHANICAL DETAILS SHEET FOR
ADDITIONAL INFORMATION.
2. PROVIDE AND INSTALL NEW 3" CPVC
CONCENTRIC VERTICAL TERMINATION KIT.
COMBUSTION AND EXHAUST FLUE UP
THROUGH ROOF. CONTRACTOR SHALL
MAINTAIN ALL APPLICABLE CLEARANCES.
REFER TO TYPICAL FLUE TERMINATION DETAIL
ON SHEET M400.
3. PROVIDE AND INSTALL NEW 10" COMBUSTION
UP THROUGH ROOF. TERMINATE WITH
GOOSENECK AND BIRD SCREEN.
CONTRACTOR SHALL MAINTAIN ALL
APPLICABLE INTAKE CLEARANCE.
4. CONTRACTOR SHALL PATCH AND REPAIR
EXISTING WALL PENETRATIONS. CONTRACTOR
SHALL PREPARE EXISTING WALL FOR NEW
FLUE PENETRATIONS. MATCH EXISTING
FINISHES.
5. PROVIDE AND INSTALL 50" W X 42" H OPPOSED
BLADE MOTOR OPERATED DAMPER. CLEAN
LOUVER AND SEAL WEATHER TIGHT. REFER
TO EXHAUST FAN CONTROL - VENTILATION
CONTROL DIAGRAM 1 ON SHEET M600.
6. REFER TO CARBON MONOXIDE MONITORING
CONTROL DIAGRAM 2 ON SHEET M600.
1 08-03-23 OWNER REVIEW
2 08-16-23 ISSUED FOR BIDS
3 10-03-23 PERMITS
EF-E
14ø
21x21 CAPPED
36x18 CAPPED
40x12 CAPPED
SSCU-E
SSCU-E
TO GAS METER
"G
4"G
"G
6"G DN TO
BLR RM
3 4
EF-E
14ø
21x21 CAPPED
36x18 CAPPED
40x12 CAPPED
SSCU-E
SSCU-E
TO GAS METER
6"G DN TO
BLR RM
"G
4"G
"G
IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,
TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING
AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND
SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT
WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
IMEG CORP. ©2023 IMEG CORP.
REF. SCALE IN INCHES
0 1 2 3
33533 W. TWELVE MILE
SUITE 200
FARMINGTON HILLS, MI 48331
P: 248.344.2800 F: 248.344.1650
The FUTURE. Built Smarter www.imegcorp.com
KEY PLAN
AGENCY APPROVAL
REVISIONS
PROFESSIONAL SEAL
CONSULTANT
No. Date Revision / Issue
DISCLAIMER
SHEET INFORMATION
Date
Project #
Drawn
Checked
Approved
SHEET TITLE
SCALE
SHEET NUMBER
Issue
PROJECT #23003104.00
AS INDICATED
/2
/2
:1 :1
P
M
760 BROWN STREET
TECUMSEH, MI 49286
Tecumseh MS Boiler Replacement
M210
LEVEL 01 PLAN - MECHANICAL
JC
JC
SK/JS/SR
23003104.00
T e c u m s e h
M S
B o il e r
R e p la c e m e n t .0
N O R
HT
1/4" = 1'-0"
LEVEL 01 PLAN - MECHANICAL
N O R
HT
1/4" = 1'-0"
LEVEL 01 DEMOLITION PLAN - MECHANICAL
KEYNOTES:
1. TERMINATE WATER HEATER FLUE WITH VENT
CAP. REFER TO TYPICAL FLUE CONCENTRIC
DETAIL ON SHEET M400.
2. 10" Ø COMBUSTION AIR UP FROM BOILER
ROOM. TERMINATE WITH GOOSENECK AND
BIRD/INSECT SCREEN. REFER TO TYPICAL
ROOF PENETRATION GOOSENECK DUCT
DETAIL ON SHEET M400.
3. REFER TO MANUFACTURER'S INSTRUCTIONS
FOR TERMINATION OF BOILER FLUES. REFER
TO TYPICAL FLUE STACK THROUGH ROOF
DETAIL ON SHEET M400.
4. CONTRACTOR SHALL REMOVE AND REPLACE
EXISTING CONCRETE CAP WITH NEW CAP
SIZED FOR NEW PENETRATIONS.
GENERAL NOTES:
1. CONTRACTOR SHALL PROVIDE
MISCELLANEOUS SUPPORT STEEL AS
REQUIRED FOR COMBUSTION AIR / FLUE
PENETRATIONS.
2. CONTRACTOR SHALL MAINTAIN AND
RECONNECT NATURAL GAS VENTING OFF OF
FIXTURES NOT BEING DEMOLISHED.
3. CONTRACTOR SHALL PATCH/REPAIR/FLASH
ROOF PENETRATIONS. CONTRACTOR SHALL
PREPARE EXISTING ROOF FOR NEW FLUE
PENETRATIONS. MATCH EXISTING FINISHES.
DEMOLITION KEYNOTES:
1. DEMOLISH EXISTING BOILER FLUE,
ACCESSORIES, AND ASSOCIATED DUCTWORK.
2. DEMOLISH EXISTING WATER HEATER FLUE.
1 08-03-23 OWNER REVIEW
2 08-16-23 ISSUED FOR BIDS
3 10-03-23 PERMITS
PRESSURE GAUGE
WITH 1/4"BALL
VALVES
UNION OR FLANGE (TYP.)
INLINE PUMP
ISOLATION
VALVE
CALIBRATED BALANCE VALVE
CHECK VALVE
BURNER MANIFOLD
MANUAL SHUTOFF
VALVE
MANUAL SHUTOFF
VALVE
VENT THROUGH
ROOF
PRESSURE
REGULATING VALVE
SAFETY SHUTOFF
VALVE
CONTROL VALVE
DRIP LEG
2 1/2" G
GAS STRAINER
INSULATION
STEEL PIPE SADDLE, AND
INSULATION SHIELD TACK
WELDED TO PIPE, FILL
SADDLE WITH INSULATION
OVERSIZE HANGER TO ALLOW LONGITUDINAL
PIPE EXPANSION AND PIPE INSULATION TO
PASS THROUGH UNBROKEN (TYP)
INSULATION SHIELD AND ROLLED SUPPORT
PLATE AS REQUIRED PER SPECS
THREADED ROD
INSULATION
CLEVIS HANGER
HIGH DENSITY INSULATION INSERT
FOR 1 1/2" PIPES AND LARGER
AS REQUIRED IN SPECIFICATIONS
NOTES:
1. REFER TO SPECIFICATION SECTIONS (SECTION 22 05 29-
PLUMBING, SECTION 23 05 29-HVAC) & (SECTION 22 07 19-
PLUMBING, SECTION 23 07 19-HVAC).
INSULATION SHIELD (TYP)
BOLT (TYP)
PIPE
RISER CLAMP
PIPE SLEEVE
PLAN
BOLT (TYP)
FIRESTOPPING
MATERIAL. REFER
TO SPECS
FLOOR SLAB PIPE SLEEVE
RISER CLAMP
RISER
INSULATION
ELEVATION
INSULATED HOT PIPE RISER SUPPORT
WELD LUG OR HUB TO PIPE
INSULATED HOT PIPE 4" AND LARGER
INSULATED COLD PIPE HANGER
UNI-STRUT OR EQUIVALENT
HIGH DENSITY INSULATION INSERT
FOR 1 1/2" PIPES AND LARGER
AS REQUIRED IN SPECIFICATIONS
THREADED ROD (TYP)
PIPE INSULATION (TYP)
TRAPEZE HANGER
TOP OF SUPPORT APPLICATION
BOTTOM OF SUPPORT APPLICATION
INSTALL CLAMP ON ALL
PIPES LESS THAN 4"Ø
BOLTS
SCREEN
PREFAB CURB
WITH WOOD
NAILER.
ROOF DECK INSULATION
ROOF DECK
DUCTWORK
FLASH ROOF
MEMBRANE TO
CURB. (NOTE 1)
1/2" HARD
WIRE MESH
12"H X 6"W X 24" EQUIPMENT
CURB. FLASH TO ROOF.
TS 2X2X3/16 GOOSENECK SUPPORT
(FOR ALL GOOSENECKS WHERE W
IS 24" OR WIDER).
ANGLE RIVETED OR
SPOT WELDED AS
REQUIRED.
ANGLE IRON REINFORCING
WHERE REQUIRED.
METAL SCREEN FRAME
STANDARD DUCT CONSTRUCTION,
SEAMS WATERTIGHT.
SHEETMETAL SCREWS
6" ON CENTERS.
CADMIUM PLATED LAG
SCREWS 6" ON CENTERS
CURB HEIGHT 18" ABOVE ROOF DECK
FRAME, ROOF &
ROOFING.
ROUND: D
RECTANGULAR: W
D
W
ROUND: D
RECTANGULAR: W + 25%
NOTES:
1. ALL ROOF FLASHING SHALL BE PER ROOF MANUFACTURER'S
RECOMMENDATIONS.
[BOTTOM OF INTAKE HEIGHT 36"
G
DRAIN
EXPANSION TANK ET-3
H W
CW
THERMOMETER IN
WELL
EXHAUST FLUE
A.S.M.E. PRESSURE AND
TEMPERATURE RELIEF VALVE
VACUUM RELIEF VALVE.
WATTS N36 OR EQUAL.
PIPE DIRECTLY OVER
FLOOR DRAIN
HOUSEKEEPING
PAD
UNION (TYP.)
CIRCULATING
PUMP CP-1
HWC T
AQUASTAT
COMBUSTION AIR
INTAKE
ROUTE AIR INTAKE AND EXHAUST FLUE TO
EXTERIOR OF BUILDING USING MATERIALS
APPROVED BY WATER HEATER
MANUFACTURER. TERMINATE ON EXTERIOR
WALL WITH HOOD OR TERMINATION FITTING
AS RECOMMENDED BY MANUFACTURER.
HWC T
CIRCULATING
PUMP CP-2
AQUASTAT
WATER CUTOFF MASTIC
PREMOLDED PIPE SEAL
SPLICING CEMENT
LAP SEALANT
METAL ROOF DECK
STAINLESS STEEL
CLAMPING RING
EPDM MEMBRANE
INSULATION
CONCRETE
ROOF DECK
VENT CAP
COMBUSTION AIR INTAKE TO
APPLIANCE. REFER TO SPEC
FOR MATERIALS
VENT FROM
APPLIANCE. REFER
TO SPEC FOR
MATERIALS
20 GAUGE GALVANIZED SHEET
METAL STRAP TO TOP OF NEXT
STRUCTURAL MEMBER. MINIMUM OF
3 EQUALLY SPACED AROUND PIPE
CLAMP
SEAL WATER TIGHT
STORM COLLAR
ROOF DECK
SIZE AS INDICATED
ON PLAN
SEAL AROUND
FLASHING BY G.C.ROOFING AND
INSULATION
BY G.C.
TALL CONE FLASHING
BIRD PROOF TOP
36" MINIMUM ABOVE
ROOF. 24" MINIMUM
ABOVE ANY WALL
WITHIN 10'-0" RADIUS
CAP HEIGHT MIN. 12"
ABOVE ROOF DECK
IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,
TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING
AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND
SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT
WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
IMEG CORP. ©2023 IMEG CORP.
REF. SCALE IN INCHES
0 1 2 3
33533 W. TWELVE MILE
SUITE 200
FARMINGTON HILLS, MI 48331
P: 248.344.2800 F: 248.344.1650
The FUTURE. Built Smarter www.imegcorp.com
KEY PLAN
AGENCY APPROVAL
REVISIONS
PROFESSIONAL SEAL
CONSULTANT
No. Date Revision / Issue
DISCLAIMER
SHEET INFORMATION
Date
Project #
Drawn
Checked
Approved
SHEET TITLE
SCALE
SHEET NUMBER
Issue
PROJECT #23003104.00
AS INDICATED
/2
/2
:1 :1
P
M
760 BROWN STREET
TECUMSEH, MI 49286
Tecumseh MS Boiler Replacement
M400
MECHANICAL DETAILS
JC
JC
SK/JS/SR
23003104.00
T e c u m s e h
M S
B o il e r
R e p la c e m e n t .0
NO SCALE
INLINE PUMP DETAIL
NO SCALE
GAS TRAIN FOR NEW BOILER
NO SCALE
PIPE SUPPORT DETAIL
NO SCALE
ROOF PENETRATION - GOOSENECK DUCT - MEMBRANE ROOF
NO SCALE
WATER HEATER - GAS TANK W/HWC
6NO SCALE
FLUE - CONCENTRIC VENT/INTAKE
NO SCALE
FLUE - THROUGH ROOF
1 08-03-23 OWNER REVIEW
2 08-16-23 ISSUED FOR BIDS
3 10-03-23 PERMITS
BLR-1
SET TO ** PSI
SET TO ** PSI
3/4"
NEW BFP-1
HWR
3/4"
BLR-2
HIGH CAPACITY AIR VENT
PIPE DISCHARGE TO DRAIN.
SAME SIZE AS AIR
SEPARATOR OUTLET.
AIR SEPARATOR.
SAME SIZE AS PIPING,
SEE 23 21 00.
ROUTE TO DRAIN (TYP.)
HOUSEKEEPING PAD (TYP.)
BOILER PROOF OF
FLOW (TYP)
H W
S
H W
S
H W
R
HWS
H W
SNEW THERMOSTAT TIED
TO LOUVER ACTUATOR
AND EXHAUST FAN
EXISTING CHIMNEY
EXISTING SKYLIGHT
NO-LOSS RAIN SHIELD
(TYP)
BOILER FLUE (TYP)
NEW BOILER FLUES
BYPASS (POT) FEEDER. SEE
23 25 00. MOUNT WITH TOP
ABOUT 36" ABOVE FLOOR.
ET-1
ET-2
PUMP
BCP-1
HWS
PUMP P-1
365 GPM
PUMP P-2
365 GPM
MTR
HWSHWS
FLOW SHALL BE UPWARD
THROUGH TEST RACK
SET TO MAINTAIN 1.5 - 6FPS
(MIN 5GPM) THROUGH
COUPON RACK
PROVIDE ONE COUPON
HOLDER AND SIGHT GLASS
FOR EACH METAL IN THE
PIPING SYSTEM. MINIMUM
OF 4. COUPONS SHALL BE
MINIMUM 3" LONG
COUPON TEST
RACK. 1" ø SCHEDULE
40 CARBON STEEL
SAMPLE DRAIN PORT
10 MICRON CARTRIDGE
FILTER
1"
SECONDARY SIDE FLOW
METER
F
PUMP
BCP-2
E X
IS
T
IN
G W
A L
L
CONNECT TO SIDE OF MAIN (NOT
TOP OR BOTTOM) TO AVOID AIR
OR DIRT ENTERING PIPING.
LOCKED OPEN SHUTOFF VALVE.
AUTOMATIC AIR
VENT (TYP.)
/4
"H W
S
/4
"H W
R
BLR-1
SET TO ** PSI
SET TO ** PSI
3/4"
BFP-
HWR
3/4"
BLR-2
AIR VENT
EXISTING AIR
SEPARATOR.
LOCKED OPEN SHUTOFF
VALVE
ROUTE TO DRAIN (TYP.)
HOUSEKEEPING PAD (TYP.)
ROUTE TO DRAIN (TYP.)
HOUSEKEEPING PAD (TYP.)
H W
S
H W
S
H W
R
H W
R
HWR
HWS
H W
S
EXISTING CHIMNEY
EXISTING SKYLIGHT
NO-LOSS RAIN SHIELD
(TYP)
BOILER FLUE (TYP)
EXISTING BOILER
FLUE
BYPASS (POT) FEEDER. SEE 23
25 00. MOUNT WITH TOP ABOUT
36" ABOVE FLOOR.
ET-1
ET-2
HWR
PUMP
BCP-1
PUMP
BCP-2
HWS
PUMP P-1
365 GPM
PUMP P-2
365 GPM
HWS
EXISTING
LOUVER
HWS
IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,
TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING
AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND
SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT
WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
IMEG CORP. ©2023 IMEG CORP.
REF. SCALE IN INCHES
0 1 2 3
33533 W. TWELVE MILE
SUITE 200
FARMINGTON HILLS, MI 48331
P: 248.344.2800 F: 248.344.1650
The FUTURE. Built Smarter www.imegcorp.com
KEY PLAN
AGENCY APPROVAL
REVISIONS
PROFESSIONAL SEAL
CONSULTANT
No. Date Revision / Issue
DISCLAIMER
SHEET INFORMATION
Date
Project #
Drawn
Checked
Approved
SHEET TITLE
SCALE
SHEET NUMBER
Issue
PROJECT #23003104.00
AS INDICATED
/2
/2
:1 :1
P
M
760 BROWN STREET
TECUMSEH, MI 49286
Tecumseh MS Boiler Replacement
M500
MECHANICAL DIAGRAMS
JC
JC
SK/JS/SR
23003104.00
T e c u m s e h
M S
B o il e r
R e p la c e m e n t .0
NO SCALE
NEW HEATING WATER FLOW DIAGRAM - CONDENSING BOILER PRIMARY/SECONDARY
NO SCALE
EXISTING HEATING WATER FLOW DIAGRAM - CONDENSING BOILER PRIMARY/SECONDARY
1 08-03-23 OWNER REVIEW
2 08-16-23 ISSUED FOR BIDS
3 10-03-23 PERMITS
DI
DI
AI
AI
AI
AI
DO
DO
FLOW PROOF. INTERLOCK WITH
BOILER OPERATION PER
MANUFACTURER'S INSTRUCTIONS
(TYPICAL EACH BOILER).
CONTROLS
BLR-2
CONTROLS
BLR-1
BOILER PARENT
CONTROLLER
H W
R
H W
S
PRIMARY
HWR
WM
GALLONS
WATER
METER
NON-POTABLE
WATER SUPPLY TO
HYDRONIC SYSTEM
HWR
CS
PUMP
STATUS
CS
PUMP
STATUS
P-1
P-2
HWS
HWR
COMMUNICATION LINK
BETWEEN STARTER AND
EXISTING CONTROL SYSTEM.
(TYP)
0 10 20 30 40 50 60 70 80 90 100
H W
S T
E M
P
F
OUTSIDE AIR TEMP °F
HEATING WATER SUPPLY
TEMPERATURE RESET SCHEDULE
BCP-1
BCP-2
SEC
HWR
TEMP
DECOUPLER
TEMP
DECOUPLER
SEC
HWS
TEMP
SEQUENCE OF OPERATION:
HEATING WATER BOILERS SHALL HAVE UNIT MOUNTED CONTROLS AND A BOILER MANAGEMENT CONTROL PANEL PROVIDED BY THE BOILER MANUFACTURER. TCC SHALL INTERFACE WITH BOILER MANUFACTURER CONTROLS AS DESCRIBED IN THIS SEQUENCE OF OPERATION. BOILER MANUFACTURER SHALL PROVIDE A GATEWAY INTERFACE CARD THAT IS COMPATIBLE WITH THE COMMUNICATION PROTOCOL OF THE FMCS NETWORK. SEQUENCES OF OPERATION FOR BOTH BOILER CONTROL SYSTEM AND FMCS SHALL BE AS FOLLOWS:
BOILER CONTROL PANEL SEQUENCE OF OPERATION:
WHEN THE FMCS ENABLES THE BOILER PARENT CONTROLLER TO RUN, THE BOILER PARENT CONTROLLER SHALL ENABLE THE LEAD BOILER. WHEN BOILER IS ENABLED THE ASSOCIATED CIRCULATING PUMP
SHALL RUN CONTINUOUSLY.
THE ON BOARD BOILER SEQUENCING CONTROLLER SHALL STAGE AND MODULATE THE BOILER PLANT TO MAINTAIN THE HIGHEST PLANT EFFICIENCY THAT WILL PROVIDE THE REQUIRED SUPPLY WATER TEMPERATURE. THE ON BOARD BOILER SEQUENCING CONTROLLER SHALL START BOILER PUMP TO PROVIDE PRE AND POST FLOW. THE ON BOARD BOILER SEQUENCING CONTROLLER SHALL VERIFY PROOF OF WATER FLOW BEFORE FIRING BOILERS. BOILER SEQUENCING CONTROLLER PANEL SHALL START/STOP BOILERS ON A FIRST ON/FIRST OFF BASIS TO EQUALIZE RUN TIME BETWEEN BOILERS.
THE FOLLOWING BOILER SEQUENCING CONTROLLER POINTS (TO INCLUDE BUT NOT LIMITED TO) SHALL BE CONTROLLED BY THE FMCS AND DISPLAYED ON THE OPERATOR WORKSTATION GRAPHICAL SCREEN:
• BOILER SYSTEM STATUS: ENABLE/DISABLE
• BOILER OUTLET WATER TEMP SETPOINT: [°F]
THE FOLLOWING BOILER SEQUENCING CONTROLLER POINTS (TO INCLUDE BUT NOT LIMITED TO) SHALL BE MONITORED BY THE FMCS AND DISPLAYED ON THE OPERATOR WORKSTATION GRAPHICAL SCREEN:
• BOILER STATUS: DISABLED/STANDBY/MANUAL OPERATION/REMOTE OPERATION/AUTO/FAULT
• FIRING RATE INPUT: [0 - 100%]
• FIRING RATE OUTPUT: [0 - 100%]
• BOILER OUTLET WATER TEMP: [°F]
• SYSTEM PRIMARY HWR TEMP: [°F]
• SYSTEM PRIMARY HWS TEMP: [°F]
• FAULT MESSAGE DISPLAY CODE: [NUMERICAL]
• RUN CYCLES: [NUMERICAL]
• RUN HOURS: [NUMERICAL]
ALARMS, INTERLOCKS & SAFETIES:
BOILER CONTROLS SHALL BE PROGRAMMED TO MAINTAIN CONSTANT SETPOINT (LAST KNOWN VALUE) IN THE EVENT THE FMCS NETWORK COMMUNICATION SIGNAL IS LOST.
FMCS SEQUENCE OF OPERATION:
FMCS SHALL OPERATE HEATING WATER SYSTEM 24 HOURS/DAY, 365 DAYS/YEAR. LEAD SECONDARY PUMP SHALL RUN CONTINUOUSLY.
ONLY ONE SECONDARY HEATING WATER PUMP SHALL RUN AT TIME. THE SECOND HEATING WATER PUMP IS FULLY REDUNDANT. FMCS SHALL AUTOMATICALLY ROTATE THE LEAD HEATING WATER PUMP ONCE/WEEK (10:00 AM EACH TUESDAY, ADJ.) TO EQUALIZE RUN TIME BETWEEN PUMPS. PROVIDE GRAPHICAL BUTTON ON OPERATOR WORKSTATION GRAPHICAL SCREEN TO ALLOW FMCS OPERATOR TO SWITCH LEAD PUMP TO NEXT ROTATION IN THE EVENT THE CURRENT LEAD PUMP REQUIRES MAINTENANCE.
FMCS SHALL MODULATE SIGNAL TO LEAD SECONDARY PUMP STARTER AS REQUIRED TO MAINTAIN HEATING WATER DIFFERENTIAL PRESSURE (DP) SETPOINT. FMCS SHALL RESET HEATING WATER DIFFERENTIAL PRESSURE (DP) SETPOINT AS REQUIRED TO MAINTAIN AT LEAST ONE HEATING WATER VALVE 95% (ADJ.) OPEN. FMCS SHALL UTILIZE COMMAND TO ALL HEATING WATER VALVE POSITIONS TO RESET THE HEATING WATER DIFFERENTIAL PRESSURE. IN NO EVENT SHALL THE FMCS DECREASE THE HEATING WATER (DP) SETPOINT BELOW 4 PSI (ADJ.) OR ABOVE 10 PSI (ADJ.).
ALL CONTROLLED AND MONITORED POINTS LISTED IN THE BOILER CONTROL PANEL SEQUENCE ABOVE SHALL BE DISPLAYED ON THE OPERATOR WORKSTATION GRAPHICAL SCREEN.
ALARMS, INTERLOCKS & SAFETIES:
TCC SHALL COORDINATE ALL SAFETY AND INTERLOCK REQUIREMENTS WITH BOILER MANUFACTURER. TCC SHALL COORDINATE AND PROVIDE THE INSTALLATION AND WIRING OF BOILER WATER DIFFERENTIAL PRESSURE/FLOW SWITCHES AND OTHER COMPONENTS PROVIDED WITH THE BOILER AS REQUIRED FOR PROPER OPERATION. TCC SHALL PROVIDE AND TERMINATE ALL SAFETY AND INTERLOCK WIRING WITH
BOILER CONTROL PANELS AS REQUIRED.
FMCS SHALL AUTOMATICALLY ENABLE THE LAG SECONDARY HEATING WATER PUMP TO RUN IN THE EVENT THE LEAD SECONDARY HEATING WATER PUMP FAILS TO OPERATE.
TCC SHALL VERIFY THE ACCEPTABLE TEMPERATURE RANGES THE BOILERS ARE APPROVED TO OPERATE AT AS PUBLISHED IN THE BOILER MANUFACTURER'S LITERATURE. IF THE TEMPERATURE RANGES LISTED IN THE MANUFACTURER'S LITERATURE DIFFER FROM THOSE IN THIS SEQUENCE OF OPERATION, CONTACT PROJECT ARCHITECT/ENGINEER FOR DIRECTION.
AN ALARM SHALL BE INDICATED TO THE FMCS OPERATOR WORKSTATION IN THE EVENT ANY OF THE FOLLOWING OCCUR:
• PRIMARY HWR TEMPERATURE DROPS BELOW 140°F (ADJ.) FOR 5 MINUTES (ADJ.) (AUTO RESET).
• PRIMARY HWS TEMPERATURE RISES MORE THAN 10°F (ADJ.) ABOVE SETPOINT (AUTO RESET).
• PRIMARY HWS TEMPERATURE DROPS MORE THAN 10°F (ADJ.) BELOW SETPOINT (AUTO RESET).
• AN ALARM IS INDICATED AT ANY BOILER ALARM PANEL.
• AN ALARM IS INDICATED AT ANY PUMP.
• SHOULD THE FMCS COMMAND THE LEAD HEATING WATER PUMP TO OPERATE AND THE PUMP FAILS TO DO SO AS DETERMINED BY THE EXISTING CONTROL SYSTEM STATUS, AN ALARM SHALL BE
INDICATED AT THE FMCS OPERATOR WORKSTATION AND THE LAG HW PUMP SHALL AUTOMATICALLY START.
• WHEN 2 GALLONS (ADJ.) OF HYDRONIC SYSTEM MAKE-UP WATER FLOWS THROUGH METER AFTER THE LAST ACKNOWLEDGEMENT. WHEN ALARM IS MANUALLY ACKNOWLEDGED, THE FMCS SHALL RE-
ZERO THE COUNTER.
BACNET INTERFACE
TO FMCS
TO/FROM FMCS THROUGH BOILER BACNET INTERFACE (TYP.)
* ENABLE/DISABLE
* HWS TEMP SETPOINT
* HWR PRIMARY
* HWS PRIMARY
R1
R2
BOILER STARTER COILS
TYPICAL OF [2].
BLR-1 BURNER CONTROL POWER
SUPPLY SHUTDOWN CONTACT.
TYPICAL FOR EACH BOILER.
ALARMS, INTERLOCKS, AND SAFETIES:
TCC SHALL PROVIDE EMERGENCY BOILER SHUTDOWN SWITCH AT EACH
BOILER ROOM EXIT MEETING CSD-1 REQUIREMENTS. ACTIVATION OF ANY
SWITCH SHALL INTERRUPT POWER TO ALL BOILER CONTROLS VIA BOILER
SAFETY SHUTDOWN CONTACTS.
TYPICAL FOR BLR-1, BLR-2
EMERGENCY BOILER SHUTDOWN
TWO WALL MOUNTED EMERGENCY
STOP SWITCHES, MUSHROOM
HEAD, N.C. CONTACT, TURN TO
RELEASE. REFER TO FLOOR PLAN
FOR LOCATIONS. ACCEPTABLE
MANUFACTURERS: SQUARE D (XAL
K174), EATON (C22-PVT45P K11), OR
GENERAL ELECTRIC
(CR104PTR20A092).
FMCS
ENABLE/DISABLE
BLR1
FMCS
ENABLE/DISABLE
BLR2
V
C O
N T
R O
L
P
W E
R N
E U
T R
A L
V
C O
N T
R
L
P
W E
R H
O T
EMERGENCY
BOILER
SHUTDOWN
EMERGENCY
BOILER
SHUTDOWN
PROVIDE COLOR ENGRAVED PHENOLIC
LABELS WITH MIN. 1/2" HIGH WHITE
LETTERS ON RED BACKGROUND FOR
EACH EMERGENCY BOILER SHUTDOWN
SWITCH. SECURELY MOUNT TO WALL
ABOVE EACH SWITCH. (TYP)
PROVIDE CARBON MONOXIDE
SENSOR WITH CONNECTION TO
THE FMCS. AN ALARM SHALL BE
INDICATED TO THE FMCS
OPERATOR WORKSTATION IN THE
EVENT THE BOILER ROOM SPACE
CO LEVEL EXCEEDS THE
FOLLOWING CONCENTRATIONS
AND DURATIONS:
50 PPM @ 60 MIN
150 PPM @ 10 MIN
400 PPM @ 5 MIN
C
EXISTING
STARTER
START/
STOP
EXISTING
STARTER
START/
STOP
EXISTING FLOW
CONTROL VALVE
HWR
EXISTING FLOW
CONTROL VALVE
HWS
NOTE:
CONTRACTOR SHALL CONFIRM CONTROL
SETPOINTS AND COMMUNICATE WITH ENGINEER
OF RECORD AND OWNER FOR CONFIRMATION.
IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,
TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING
AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND
SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT
WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
IMEG CORP. ©2023 IMEG CORP.
REF. SCALE IN INCHES
0 1 2 3
33533 W. TWELVE MILE
SUITE 200
FARMINGTON HILLS, MI 48331
P: 248.344.2800 F: 248.344.1650
The FUTURE. Built Smarter www.imegcorp.com
KEY PLAN
AGENCY APPROVAL
REVISIONS
PROFESSIONAL SEAL
CONSULTANT
No. Date Revision / Issue
DISCLAIMER
SHEET INFORMATION
Date
Project #
Drawn
Checked
Approved
SHEET TITLE
SCALE
SHEET NUMBER
Issue
PROJECT #23003104.00
AS INDICATED
/2
/2
:1 :1
P
M
760 BROWN STREET
TECUMSEH, MI 49286
Tecumseh MS Boiler Replacement
M501
CONTROLS DIAGRAMS
JC
JC
SK/JS/SR
23003104.00
T e c u m s e h
M S
B o il e r
R e p la c e m e n t .0
NO SCALE
HEATING CONTROL - CONDENSING BOILER PRIMARY/SECONDARY
1 08-03-23 OWNER REVIEW
2 08-16-23 ISSUED FOR BIDS
3 10-03-23 PERMITS
AI
DO
T
AI
ROOM
EXHAUST
AIR
CS
EXHAUST
FAN
ACT
FAN
STATUS
COMMUNICATION LINK
BETWEEN MOTOR STATER
GATEWAY & FMCS
WALL
MOUNTED
TEMPERATURE
TRANSMITTER
ACT
N.O.
OUTSIDE
AIR
SEQUENCE OF OPERATION::
FAN SHALL BE STARTED AND STOPPED THROUGH A HAND-OFF-AUTO SWITCH ON THE FACE OF
THE MOTOR STARTER. WHEN PLACED IN THE HAND POSITION THE EXHAUST FAN SHALL RUN
CONTINUOUSLY. WHEN PLACED IN THE AUTO POSITION THE FMCS SHALL CONTROL FAN
OPERATION. WHEN PLACED IN THE OFF POSITION THE EXHAUST FAN MOTOR SHALL BE DE-
ENERGIZED.
ROOM VENTILATION FAN SHALL BE DISABLED FROM OPERATING BY THE FMCS WHENEVER O.A.
TEMP DROPS BELOW 34°F (ADJ.) WHEN O.A. TEMP RISES ABOVE 38°F (ADJ.) ROOM
VENTILATION FAN SHALL BE ENABLED TO RUN BY THE FMCS.
FMCS SHALL INITIATE FAN SPEED TO MAINTAIN ROOM TEMP OF 78°F (ADJ.).
WHEN ROOM TEMP DROPS BELOW 76°F (ADJ.) FOR 10 MINUTES (ADJ.) WITH FAN OPERATING
AT MIN. RPM, EXHAUST FAN SHALL BE DE-ENERGIZED.
WHEN FAN IS INDEXED TO RUN THE FOLLOWING SHALL OCCUR:
• EXHAUST DAMPER SHALL FULLY OPEN
• ALL INTAKE DAMPERS SHALL FULLY OPEN
• EXHAUST FAN SHALL BE ENERGIZED TO RUN AFTER 15 SECOND (ADJ.) DELAY TO ALLOW
FOR OPENING OF DAMPERS.
WHEN EXHAUST FAN IS DE-ENERGIZED THE FOLLOWING SHALL OCCUR:
• EXHAUST DAMPER AND ALL INTAKE DAMPERS SHALL FULLY CLOSE
WHEN FAN IS ENERGIZED, 2-POSITION DAMPER SHALL FULLY OPEN. WHEN FAN IS DE-
ENERGIZED, 2-POSITION DAMPER SHALL FULLY CLOSE.
ALARMS, INTERLOCKS AND SAFETIES:
AN ALARM…
This is the start of the file's text. The full file is on GovTribe.