Drawings-Specs_Ethel_Bottoms.pdf
PDF 783 KB Posted
- Solicitation number
- 140F0822Q0012
About this file
This document includes specifications for a gravel delivery project for the White River National Wildlife Refuge Ethel Bottoms site. The U.S. Fish and Wildlife Service Dale Bumpers White River National Wildlife Refuge is requesting up to 30 loads per day of SB-2 granite road gravel meeting Arkansas specifications for a 6-inch lift. Deliveries must commence no later than July 11, 2022 and be complete by October 30, 2022, with access dependent on dry weather conditions. Certified truck scales in the area will be used to measure weight tickets for each load.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ethel
CO
UN
TY
HW
Y 6
CO
UN
TY
H
WY
0 1 2 30.5 Miles UTM ZONE 15
NAD 83
U.S. Fish & Wildlife Service Dale Bumpers White River National Wildlife Refuge Arkansas County, Arkansas
Ethel Bottoms Gravel Site
Legend Gravel Site Main Roads Towns DBWRNWR North Unit DBWRNWR South Unit
Ethel Bottoms Gravel Site +/- 8 miles
Latitude: 34.245552 Longitude: -91.118597
ROADWAY SURFACING MATERIAL
1. Station: __White River NWR______ Date:___1/25/2022_ Contact:______David McCaghren _Telephone No.:__256-642-5417_
Material Description (i.e., gravel, aggregate, etc.): ___SB-2 Granite Road Gravel_
Specification Section/Paragraph/No. (Reference applicable State
Department Standard and Specification, if known):_Arkansas SB-2 1 ½ size stone and smaller with fines ___
2. Total Tons/Yards Required: __Up to___This will depend on price __
3. Check one or more: ____ Stock Piled (spot dumped) __X___ Tail Gate Spread Thickness: _6”____
4. Maximum/Minimum Amount to be delivered daily: 30 loads per day minimum
Attach a delivery and/or local site map.
5. Are there State certified scales in the area? __X__ Yes ____ No NOTE: If yes, weight tickets are required for each delivery.
If no, delivery must be by cubic yards.
6. Required commencement date for delivery: __7/11/2022___
7. Last date for delivery: ___10/30/2022______________
Local conditions (bridge restrictions, weather conditions, water levels, road flooding, etc.) that may affect delivery: Project area is a gravel road/ levee.
Access requires dry weather.
| Drawings-Specs Ethel Bottoms |
| Ethel Bottoms Gravel Site Map |
| SB-2 gravel specs |
SB-2 gravel specs