Drawings_NAMA_340706_Waterlines.pdf

PDF 9 MB Posted

Attached to
Sources Sought Notice NAMA 340706
Solicitation number
140P2026R0089
Issued by

About this file

This document comprises 100% Final Construction Documents (Volume 02) for the Repair Lincoln Reflecting Pool project located at the National Mall in Washington, D.C. The project is under the jurisdiction of the National Park Service, Department of the Interior, with a contract number 140P2020C0035 and PMIS 340706. The A/E (Architect/Engineer) contract number is 12/17/202540001647, with Ahmad Khan serving as the Professional Engineer from the District of Columbia.

The construction documents include detailed civil engineering drawings prepared by multiple firms: DHM Design (Denver, CO) as the prime landscape architect, WSP (Washington DC and Chicago, IL) for civil and water systems, 360 Engineering (Golden, CO) for mechanical systems, Silman (New York, NY) for structural design, and WJE Associates (Cleveland, OH) as materials specialist. The project involves comprehensive water infrastructure replacement including: approximately 1,985 linear feet of open cut construction to replace 12-inch HDPE (High-Density Polyethylene) supply and return headers with new 12-inch Class 52 cement-lined ductile iron pipe and HDPE DR-11 pipe; removal and replacement of existing water main sections totaling approximately 525 linear feet; approximately 142 linear feet of cured-in-place pipe (CIPP) repairs; pavement demolition and restoration; and permanent concrete and pavement patching. The documents specify general notes, site-specific conditions, spill prevention and response procedures, testing and inspection requirements, and detailed construction specifications for pipe trenches, valve installations, sewer main crossings, and mechanical joint connections. Total open cut construction is approximately 21,015 square feet (0.482 acres).

View the file

Other files

File Type Posted
A14_SSN_NAMA_340706.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING INDEX

PERMITTING:

MARTIN/MARTIN

LAKEWOOD, CO

MATERIALS SPECIALIST:

WJE ASSOCIATES

CLEVELAND, OH

CIVIL & WATER:

JVA, BOULDER, CO,

WSP, CHICAGO, IL

MECHANICAL &

360 ENGINEERING

GOLDEN, CO

ELECTRICAL:

PRIME/LANDSCAPE:

DHM DESIGN

DENVER, CO

STRUCTURAL:

SILMAN

NEW YORK, NY

PLUMBING:AE DESIGN

DENVER, CO

COST ESTIMATOR:

MBP

VIENNA, VA

A/E FIRM - A/E CONTRACT NUMBER

12/17/2025

40001647

Ahmad Khan

D I S

T R I C T O F CO L UM

B

I A

P R

O F

E

S S I O N A L E N G

I N E

E R

A

HMA D

A S L A M

K HA

N

Draft

./C-001_REPLCEMENT_COVER.DWG#,COVER

./C-001_REPLCEMENT_COVER.DWG#,COVER

./C-002_GENERAL NOTES AND LEGEND.DWG#,C002

./C-002_GENERAL NOTES AND LEGEND.DWG#,C002

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO. DRAWING NO.

OF

TITLE OF SHEETA/E FIRM

PRIME:

DHM DESIGN

DENVER, CO

PKG.

NO. SHEET

SUBCONTRACTOR:

WSP

WASHINGTON DC 9

170229

REPAIR LINCOLN REFLECTING P

100% FINAL CONSTRUCTION DOCUMENTS | VOLUME 02

NATIONAL MALL, WASHINGTON D.C.

340706

VOLUME 02

C :\T

EM

P\

N

PS

\N

AM

A_

LI

N C

O

LN

M

EM

O R

IA

L

PO

O

L_ O

N T

EM

P\

-1 0-

_D

ES

IG

N A

D

JU

ST

M

EN

TS

\C

IV

IL

\C

-0

_G

EN

ER

AL

N O

TE

S

AN

D

L

EG

EN

D

.D W

G

/8 /2

1:

P M

U

SA

G

W.MAHONEY

A.GORETOY

T.PAYNE

12/17/2025

C002

SITE SPECIFIC NOTES:

SPILL PREVENTION AND RESPONSE PROCEDURE:

GENERAL NOTES:

TESTS AND INSPECTIONS

LEGEND

EXISTING FEATURES

PROPOSED FEATURES

GENERAL NOTES AND

LEGEND 2

D I S

T R I C T O F CO L UM

B

I A

P R

O F

E

S S I O N A L E N G

I N E

E R

A

HMA D

A S L A M

K HA

N

Draft

H Y

D

C

C

C

C

C

C

C

C

C

C

C

C

CC

C

C

DH

-4

OW

-5

Lincoln Memorial Reflecting Pool

Ash Road

JFK Hockey Field

NEW HDPE

NE

W

D I

SU

PP

LY

SUPPLY

APPROXIMATE LOCATION OF

EXISTING 12-IN FLANGED

CONNECTION (LIMIT OF DUCTILE

IRON REPLACEMENT PIPE)

APPROX. 1,985 FEET OPEN CUT CONSTRUCTION

REPLACE 12-IN HDPE SUPPLY AND RETURN HEADERS

WITH HDPE DR-11 PIPE FULL LENGTH OF HEADERS

SEE SHEET C005 AND C006 FOR RETURN PIPE DIAMETERS

EXISTING WATER

TREATMENT

BUILDING

REPLACE 285 FEET OF EXISTING 12-IN HDPE WITH

NEW 12-IN CLASS 52 CEMENT LINED DUCTILE IRON PIPE

LIMIT OF DUCTILE IRON

SUPPLY PIPE REPLACEMENT

OPEN CUT CONSTRUCTION APPROX.285 L.F.

NOTE:

APPROX. TOTAL OPEN CUT CONSTRUCTION (21,015 SQ.FT. or 0.482 AC)

TEMPORARY CONSTRUCTION FENCE (TYP.)

TEMPORARY

CONSTRUCTION FENCE

FIELD VERIFY EXISTING

PIPING ARRANGEMENT

DURING CONSTRUCTION

REPLACE 240 FEET OF EXISTING 12-IN. HDPE SUPPLY

WITH NEW 12-IN. DIPS HDPE DR-11 PIPE TO PIPE BEND

APPROXIMATE LOCATION OF

EXISTING 12-IN FLANGED

CONNECTION (LIMIT OF HDPE

RETURN PIPE REPLACEMENT)

12" HDPE FOR ALL RETURN

PIPE REPLACEMENT

NATIONAL PARK SERVICE

USPP H1 STABLES (2023)

NEW OXYGEN

GENERATOR UNIT

ON CONC. PAD

STABLES ACCESS FROM THE

INDEPENDENCE AVENUE SW

APPROX. 525 FEET OPEN CUT PIPE REPLACEMENT OF

SUPPLY AND RETURN PIPING FROM TREATMENT

BUILDING TO BENDS AT CIPP REPAIR AREA

APPROX 142 L.F. CIPP REPAIR

PIPES AREA

EXTENDED POOL REPAIR PROJECT

AREA, SEE CONTRACT 140P2024F0335,

PMIS 291052, VOLUME 02 (PART 2 OF 2)

PROJECT AREA

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO. DRAWING NO.

OF

TITLE OF SHEETA/E FIRM

PRIME:

DHM DESIGN

DENVER, CO

PKG.

NO. SHEET

SUBCONTRACTOR:

WSP

WASHINGTON DC 9

170229

REPAIR LINCOLN REFLECTING POOL

100% FINAL CONSTRUCTION DOCUMENTS | VOLUME 02

NATIONAL MALL, WASHINGTON D.C.

340706

VOLUME 02

C :\T

EM

P\

N

PS

\N

AM

A_

LI

N C

O

LN

M

EM

O R

IA

L

PO

O

L_ O

N T

EM

P\

-1 0-

_D

ES

IG

N A

D

JU

ST

M

EN

TS

\C

IV

IL

\C

-0

_W M

R

EP

AI

R

P R

O

JE

C T

O

VE

R

VI

EW

_F

U

LL

S

IT

E.

D

W G

/8

/2

1:

P

M U

SA

G

W.MAHONEY

A.GORETOY

T.PAYNE

12/17/2025

C003NOTE:

FIELD VERIFY LOCATIONS AND PROTECT TREES WITHIN

4FT OF CONSTRUCTION FENCE.

EXISTING FEATURES

PROJECT FEARTURES

PROJECT OVERVIEW

D I S

T R I C T O F CO L UM

B

I A

P R

O F

E

S S I O N A L E N G

I N E

E R

A

HMA D

A S L A M

K HA

100% FINAL CONSTRUCTION DOCUMENTS | VOLUME 02

12/17/2025

D I S

T R I C T O F CO L UM

B

I A

P R

O F

E

S S I O N A L E N G

I N E

E R

A

HMA D

A S L A M

K HA

D I S

T R I C T O F CO L UM

B

I A

P R

O F

E

S S I O N A L E N G

I N E

E R

A

HMA D

A S L A M

K HA

Lincoln Memorial Reflecting Pool

PROJECT AREA EXTENT 12 x 3 INCH HDPE TEE AND

CONNECTION TO EXISTING 3-IN.

SUPPLY VALVE ON SOUTH SIDE OF

POOL STRUCTURE (TYP. 30 PLACES)

4 TO 8 x 4 INCH HDPE TEE (SEE DIAGRAM

BELOW FOR SIZING) AND CONNECTION TO

EXISTING 4-IN. RETURN VALVE ON SOUTH

SIDE OF POOL STRUCTURE (TYP. 12 PLACES)

REPLACE EXISTING RETURN PIPE

WITH NEW HDPE DR-11 GRAVITY RETURN PIPE

OF SIMILAR DIAMETER TO EXISTING

(SEE DIAGRAM BELOW FOR SIZING)

REPLACE EXISTING 12-IN. SUPPLY PIPE

WITH NEW 12-IN. HDPE DR-11 SUPPLY PIPE

REPLACE 4-IN.

C.O. IN KIND

FIELD VERIFY EXISTING

PIPING ARRANGEMENT

DURING CONSTRUCTION

TEMPORARY CONSTRUCTION FENCE

(TYP.)

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO. DRAWING NO.

OF

TITLE OF SHEETA/E FIRM

PRIME:

DHM DESIGN

DENVER, CO

PKG.

NO. SHEET

SUBCONTRACTOR:

WSP

WASHINGTON DC 9

170229

REPAIR LINCOLN REFLECTING POOL

100% FINAL CONSTRUCTION DOCUMENTS | VOLUME 02

NATIONAL MALL, WASHINGTON D.C.

340706

VOLUME 02

C :\T

EM

P\

N

PS

\N

AM

A_

LI

N C

O

LN

M

EM

O R

IA

L

PO

O

L_ O

N T

EM

P\

-1 0-

_D

ES

IG

N A

D

JU

ST

M

EN

TS

\C

IV

IL

\C

-0

_W M

R

EP

AI

R

_P O

O L-

EA

ST

.D W

G

/8 /2

1:

P M

U

SA

G

W.MAHONEY

A.GORETOY

T.PAYNE

12/17/2025

C006

WATER RETURN HEADER

8x4 TEE 8x4 TEE 6x4 TEE 6x4 TEE

6x4 TEE 4x4 TEE 4x4 TEE

TEMPORARY PROJECT AREA

TEMPORARY CONSTRUCTION FENCE

NOTE:

FIELD VERIFY LOCATIONS AND PROTECT TREES WITHIN 4FT

OF CONSTRUCTION FENCE.

WATER PIPE REPLACEMENT

PLAN-EAST 6

D I S

T R I C T O F CO L UM

B

I A

P R

O F

E

S S I O N A L E N G

I N E

E R

A

HMA D

A S L A M

K HA

D I S

T R I C T O F CO L UM

B

I A

P R

O F

E

S S I O N A L E N G

I N E

E R

A

HMA D A S L A M K HA

REMOVE AND REPLACE

EXISTING WATER MAIN

WITH NEW 12" HDPE POOL

WATER SUPPLY PIIPE

REMOVE AND REPLACE

EXISTING WATER MAIN

WITH NEW 12" HDPE POOL

WATER RETURN PIIPE

NEW

WATER MAIN

PROTECT AND MAINTAIN

EXISTING GEOTEXTILE FABRIC PROTECT AND MAINTAIN

EXISTING GEOTEXTILE FABRIC

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO. DRAWING NO.

OF

TITLE OF SHEETA/E FIRM

PRIME:

DHM DESIGN

DENVER, CO

PKG.

NO. SHEET

SUBCONTRACTOR:

WSP

WASHINGTON DC 9

170229

REPAIR LINCOLN REFLECTING POOL

100% FINAL CONSTRUCTION DOCUMENTS | VOLUME 02

NATIONAL MALL, WASHINGTON D.C.

340706

VOLUME 02

C :\T

EM

P\

N

PS

\N

AM

A_

LI

N C

O

LN

M

EM

O R

IA

L

PO

O

L_ O

N T

EM

P\

-1 0-

_D

ES

IG

N A

D

JU

ST

M

EN

TS

\C

IV

IL

\C

8-

0_

D

ET

AI

LS

.D W

G

/8 /2

1:

P M

U

SA

G

W.MAHONEY

A.GORETOY

T.PAYNE

12/17/2025

C008 DETAILS-1

D I S

T R I C T O F CO L UM

B

I A

P R

O F

E

S S I O N A L E N G

I N E

E R

A

HMA D

A S L A M

K HA

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO. DRAWING NO.

OF

TITLE OF SHEETA/E FIRM

PRIME:

DHM DESIGN

DENVER, CO

PKG.

NO. SHEET

SUBCONTRACTOR:

WSP

WASHINGTON DC 9

170229

REPAIR LINCOLN REFLECTING POOL

100% FINAL CONSTRUCTION DOCUMENTS | VOLUME 02

NATIONAL MALL, WASHINGTON D.C.

340706

VOLUME 02

C :\T

EM

P\

N

PS

\N

AM

A_

LI

N C

O

LN

M

EM

O R

IA

L

PO

O

L_ O

N T

EM

P\

-1 0-

_D

ES

IG

N A

D

JU

ST

M

EN

TS

\C

IV

IL

\C

8-

0_

D

ET

AI

LS

.D W

G

/8 /2

1:

P M

U

SA

G

W.MAHONEY

A.GORETOY

T.PAYNE

12/17/2025

C009 DETAILS-2

D I S

T R I C T O F CO L UM

B

I A

P R

O F

E

S S I O N A L E N G

I N E

E R

A

HMA D

A S L A M

K HA

Sheets and Views
1 COVER SHEET
2 GENERAL NOTES AND LEGEND
3 PROJECT OVERVIEW
6 WATER PIPE REPLACEMENT PLAN-EAST
8 DETAILS-1
9 DETAILS-2

File details come from the government source that posted it. Updated .