Drawings FH Interior BPM057745.pdf

PDF 3 MB Posted

Attached to
DNR Fair Hill NRMA Interior Finishes
Solicitation number
BPM057745
Issued by
Cecil County, Maryland

About this file

This is an architectural drawing document prepared by the Maryland Department of Natural Resources, Engineering & Construction division for the Fair Hill Natural Resource Management Area renovation project located at 350 Ranger Skinner Drive, Elkton, MD 21921. The drawing (A-8) details finish schedules and interior specifications for the renovation of Buildings 1 and 2, with a project number P-043-212-010. The document specifies architectural finishes for multiple restroom areas including women's, men's, family, and jockey dressing room facilities, as well as support spaces such as janitor's closets and mechanical rooms. Finishes include catalyzed water-based Marlite Artizan Max paint for ceilings, HPL-FRP wall panels with epoxy on gypsum board and aluminum trim for walls, seamless flake broadcast epoxy resin flooring systems with six-inch high coved bases, and exterior and interior acrylic latex paint applications on doors, frames, windows, and sashes. The drawing also depicts recessed drain details and partition configurations for shower stall assemblies with trowel-grade epoxy resin floor coatings on prepared wood substrates and epoxy-based filler materials.

The document includes cross-referenced details to specification sheets and other drawing sheets dated between February 2025 and March 2026, indicating the project was actively in design development phases. The drawing set encompasses multiple sheets (A-1 through A-12, C-1, CS, and related documents), reflecting comprehensive architectural documentation. Specific construction details are provided at a scale of 6 inches equals 1 foot for floor base configurations and drain placements. The project focuses on providing all necessary labor, equipment, materials, supplies, and insurance for installing architectural finishes in the public restrooms under renovation, requiring contractors to meet the detailed specifications established in the finish schedules and interior detail drawings.

View the file

Other files

File Type Posted
Bid Response Revised BPM057745.pdf PDF
Attachment P List of ALL Subcontractors (2026).xlsx XLSX spreadsheet
Prebid QA BPM057745.pdf PDF
ITB Revised BPM057745.pdf PDF
Project Manual FH Interior BPM057745.pdf PDF
Amendment # 1 BPM057745.pdf PDF
Amendment 1 Drawings BPM057745.pdf PDF
Bid Response BPM057745.pdf PDF
ITB BPM057745.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FINISH SCHEDULE

LOCATION CEILING WALLS

CATALYZED WATER-BASED

MARLITE ARTIZAN MAX

WOMEN'S RESTROOM HPL-FRP WALL PANELS WITH

EPOXY ON GYPSUM BOARD

ALUMINUM TRIM*

CATALYZED WATER-BASED

MARLITE ARTIZAN MAX

FAMILY RESTROOM

EPOXY ON GYPSUM BOARD

HPL-FRP WALL PANELS WITH

ALUMINUM TRIM*

WOMEN'S JOCKEY CATALYZED WATER-BASED

MARLITE ARTIZAN MAX

HPL-FRP WALL PANELS WITH

DRESSING ROOM EPOXY ON GYPSUM BOARD

ALUMINUM TRIM*

CATALYZED WATER-BASED

MARLITE ARTIZAN MAX

MEN'S RESTROOM HPL-FRP WALL PANELS WITH

EPOXY ON GYPSUM BOARD

ALUMINUM TRIM*

MEN'S JOCKEY CATALYZED WATER-BASED

MARLITE ARTIZAN MAX

HPL-FRP WALL PANELS WITH

DRESSING ROOM EPOXY ON GYPSUM BOARD

ALUMINUM TRIM*

JANITOR'S CLOSET

CATALYZED WATER-BASED MARLITE STANDARD FRP

EPOXY ON GYPSUM BOARD PANELS WITH PVC TRIM

MECHANICAL ROOM

CATALYZED WATER-BASED CATALYZED WATER-BASED

EPOXY ON GYPSUM BOARD EPOXY ON GYPSUM BOARD

�----1/2" MOISTURE-RESISTANT GYPSUM WALLBOARD

i----SPECIFIED FRP WALL PANELS WITH TRIM

�---APPLY WHITE SILICONE SEALANT ALONG TOP

OF SCREED WHERE WALL FINISH IS PAINT

i----+-----lNTEGRAL EPOXY COVE BASE

WITH ZINC METAL SCREED

co

A-8

�TROWEL-GRADE EPOXY RESIN FLOOR

COATING ON PREPPED WOOD SUBSTRATE

EPOXY RESIN BASE DETAIL

SCALE: 6" = 1 '-0"

State of Maryland

FLOORS

SEAMLESS FLAKE BROADCAST

EPOXY RESIN FLOORING SYSTEM

SEAMLESS FLAKE BROADCAST

EPOXY RESIN FLOORING SYSTEM

SEAMLESS FLAKE BROADCAST

EPOXY RESIN FLOORING SYSTEM

SEAMLESS FLAKE BROADCAST

EPOXY RESIN FLOORING SYSTEM

SEAMLESS FLAKE BROADCAST

EPOXY RESIN FLOORING SYSTEM

1-

LL

z

[lJ

CD

N l r

BASE

6-INCH HIGH COVED BASE

INTEGRAL WITH EPOXY RESIN

FLOORING SYSTEM**

6-INCH HIGH COVED BASE

INTEGRAL WITH EPOXY RESIN

FLOORING SYSTEM**

6-INCH HIGH COVED BASE

INTEGRAL WITH EPOXY RESIN

FLOORING SYSTEM**

6-INCH HIGH COVED BASE

INTEGRAL WITH EPOXY RESIN

FLOORING SYSTEM**

6-INCH HIGH COVED BASE

INTEGRAL WITH EPOXY RESIN

FLOORING SYSTEM**

6-INCH HIGH COVED BASE

INTEGRAL WITH EPOXY RESIN

FLOORING SYSTEM**

6-INCH HIGH COVED BASE

INTEGRAL WITH EPOXY RESIN

FLOORING SYSTEM**

2 x 6 BLOCKING

2 x 6 BLOCKING

2 PLAN VIEW OF DRAIN

A-8 SCALE: 6" = 1 '-0"

DEPARTMENT OF NATURAL RESOURCES

Engineering & Construction

DOORS AND FRAMES

EXTERIOR ACRYLIC LATEX PAINT ON

FACTORY PRIMED SLABS AND FRAMES

EXTERIOR ACRYLIC LATEX PAINT ON

FACTORY PRIMED SLABS AND FRAMES

EXTERIOR ACRYLIC LATEX PAINT ON

FACTORY PRIMED SLABS AND FRAMES

EXTERIOR ACRYLIC LATEX PAINT ON

FACTORY PRIMED SLABS AND FRAMES

EXTERIOR ACRYLIC LATEX PAINT ON

FACTORY PRIMED SLABS AND FRAMES

EXTERIOR ACRYLIC LATEX PAINT ON

FACTORY PRIMED SLABS AND FRAMES

INTERIOR ACRYLIC LATEX PAINT ON

FACTORY PRIMED SLABS AND FRAMES

,------i------WIDE FLANGE OF DRAIN BODY

WINDOWS AND FRAMES

FACTORY PRIMED SASH AND FRAMES

FACTORY PRIMED SASH AND FRAMES

FACTORY PRIMED SASH AND FRAMES

FACTORY PRIMED SASH AND FRAMES

FACTORY PRIMED SASH AND FRAMES

TOP OF STRAINER I:s----- 1/4" BELowl FLOOR DECK

COMMENTS

**SEE DETAIL 3/A-8.

**SEE DETAIL 3/A-8.

**SEE DETAIL 3/A-8.

**SEE DETAIL 3/A-8.

**SEE DETAIL 3/A-8.

**SEE DETAIL 3/A-8.

**SEE DETAIL 3/A-8.

1'-2-1/8" X 1'-2-1/8"

EXTENT OF WIDE FLANGE

�-.ADJUSTABLE STRAlr ER SET IN WIDE

FLANGE; SEE PLAN\ IEW AT LEFT.

�-W'IDE fLANGE z

1-

TROWEL-GRADE EPOXY RESIN -LOOR�,

COATING ON PREPPED WOOD SUB! TRATE

Cl) Cl)

UJ

UJ

ct::

ct::

LL

1,.....+--+-:::POXY-BASED FILLER

[lJ

CD

N

LL

A-8

Ml'<t oJ ' • .,.,,•.·L ",. '-"-',. '--.,,_ '\. ...,_ "-'\. ...,_ '\. ..._ '-"\. ..._ ..,_ '-...,_ "\.-.,,_ "\.

':::::::::: ::::::::: \))));>/, /;;. / -� Y/.'/,� ,_.,,, .Y,///'///:' ij .· ;;' ''•>>;})?·)/'":::::::::':::::::::::

A-8

✓ /I

RECESSED DRAIN DETAIL

SCALE: 6" = 1 '-0"

FINISH SCHEDULE AND INTERIOR DETAILS

FAIR HILL NATURAL RESOURCE MANAGEMENT AREA

RENOVATION OF BUILDINGS 1 AND 2

350 RANGER SKINNER DRIVE

, '- ELKTON, MD 21921

' / Project Number:

P-043-212-010

Dote: 03/16/2026

Drawing Number:

A-8

SHEET

/ '- X OF Y ✓

State of Maryland

DEPARTMENT OF NATURAL RESOURCES

Engineering & Construction

PARTITION AND SHOWER STALL DETAILS

SITE ASSEMBLED GANGED SHOWER STALL ASSEMBLY

SCALE: NTSA-10

A-9

AutoCAD SHX Text Project Number:

AutoCAD SHX Text Drawing Number:

AutoCAD SHX Text Date:

AutoCAD SHX Text

AutoCAD SHX Text

SHEET

AutoCAD SHX Text FAIR HILL NATURAL RESOURCE MANAGEMENT AREA RENOVATION OF BUILDINGS 1 AND 2 350 RANGER SKINNER DRIVE ELKTON, MD 21921

AutoCAD SHX Text 10/04/2024

AutoCAD SHX Text P-043-212-010

Fair Hill NRMA_Jockey Restrooms Renovation_A-2_03-16-2026
Fair Hill NRMA_Jockey Restrooms Renovation_A-3A_03-16-2026
Fair Hill NRMA_Jockey Restrooms Renovation_A-3B_03-16-2026
Fair Hill NRMA_Jockey Restrooms Renovation_A-3C_03-16-2026
Fair Hill NRMA_Jockey Restrooms Renovation_A-4A_03-25-2026
Fair Hill NRMA_Jockey Restrooms Renovation_A-4C_03-25-2026
Fair Hill NRMA_Jockey Restrooms Renovation_A-5_03-25-2026
Fair Hill NRMA_Jockey Restrooms Renovation_A-6_03-25-2026
Fair Hill NRMA_Jockey Restrooms Renovation_A-7A_03-19-2026
Fair Hill NRMA_Jockey Restrooms Renovation_A-8_03-30-2026
Fair Hill NRMA_Jockey Restrooms Renovation_A-9_11-20-2025
TEMP_GANGED SHOWERS.pdf
Fair Hill NRMA_Jockey Restrooms Renovation_CS_02-21-2025
Fair Hill NRMA_Jockey Restrooms Renovation_C-1_02-21-2025
Fair Hill NRMA_Jockey Restrooms Renovation_A-1_02-21-2025
Fair Hill NRMA_Jockey Restrooms Renovation_A-2_02-21-2025
Fair Hill NRMA_Jockey Restrooms Renovation_A-3_02-21-2025
Fair Hill NRMA_Jockey Restrooms Renovation_A-4_02-21-2025
Fair Hill NRMA_Jockey Restrooms Renovation_A-5_02-21-2025
Fair Hill NRMA_Jockey Restrooms Renovation_A-6_02-21-2025
Fair Hill NRMA_Jockey Restrooms Renovation_A-7_02-21-2025
Fair Hill NRMA_Jockey Restrooms Renovation_A-8_02-21-2025
Fair Hill NRMA_Jockey Restrooms Renovation_A-9_02-21-2025
Fair Hill NRMA_Jockey Restrooms Renovation_A-10_02-21-2025
Fair Hill NRMA_Jockey Restrooms Renovation_A-11_02-21-2025
Fair Hill NRMA_Jockey Restrooms Renovation_A-12_02-21-2025
Fair Hill NRMA_Jockey Restrooms Renovation_D-1_02-21-2025
Fair Hill NRMA_Jockey Restrooms Renovation_A-10_02-21-2025.pdf
Sheets and Views
A-10

File details come from the government source that posted it. Updated .