Drawings.pdf
PDF 4 MB Posted
- Attached to
- Downey Park Skate Area Renovation
- Solicitation number
- Y26-724
- Issued by
- Orange County, Orlando City, Florida
About this file
This is a drawing file associated with an Invitation for Bids issued by Orange County, Florida for the Downey Park Skate Area Renovation project (Y26-724). The project involves the demolition of existing skate park equipment and construction of a new concrete surface including a skate flow bowl and deck at Downey Park, located at 10107 Flowers Avenue, Orlando, Florida, with an estimated project cost of $514,000. The scope of work includes site preparation with trenching and grading, drainage infrastructure installation, concrete paving, and landscaping restoration. The project is structured in two phases, with Phase 1 (street skate area) as the base bid and Phase 2 (skate bowl) as an alternate combined bid. A mandatory pre-bid meeting is scheduled for March 9, 2026 at 1:00 PM, with a non-mandatory site visit at 2:00 PM. Sealed bids must be submitted electronically via the OpenGov e-Procurement Platform by April 2, 2026 at 4:00 PM EST. Questions regarding the solicitation must be submitted by March 18, 2026 at 4:00 PM EST. The contractor must achieve substantial completion within 210 calendar days and final completion within 240 calendar days from the Official Notice to Proceed.
The drawings file references multiple drawing sheets (C001, C002, C101A, C101, C102, C102A, C201, C201A, C301, C401, C402, C403, C404, and CS1) that detail the project design specifications. Qualified general contractors must demonstrate at least three similar projects completed within the last ten years, with preference for those who have completed a skate bowl or similar skate park project within the last three years as prime contractor. A bid bond or alternative surety equal to at least 10% of the total estimated contract amount is required. The contractor will be selected as the lowest responsive and responsible bidder and must provide performance and payment bonds equal to the contract amount, along with proof of $1,000,000 commercial general liability insurance. Payment will be processed monthly based on percentage of work completed with 10% retainage until final completion, subject to Florida Statute 218 requirements, with progress payments and final payment due within 20 business days of respective approval and completion certification. No incumbent vendor or current contractor is listed for this project, and Orange County is exempt from federal and state sales taxes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Downey_Park_Skate_Area_Renovation.pdf | ||
| Spec_Manual_.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2124C001 C001 (1)
| 2124C002-C002 |
| 2124C101A C101A (1) |
| 2124C101-C101 |
| 2124C102 C102 (1) |
| 2124C102A-C102 |
| 2124C201 C201 (1) |
| 2124C201a-C201 |
| 2124C301 C301 (1) |
| 2124C401 Layout1 (1) |
| 2124C402 c402 (1) |
| 2124C403 Layout1 (1) |
| 2124C404 c404 (1) |
| 2124CS1 Model (1) |
File details come from the government source that posted it. Updated .