Drawings.pdf
PDF 4 MB Posted
- Attached to
- Downey Park Skate Area Renovation
- Solicitation number
- Y26-724
- Issued by
- Orange County, Orlando City, Florida
About this file
This is a drawing set file for the Downey Park Skate Area Renovation project issued by Orange County, Florida. The file contains architectural and design drawings for the skate park renovation project, including site layouts, concrete surface designs, drainage infrastructure details, and landscape restoration plans. The project encompasses demolition of existing skate park equipment and construction of a new contiguous concrete surface with a concrete skate flow bowl and deck located at 10107 Flowers Avenue, Orlando, Florida. The work is divided into two phases: Phase 1 (street skate area) as the base bid and Phase 2 (skate bowl) as an alternate combined bid. Sealed bids are due electronically via the OpenGov e-Procurement Platform by April 2, 2026 at 4:00 PM EST. A mandatory pre-bid meeting is scheduled for March 9, 2026 at 1:00 PM with a non-mandatory site visit at 2:00 PM at the project location. The selected contractor must achieve substantial completion within 210 calendar days and final completion within 240 calendar days from the Official Notice to Proceed.
The estimated project cost is $514,000. Qualifying contractors must have completed at least three similar projects within the last ten years, with preference for those who have completed a skate bowl or similar skate park project within the last three years as prime contractor. A bid bond or alternative surety equal to at least 10% of the total estimated contract amount is required for offers exceeding $100,000, and the selected contractor must provide performance and payment bonds equal to the contract amount and maintain $1,000,000 in commercial general liability coverage. Monthly progress payments will be processed based on the percentage of work completed with 10% retainage until final completion, subject to Florida Statute 218 (Local Government Prompt Payment Act), with payments due within 20 business days. No incumbent vendor is listed for this project, and the County is exempt from federal and state sales taxes. Timely questions must be submitted by March 18, 2026 at 4:00 PM EST through the OpenGov question and answer module.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Downey_Park_Skate_Area_Renovation.pdf | ||
| Spec_Manual_.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2124C001 C001 (1)
| 2124C002-C002 |
| 2124C101A C101A (1) |
| 2124C101-C101 |
| 2124C102 C102 (1) |
| 2124C102A-C102 |
| 2124C201 C201 (1) |
| 2124C201a-C201 |
| 2124C301 C301 (1) |
| 2124C401 Layout1 (1) |
| 2124C402 c402 (1) |
| 2124C403 Layout1 (1) |
| 2124C404 c404 (1) |
| 2124CS1 Model (1) |
File details come from the government source that posted it. Updated .